Name of the Work:FDR works to the existing tank, vizianagaram

Name of the Circle :Superintending Engineer Dam Maintenance Circle NSRS Srisailam Project Kurnool Dist., Name of the Divisiion:Executive Engineer Dam Maintenance Division NSRS Srisailam Project Kurnool Dist., Name of the Sub Divisiion:Dy.Executive Engineer Dam Maintenance Sub Division-I NSRS Srisailam Project Kurnool Dist., Name of the Section:Assistant Executive Engineer Spillway Section NSRS Srisailam Project Kurnool Dist., Stamp Print Stamp Print Stamp Print Stamp Print

LEAD STATEMENT Is VAT deduct for Cement & Steel in lead statement 5% YES

LEAD MR CT

SOURCE

Fine aggregate/ sand(un-screened) for concrete items & filter items) (Including Seigniorage charges) Fine aggregate /Sand (Screened) for mortar , plastering and sand blasting items. (Including Seigniorage charges) Sand for filling (Including Seigniorage Charges) Gravel (M-008) 40mm Nominal size 25mm Nominal size 20mm Nominal size 12.5mm Nominal size 10mm Nominal size 6mm Nominal size 5 to 10mm size <2.36mm 80-40mm size 40-20mm size 20-10mm size 10-4.75mm size Stones chips at Quarry Uncoursed Rubble stones at Quarry Random Rubble stones

NO

VIZIANAGARAM

NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO

0 25 0 25 0 25 0 0 23 0 0 0 0 21 0 0 24 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

VIZIANAGARAM VIZIANAGARAM VIZIANAGARAM VIZIANAGARAM VIZIANAGARAM VIZIANAGARAM VIZIANAGARAM VIZIANAGARAM VIZIANAGARAM VIZIANAGARAM VIZIANAGARAM VIZIANAGARAM VIZIANAGARAM VIZIANAGARAM VIZIANAGARAM VIZIANAGARAM VIZIANAGARAM VIZIANAGARAM

Rough stones for revetment Cement (including loading charges) Steel(including loading Charges)HYSD Steel(including loading Charges) 6mm MS Rods Structural Steel (angle, channels, beams & bars etc.,) Structural Steel (plates & flats etc.,) RCC Hume Pipes 150mm dia NP-2 RCC Hume Pipes 225mm dia NP-2 RCC Hume Pipes 300mm dia NP-2 RCC Hume Pipes 300mm dia NP-3 RCC Hume Pipes 450mm dia NP-2 RCC Hume Pipes 450mm dia NP-3 RCC Hume Pipes 600mm dia NP-2 RCC Hume Pipes 600mm dia NP-3 RCC Hume Pipes 900mm dia NP-2 RCC Hume Pipes 900mm dia NP-3 RCC Hume Pipes 1000mm dia NP-2 RCC Hume Pipes 1000mm dia NP-3 RCC Hume Pipes 1200mm dia NP-2 RCC Hume Pipes 1200mm dia NP-3

NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO

21 0 0 0 0 0 35 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

VIZIANAGARAM LOCAL LOCAL LOCAL LOCAL LOCAL VIZIANAGARAM VIZIANAGARAM VIZIANAGARAM VIZIANAGARAM VIZIANAGARAM VIZIANAGARAM VIZIANAGARAM VIZIANAGARAM VIZIANAGARAM VIZIANAGARAM VIZIANAGARAM VIZIANAGARAM VIZIANAGARAM VIZIANAGARAM YES YES YES YES YES

CERTIFICATES:Certified that the leads furnished above are correnct to the best of my knowledge. Certified that the materials are sufficiently available in the above quarries Certified that materials(coarse aggrigate)are inclusive of blasting charges Certified that the reates are inclusive of seigniorage charges.
Provsions:VAT @ Insurance Premium @ Labour Cess@ miscllaneous items stationary miscllaneous items miscllaneous items Use of Superplastisizer 5.00% 0.44% 1.00% 3.00% 2.00% 3.00% 4.00% YES YES YES NO NO NO NO YES

LEAD STATEMENT
Name of the Work:- FDR works to the existing tank, vizianagaram Deduct VAT@5% (on Lead in KM Source of Supply S.S.R Sl.No Intial Cost

Conveyance charges including Contractor Profit @ 14%

Deduct Contractor Profit@14% on Conveyance charges

cement and steel)

Sl. No

Description of Item

MR

CT

Total

1 CERTIFICATES:1 2 3 4 Certified that the leads furnished above are correnct to the best of my knowledge. Certified that the materials are sufficiently available in the above quarries Certified that materials(coarse aggrigate)are inclusive of blasting charges Certified that the reates are inclusive of seigniorage charges.

Executive Engineer Dam Maintenance Division NSRS Srisailam Project Kurnool Dist.,

Dy.Executive Engineer Dam Maintenance Sub Division-I NSRS Srisailam Project Kurnool Dist.,

Assistant Executive Engineer Spillway Section NSRS Srisailam Project Kurnool Dist.,

Net Total

Unit

Abstract of work items

WORK ITEM RATES FOR THE YEAR - 2012-13 * Add Leads and Lifts, Area Allowance and VAT as applicable in the estimate ** Area Allowance includes profit component also Itemwise unit rate for Labour Component 5.00 6.00

Chapterwise item No. 1 Chapter I IRR-DAW IRR-DAW-1


Check Box 119

S.NO 2

Item description 3 DAM AND ALLIED WORKS EXCAVATION & FOUNDATION TREATMENT WORKS:

Unit 4

Rate

IRR-DAW-11

Excavation for foundation in all kinds of soil including boulders upto 0.30 m diameter for dam, spillway, intake structure and other appurtenant works and placing the excavated soil neatly in dump area or disposing off the same as directed etc., complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit) Excavation for foundation in ordinary rock (including HDR) without blasting including boulders above 0.3 m upto 0.6 m dia for dam, spillway, intake structure and other appurtenant works and placing the excavated material neatly in dump area or disposing off the same as directed etc., complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit) Excavation for foundation in hard rock (including F&F) requiring blasting including boulders above 0.6 m upto 1.2 m dia. for dam, spillway, intake structure and other appurtenant works and placing the excavated material neatly in dump area or disposing off the same as directed etc., complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit) Excavation for foundation in hard rock of all toughness by blasting including boulders above 1.2 m dia. for dam, spillway, intake structure and other appurtenant works and placing the excavated rock neatly in dump area or stack yard including levelling as directed etc., complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit) Excavation for foundation in hard rock of all toughness including boulders above 1.2 m dia. by controlled blasting method and controlling fly-rock by muffling arrangements for dam, spillway, intake structure and other appurtenant structures etc., including placing and levelling the excavated rock neatly in dump area or other place as directed etc., complete with lead upto upto 1 km and all lifts. Labour Component (including contractor's profit) Excavation for foundation in hard rock of all toughness including boulders above 1.2 m dia. by line drilling and smooth blasting and controlling fly-rock by muffling arrangements for dam, spillway, intake structure and other appurtenant structures etc., including dressing sides and bed to required level / profile, placing and levelling the excavated rock neatly in dump area or other place as directed etc., complete with lead upto 1 km and all lifts.

