SCHEDULE OF QUANTITY SUPPLY, ERECTION & COMMISSIONING OF 2 X 3.

15 MVA 33/11KV SUB-STATION at Budhapal (Firms shall quote the unit rate and total rates including all Taxes and Duties) Sl. No. Particulars Unit Qty 1 Part-A (i) 33Kv Incoming Supply, installation with foundation & painting as per approved drawing 1 RSJ 150 mm X 150 mm X 10 mtr long required for Pole Structure (34.6 kg/mtr) Supply, installation with foundation as per approved drawing & painting 2 RSJ 150 mm X 150 mm X 6 mtr long required for Pole Structure (34.6 kg/mtr) Supply, installation with painting - MS Channel (100x50x5 mm) thickness 3 of flange 7.7 mm, (9.56 kg/mtr) Supply, installation with painting - Bracing Angle (50 x 50 x 6 mm (4.5 4 kg/mtr) 5 Installation of 232 Sqmm AAAC for BUS arrangement Supply, installation with civil works for foundation of - 33Kv Isolator with 6 earth switch Supply, installation with civil works for foundation of - 33Kv Isolator 7 without earth switch 8 Supply, installation of - 33Kv LA Supply, installation of - Disc Insulator (B & S) 70 KN sutable for 232 sq mm 9 AAAC 10 Supply, installation of - B&S Hard ware fittings Installation & Commissioning of - 33Kv VCB with CT & Control Relay Panel 11 (Excluding Foundation) (ii) 33Kv Bus 12 Supply, installation with foundation & painting as per approved drawing RSJ 150 mm X 150 mm X 10 mtr long required for Pole Structure (34.6 kg/mtr) 13 Supply, installation with painting - MS Channel (100 x 50 x 5 mm) thickness of flange 7.7 mm, (9.56 kg/mtr) 14 Supply, installation with painting -Bracing Angle (50x50x6 mm) (4.5 kg/mtr) 15 Supply, installation of Disc Insulator (B & S) 16 Supply, installation of B&S Hard ware fittings 17 Installation & Commissioning of 33Kv VCB with CT & Control Relay Panel (Excluding Foundation) 18 Installation & Commissioning of 33 Kv PT (single phase) Installation & Commissioning of of 33/11 KV, 3.15MVA Power Transformer 19 (Excluding Foundation) (iii) Mounting of 33Kv Post Insulator Unit Rate (Rs.) 2 Supply Amount (Rs.) 3=(1x2) Unit Rate (Rs.) 4 Errection Amount (Rs.) 5(4x1) Total Amount of supply & installation (Rs.) 6=(3+5)

No

0.00

0.00

0.00

No Kg Kg Km Set Set No No Set Set No

2 1710 1080 0.5 1 3 12 60 15 2 8

0.00 0.00 0.00 To be supplied by WESCO 0.00 0.00 0.00 0.00 0.00 To be supplied by WESCO

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 Kg kg No No Set No No 361 1080 60 15 2 3 2 0.00 0.00 0.00 0.00 To be supplied by WESCO To be supplied by WESCO To be supplied by WESCO

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Page 1 of 17

SCHEDULE OF QUANTITY SUPPLY, ERECTION & COMMISSIONING OF 2 X 3.15 MVA 33/11KV SUB-STATION at Budhapal (Firms shall quote the unit rate and total rates including all Taxes and Duties) Sl. No. Particulars Unit Qty Unit Rate (Rs.) Supply Amount (Rs.) 0.00 0.00 0.00 0.00 Unit Rate (Rs.) Errection Amount (Rs.) 0.00 0.00 0.00 0.00 Total Amount of supply & installation (Rs.) 0.00 0.00 0.00 0.00

