Sei sulla pagina 1di 6

References

Amaro, G.M., Hendry, L.C., and Kingsman, B.G., 1999. Competitive advantage, customisation and a new taxonomy for non make-to-stock companies. International Journal of Operations & Production Management, 19 (4), 349-371. Baker, K.R., 1974. Introduction to sequencing and scheduling. New York, USA: John Wiley & Sons Inc. Bechte, W., 1988. Theory and practice of load-oriented manufacturing control. International Journal of Production Research, 26 (3), 375-395. Bechte, W., 1994. Load-oriented manufacturing control just-in-time production for job shops. Production Planning & Control, 5 (3), 292-307. Bergamaschi, D., Cigolini, R., Perona, M., and Portioli, A., 1997. Order review and release strategies in a job shop environment: a review and a classification. International Journal of Production Research, 35 (2), 339-420. Bertrand, J.W.M. and van de Wakker, A.M., 2002. An investigation of order release and flow time allowance policies for assembly job shops. Production Planning & Control, 13 (7), 639-648. Bertrand, J.W.M. and van Ooijen, H.P.G., 2002. Workload based order release and productivity: a missing link. Production Planning & Control, 13 (7), 665-678. Bertrand, J.W.M. and Wortmann, J.C., 1981, Production Control and Information Systems for Component-Manufacturing Shops, Eindhoven University of Technology, Elsevier Scientific Publishing Company. Bertrand, J.W.M., Wortmann, J.C., & Wijngaard, J., 1990. Production control, a structural and design oriented approach. North-Holland: Elsevier Science Publishers B.V. Breithaupt, J.-W., Land, M.J., and Nyhuis, P., 2002. The workload control concept: theory and practical extensions of Load Oriented Order Release. Production Planning & Control, 13 (7), 625-638. Cheng, T.C.E. and Gupta, M.C., 1989. Survey of scheduling research involving due date determination decisions. European Journal of Operational Research, 38 (2), 156-166. Choi, B.K. and You, N.K., 2006. Dispatching rules for dynamic scheduling of one-of-akind production. International Journal of Computer Integrated Manufacturing, 19 (4), 383-392. Cigolini, R. and Portioli-Staudacher, A., 2002. An experimental investigation on workload limiting methods within ORR policies in a job shop environment. Production Planning & Control, 13 (7), 602-613.

102

References

Conway, R.W., Maxwell, W.L., & Miller, L.W., 1967. Theory of scheduling. 1st edn. Reading, Massachusetts, USA: Addison-Wesley Publishing Company. Coughlan, P. and Coghlan, D., 2002. Action research for operations management. International Journal of Operations & Production Management, 22 (2), 220-240. Cowan, D.A., 1986. Developing a process model of problem recognition. The Academy of Management Review, 11 (4), 763-776. Fowler, J.W., Hogg, G.L., and Mason, S.J., 2002. Workload control in the semiconductor industry. Production Planning & Control, 13 (7), 568-578. Fredendall, L.D., Ojha, D., and Patterson, J.W., 2009. Concerning the theory of workload control. European Journal of Operational Research, 201 (1), 99-111. Fry, T.D., Oliff, M.D., Minor, E.D., and Leong, G.K., 1989. The Effects of Product Structure and Sequencing Rule on Assembly Shop Performance. International Journal of Production Research, 27 (4), 671-686. Gaalman, G.J.C. and Perona, M., 2002. Editorial workload control in job shops. Production Planning & Control, 13 (7), 565-567. Germs, R. and Riezebos, J., 2010. Workload balancing capability of pull systems in MTO production. International Journal of Production Research, 48 (8), 2345-2360. Hans, E.W., Herroelen, W., Leus, R., and Wullink, G., 2007. A hierarchical approach to multi-project planning under uncertainty. Omega-International Journal of Management Science, 35 (5), 563-577. Hendry, L.C., Kingsman, B.G., and Cheung, P., 1998. The effect of workload control (WLC) on performance in make-to-order companies. Journal of Operations Management, 16 (1), 63-75. Hendry, L.C., Land, M.J., Stevenson, M., and Gaalman, G.J.C., 2008. Investigating implementation issues for workload control (WLC): a comparative case study analysis. International Journal of Production Economics, 112 (1), 452-469. Hendry, L.C. and Wong, S.K., 1994. Alternative order release mechanisms: a comparison by simulation. International Journal of Production Research, 32 (12), 2827-2842. Henrich, P., 2005, Applicability aspects of workoad control in job shop production, PhD Thesis University of Groningen, Labyrinth Publications, Ridderkerk. Henrich, P., Land, M.J., and Gaalman, G.J.C., 2004. Exploring applicability of the workload control concept. International Journal of Production Economics, 90 (1), 187198. Henrich, P., Land, M.J., and Gaalman, G.J.C., 2006. Grouping machines for effective workload control. International Journal of Production Economics, 104 (1), 125-142.