cum cum

107.90 18.50

Check Box 120

IRR-DAW-12

cum cum

143.10 24.10

Check Box 121

IRR-DAW-13

cum cum

215.60 42.80

Check Box 122

IRR-DAW-14(a)

cum cum

385.50 82.50

Check Box 123

IRR-DAW-15(b)

cum

593.30

cum

90.70

Check Box 124

IRR-DAW-16(c)

i ) For the purpose of payment 1 m width of excavation along boundary of excavation shall be treated as excavation by line drilling and smooth blasting and remaining portion shall be treated as excavation by normal / controlled blasting as the case may be. ii ) The rate includes controlling fly-rock wherever required. iii ) The rate under this item shall be paid only on ascertaining that the excavated face has come off neatly as per specifications or atleast 50 percent of smooth blast holes are visible for inspection and are spaced at specified interval. iv ) In case, where the above criteria is not fulfilled payment shall be restricted to rate provided for excavation by normal blasting or controlled blasting as the case may be. Labour Component (including contractor's profit) Preparing foundation bed for masonry or concrete by benching, stepping, removing all loose material by wedging / chiselling and disposing off the same as directed and cleaning the surface with air and water jet etc.,complete with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit) Preparing foundation bed for cut-off trench filling in rock portion by removing all loose materials by wedging / chiselling and disposing off the same as directed etc., complete with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit) Drilling 45 to 50 mm dia holes vertical or inclined upto 10 degrees to vertical in rock /masonry / concrete by percussion drilling using waggon drill or any other suitable equipment including cost of all materials, machinery, labour, redrilling through partially set grout wherever required etc., complete for drilling upto 6 m depth from surface. The item rate for drilling through rock / masonry / concrete includes redrilling through partially set grout, if any, in the portion of the hole drilled and grouted. Beyond 6 m upto 12 m from surface : Beyond 12 m upto 18 m from surface : Beyond 18 m upto 24 m from surface Beyond 24 m upto 30 m from surface Beyond 30 m upto 36 m from surface Beyond 36 m upto 42 m from surface Beyond 42 m upto 48 m from surface Labour Component (including contractor's profit)

cum

817.10

cum

238.70

Check Box 125

IRR-DAW-17

sqm sqm

28.90 22.10

Check Box 126

IRR-DAW-18

sqm sqm

18.70 18.70

Check Box 127

IRR-DAW-19

Rm

187.50

Rm Rm Rm Rm Rm Rm Rm Rm

206.30 226.90 249.60 274.60 302.10 332.30 365.50 36.00

Check Box 128

IRR-DAW-110

10

Flushing grout holes of all sizes with water and air jets alternatively for an average period of 30 minutes including water intake observations after flushing, cost of all materials, machinery, labour etc., complete. Labour Component (including contractor's profit) Consolidation grouting with neat cement grout mix of suitable consistency under specified pressure as directed in drilled holes by stage grouting method including cost of all materials, machinery, labour, redrilling if necessary etc.,complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit) Curtain grouting with neat cement grout mix of suitable consistency under specified pressure as directed in drilled holes by stage grouting method including cost of all materials, machinery, labour, redrilling if necessary etc., complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit) Providing and fixing 25 mm dia 3 m long cold twisted deformed steel dowel bars with one end driven into 45 to 50 mm diameter 1.50 m deep hole drilled in bed rock and other end provided with Lbend for embedding in concrete / masonry of over flow / non-over flow blocks and other appertenant works including cost of drilling and cleaning hole, filling hole with cement mortar 1 : 1 proportion, driving anchor rod, cost of all materials, machinery, labour etc., complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit)

Rm Rm

45.20 14.30

Check Box 132

IRR-DAW-111(a)

11

tonne tonne

8596.60 2297.00

Check Box 133

IRR-DAW-112(b)

12

tonne tonne

9377.10 2948.40

Check Box 134

IRR-DAW-113

13

Each

965.70

Each

83.20

Abstract of work items

Check Box 135

IRR-DAW-114

14

Providing and fixing 25 mm dia. 2.75 m long ribbed steel anchor rods with one end split and driven firmly using steel wedge into 1.25 m deep 45 to 50 mm dia. hole drilled in bed rock and other end provided with L- bend for embedding in concrete / masonry for spillway and appurtenant works including drilling and cleaning hole, filling hole with thick cement slurry, driving anchor rod, cost of all materials, machinery, labour, steel wedge etc., complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit)

Each

883.30

Each

94.50

IRR-DAW-2

REINFORCEMENT & CEMENT CONCRETE WORKS : Providing, fabricating and placing in position reinforcement steel for RCC,below 36 dia rods overlaps and wastages wherever required, tying with 1.25 mm diameter soft annealed steel wire, including cost of all materials, machinery, labour etc., complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit)