Supply, installation with foundation & painting as per approved drawing 20 RSJ 150 mm X 150 mm X 6.0 mtr long required for Pole Structure (34.6 kg/mtr) Supply, installation with painting - MS Channel (100x50x5 mm) thickness 21 of flange 7.7 mm, (9.56 kg/mtr) Supply, installation with painting Bracing Angle (50x50x6 mm) (4.5 kg/mtr) 22 23 Supply, installation 33Kv Post Insulator (iv) Mounting of 11Kv Post Insulators Supply, installation with foundation & painting as per approved drawing 24 RSJ 150 mm X 150 mm X 6 mtr long required for Pole Structure (34.6 kg/mtr) Supply, installation with painting - MS Channel (100x50x5 mm) thickness 25 of flange 7.7 mm, (9.56 kg/mtr) Supply, installation with painting - Bracing Angle (50x50x6)mm (4.5 26 kg/mtr) 27 Supply, installation 11Kv Post insulators (v) 11 KV Bus with Feeder bay 4 Nos Supply, installation with foundation & painting as per approved drawing 28 RSJ 150 mm X 150 mm X 10 mtr long required for Pole Structure (34.6 kg/mtr) Supply, installation with painting - MS Channel (100x50x5 mm) thickness 29 of flange 7.7 mm, (9.56 kg/mtr) Supply, installation with painting -Bracing Angle (50x50x6 mm) (4.5 30 kg/mtr) 31 Supply, installation of Disc Insulator (B & S) 32 Supply, installation of B&S Hard ware fittings Supply, installation with civil works for foundation of 11Kv AB Switch 630 33 A (for Transformer Bay) Supply, installation with civil works for foundation of 11Kv AB Switch 400 34 A (For outgoing Feeder Bay) 35 Supply, installation with civil works for foundation of 11Kv HG fuse Installation & Commissioning of 11Kv VCB (630 A) complete set with CT & 36 Control Relay Panel (Excluding Foundation) 37 Installation & Commissioning of 11 KV PT (single phase) 38 Installation & Commissioning of 11 KV LA (vi) 33/0.4 KV Station Transformer Supply, installation with foundation & painting as per approved drawing 39 RSJ 150 mm X 150 mm X 10 mtr long required for Pole Structure (34.6 kg/mtr)

No Kg Kg No

4 103 135 12

No Kg Kg No

4 103 135 6

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

No Kg Kg No No Set Set Set Set No No

18 1677 466 56 28 3 4 4 6 6 18

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 To be supplied by WESCO To be supplied by WESCO 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

No

0.00

0.00

0.00

Page 2 of 17

SCHEDULE OF QUANTITY SUPPLY, ERECTION & COMMISSIONING OF 2 X 3.15 MVA 33/11KV SUB-STATION at Budhapal (Firms shall quote the unit rate and total rates including all Taxes and Duties) Sl. No. Particulars Unit Qty Unit Rate (Rs.) Supply Amount (Rs.) 0.00 0.00 0.00 To be supplied by WESCO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Unit Rate (Rs.) Errection Amount (Rs.) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total Amount of supply & installation (Rs.) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Supply, installation with painting - MS Channel (100x50x5 mm) thickness of flange 7.7 mm, (9.56 kg/mtr) Supply, installation with painting - Bracing Angle (50x50x6 mm (4.5 41 kg/mtr) Supply, installation with civil works for foundation of 33 KV AB Switch 42 40 Installation and Commissioning of 33/0.4 KV,100 KVA Station Transformer with cable box 44 Supply, installation with civil works for foundation of 33 Kv HG Fuse 45 Supply, installation with civil works for foundation of 33 KV LA (vii) Other Items Supply, installation with civil works - Earthing Electrode with chamber 46 43 47 48 49 50 51 52 53 53 54 Supply, installation with civil works - GI flat 90X6 mm size under ground for mat Supply, installation -GI flat 50X6 mm size for riser Supply, installation - GI flat 25X6 mm size for riser Supply, installation - 8 swg GI wire Supply & Fixing of Earth bond Supply, installation with fabrication - Lightning Mast (spike ) with base plate to be mounted on RSJ pole Supply, installation & commissioning - Battery with Charger 2V X 12nos including wooden stand plantee type battery of Exide Make & suitable charger cum DCDB of Caldyne Make. Supply, installation & commissioning - ACDB (indoor) as per specification & approved drawing Supply, installation & commissioning - SDB (out door) as per specification & approved drawing Supply, installation with civil works for foundation of poles - 1x400 Watt HPSV outdoor Light fittings (Make PHILIPS / CGL) along with Tubular Poles of 10 mtr height (410 SP 48) with Junction box as per IS 2713 / 1980.