References

103

Herroelen, W. and Leus, R., 2004. Robust and reactive project scheduling: a review and classification of procedures. International Journal of Production Research, 42 (8), 15991620. Hopp, W.J., Iravani, S.M.R., and Shou, B., 2007. A diagnostic tree for improving production line performance. Production and Operations Management, 16 (1), 77-92. Hopp, W.J. & Spearman, M.L., 2001. Factory physics. 2nd edn.: McGraw-Hill Higher Education. Jain, A.S. and Meeran, S., 1999. Deterministic job-shop scheduling: Past, present and future. European Journal of Operational Research, 113, 390-434. Kingsman, B.G., 2000. Modelling input-output workload control for dynamic capacity planning in production planning systems. International Journal of Production Economics, 68, 73-93. Kingsman, B.G. and Hendry, L.C., 2002. The relative contribution of input and output controls on the performance of a workload control system in Make-To-Order companies. Production Planning & Control, 13 (7), 579-590. Kingsman, B.G., Hendry, L.C., Mercer, A., and de Souza, A., 1996. Responding to customer enquiries in make-to-order companies: problems and solutions. International Journal of Production Economics, 46-47, 219-231. Land, M.J., 2004, Workload control in job shops, grasping the tap, PhD thesis University of Groningen, Labyrinth Publications, Ridderkerk. Land, M.J. and Gaalman, G.J.C., 1996. Workload control concepts in job shops: A critical assessment. International Journal of Production Economics, 46-47, 535-548. Land, M.J. and Gaalman, G.J.C., 1998. The performance of workload control concepts in job shops: Improving the release method. International Journal of Production Economics, 56-57, 347-364. Land, M.J. and Gaalman, G.J.C., 2009. Production planning and control in SMEs: time for change. Production Planning & Control, 20 (7), 548-558. Little, J.D.C., 1961. A proof for the queuing formula: L = W. Operations Research, 9 (3), 383-387. Ldding, H., 2005. Verfahren der Fertigungssteuerung. Berlin, Germany: SpringerVerlag. Lu, H.L., Huang, G.Q., and Yang, H.D., 2010. Integrating order review/release and dispatching rules for assembly job shop scheduling using a simulation approach. International Journal of Production Research, Published online. Melnyk, S.A. and Ragatz, G.L., 1989. Order review/release - research issues and perspectives. International Journal of Production Research, 27 (7), 1081-1096.

104

References

Melnyk, S.A., Ragatz, G.L., and Fredendall, L.D., 1991. Load smoothing by the planning and order review/release systems: a simulation experiment. Journal of Operations Management, 10 (4), 512-523. Melnyk, S.A., Tan, K.C., Denzler, D.R., and Fredendall, L.D., 1994. Evaluating variance control, order review/release and dispatching: a regression analysis. International Journal of Production Research, 32 (5), 1045-1061. Natarajan, K., Mohanasundaram, K.M., Babu, B.S., Suresh, S., Raj, K.A.A.D., and Rajendran, C., 2007. Performance evaluation of priority dispatching rules in multi-level assembly job shops with jobs having weights for flowtime and tardiness. International Journal of Advanced Manufacturing Technology, 31 (7-8), 751-761. Neely, A.D., Richards, A.H., Mills, J.F., Platts, K.W., and Bourne, M.C.S., 1997. Designing performance measures: a structured approach. International Journal of Operations & Production Management, 17 (11), 1131-1152. NEVEM-workgroup, 1989. Performance Indicators in Logistics.: Springer-Verlag, London, UK. Nyhuis & Wiendahl, H.-P., 2009. Fundamentals of Production Logistics. Berlin, Germany: Springer-Verlag. Oosterman, B., Land, M.J., and Gaalman, G.J.C., 2000. The influence of shop characteristics on workload control. International Journal of Production Economics, 68 (1), 107-119. Park, C., Song, J., Kim, J.-G., and Kim, I., 1999. Delivery date decision support system for the large scale make-to-order manufacturing companies: a Korean electric motor company case. Production Planning & Control, 10 (6), 585-597. Perona, M. and Portioli, A., 1998. The impact of parameters setting in load oriented manufacturing control. International Journal of Production Economics, 55 (1), 133-142. Pokras, S., 1990. Systematic problem-solving and decision making. London, UK: Kogan Page LTD. Reeja, M.K. and Rajendran, C., 2000. Dispatching rules for scheduling in assembly jobshops - Part 2. International Journal of Production Research, 38 (10), 2349-2360. Sabuncuoglu, I. and Karapinar, H.Y., 1999. Analysis of order review/release problems in production systems. International Journal of Production Economics, 62, 259-279. Salegna, G.J. and Park, P.S., 1996. Workload smoothing in a bottleneck job shop. International Journal of Operations & Production Management, 16 (1), 91-110. Silva, C. 2009. A reverse methodology to set parameters for a Workload Control Production Planning concept, Fifteenth International Working Seminar on Production Economics, Innsbruck, Conference Proceedings, 1, 449-458.