Check Box 137

IRR-DAW-21A

15

56948.70 tonne tonne 2701.80

Check Box 138

IRR-DAW-21B

16

Providing, fabricating and placing in position reinforcement steel for RCC above 36 dia with welding and wastage at 2.5%, tying with 1.25 mm diameter soft annealed steel wire, including cost of all materials, machinery, labour etc., complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit) Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 80 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for plain concrete works with initial lead upto 1 km and all lifts. ( Cement content : 250 kg /cum with use of super plasticiser equla to 0.4% of cement content, CA : 0.98 cum, Blending Ratio of CA -40:30:20:10, FA : 0.35 cum )) Labour Component (including contractor's profit) Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 80 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for plain concrete works with initial lead upto 1 km and all lifts. ( Cement content : 300 kg /cum with use of super plasticiser equla to 0.4% of cement content, CA : 0.90 cum, Blending Ratio of CA -40:30:20:10, FA : 0.4 cum )) Labour Component (including contractor's profit) Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N / sq mm ) grade cement concrete using 80 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for plain concrete works with initial lead upto 1 km and all lifts. ( Cement content : 220 kg /cum with use of super plasticiser, CA: 0.98 cum, Blending Ratio of CA --40:30:20:10, FA: 0.37 cum ) Labour Component (including contractor's profit) Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for RCC works of gallery, sluice, spillway crest, spillway d / s face, energy dissipating structures, training walls, piers, abutments and such other locations with initial lead upto 1 km and all lifts. ( Cement content : 310 kg / cum with use of super plasticiser, CA : 0.90 cum, blending ratio of CA--50:30:20, FA : 0.40 cum) Labour Component (including contractor's profit) Providing and laying insitu vibrated M-25 ( 28 days cube compressive strength not less than 25 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for RCC works of gallery, sluice, spillway crest, spillway d / s face, energy dissipating structures, training walls, piers, abutments and such other locations with initial lead upto 1 km and all lifts. ( Cement content : 360 kg / cum with use of super plasticiser,CA : 0.90 cum, blending ratio of CA--50:30:20, FA : 0.40 cum) Labour Component (including contractor's profit) Providing and laying insitu vibrated M-25 ( 28 days cube compressive strength not less than 25 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for RCC works of gallery, sluice, spillway crest, spillway d / s face, energy dissipating structures, training walls, piers, abutments and such other locations with initial lead upto 1 km and all lifts. ( Cement content : 380 kg / cum with use of super plasticiser,CA : 0.90 cum, blending ratio of CA--65:35, FA : 0.40 cum) Labour Component (including contractor's profit) Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for plain concrete works with initial lead upto 1 km and all lifts. ( Cement content : 260 kg /cum with use of super plasticiser,CA : 0.90 cum, Blending Ratio of CA -- 50:30:20, FA : 0.40 cum) Labour Component (including contractor's profit) Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates with placing and sinking plums of size 150 to 80 mm upto 15 percent for gravity type structures including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete with initial lead upto 1 km and all lifts. ( Cement content : 260 kg / cum of concrete with use of plums and super plasticiser,, CA : 0.77 cum, Blending Ratio of CA : 50:30:20,FA : 0.34 cum, plums of size 150 to 80 mm : 0.25 cum) Labour Component (including contractor's profit) Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for plain concrete works with initial lead upto 1 km and all lifts. ( Cement content 220 kg /cum with use of super plasticiser,CA : 0.90 cum, Blending Ratio of CA : 50:30:20, FA : 0.40 cum ) Labour Component (including contractor's profit)

57969.50 tonne tonne 3599.60

Check Box 139

IRR-DAW-22

17

cum

3390.00

cum

133.40

Check Box 140

IRR-DAW-22A (new Item1 201011)

18

cum

3644.30

cum

133.40

Check Box 141

IRR-DAW-23

19

cum.

3210.70

cum.

133.40

Check Box 142

IRR-DAW-24

20

cum.

4508.50

cum.

265.70

Check Box 143

IRR-DAW-24A (new Item2 201011)

21

cum.

4823.00

cum.

265.70

Check Box 144

IRR-DAW-24B (new Item3 201011)

22

cum.

4929.40

cum.

265.70

Check Box 145

IRR-DAW-25

23

cum.

4004.40

cum.

959.80

Check Box 146

IRR-DAW-26

24

cum.

3896.00

cum.

936.40

Check Box 147

IRR-DAW-27

25

cum.

3673.20

cum.

869.30

Abstract of work items

Check Box 148

IRR-DAW-28

26

Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for plain concrete works with initial lead upto 1 km and all lifts. ( Cement content : 280 kg /cum with use of super plasticiser,CA : 0.80 cum, Blending Ratio of CA -- 65:35, FA : 0.44 cum) Labour Component (including contractor's profit) Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for RCC works of spillway bridge, blockouts and such other similar structures with conjested reinforcement with initial lead upto 1 km and all lifts. ( Cement content : 330 kg / cum with use of super plasticiser, CA : 0.80 cum, Blending Ratio of CA -- 65:35, FA : 0.44 cum). Labour Component (including contractor's profit) Providing and forming porous concrete body drain of size 68.5 x 68.5 cm with 23 cm diameter central hole using cement and 20 mm down approved, clean, hard, graded coarse aggregates in 1 : 3.50 proportion by volume including cost of all materials, machinery, labour, formwork, curing etc., complete with initial lead upto 1 km and all lifts.(M15 Cement content : 400kg/cum, CA : 1cum, Blending Ratio of CA -- 65:35) Labour Component (including contractor's profit) Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for RCC solid parapet consisting of 35 cm x 20 cm kerb, 35 cm x 35 cm x 1 m pillars spaced approximately at 3.35 m c / c, 12.5 cm thick wall 80 cm height with 12.5 cm thick and 35 cm wide coping slab for wall and 12 .5 cm thick 40 cm x 40 cm coping for pillars with top edges of kerb and coping chamferred / rounded as directed etc., complete ( excluding cost of providing and placing reinforcement steel and gate ) with initial lead upto 1 km and all lifts. ( Cement content 350 kg / cum with use of super plasticiser( 0.4% by wt.of cement), CA : 0.80 cum, Blending Ratio of CA--65:35, FA : 0.44 cum) Labour Component (including contractor's profit) Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete for RCC ornamental parapet consisting of 35 cm x 20 cm kerb, 35 cm x 35 cm x 1 m pillars spaced approximately at 3.5 m apart, 20 cm x 15 cm posts 80 cm height approximately 30 cm c / c with 12.5 cm thick and 35 cm wide coping slab for posts and pillars with top edges of kerb and coping chamferred or rounded as directed etc., complete ( excluding cost of providing and placing reinforcement steel and gate ) with initial lead upto 1 km and all lifts. ( Cement content : 350 kg / cum with use of super plasticiser, CA : 0.80 cum, Blending Ratio of CA--65:35, FA : 0.44 cum) Labour Component (including contractor's profit) Providing and laying insitu M- 25 ( 28 days cube compressive strength not less than 25 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting, finishing, curing, packing joints with asphalt mortar etc., complete with initial lead upto 1 km and all lifts. ( Cement content : 380 kg / cum with use of super plasticiser, CA : 0.80 cum, Blending Ratio of CA--65:35, FA : 0.45 cum) Labour Component (including contractor's profit) Pre-cooling to control placement temperature of cement concrete in the range of 18 to 21 C at the concrete placement point by inundation of coarse aggregates and adding flaked ice as part of mixing water including cost of all materials, machinery, labour etc., complete with all leads and lifts. Labour Component (including contractor's profit)

cum.

3929.40

cum.

890.00

Check Box 149

IRR-DAW-29

27

cum.

5518.80

cum.