Kg Kg set No set No No Kg Kg kg kg No No set No No

236 79 1 1 1 3 35 2000 600 700 50 40 12 1 1 1

55

No

0.00

0.00

0.00

Supply, Laying with civil works - 3.5 C X 185 sq mm LT, PVC, Al, Armoured cable in the cable trench, cable termination at both ends should be done 56 by providing suitable lugs, cable glands pvc tape, ampere tapes etc

Mtr

50

0.00

0.00

0.00

Page 3 of 17

SCHEDULE OF QUANTITY SUPPLY, ERECTION & COMMISSIONING OF 2 X 3.15 MVA 33/11KV SUB-STATION at Budhapal (Firms shall quote the unit rate and total rates including all Taxes and Duties) Sl. No. Particulars Unit Qty Unit Rate (Rs.) Supply Amount (Rs.) Unit Rate (Rs.) Errection Amount (Rs.) Total Amount of supply & installation (Rs.)

Supply, Laying of following size control cable & Termination. This includes Fixing of cable rack by full welding with two emboded GI flat, placing of cable trays with supply of required jointing sleeve and GI bolt nuts, etc., 57 laying of cable over the cable tray by providing cable markers cable glands at both end with terminations by providing ferruls, cable lugs (ring type) with dressing a 3 C x 2.5 sq mm PVC, Cu, Armoured control cable b 4C X 2.5 sq mm PVC, Cu, Armoured control cable c 10 C X 2.5 sq mm PVC, Cu, Armoured control cable d 2C X 4 sq mm LT, PVC, Al, Armoured cable for switchyard Lighting 58 Supply and placement of following Safety & Measuring Equipments a Earth Tester b 2.5 KV Insulation Meggar c Fire Extinguisher

Mtr Mtr Mtr Mtr No No No

50 200 200 250 1 1 4

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

Page 4 of 17

SCHEDULE OF QUANTITY SUPPLY, ERECTION & COMMISSIONING OF 2 X 3.15 MVA 33/11KV SUB-STATION at Budhapal (Firms shall quote the unit rate and total rates including all Taxes and Duties) Sl. No. Particulars Unit Fire Bucket & stand Shock Treatment Chart 33kv Hand Gloves H T Rubber Mat Digital Clamp on Meter T & P Box Emergency Light First Aid Box with Medicine TOTAL of Part-A No No Pair Mtr Pair No No Set Qty 4 2 4 10 1 1 2 1 Unit Rate (Rs.) Supply Amount (Rs.) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Not applicable Not applicable Not applicable Not applicable Unit Rate (Rs.) Errection Amount (Rs.) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total Amount of supply & installation (Rs.) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

d e f g h i j k

1 2 3 4

Part-B Sq.mtr 2000 Contour Survey Cum UR Cutting & Levelling Boundary Wall including gate pillar with supply of all required materials of RM 160 approved quality to complete the job Steel gate for Boundary wall as per specification and approved drawing kg 250 including supply of all required materials of approved quality Construction of control room including PHD works, Electrical works, inside cable trench, overhead water tank etc., complete in all respect excluding Sq mtr bore well, but including supply of all required materials of approved quality to complete the work Deep Bore well with casing pipe, flexible pipe with 1.5 HP sub merged set pump connecting cable complete in all respect including supply of all required materials of approved quality Metal Spreading of 33/11Kv S/S including sand spreading as per specification including supply of all required materials of approved quality Sq mtr

108

Not applicable

0.00

0.00

Not applicable

0.00

0.00

200

Not applicable

0.00

0.00

Foundation for Power Transformer with RRG massonary with guide rail as per specification and approved drawing including supply of all required materials of approved quality. Foundation for 33 KV VCB with CT & CR Pannel as per specification and 9 approved drawing including supply of all required materials of approved quality. Foundation for 11 KV VCB with CT & CR Pannel as per specification and 10 approved drawing including supply of all required materials of approved quality. Switch yard cable trench with cover as per specification and approved 11 drawing including supply of all required materials of approved quality 8 a) 300 mm width b) 600 mm width

No

Not applicable

0.00

0.00

No

Not applicable

0.00

0.00

No

Not applicable

0.00

0.00

Mtr Mtr

10 20

Not applicable Not applicable

0.00 0.00

0.00 0.00

Page 5 of 17

SCHEDULE OF QUANTITY SUPPLY, ERECTION & COMMISSIONING OF 2 X 3.15 MVA 33/11KV SUB-STATION at Budhapal (Firms shall quote the unit rate and total rates including all Taxes and Duties) Sl. No. Particulars Unit Qty Unit Rate (Rs.) Supply Amount (Rs.) Unit Rate (Rs.) Errection Amount (Rs.) 0.00 Total Amount of supply & installation (Rs.) 0.00