References

105

Slack, N., Chambers, S., & Johnston, R., 2010. Operations Management. Harlow, Essex: Pearson Education Limited. Soepenberg, G.D., Land, M.J., and Gaalman, G.J.C., 2008. The order progress diagram: A supportive tool for diagnosing delivery reliability performance in make-to-order companies. International Journal of Production Economics, 112 (1), 495-503. Stevenson, M., 2006. Refining a Workload Control (WLC) Concept: a case study. International Journal of Production Research, 44 (4), 767-790. Stevenson, M., Hendry, L.C., and Kingsman, B.G., 2005. A review of production planning and control: the applicability of key concepts to the make-to-order industry. International Journal of Production Research, 43 (5), 869-898. Stevenson, M., Huang, Y., and Hendry, L.C., 2009. The development and application of an interactive end-user training tool: part of an implementation strategy for workload control. Production Planning & Control, 20 (7), 622-635. Stevenson, M. and Silva, C., 2008. Theoretical development of a workload control methodology: evidence from two case studies. International Journal of Production Research, 46 (11), 3107-3131. Stoop, P.P.M. and Bertrand, J.W.M., 1997. Performance prediction and diagnosis in two production departments. Integrated Manufacturing Systems, 8 (2), 103-109. Threr, M., Silva, C., and Stevenson, M., 2010a. Optimising workload norms: the influence of shop floor characteristics on setting workload norms for the workload control concept. International Journal of Production Research, Published online. Threr, M., Silva, C., and Stevenson, M., 2010b. Workload control release mechanisms: from practice back to theory building. International Journal of Production Research, 48 (12), 3593-3617. van Ooijen, H.P.G., 1998. Delivery performance improvement by controlled work-order release and work-center load balancing. International Journal of Production Economics, 56-57, 661-675. von Cieminski, G. and Nyhuis, P., 2007. Modeling and analysing logistic interdependencies in industrial-enterprise logistics. Production Engineering, 1 (1), 407413. Wagner, C., 1993. Problem solving and diagnosis. OMEGA International Journal of Management Science, 21 (6), 645-656. Westbrook, R., 1995. Action research: a new paradigm for research in production and operations management. International Journal of Operations & Production Management, 15 (12), 6-20. White, G.P., 1996. A survey and taxonomy of strategy-related performance measures for manufacturing. International Journal of Operations & Production Management, 16 (3), 42-61.

106

References

Wiendahl, H.-P., 1988. The Throughput Diagram - An Universal Model for the Illustration, Control and Supervision of Logistic Processes. Annals of the CIRP, 37 (1), 465-468. Wiendahl, H.-P., 1995. Load-Oriented Manufacturing Control. Berlin, Germany: Springer-Verlag. Wiendahl, H.-P., Glssner, J., and Petermann, D., 1992. Application of load-oriented manufacturing control in industry. Production Planning & Control, 3 (2), 118-129 Hannover. Wisner, J.D., 1995. A review of the order release policy research. International Journal of Operations & Production Management, 15 (6), 25-40. Yin, R.K., 1989. Case Study Research: Design and Methods. Newbury Park, California, USA: Sage Publications. Zpfel, G. and Missbauer, H., 1993. Production planning and control (PPC) systems including load-oriented order release - problems and research perspectives. International Journal of Production Economics, 30/31, 107-122.

References

107

Potrebbero piacerti anche