Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
A 1 2 3 4 5 6 B 1 2 2 3 5 6 C 1 2 3 4 1 2 3 4 5 6 7 8
Outdoor/Indoor Power installation is ready for the new BTS 3900? The Power installation for the new RBS are labeled? The Jumper are Labeled for the Swap? Cable ladder/clamp support are installed all the way up to the supports ? Cable tray between tower and feeder entry is in place? Cable tray between feeder entry and BTS 3900 is properly installed Earthing/Grounding System All the earth bars have enough holes for earthings kit connections. The tower is properly earthed? Cable tray between tower and BTS 3900 is earthed ? All above ground and under ground connections are done as per the standard The earthing value is less than 5 Ohms Earthbar before cabinet,OK ? Civil Tower Leveled? Tower well paint? Tower/Poles Legs Condition Fence available Shelter/Room Situation Shelter/Room door is OK? Shelter/Room floor is ok? Shelter Roof is ok? Room Painting ok? Glande Plate (feeder Entry)
OK OK
N/A Cleared
Checkecking the light in side shelter Checkecking the light out side shelter check the fire extinguisher. Site Ready for Swap? YES Remarks and notes: NO
Date : 2012.07.02
Rev. C
Date : 2012.07.02
Rev. C
Photo 1
Cleared
Photo 2
Photo 3
Date : 2012.07.02
Rev. C
Date : 2012.07.02
Rev. C
Photo 5
Photo 6
Date : 2012.07.02
Rev. C
Date : 2012.07.02
Rev. C
Photo 7
Photo 8
Photo 9
Date : 2012.07.02
Rev. C
Date : 2012.07.02
Rev. C
Photo 10
Photo 11
Photo 12
Date : 2012.07.02
Rev. C
Date : 2012.07.02
Rev. C
Photo 13
Photo 14
Photo 15
Date : 2012.07.02
Rev. C
Date : 2012.07.02
Rev. C
Date : 2012.07.02
Rev. C