1260.30

Check Box 150

IRR-DAW-210

28

Rm

2133.80

Rm

432.50

Check Box 151

IRR-DAW-211(a)

29

Rm

2040.50

Rm

535.90

Check Box 152

IRR-DAW-212(b)

30

Rm

2081.60

Rm

568.60

Check Box 153

IRR-DAW-213

31

cum

4576.00

cum

1078.30

Check Box 154

IRR-DAW-214

32

cum cum

72.50 10.30

Check Box 155

IRR-DAW-215

33

Conveying and fixing elastomeric bearing for spillway bridge including cleaning and preparing surface, mixing and applying adhesive, fixing bearing in correct position etc., including cost of all materials except bearings, machinery, labour etc., complete with all leads and lifts. Labour Component (including contractor's profit) Providing and constructing 150 mm dia hume pipe weep holes for concrete / masonry walls including providing 20 x 20 x 20 cm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 10 cm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour etc., complete with lead upto 1 km and all lifts. Labour Component (including contractor's profit) Providing and forming expansion joint for spillway bridge consisting of 75 x 75 x 6 mm angles 2 numbers provided with 25 cm long 12 mm dia. anchors fixed to both flanges at 15 cm c /c and 140 x 6 mm plate welded on top of one of the angle including cost of all materials, machinery, labour, providing and fixing 38 mm thick joint filler board matching the thickness of wearing coat, painting etc., complete with lead upto 1 km and all lifts. Labour Component (including contractor's profit) MASONRY & GUNITING WORKS : Providing and constructing un-coursed rubble stone masonry using approved stones in cement mortar 1 : 3 proportion including cost of all materials, machinery, labour, scaffolding, cleaning, packing mortar, wedging stone chips, curing etc., complete with initial lead upto 1 km and all lifts.( Cement content : 190 kg/cum of masonry, rubble stones : 0.85 cum,stone chips : 0.15 cum/cum, FA : 0.4 cum) Labour Component (including contractor's profit)

Each Each

268.10 219.50

Check Box 156

IRR-DAW-216

34

Rm

379.10

Rm

50.80

Check Box 157

IRR-DAW-217

35

Rm

1757.60

Rm

228.80

IRR_DAW-3

Check Box 158

IRR_DAW-31

36

cum

2444.20

cum

813.70

Check Box 159

IRR_DAW-32

37

Providing and constructing un-coursed rubble stone masonry using approved stones in cement mortar 1 : 4 proportion including cost of all materials, machinery, labour, scaffolding, cleaning, packing mortar, wedging stone chips, curing etc., complete with initial lead upto 1 km and all lifts.( Cement content : 143 kg/cum of masonry, rubble stones : 0.85 cum, stone chips : 0.15 cum/cum, cum FA : 0.4 cum) Labour Component (including contractor's profit) cum Providing and constructing coursed rubble face stone masonry using approved rubble stones in cement mortar 1 : 3 proportion including cost of all materials, machinery, labour, scaffolding, ramps, cleaning, packing mortar, wedging stone chips, curing etc., with initial lead upto 1 km and all lifts.( Thickness of the CR face assumed: 0.75 m, Cement content : 178 kg/cum of masonry, rubble stones : 0.35 cum, stone chips : 0.15 cum/cum, FA : 0.375 cum, CR stones 30 x 30 x 45 cm : 9.75 No, CR stones 30 x 30 x 60 cm : 3.25 No) Labour Component (including contractor's profit)

2189.10

813.70

Check Box 160

IRR_DAW-33

38

cum

2571.60

cum

904.70

Abstract of work items


Providing and constructing coursed rubble face stone masonry using approved rubble stones in cement mortar 1 : 4 proportion including cost of all materials, machinery, labour, scaffolding,ramps, cleaning, packing mortar, wedging stone chips, curing etc., with initial lead upto cum 1 km and all lifts. ( Cement content : 134 kg/cum of masonry, rubble stones : 0.35 cum, stone chips : 0.15 cum/cum, FA : 0.375 cum, CR stones 30 x 30 x 45 cm : 9.75 No, CR stones 30 x 30 x 60 cm : 3.25 No) Labour Component (including contractor's profit) cum Providing and constructing chisel drafted and hammer dressed face stone masonry with approved stones in cement mortar 1 : 3 proportion including cost of all materials, machinery, labour, scaffolding, ramps, cleaning, packing mortar, wedging stone chips, curing etc.,complete with initial cum lead upto 1 km and all lifts.( Cement content : 167 kg/cum of masonry, rubble stones : 0.35 cum, stone chips : 0.15 cum/cum, FA : 0.35 cum, Dressed stones 30 x 30 x 45 cm : 10 No, Dressed stones 30 x 30 x 60 cm : 3.40 No) Labour Component (including contractor's profit) cum Providing and constructing chisel drafted and hammer dressed face stone masonry with approved stones in cement mortar 1 : 4 proportion including cost of all materials, machinery, labour, scaffolding, ramps, cleaning, packing mortar, wedging stone chips, curing etc.,complete with initial lead upto 1 km and all lifts.( Cement content : 125 kg/cum of masonry, rubble stones : 0.35 cum, stone chips : 0.15 cum/cum, FA : 0.35 cum, Dressed stones 30 x 30 x 45 cm : 10 No, Dressed stones 30 x 30 x 60 cm : 3.40 No) Labour Component (including contractor's profit) Providing cement mortar pointing to coursed rubble face stone masonry 50 mm deep in CM 1 : 2 proportion by volume including raking and cleaning joints, pressing mortar into joints, cost of all materials, labour, scaffolding, finishing, curing etc., complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit) Providing cement mortar pointing to coursed rubble face stone masonry 50 mm deep in CM 1 : 3 proportion by volume including raking and cleaning joints, pressing mortar into joints, cost of all materials, labour, scaffolding, finishing, curing etc., complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit) CONTRACTION JOINT WORKS: Providing 25 mm thick guniting to rock or masonry surface in cement mortar 1 : 3 proportion by weight including cost of all materials, machinery, labour, raking-out and cleaning joints, scaffolding wherever required and all other ancillary operations etc., complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit) Providing and constructing contraction joints by fixing 16 SWG 60 cm wide annealed copper sheets in two lines with 8 mm dia steel dowel rods on either side at one metre interval, forming 125 x 125 mm size groove in between copper strips for filling asphalt including fixing 15 mm dia two legged G.I pipe with U - bend at bottom for circulation of steam at intervals and forming 150 mm dia formed drain behind water seals including cost of all materials, machinery, labour, filling asphalt, circulation of steam through pipes etc., complete with all leads and lifts. Labour Component (including contractor's profit) Providing and constructing contraction joints by fixing 310 mm wide central bulb type approved quality PVC water stop in two lines with 8 mm diameter steel dowel rods on either side at 1m interval, forming 125 x 125 mm size groove in between two water stops, providing & fixing 15 mm dia two legged G.I pipe with U-bend at bottom for circulation steam at interval, forming 150 mm diameter formed drain behind water seals including filling groove with asphalt, circulation of steam at intervals, cost of all materials, machinery, labour etc., complete with all leads and lifts. Labour Component (including contractor's profit)
Check Box 169