Approach road as per specification and approved drawing including supply of all required materials of approved quality EXTRA ITEMS (IF REQUIRED AS PER SITE CONDITION) including supply of all 13 required materials of approved quality a Excavation in all type of soil b PCC 1:3:6 including scafolding c PCC 1:2:4 including scafolding d RCC 1:2:4 including scafolding excluding supply of steel e Reinforced steel f Brick work 230 mm (full brick) g Brick work 125 mm (Halfl brick) h RRGH Masonary TOTAL of Part-B Grand Total (Part A + Part B) 12 Amount in Words : Name of the Bidder : Signature : Seal :

Mtr

30

Not applicable

Cum Cum Cum Cum Kg Cum Cum Cum

1 1 1 1 1 1 1 1

Not applicable Not applicable Not applicable Not applicable Not applicable Not applicable Not applicable Not applicable Not applicable 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Note : (i) Bidders can enter figures only in the cells highlighted in "Yellow" colour. (ii) In case of Part - B, no separate rate is required to be quoted against the supply of civil construction materials. All such rates should be included in the installation rate.

Page 6 of 17

BOQ FOR 33KV LINE from 132/33 KV Rengali Grid Substation to Budhapal Substation (30 Km)
SUPPLY, ERECTION, TESTING & COMMISSIONING OF 33 KV LINE (Firms shall quote the unit rate and total rates including all Taxes and Duties) Sl. No. Particulars Unit Qty Unit Rate (Rs.) 2 Supply Amount (Rs.) 3=(1x2) Unit Rate (Rs.) 4 Errection Amount (Rs.) 5(4x1) Total Amount of supply & installation (Rs.) 6=(3+5)

1
A Intermediate Support with PSC Pole Supply, Installation with brick batting of 9 M x 415 Kg PSC Poles (Excluding foundation concreting) as per standard approved drawing/schedule & ISS/REC 2 Stone Pad (450 mm x 450 mm x 90 mm) for PSC poles including supply of all materials required as per standard approved drawing/schedule & ISS/REC 3 Supply, installation of 33KV 'V' Cross Arm (GI Channel 100 mm x 50 mm x 6 mm), (9.56 kg/mtr) as per standard approved drawing/schedule & ISS/REC 4 Supply, installation of GI Cross Arm holding Clamps with bolts & nuts as per standard approved drawing/schedule & ISS/REC 5 Supply, installation of 33 KV Pin Insulators with GI pin as per standard approved drawing/schedule & ISS/REC 6 Supply, installation of GI F-Bracket with bolts & nuts as per standard approved drawing/schedule & ISS/REC 7 Supply, installation of Pole Earthing complete with coil earthing & 8 SWG GI Wire as per standard approved drawing/schedule & ISS/REC 8 Concreting of poles (Approx Qty.) including supply of all required civil construction materials as per standard approved drawing/schedule & ISS/REC 9 Supply, installation of GI Barbed Wire for each pole as anti climbing device as per standard approved drawing/schedule & ISS/REC 10 Supply, installation of Danger plates & clamps with bolts & nuts as per standard approved drawing/schedule & ISS/REC 11 Supply and fixing of Number plate as per standard approved drawing/schedule & ISS/REC 12 Supply, installation of GI Stay Set (20 x 1800 mm) complete including Concreting, stay wire etc as per standard approved drawing/schedule & ISS/REC Total of A 1 Nos. 360

0.00

0.00

0.00

Nos.

360

0.00

0.00

0.00

Nos.

360

0.00

0.00

0.00

Nos. Nos. Nos. Nos.

360 1080 360 360

0.00 0.00 0.00 0.00

0.00

0.00

0.00 0.00

0.00 0.00

0.00

0.00

Nos.

120

0.00

0.00

0.00

Kg

720

0.00

0.00

0.00

Nos. Nos. Nos.

