A Florida Condominium
1440 Ocala Road, Tallahassee, FL 32304
Meeting of the
Board of Directors
November 15, 2007, at7:00 PM
At the Westwood Clubhouse
AGENDA
V. Old Business
A. Consideration of Budget Committee’s Recommended WHOA 2008 Budget.
B. Consideration of Nomination Committee’s Recommended Slate for Election to
WHOA Board of Directors at the February 24, 2008 Annual Membership Meeting.
C. Continuation of Board’s consideration of Leo Rotan’s management proposal for
the Board.
IX. Adjournment
NOTICE OF MEETING
OF WESTWOOD HOMEOWNERS ASSOCIATION
BOARD OF DIRECTORS
In attendance:
David Stevenson (DS), President
Leo Rotan (LR), Vice President
Bill Graham (BG), Treasurer
Jeff Clotfelter (JC), Secretary
Proof of notice:
-proof of notice was mailed three days ago, certification is on file.
Presidents report:
- 2 carpenters’ progress
- Monroe has completed work on the pump room, both doors lock
- Vernon has worked on 512, 411, 412 temporary stabilization
- -no charge, he submitted receipts
- Both Vernon and Monroe are certified for residential but not commercial
carpentry work. This means they can’t work on buildings with more than 3 units.
BG will follow up to see if this applies to us.
-
- We still need to find a painter
-
- Clubhouse cleaning- Anita Black doesn’t have a business license
-
- DS has been issued a summons to appear
- The owner of 108 is suing DS instead of Westwood for leak detection services
- BG moves to authorize to notify Brown and Brown that the notice has been
served and is directed at the wrong entity, LR seconds
Treasurers/management report:
- trial balance and accounts receivable reports are on file
- bottom line is the community is getting healthier
Arbor report
- stray trees
- Cris Revell from the city said they will be by to get rid of them
- H&H’s summary of their work is attached
- They have turned in a bid for the sod ($600). That includes some additional dirt
for fill
- An issue with landscaping is fungus and worms, in addition to drought, has killed
some grass. We need some more information to make a game plan
- BG moves to go with H&H proposal for sod, fungicide application, and clubhouse
beautification. JC seconds
Lighting report:
- dumpster lighting proposal is forthcoming, possibly by Thanksgiving
- BG moves to authorize LR to spend up to $500 for the new light, JC seconds
Old business:
- budget committee recommends (see 2008 proposed assessments)
- BG moves to accept the 2008 budget (see attached), $318,068 as recommended
by the budget committee, LR seconds
- BG moves to accept the 2008 proposed assessments (see attached), JC seconds
- BG moves to spend no reserves unless absolutely necessary, consider it a zero
balance item, LR seconds
New business:
- Southeast Carpentry’s’ proposal for the repair of 407’s deck comes to $10312
- BG moves to accept their bid, subject to verification of insurance, workers comp,
liability, JC seconds
- BG will notify Southeast
Agenda
1. Call to order and confirmation of Committee Members present
2. Review of Charge to this Ad Hoc Committee from the Board of Directors
3. Review of Guidelines for Nominating Committees from the Florida Statues and
Timelines for receipt of intent to seek board membership; notification to
Westwood Condo Owners by the Board of Directors of information related to
the Election and Annual Meeting (February 24, 2008 at 2:00 p.m., Westwood
Clubhouse)
4. Review of openings on the Board of Directors for 2008-2010
5. Identification of persons who have expressed interest is seeking seats on the
2008-2010 Board of Directors
6. Review of *Template for Qualifications Statement for members of the
Westwood Association interested is seeking a seat on the Westwood Board
7. OTHER
8. Adjournment
Committee Members:
Mrs. Elaine Ussery, Unit #107 Mrs. Josephine Newton, Unit #512
Mr. Mark Leadon, Unit# 216 Dr. Fanchon Funk, Chair, Unit#113
Mrs. Hazel Harms, Unit #401
*Dev. And Approved by Nominating Committee: November 12, 2007
TYPE OF UNIT
PRIORITY Unit Owner
PROBLEM NUMBER
carpentry 101 Ed McCabe
carpentry 103 Victor & Lizbeth Novelliere
carpentry 103 Victor & Lizbeth Novelliere
1 water/drainage WW
water/drainage WW
grounds WW Clubhouse
In
Description of Problem
Progress
rotted facia boards under gutters
N.E. corner facia board rotten
window trim is broken off
Missing entrance gate on the front side of the unit closest
to the pool.
silver metal flashing of flat roof needs painting
Rotten wood on front fence; gate was cut off at bottom
and needs replacing after sidewalk replaced.
sidewalk to gate (non-parking entrance) is broken &
elevated due to tree roots
silver metal flashing of flat roof needs painting
facia board on carport needs paint
Dead shrubs need to be replaced
top floor gutter is bent down between unit 219 and 220
Roof Repair - no description
Roof Repair - no description
WDO REPORT: rot on facia board over top of rear
storage room door near roof, and on top fence gate; utility
room door delaminating
Gate missing by garbage can area, gate missing by A/C
unit
Roof Repair - no description
Dead azalea bush at end of unit near trash bin. Needs to
be removed/replaced.