Check Box 161

IRR_DAW-34

39

2332.80

904.70

Check Box 162

IRR_DAW-35

40

2707.00

1105.80

Check Box 163

IRR-DAW-36

41

cum

2479.00

cum

1105.80

Check Box 164

IRR-DAW-37

42

sqm sqm

93.20 64.40

Check Box 165

IRR-DAW-38

43

sqm sqm

86.00 64.40

IRR_DAW-4

Check Box 166

IRR-DAW-41

44

sqm sqm

426.70 127.60

Check Box 167

IRR-DAW-42

45

Rm

13637.70

Rm

130.90

Check Box 168

IRR-DAW-43

46

Rm

2185.90

Rm

86.00

IRR-DAW-44

47

Providing and constructing contraction joints by fixing 16 SWG 60 cm wide annealed copper sheets in single line with 8 mm dia steel dowel rods on either side at 1 metre interval including cost of all materials, machinery, labour etc., complete with all leads and lifts. Labour Component (including contractor's profit) Providing and constructing contraction joints by fixing 23 cm wide central bulb type PVC water stop in single line supported by 10 mm dia steel dowel rods on either side at 1 metre interval including cost of all materials, machinery, labour, valcunising joints etc., complete with all leads and lifts. Labour Component (including contractor's profit)

Rm Rm

6355.90 99.90

Check Box 170

IRR-DAW-45

48

Rm Rm

191.20 79.20

IRR-DAW-5

EARTH / ROCKFILL EMBANKMENT WORKS : Providing hearting embankment using selected impervious soil from approved borrow areas in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transportation, spreading soil in layer of specified thickness, breaking clods, sectioning, watering, compacting to density control of not less than 95 percent or as stipulated using sheep / pad foot roller etc., complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit) Providing cut-off trench filling using selected impervious soil from approved borrow areas in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transportation, spreading soil to specified thickness, breaking clods, sectioning, watering, compacting to density control of not less than 95 percent using sheep foot / pad foot roller as stipulated etc., complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit) Providing casing embankment using semi-pervious soil from approved borrow areas in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all other operations such as excavation, sorting out, transportation, spreading soil in layers of specified thickness, breaking clods, sectioning, watering, compacting to density control of not less than 95 percent using sheep foot / pad foot roller as stipulated etc., complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit) Providing casing embankment using semi-pervious soil available from excavation in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all other operations such as re-excavation, sorting out, transportation, spreading in layers of specified thickness, breaking clods, sectioning, watering, compacting to specified density control of not less than 95 percent using sheep foot / pad foot roller as stipulated etc., complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit) Providing casing embankment using semi-pervious soil available from excavation in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all other operations such as re-excavation, sorting out, transportation, spreading in layers of specified thickness, breaking clods, sectioning, watering, compacting to specified density control of not less than 90 percent using 2Tonne Roller as stipulated etc., complete with initial lead upto 1 km and all lifts. (For Maintenance Works)

Check Box 171

IRR-DAW-51

49

cum

150.00

cum

15.50

Check Box 172

IRR-DAW-52

50

cum

159.00

cum

16.90

Check Box 173

IRR-DAW-53

51

cum

159.70

cum

16.80

Check Box 174

IRR-DAW-54

52

cum

138.00

cum

14.30

Check Box 175

IRR-DAW-54-A (New Item1 -201112)

53

cum

102.80

Abstract of work items

Labour Component (including contractor's profit) Providing homogeneous embankment using soil from approved borrow area in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transportation, spreading soil in layer of specified thickness, breaking clods, sectioning, watering, compacting to density control of not less than 95 percent or as stipulated using sheep / pad foot roller etc., complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit) Providing embankment adjacent to masonry / concrete structures and filling trial pits using impervious soil from approved borrow areas in layers of 10 to 15 cm and compacting each layer to density control of not less than 95 percent using pneumatic tampers or by vibratory earth rammers including cost of all materials, machinery, labour, picking previous layer, spreading soil in layer, breaking clods, watering etc., complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit) Providing and constructing rockfill embankment with 300 mm down graded stones and quarry spalls from approved source including cost of all materials, machinery, labour, spreading stones and spalls in layers, hand packing, wedging, finishing the surface to required slopes etc., complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit) Providing and constructing dry rubble rock-toe using rubble and stone chips from approved source including cost of all materials, machinery, labour, hand packing rubble and stone chips, finishing top and sides to required slopes etc., complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit) Providing and constructing dry rubble rock-toe with rubble and stone chips from dump yard including cost of all materials, machinery, labour, hand packing rubble and stone chips, finishing top and sides to required slopes etc., complete with initial lead upto 1 km and all lifts. Note: Useful rubble and stone chips will be issued at dump yard at the issue rate for usefull rubble /stone chips. Sorting out and breaking charges included in rate analysis. Labour Component (including contractor's profit)
Check Box 181

cum

14.30

Check Box 176

IRR-DAW-55

54

cum

152.10

cum

15.80

Check Box 177

IRR-DAW-56

55

cum

252.80

cum

87.30

Check Box 178

IRR-DAW-57

56

cum cum

436.80 79.30

Check Box 179

IRR-DAW-58

57

cum cum

483.10 150.70

Check Box 180

IRR-DAW-59

58

cum

444.00

cum

104.90

IRR-DAW-510

59

Providing and laying 30 cm diameter open jointed hume pipes with collars in rock-toe for drainage including cost of all materials, machinery, labour etc., complete with lead upto 1 km and all lifts. Labour Component (including contractor's profit) FILTER & PITCHING WORKS : Providing and constructing 1.20 m internal diameter and average 3 m height RCC manhole with 60 cm dia. top cover in M-15 grade cement concrete using 20 mm down graded, clean, hard coarse aggregate, 20 cm thick for bed / sides / top slab / 1.5 m long cut-off wall and 7.5 cm thick for cover including providing 12 mm dia reinforcement bars at 30 cm c / c bothways for bed / sides / cut-off wall / top slab / rungs and 8 mm dia bars at 15 cm c / c bothways for cover, excavation for foundation, providing 30 cm dia hume pipe outlet, cost of all materials, machinery, labour, formwork, scaffolding, batching, mixing, laying, vibrating, finishing, curing etc., complete with lead upto 1 km and all lifts.( Cement content : 300 kg/cum , CA : 0.80 cum, Blending Ratioof CA -- 65:35,FA : 0.44 cum, superplasticizer (0.4% by wt. of cement) Labour Component (including contractor's profit) Providing and constructing longitudinal and cross graded filter drains using sand and 80-20 mm and 20 mm down graded aggregates satisfying specified filter creteria in layers as per specifications including cost of all materials, machinery, labour, laying to required slopes, compaction etc. complete with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit) Providing and constructing 1.40 m thick vertical or inclined graded filter media consisting of 20 cm thick sand layers, 25 cm thick 20 mm down coarse aggregate layers and 50 cm thick 80-20 mm coarse aggregate layer using approved materials satisfying specified filter creteria as per specifications including cost of all materials, machinery, labour, laying to required slope, compaction etc., complete with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit) Providing and constructing graded filter media below and behind rock-toe consisting of 20 cm thick sand, 25 cm thick 20 - 4.75 mm and 40 cm thick 80 - 20 mm size graded coarse aggregates satisfying filter creteria as per specifications including cost of all materials, labour, machinery, laying to required slope, compaction etc., complete with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit) Providing and constructing graded filter media below and behind rock-toe consisting of 30 cm thick, 80 - 20 mm size graded coarse aggregates satisfying filter creteria as per specifications including cost of all materials, labour, machinery, laying to required slope, compaction etc., complete with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit) Providing and laying filter media consisting of 2 layers of 250 gsm poly-propeline non-woven filter fabric and 400 mm thick 20 mm down graded coarse aggregate for vertical / inclined and horizontal filter blanket for embankment including cost of all materials, machinery, labour etc., complete with lead upto 50 m for aggregate and all leads for fabric and all lifts. Labour Component (including contractor's profit) Providing and constructing 45 cm thick chimney filter using clean approved sand satisfying filter creteria including cost of all materials, machinery, labour, compacting etc., complete with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit) Providing and constructing 90 cm thick transition cum filter media behind rockfill using approved sand and 80-20 mm and 20 mm down graded aggregates satisfying the filter creteria in layers of 30 cm thickness each as per specifications including cost of all materials, machinery, labour, laying each layer to required slope, compaction etc., complete with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit) Providing and constructing 60 cm thick hand packed rough stone revetment with 65 to 75 cm long through stones at 1.50 m c / c over a backing of 45 cm thick graded filter media consisting of sand, 10 mm and 40 mm size approved graded aggregates laid in layers of 15 cm thick each including cost of all materials, machinery, labour, laying to required slopes, wedging with chips, finishing etc. complete with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit)