360 360 90

0.00 0.00 0.00 0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 7 of 17

BOQ FOR 33KV LINE from 132/33 KV Rengali Grid Substation to Budhapal Substation (30 Km)
SUPPLY, ERECTION, TESTING & COMMISSIONING OF 33 KV LINE (Firms shall quote the unit rate and total rates including all Taxes and Duties) Sl. No. Particulars Unit Qty Unit Rate (Rs.) 2 Supply Amount (Rs.) 3=(1x2) Unit Rate (Rs.) 4 Errection Amount (Rs.) 5(4x1) Total Amount of supply & installation (Rs.) 6=(3+5)

1
B Cut Point / Angle Point with Single pole support on 9.0 meter PSC POLE as per standard approved drawing/schedule & ISS/REC 1 Supply, Installation with concreting of 9 M x 415 Kg PSC POLE as per standard approved drawing/schedule & ISS/REC 2 Stone Pad (450 x 450 x 90 mm) for PSC poles including supply of all materials required as per standard approved drawing/schedule & ISS/REC 3 Supply, installation of 33KV 'V' Cross Arm (GI channel 100 mm x 50 mm x 6 mm) (9.56 kg/mtr) as per standard approved drawing/schedule & ISS/REC 4 Supply,installation of GI Cross Arm holding Clamps with bolts& nuts as per standard approved drawing/schedule & ISS/REC 5 Supply, installation of 11 KV Disc insulators as per standard approved drawing/schedule & ISS/REC 6 Supply, installation of 33 KV Hardware Fitting as per standard approved drawing/schedule & ISS/REC 7 Supply, installation of GI F-Bracket with bolts & nuts as per standard approved drawing/schedule & ISS/REC 8 Supply, installation of Pole Earthing complete with coil earthing & 8 SWG GI Wire as per standard approved drawing/schedule & ISS/REC Supply, installation of GI Barbed Wire for each pole as anti 9 climbing device as per standard approved drawing/schedule & ISS/REC 10 Supply, installation of Danger plates & clamps with bolts & nuts as per standard approved drawing/schedule & ISS/REC 11 Supply, installation of GI Stay Set (20 x 1800mm) complete including Concreting, stay wire etc as per standard approved drawing/schedule & ISS/REC 12 Supply and fixing of Number plate as per standard approved drawing/schedule & ISS/REC

Nos.

30

0.00

0.00

0.00

Nos.

30

0.00

0.00

0.00

Nos.

60

0.00

0.00

0.00

Nos. Nos. Nos. Nos. Nos.

30 540 180 60 30

0.00 0.00 0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00

0.00

Kg

60

0.00

0.00

0.00

Nos.

30

0.00

0.00

0.00

Set Nos.

60 30

0.00 0.00

0.00

0.00

0.00

0.00

Page 8 of 17

BOQ FOR 33KV LINE from 132/33 KV Rengali Grid Substation to Budhapal Substation (30 Km)
SUPPLY, ERECTION, TESTING & COMMISSIONING OF 33 KV LINE (Firms shall quote the unit rate and total rates including all Taxes and Duties) Sl. No. Particulars Unit Qty Unit Rate (Rs.) 2 Supply Amount (Rs.) 3=(1x2) Unit Rate (Rs.) 4 Errection Amount (Rs.) 5(4x1)
0.00

Total Amount of supply & installation (Rs.) 6=(3+5)


0.00

1
13 Stringing of AAA conductor (100 Sq.mm) as per Sag-Tension chart in 3 phases including sag, binding, jumpering etc., required to complete the work as per standard approved drawing/schedule & ISS/REC. Total of B
Km

30 To be supplied by WESCO 0.00

0.00

0.00

Page 9 of 17

BOQ FOR 33KV LINE from 132/33 KV Rengali Grid Substation to Budhapal Substation (30 Km)
SUPPLY, ERECTION, TESTING & COMMISSIONING OF 33 KV LINE (Firms shall quote the unit rate and total rates including all Taxes and Duties) Sl. No. Particulars Unit Qty Unit Rate (Rs.) 2 Supply Amount (Rs.) 3=(1x2) Unit Rate (Rs.) 4 Errection Amount (Rs.) 5(4x1) Total Amount of supply & installation (Rs.) 6=(3+5)