Leaking gutters are causing dirt and mud to drain into
carport space for units 222 and 221
Roof Repair - no description
need 2 new hinges for heavy gate
Black drain pipe improperly installed; is lying on top of
ground and not hooked up to anything
Roof Repair - no description
corner trim needs caulking to prevent water intrusion
Water Leak
Retaining wall insufficient
back door deck needs cleaning & painting to stop rot
missing stucco at back roof - side of next unit's second
story
The brown wooden railing was removed from the patio
parking area for Unit 305 & blocked 306's parking space.
The fence needs to be replaced.
dead tree branches left near a bush at the steps leading
to #306.
Rails on deck missing
section of wooden walkway in front of unit (toward park) is
loose (also section behind 309)
Gutters are full, full of pine straw, etc. and don't work; also
gutter over entrance to deck is bent from a fallen limb
Foundation cracking (owner problem) has resulted in
stucco buckling and cracking. Needs to be repaired after
foundation fixed
Roof damaged by falling tree; roof repaired but ceiling
never painted
Roof Repair - no description
Roof Repair - no description
Not Described
latch on trash can door is missing
floor boards on deck are tilting down toward the east;
deck supports need fixing
We propose hereby to furnish material and labor– complete in accordance with the above specifications for
the sum of: $10,312.00 Payment as follows: 50% deposit ($5156); balance at completion ($5156).
Conditions: Southeast Carpentry, hereafter referred to as contractor, will perform in a workmanlike manner, according to local industry practices, the
work described in this contract. Contract price applies only to work described in this contract. Additional work will be performed only upon written
change order. Carpentry estimates do not include discovered damage. All deposits are non-refundable. Contractor shall not be held liable for any loss,
damage or delay caused by inclement weather, material stolen after delivery to work site, acts of God, accidents, labor and/or material shortages,
delayed material delivery from any supplier, or any other cause beyond the reasonable control of the contractor. All listed schedules are contingent
upon the weather and its suitability to us. Any payment amount not properly paid in accordance with this contract shall bear interest at the rate
of 1.5% per month, 18% per annum. Buyer will pay all costs of collection of such delinquent accounts including court costs and reasonable
attorney’s fees. In connection with any litigation, including appeals arising out of this contract, the contractor shall be entitled to recover all costs
incurred, including reasonable attorney’s fees. Buyer agrees the venue for any legal proceedings will be at the discretion of the contractor. This
contract, including any pages or exhibits incorporated by reference, constitutes the full and complete agreement of the parties.
ACCEPTANCE OF PROPOSAL -- The above prices, specifications, and conditions are satisfactory and are hereby
accepted. You are authorized to do the work and payment will be made as specified above.
____________________________________________________________ ___________________________________________
Name (please print) Title
X___________________________________________________________________ ________________________________
Buyer’s Authorized Signature Date
Unit #407
1. Back deck
• Remove existing stucco divider wall between the #407 and #406 deck. Build a shadow box
privacy fence in its place, keeping the same size/shape.
• Keep the full picket fence at the deck perimeter; replace any rotted boards.
• Replace all deck floor boards with 2x6 PT.
• Run a new 2x8 support beam (bolted to the support posts) under the outside band (header
joist) supporting the deck. Includes the #406 side.
• Install support blocks under the 2x6 floor joists.
• Trim the joist tails to 6”
• The round posts for the back deck are OK.
• Keep the floor trap door on the #407 side.
3. Notes
• Does not include repairs to the #406 decking except as noted.
• Fasteners: use 4-5” galvanized lag screws for the framing-to-post joints. Use 12-16d
galvanized common nails for framing. Use 3” galvanized or treated decking screws for all
new deck flooring.
• Includes a building permit.
• Does not include general wood rot repairs to the other woodwork on the building, i.e. siding,
trim, doors, fascia, soffits, corner boards, etc.
• We will pile up the construction debris at a location chosen by the homeowner’s association
and the debris will be hauled off by others.