Rm Rm

671.10 23.60

IRR-DAW-6

Check Box 182

IRR-DAW-61

60

Each

40789.40

Each

7909.80

Check Box 183

IRR-DAW-62

61

cum cum

831.40 111.70

Check Box 184

IRR-DAW-63

62

cum

916.20

cum

111.70

Check Box 185

IRR-DAW-64

63

cum

876.60

cum

100.30

Check Box 186

IRR-DAW-64-A (New Item2 201112)

64

cum cum

1020.50 37.60

Check Box 187

IRR-DAW-65

65

sqm sqm

847.20 43.30

Check Box 188

IRR-DAW-66

66

cum cum

537.80 88.90

Check Box 189

IRR-DAW-67

67

cum

896.70

cum

117.40

Check Box 190

IRR-DAW-68

68

sqm

766.00

sqm

130.00

Abstract of work items


Providing and constructing 60 cm thick hand packed rough stone revetment with 65 to 75 cm long through stones at 1.50 m c / c over a backing of 60 cm thick graded filter media consisting of sand, 10 mm and 40 mm size approved graded aggregates laid in layers of 20 cm thick each including cost of all materials, machinery, labour, laying to required slopes, wedging with chips, finishing etc. complete with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit) Providing and constructing 60 cm thick hand packed rough stone riprap over a backing of 45 cm thick graded filter media consisting of sand, 10 mm and 40 mm size graded approved aggregates laid in layers of 15 cm thick each including cost of all materials, machinery, labour, laying to required slopes, wedging with stone chips etc., complete with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit) Providing and constructing 75 cm thick hand packed rough stone riprap over a backing of 45 cm thick graded filter media consisting of sand, 10 mm and 40 mm size graded approved aggregates laid in layers of 15 cm thick each including cost of all materials, machinery, labour, laying to required slopes, wedging with stone chips, etc., complete with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit) Providing and constructing 90 cm thick hand packed rough stone riprap over a backing of 45 cm thick graded filter media consisting of sand, 10 mm and 40 mm size graded approved aggregates laid in layers of 15 cm thick each including cost of all materials, machinery, labour, laying to required slopes, wedging with stone chips etc., complete with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit) Providing and laying Hariyala or other approved quality turfing sods for the slopes of earthen embankments over 20 mm thick sand backing including cost of all materials, machinery, labour including preparing surface, spreading sand, watering for 15 days etc., complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit)

Check Box 191

IRR-DAW-69

69

sqm

910.20

sqm

147.10

Check Box 192

IRR-DAW-610

70

sqm

715.90

sqm

99.50

Check Box 193

IRR-DAW-611

71

sqm

782.60

sqm

108.40

Check Box 194

IRR-DAW-612

72

sqm

860.30

sqm

126.30

Check Box 195

IRR-DAW-613

73

sqm sqm

85.30 50.30

Chapter II IRR-TAW IRR-TAW-1


Check Box 196

TUNNEL AND ALLIED WORKS EXCAVATION : Excavation for adit by tunnelling methods in all types of rock including cost of all materials, machinery, labour, scaling excavated surface, ventilation, lighting, drainage, removing and hauling the excavated muck outside adit upto specified dump area and all other ancillary operations etc., complete with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit) Excavation for vertical / inclined shaft in all types of soft / hard rock including cost of all materials, machinery, labour, shoring, strutting, scaling excavated surface, ventilation, lighting, drainage, removing and hauling excavated muck outside shaft upto specified dump area and all other ancillary operations etc., complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit) Excavation for tunnel by tunnelling methods in rock not requiring supports including cost of all materials,machinery, labour, scaling excavated surface, removing under-cuts, ventilation, lighting, drainage, removing and hauling the excavated muck outside tunnel upto specified dump area and all other ancillary operations etc., complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit) Excavation for tunnel by tunnelling methods including excavation for supports in all types of soil / rock strata requiring supports ( excluding cost of providing supports ) including cost of all other materials, machinery, labour, scaling excavated surface, ventilation, lighting, drainage, removing and hauling the excavated muck outside tunnel upto specified dump area and all other ancillary operations etc., complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit) Excavation for tunnel by heading and benching tunnelling methods including excavation for supports in all types of soil / rock strata requiring supports ( excluding cost of providing supports ) for roof before benching including cost of all other materials, machinery, labour, scaling excavated surface, ventilation, lighting, drainage removing and hauling excavated muck outside tunnel upto specified dump area and all other ancillary operations etc., complete with initial lead upto 1 km and all lifts. NOTE: Where mucking is to be carried out through shaft using winch and mucking tub system increase the basic rates for items 3, 4 & 5 by 8 percent. Labour Component (including contractor's profit) Removing and hauling muck overfallen due to natural causes such as geological faults etc., out of tunnel including breaking large fragments by blasting if necessary and disposing off the same in specified dump area or as directed including cost of all materials, machinery, labour, ventilation, drainage, lighting and all other ancillary operations etc., complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit) DEWATERING & GUNITING WORKS : Dewatering tunnel by pumping out water collected by natural drainage inside tunnel including providing sump wherever necessary, cost of all materials, machinery, labour, drainage, lighting, ventilation and all other ancillary operations etc., complete. Labour Component (including contractor's profit) Providing 25 mm thick guniting to sides and arch of tunnel in cement mortar 1 : 3 proportion by weight including cost of all materials, machinery, labour, ventilation, lighting, drainage and all other ancillary operations etc., complete with lead upto 1 km and all lifts. Labour Component (including contractor's profit) Shortcreting in two layers (each layer+38 mm thickness) for slabs duly fixing chain weld wire mesh 100 x 100x5 mm in between the two layers including cost and conveyance of all materials, labour charges, all heads, lifts, seigniorage, centering, scaffolding, machine mixing, laying concrete with shortcrete machine etc. complete as per specification and as directed by Engineer-in-Charge Labour Component (including contractor's profit)