1
C Extra Items as per site Requirement 1 Supply, installation with concreting of following Single pole structure including fitting of all accessories (X-arm, insulator, fitting, earthing, grouting, danger board, anticlimbing etc. complete) as per standard approved drawing/schedule & ISS/REC. a) 10 Mtr / 425 kg PSC Pole b) 13 Mtr RS Joist Pole (150x150 mm, 34.6 kg/mtr) 2 Supply, installation with concreting of following Double Pole structure & its erection including fitting of all accessories (X-arm, Xbracing, insulator, hardware fitting, coil earthing, grouting, danger board, anti climbing etc. complete) as per standard approved drawing/schedule & ISS /REC. a) 9 Mtr / 300 kg PSC Pole b) 13 Mtr R.S. Joist (150x150 mm, 34.6 kg/mtr) 3 Supply, installation with concreting of following Triple Pole structure & its erection including fitting of all accessories (X-arm, Xbracing, insulator, hardware fitting, coil earthing, grouting, danger board, anti climbing etc. complete) as per standard approved drawing/schedule & ISS. a) 9 Mtr, 300 Kg PSC Pole b) 10 Mtr, 425 kg PSC Pole c) 13 Mtr R.S. Joist (150x150 mm, 34.6 kg/mtr) 4 Supply, installation with concreting of following Four Pole structure & its erection including fitting of all accessories (X-arm, X-bracing insulator, hardware fitting,clamps, coil earthing, grouting, danger board, anti climbing etc. complete) as per standard approved drawing/schedule & ISS /REC. a) 9 Mtr / 300 Kg PSC Pole b) 10 Mtr / 425 kg PSC Pole c) 13 Mtr R.S. Joist (150x150 mm, 34.6 kg/mtr) 5 Supply, installation of Guarding for Road/11 KV/L.T. Line etc. crossing with supply of all materials and its installation as per standard approved drawing & ISS / REC as below . a) Upto span length of 50 Mtrs.

No No

1 1

0.00 0.00

0.00 0.00

0.00 0.00

No. No.

1 1

0.00 0.00

0.00 0.00

0.00 0.00

No. No. No.

1 1 1

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

No. No. No.

1 1 1

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

No.

0.00

0.00

0.00

Page 10 of 17

BOQ FOR 33KV LINE from 132/33 KV Rengali Grid Substation to Budhapal Substation (30 Km)
SUPPLY, ERECTION, TESTING & COMMISSIONING OF 33 KV LINE (Firms shall quote the unit rate and total rates including all Taxes and Duties) Sl. No. Particulars Unit Qty Unit Rate (Rs.) 2 Supply Amount (Rs.) 3=(1x2)
0.00

Errection Unit Rate (Rs.) 4 Amount (Rs.) 5(4x1)


0.00

Total Amount of supply & installation (Rs.) 6=(3+5)


0.00

1
6 b) Upto span length of 100 Mtrs. Supply, installation of strut pole of following size including supply & installation with required clamps a) 9 Mtr / 415 Kg PSC Pole b) 10 Mtr / 425 kg PSC Pole Total of C Grand Total = (A) + (B) + ('C)
No.

No. No.

1 1

0.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

Amount in Words : Name of the Bidder : Signature : Seal : Note : Bidders can enter figures only in the cells highlighted in "Yellow" colour.

Page 11 of 17

BOQ FOR 11KV LINE from Budhapal (30 Km)


SUPPLY, ERECTION, TESTING & COMMISSIONING OF 11 KV LINE (Firms shall quote the unit rate and total rates including all Taxes and Duties) Sl. No. Particulars Unit Qty 1
A Intermediate Support with PSC Pole Supply, Installation with brick batting of 8 M x 200 Kg PSC Poles 1 (Excluding foundation concreting) as per standard approved drawing/schedule & ISS/REC Stone Pad (450 x 450 x 90 mm) for PSC poles including supply of all 2 materials required as per standard approved drawing/schedule & ISS/REC Supply, installation of 11 KV 'V' Cross Arm (GI channel 75 x 40 x 6 of 3 7.14 kg/mtr) as per standard approved drawing/schedule & ISS/REC 4 5 6 7 Supply, installation of GI cross arm holding clamps with bolts& nuts as per standard approved drawing/schedule & ISS/REC Supply, installation of 11 KV Pin Insulators with GI Pin as per standard approved drawing/schedule & ISS/REC Supply, installation of GI F-Bracket with bolts & nuts as per standard approved drawing/schedule & ISS/REC Supply, installation of GI Barbed Wire for each pole as anti climbing device as per standard approved drawing/schedule & ISS/REC Supply, installation of Pole Earthing complete with coil earthing & 8 SWG GI Wire as per standard approved drawing/schedule & ISS/REC

Supply Unit Rate (Rs.) 2 Amount (Rs.) 3=(1x2) Unit Rate (Rs.) 4

Errection Amount (Rs.) 5(4x1)

Total Amount of supply & installation (Rs.) 6=(3+5)

Nos.

