Sequencing Batch Reactors (SBR)

14.05.2012

Methods of wastewater treatment


Mechanical treatment Biological treatment
Wetlands

Chemical-physic. treatment Neutralisation

Screens Grit chambers Sedimentation tanks Filtration

Wastewater lagoon Bio-immersion contactor Bio-filter systems Activated sludge treatment Anaerobic wastewater
treatment

Precipitation / flocculation Flotation process Ion exchange Adsorption / Extraction Chemical oxidation / reduction

Rotating biological contactor Membrane filtration

2012-05-14
2 2

Sequencing treatment(SBR)
SBR Sequencing Batch Reactor principle of operation: Biological processes take place in subsequent phases in one reactor Controlled input of wastewater is fed to reactor Adapted in an optimal way to fluctuating amounts and loads Containing high level of performance buffer Relatively low expences for technical equipment Process control is friendly with modern control systems Simple operation and low level of maintenance
2012-05-14 2014.05.2012
3 33

History of SBR technology progress


In 1914 first SBR plants in England In 1915 first SBR plants in USA Since 1920 previously installed SBR treatment plants have been reconstructed to plants with continous treatment technologies because of complicated control without automation facilities In 1950 - new development stage in Netherlands In 1960 new impulse with better evaluation of cycle duration, the term of SBR comes into force In 1985 rediscovered for wastewater treatment in Germany Starting 1995 SBR technology is rapidly spreading in Germany Since 2000 have been installed more than 200 SBR plants in Germany. Trends of spreading are observed. Since 2006 small SBR plants for 4-400 PE have been started installing in Lithuania
2012-05-14 2014.05.2012
4 4

Flow schemes of wastewater treatment

Troughflow system

Continuous flow Use of free gradient

Preferred by significant fluctuations Optimal control possible

SBR system

Continuous flow Use of free gradient

Preferred by significant fluctuations Optimal control possible 5 5

2012-05-14 2014.05.2012

SBR treatment operating principle


inflow BioP

discharge nitrification surplus sludge

clean water outlet

SBR Cycle
sedimentation

``

mixing & aerating inflow Deni denitrification

settling

filling & mixing

2014.05.2012

6 6

Advantages of AQUAmax and SBR technology


All the phases of treatment process (denitrification, nitrification, reduction of organic substances, biological phosphorus elimination and sedimentation) take place in the same tank by determined stages. Smart control system allows adjust operating parameters to real conditions. Excessive flows usually cause problems for continuous wastewater treatment systems. SBR technology with separate buffer tank avoids these problems. Sedimentation of active sludge is proceeding in almost ideal conditions as untreated wastewater cant flow into SBR tank and provoke mixing or other turbulent occurences. Sampling. As the pumping out process is of a short duration only, the treated water is collected into a suitable container in the filtering tank (accessory: 1.5 l sampling bottle). The container is mounted in the vicinity of the cover and is thus easily accessible from above. Alternatively a container can be deployed in a separate sampling shaft. Energy-saving operation. If, over a period of more than 4 hours, no wastewater flows into the plant, then the system switches automatically into the energysaving holiday operation. The aeration time is reduced to the point that the micro-organisms just have sufficient oxygen available. With normal loading the plant switches back into the operating mode set.
26/04/2012 7

Small SBR treatment plants


3

SBR wastewater treatment plant for 4-8 PE


Main components of this wastewater treatment plant are: 1. Tank SNIGO 2. AQUAmax Basic equipment 1 3. Control panel

2014.05.2012

8 8

Small SBR treatment plants


AQUAmax Basic the heart of wastewater treatment plant: 1. Body 2. Control panel 3. Aerator 4. Pump 5. Floating switch 6. Clear water evacuation
6 1 2

9 9

Small SBR treatment plants


Three functions in one plant: 1. Settling 2. Wastewater treatment 3. Sampling
3 1

2
2014.05.2012
10 10

Small SBR treatment plants


AQUAmax type Z are assigned for bigger plants up to 50 PE simply hung to the top of tank by chains

11

Installation to polyethylene tank


(plants up to 16 PE)

2014.05.2012

12 12

Installation to polyethylene tank


(plants from 17 up to 50 PE)

13

Small SBR treatment plants


SBR wastewater treatment plants from 60 PE up to 650 PE:
Designed for small villages or camping places Big buffer tank for required wastewater accumulation Excessive sludge can be discharged to primary sludge tank or separate sludge tank

2014.05.2012

14 14

SBR treatment plants for small villages


Main equipment for wastewater treatment from 60 PE up to 400 PE is floating aerators with mixers. Advantages of these aerators: Simple maintenance Submersible motor Floating unit consist of 2 separate parts so this unit can be easily removed or installed via the tank opening with standard (600 mm) diameter The float is secured with pantoon guides and floats only up and down
2014.05.2012
15 15

SBR treatment plants for small villages

2014.05.2012

16 16

Treatment efficiency
BEFORE TREATMENT BOD5 COD Suspended solids N tot P tot 500 mg/l 1040 mg/l 440 mg/l 68,8 mg/l 11 mg/l AFTER AQUAmax 25 mg/l 90 mg/l 25 mg/l 20 mg/l 2 mg/l
(maximum values)

2014.05.2012

17 17

Energy consumption

18

Our representative projects:


Reconstruction of old wastewater treatment plant at Valaviiai village (250 PE) Complex wastewater treatment plant for meat processing factory Samsonas

19

Reconstruction of wastewater treatment plant at village Valaviiai

2014.05.2012

20 20

Reconstruction of wastewater treatment plant at village Valaviiai


Before reconstruction: After reconstruction:

Samsonas wastewater treatment plant

2014.05.2012

22 22

Samsonas wastewater treatment plant

2014.05.2012

23 23

Contacts
Egidijus Jakuionis - commercial director, ej@eneka.lt Rasa Kvedarien - manager, rk@eneka.lt Ingrida Charkova - project manager, ingrida@eneka.lt

24

Thats all!
Thanks for your attention!