IRR-TAW-11

74

cum cum

1540.70 453.90

Check Box 197

IRR-TAW-12

75

cum cum

1960.20 913.70

Check Box 198

IRR-TAW-13

76

cum

1571.90

cum

448.00

Check Box 199

IRR-TAW-14

77

cum

1619.50

cum

462.50

Check Box 200

IRR-TAW-15

78

cum

1656.10

cum

496.50

Check Box 201

IRR-TAW-16

79

cum

328.60

cum

69.70

IRR-TAW-2 IRR-TAW-21

Check Box 202

80

Kwhr Kwhr

20.40 6.50

Check Box 203

IRR-TAW-22

81

sqm sqm

530.10 144.30

Check Box 204

IRR-TAW-23 (new Item4 2010-11)

82

sqm

1235.70

sqm

144.30

IRR-TAW-3

TEMPORARY & PERMANENT SUPPORTS : Providing and fixing 25 mm diameter steel rock bolts with mechanical / wedge type anchorage including drilling 35 mm dia holes, providing 15 cm long 20 mm thick steel tapered wedge, 10 mm thick plate washers and nuts, tightening bolt by torque wrench, cost of all materials, machinery, labour, ventilation, lighting, drainage and all other ancillary operations etc., complete with lead upto 1 km and all lifts. Labour Component (including contractor's profit)

Check Box 205

IRR-TAW-31

83

Rm

1010.30

Rm

242.30

Abstract of work items


Providing and fixing 25 mm diameter steel rock bolts with resin bond cement capsule anchorage including drilling 35 mm dia holes, inserting grout capsule, driving bolt,fixing 10 mm thick plate washers and nuts and tightening the same by torque wrench after hardening of cement grout, cost of all materials, machinery, labour, ventilation, lighting, drainage and other ancillary operations etc., complete with lead upto 1 km and all lifts. Labour Component (including contractor's profit) Providing, fabricating and fixing in position permanent structural steel supports as per details including cost of all materials, machinery, labour, cutting, bending, welding, grinding, lighting, ventilation, drainage and all other ancillary operations etc., complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit) Providing, fabricating and fixing in position temperary structural steel supports as per details and dismantling the same before concreting including cost of all materials, machinery, labour, cutting, bending, welding, grinding, ventilation, lighting, drainage and all other ancillary operations etc.,complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit) Providing and fixing hard variety cut jungle wood for lagging / blocking locations in tunnel wherever required including cost of all materials, machinery, labour, fixing in position, lighting, ventilation, drainage etc complete with all leads and lifts. Labour Component (including contractor's profit) MASONRY WORKS : Providing and constructing un-coursed rubble stone masonry with approved stones from tunnel excavated muck in cement mortar 1 : 6 proportion for backfilling over cuts / slips on tunnel sides due to geological faults etc., including cost of all materials, machinery, labour, cleaning,scaffolding, packing mortar, wedging stone chips, curing, ventilation, lighting, drainage complete with lead upto 1 km and all lifts.(cement content : 95 kg/cum of masonry, Rubble stones : 0.83 cum, Stone chips : 0.13 cum,FA : 0.40 cum) Labour Component (including contractor's profit) REINFORCEMENT & CONCRETE WORKS : Providing, fabricating and placing in position reinforcement steel for tunnel RCC works including cleaning, straightening, cutting, bending, hooking, lapping / welding joints wherever required, tying with 1.25 mm dia.soft annealed steel wire, including cost of all materials, labour, machinery, ventilation, lighting, drainage etc.,complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit) Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates crushed from tunnel excavated muck for filling and levelling over-cuts in bed due to geological faults etc., including cost of all materials, machinery, labour, cleaning bed, batching, mixing, conveying and laying, levelling, compacting, finishing, curing, lighting, ventilation, drainage etc., complete with initial lead upto 1 km and all lifts. ( Cement content : 220 kg / cum, CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum, Superplasticizer 0.4% by wt. of cement) Labour Component (including contractor's profit) Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sqmm ) grade cement concrete using 40 mm and down size approved clean, hard, graded aggregates crushed from tunnel muck for kerb and bed lining including cost of all materials, machinery, labour, formwork, batching, mixing, conveying upto placing point in agitator cars, placing in position, levelling, vibrating, finishing, curing, ventilation, lighting, drainage and all other ancillary operations etc., complete with lead upto 1 km and all lifts. ( Cement content 330 kg / cum for use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) Labour Component (including contractor's profit) Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sqmm ) grade cement concrete using 40 mm and down size approved clean, hard, graded aggregates crushed from tunnel muck for sides and arch lining including cost of all materials, machinery, labour, formwork, batching, mixing, conveying upto placing point in agitator cars, placing in position, levelling, vibrating, finishing, curing, ventilation, lighting, drainage and all other ancillary operations etc., complete with lead upto 1 km and all lifts. ( Cement content 330 kg / cum for use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) Labour Component (including contractor's profit) DRILLING & GROUTING WORKS : Drilling 32 mm diameter grout holes in concrete / rock by percussion drilling using jack hammer or stooper drills as directed to specified depth for consolidation / contact grouting including cost of all materials, machinery, labour, cleaning holes, ventilation, lighting, drainage and all other ancillary operations etc., complete. Labour Component (including contractor's profit) Grouting cement slurry in grout holes under specified pressure for consolidation / contact grouting including cost of all materials, machinery, labour, redrilling wherever necessary, ventilation,lighting, drainage and other ancillary operations etc., complete with lead upto 1 km and all lifts. Labour Component (including contractor's profit) Drilling 75 mm diameter drainage holes vertical or inclined in rock / concrete in tunnel by percussion drilling using waggon drill or other suitable drilling equipment including cost of all materials, machinery, labour, ventilation, lighting, drainage etc., complete. Labour Component (including contractor's profit)