420

0.00

0.00

0.00

Nos.

420

0.00

0.00

0.00

Nos. Nos. Nos. Nos. Kg

420 420 1260 420 840

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

Nos.

420

0.00

0.00

0.00

Concreting of poles (Approx Qty.) including supply of all required civil construction materials as per standard approved drawing/schedule & ISS/REC Supply, installation of Danger plates & clamps with bolts & nuts as per 10 standard approved drawing/schedule & ISS/REC 11 Supply and fixing of Number plate as per standard approved drawing/schedule & ISS/REC 12 Supply, installation of GI Stay Set (20 x 1800mm) complete including Concreting, stay wire etc as per standard approved drawing/schedule & ISS/REC Total A 9 B Cut Point / Angle Point with Single pole support on 8.0 meter PSC POLE as per standard approved drawing/schedule & ISS/REC 1 Supply, Installation with concreting of 8.0 x 200 Kg PSC POLE as per standard approved drawing/schedule & ISS/REC

Nos. Nos. Nos. Nos.

150 420 420 90

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

Nos.

30

0.00

0.00

0.00

Page 12 of 17

BOQ FOR 11KV LINE from Budhapal (30 Km)


SUPPLY, ERECTION, TESTING & COMMISSIONING OF 11 KV LINE (Firms shall quote the unit rate and total rates including all Taxes and Duties) Sl. No. Particulars Unit Qty 1
2 Stone Pad (450 x 450 x 90 mm) for PSC poles including supply of all materials required as per standard approved drawing/schedule & ISS/REC Supply, installation of 11 KV V Cross Arm (GI channel 75 x 40 x 6 of 7.14 kg/mtr) as per standard approved drawing/schedule & ISS/REC Supply,installation of GI cross arm holding clamps with bolts& nuts as per standard approved drawing/schedule & ISS/REC Supply, installation of 11 KV Disc insulators as per standard approved drawing/schedule & ISS/REC Supply, installation of 11 KV Hardware Fitting as per standard approved drawing/schedule & ISS/REC Supply, installation of GI F-Bracket with bolts & nuts as per standard approved drawing/schedule & ISS/REC Supply, installation of GI Barbed Wire for each pole as anti climbing device as per standard approved drawing/schedule & ISS/REC Supply, installation of Pole Earthing complete with coil earthing & 8 SWG GI Wire as per standard approved drawing/schedule & ISS/REC Nos. 30

Supply Unit Rate (Rs.) 2 Amount (Rs.) 3=(1x2)


0.00

Errection Unit Rate (Rs.) 4 Amount (Rs.) 5(4x1)


0.00

Total Amount of supply & installation (Rs.) 6=(3+5)


0.00

3 4 5 6 7 8

Nos. Nos. Nos. Nos. Nos. Kg

60 30 180 180 60 60

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

9 10

Nos. Nos. Nos. Nos.

30 30 60 30

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

Supply, installation of Danger plates & clamps with bolts & nuts as per standard approved drawing/schedule & ISS/REC Supply, installation of GI Stay Set (20 x 1800mm) complete including 11 Concreting, stay wire etc as per standard approved drawing/schedule & ISS/REC 12 Supply and fixing of Number plate as per standard approved drawing/schedule & ISS/REC 13 Stringing of AAA conductor (55 Sq.mm) as per Sag-Tension chart in 3 phases including sag, binding, jumpering etc., required to complete the work as per standard approved drawing/schedule & ISS/REC. Total B C Extra Items as per site Requirement 1 Supply, installation with concreting of following sizes Single pole structure & its erection including fitting of all accessories (X-arm, insulator, fitting, coil earthing, grouting,danger board,anticlimbing etc. complete) as per standard approved drawing/schedule & ISS/REC. a) 9 Mtr / 300 Kg PSC Pole

Km

30

To be supplied by WESCO 0.00

0.00 0.00

0.00 0.00

No.

