Dewatering (pronounced /diwtr/) is the removal of water from solid material or soil by wet classification, centrifugation, filtration, or similar solid-liquid separation processes, such as removal of residual liquid from a filter cake by a filter press as part of various industrial processes. Construction dewatering, unwatering, or water control are common terms used to describe removal or draining groundwater or surface water from a riverbed, construction site, caisson, or mine shaft, by pumping or evaporation. On a construction site, this dewatering may be implemented before subsurface excavation for foundations, shoring, or cellar space to lower the water table. This frequently involves the use of submersible "dewatering" pumps, centrifugal ("trash") pumps, eductors, or application of vacuum to well points.
Contents
1 Dewatering by deep wells 2 Dewatering by wellpoints 3 Dewatering by horizontal drainage 4 Control of pore pressures 5 Waste dewatering
Deep wells can be installed in a ring around an excavation to lower the water level and maintain a safe, dry site. Several equations can be used to design deep well dewatering systems, however many of these are based on empirical data and occasionally fail. Practice and experience, along with a firm understanding of the underlying principles of dewatering, are the best tools for designing a successful system.[2] Some dewatering situations "are so common that they can be designed almost by rule of thumb".[3] Deep wells are also used for aquifer testing and for groundwater drainage by wells.[4]
Dewatering by wellpoints
Wellpoints are small-diameter (about 50 mm) tubes with slots near the bottom that are inserted into the ground from which water is drawn by a vacuum generated by a dewatering pump. Wellpoints are typically installed at close centers in a line along or around the edge of an excavation. As a vacuum is limited to 0 bar, the height to which water can be drawn is limited to about 6 meters (in practice).[5] Wellpoints can be installed in stages, with the first reducing the water level by up to five meters, and a second stage, installed at a lower level, lowering it further.The water trickling between the deep wells may be collected by a single row of well point at the toe. This method ensures a much thicker width free from seepage forces.