0.00

0.00

0.00

Page 13 of 17

BOQ FOR 11KV LINE from Budhapal (30 Km)


SUPPLY, ERECTION, TESTING & COMMISSIONING OF 11 KV LINE (Firms shall quote the unit rate and total rates including all Taxes and Duties) Sl. No. Particulars Unit Qty 1
2 b) 12 Mtr R.S Joist Pole (150x150 mm, 34.6 kg/mtr.) Supply, installation with concreting of following sizes of Double Pole structure & its erection including fitting of all accessories (straight X-arm, X-bracing, insulator, fitting, coil earthing, grouting, danger board, anti climbing etc. complete) as per standard approved drawing/schedule & ISS/REC. a) 9 Mtr / 300 Kg PSC Pole b) 11 Mtr / 330 kg PSC Pole c) 12 Mtr R.S.Joist (150x150 mm, 34.6 kg/mtr.) Supply, installation with concreting of following Triple Pole structure & its erection including fitting of all accessories (X-arm, X-bracing, insulator, fitting, coil earthing, grouting, danger board, anti climbing etc. complete) as per standard approved drawing/schedule & ISS / REC. No. 1

Supply Unit Rate (Rs.) 2 Amount (Rs.) 3=(1x2)


0.00

Errection Unit Rate (Rs.) 4 Amount (Rs.) 5(4x1)


0.00

Total Amount of supply & installation (Rs.) 6=(3+5)


0.00

No. No. No.

1 1 1

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

a) 9 Mtr / 300 kg PSC Pole No. b) 11 Mtr / 330 Kg PSC Pole No. c) 12 Mtr R.S. Joist (150x150 mm, 34.6 kg/mtr) No. Supply, installation with concreting of following Four Pole structure & its erection including fitting of all accessories (X-arm, X-bracing insulator, fitting, coil earthing, grouting, danger board, anti climbing etc. complete) as per standard approved drawing/schedule & ISS /REC. a) 9 Mtr / 300 kg PSC Pole b) 11 Mtr / 330 Kg PSC Pole c) 12 Mtr R.S. Joist (150x150 mm, 34.6 kg/mtr) Supply, installation of Guarding for Road/11 KV/L.T. Line etc. crossing with supply of all materials and its installation as per standard approved drawing & ISS / REC as below . a) Up to span length of 50 Mtrs. b) Up to span length of 100 Mtrs. Supply, installation of following size strut pole including supply & installation with required clamps a) 8 Mtr , 200 Kg PSC Pole b) 9 Mtr / 300 kg PSC Pole Total C Grand Total = (A) + (B) + ('C) No. No. No.

1 1 1

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

1 1 1

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

No. No.

1 1

0.00 0.00

0.00 0.00

0.00 0.00

No. No.

1 1

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

Page 14 of 17

BOQ FOR 11KV LINE from Budhapal (30 Km)


SUPPLY, ERECTION, TESTING & COMMISSIONING OF 11 KV LINE (Firms shall quote the unit rate and total rates including all Taxes and Duties) Sl. No. Particulars Unit Qty 1 Amount in Words : Name of the Bidder : Signature : Seal : Note : Bidders can enter figures only in the cells highlighted in "Yellow" colour. Unit Rate (Rs.) 2 Supply Amount (Rs.) 3=(1x2) Unit Rate (Rs.) 4 Errection Amount (Rs.) 5(4x1) Total Amount of supply & installation (Rs.) 6=(3+5)

Page 15 of 17

Summery - Budhapal ( Package - A) Sl. No. 1 Description of Work Supply Supply,Erection & Commissioning of 2 x 3.15 MVA, New 33/11 KV Primary Substation at Budhapal Supply,Erection & Commissioning of 33 KV Link Line from 132/33 KV Rengali Grid to Budhapal Primary Substation Supply,Erection & Commissioning of 11 KV Link Line from Budhapal Primary Substation 0.00 Quoted Value (in Rs.) Installation 0.00

0.00

0.00

0.00

0.00

Total Quoted value of Package - A (Budhapal)