Check Box 206

IRR-TAW-32

84

Rm

969.70

Rm

223.40

Check Box 207

IRR-TAW-33

85

tonne tonne

86772.70 13020.40

Check Box 208

IRR-TAW-34

86

tonne tonne

20136.60 6489.20

Check Box 209

IRR-TAW-35

87

cum cum

28426.60 1179.40

IRR-TAW-4

Check Box 210

IRR-TAW-41

88

cum

1886.70

cum

622.00

IRR-TAW-5

Check Box 211

IRR-TAW-51

89

tonne

68441.20

tonne

7660.80

Check Box 212

IRR-TAW-52

90

cum

4707.50

cum

614.70

Check Box 213

IRR-TAW-53

91

cum

5774.00

cum

766.30

Check Box 214

IRR-TAW-54

92

cum

5938.30

cum

593.10

IRR-TAW-6

Check Box 215

IRR-TAW-61

93

Rm Rm

347.20 116.50

Check Box 216

IRR-TAW-62

94

tonne tonne

9383.10 1797.60

Check Box 217

IRR-TAW-63

95

Rm Rm

339.70 48.00

Chapter III IRR-CAW IRR-CAW-1


Check Box 218

CANAL AND ALLIED WORKS EXCAVATION WORKS : Excavation in all kinds of soil including boulders upto 0.3 m diameter for canal, seating of embankment, filter drains / catch water drains etc., including dressing bed and sides to required level and profile, cost of all materials, machinery, labour, placing the excavated soil neatly in dump area or for the formation of service road / embankment as directed etc., complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit) Excavation in all kinds of soil including boulders upto 0.30 m dia for field channels, seating of embankment for field channels etc., including dressing of bed and sides to required profile, cost of all materials, machinery, labour, placing the excavated stuff for formation of service road / embankment as directed etc., complete with lead upto 10 m and lift upto 3 m. (Machinery excavation and manual conveyance) Labour Component (including contractor's profit)

IRR-CAW-11

96

cum

83.70

cum

18.60

Check Box 219

IRR-CAW-12

97

cum

44.40

cum

15.30

Abstract of work items


Excavation in ordinary rock (including HDR) without blasting including boulders above 0.30 m upto 0.6 m dia. for canals, seating of embankment, filter drain / catch water drains etc., including dressing of bed and sides to required level and profile, cost of all materials, machinery, labour, placing the excavated soft rock neatly in dump area or for formation of service road as directed etc., complete with lead upto 1 km and all lifts. Labour Component (including contractor's profit) Excavation in ordinary rock (including HDR) without blasting including boulders above 0.3 m upto 0.60 m dia. for field channels, seating of embankment for field channels etc., including dressing of bed and sides to required profile, cost of all materials, machinery, labour, placing the excavated stuff for formation of service road as directed etc.,complete with lead upto 10 m and lift upto 3 m. (Machinery excavation and manual conveyance) Labour Component (including contractor's profit) Excavation in hard rock (including F&F rock) requiring blasting including boulders above 0.6 m upto 1.2 m dia. for canals, seating of embankment, filter drain / catch water drains etc., including dressing bed and sides to required level and profile, cost of all materials, machinery, labour, placing the excavated rock in dump area or for formation of service road as directed etc., complete with lead upto 1 km and all lifts. Labour Component (including contractor's profit) Excavation in hard rock of all toughness by blasting including boulders above 1.2 m dia. for canals, seating of embankment, filter drain / catch water drains etc., including levelling the bed by removing all projections by hammering / chiselling, cost of all materials, machinery, labour, placing the excavated rock neatly in approved dump area and levelling the same as directed etc., complete with initial lead upto 1 km and all lifts. i ) The rate under this item shall be adopted for canals designed for carrying capacity of less than 15 cumecs or where the average depth excavation in hard rock is less than 3 m. ii ) The rate includes levelling canal bed by hammering / chiselling all rock projections wherever required. Labour Component (including contractor's profit) Excavation in hard rock of all toughness including boulders above 1.2 m dia. by approved controlled blasting methods for canals, cut-off trench of embankment, filter / catch-water drains etc., including controlling fly-rock by muffling arrangements such as placing 50 x 50 mm opening chain link mesh or waste tyres and sand bags, monitoring ground vibrations at specified locations, costof all materials, machinery, labour, placing excavated rock neatly in approved dump area or other place as directed etc., complete with lead upto 1 km and all lifts. i) The rate under this item shall be adopted for canals designed for carrying capacity of less than 15 cumecs or where the average depth excavation in hard rock is less than 3 m. ii ) The rate under this item shall be adopted where the control of fly-rock and ground vibrations is required. Labour Component (including contractor's profit) Excavation in hard rock of all toughness including boulders above 1.2 m dia. for dressing canal sides neatly on either side to required profile by line drilling and smooth blasting including removing under-cuts by chiselling / hammering, placing the excavated rock neatly in dump area or other place as directed, cost of all materials, machinery, labour etc., complete with lead upto 1 km and all lifts. i) For excavation of canal below free board level combination of normal controlled blasting and line drilling and smooth blasting shall be adopted to obtain neat side slopes. For the purpose of payment 1 m width of excavation on either side shall be treated as excavation by line drilling and smooth blasting and remaining portion shall be treated as excavation by normal / controlled blasting as the case may be. ii ) The rate under this item shall be adopted for canals designed for carrying capacity of less than 15 cumecs or where the average depth of excavation in hard rock is less than 3 m. iii ) The rate includes controlling fly-rock wherever required. iv ) The rate under this item shall be paid only on ascertaining that the excavated face has come off neatly as per specifications or atleast 50 percent of smooth blast holes are visible for inspection and are spaced at specified interval. v ) In case, where the above criteria is not fulfilled payment shall be restricted to the rate provided for excavation by normal blasting or controlled blasting as the case may be. Labour Component (including contractor's profit) Excavation in hard rock by blasting including boulders above 1.2 m dia. for canals, seating embankment etc., including levelling bed by removing all projections by hammering / chiselling, cost of all materials, machinery, labour, placing the excavated rock neatly in approved dump area and levelling the same as directed etc.,complete with initial lead upto 1 km and all lifts. 104 i ) The rate under this item shall be adopted for canals designed for carrying capacity of more than 15 cumecs or where the average depth of excavation in hard rock is more than 3 m. ii ) The rate includes levelling canal bed by hammering /chiselling all rock projections wherever required. Labour Component (including contractor's profit) Excavation in hard rock of all toughness including boulders above 1.2 m dia. by approved controlled blasting methods for canals, cut-off trench of embankment etc., including controlling fly-rock by muffling arrangements such as placing 50 x 50 mm opening chain link mesh or waste tyres and sand bags, monitoring ground vibrations at specified locations, cost of all materials, machinery, labour, placing excavated rock neatly in approved dump area or other place as directed etc., complete with lead upto 1 km and all lifts. i ) The rate under this item shall be adopted for canals designed for carrying capacity of more than 15 cumecs or where the average depth of excavation in hard rock is more than 3 m. ii ) The rate under this item shall be adopted where the control of fly-rock and ground vibrations is required. Labour Component (including contractor's profit) Excavation in hard rock of all toughness including boulders above 1.2 m dia. for dressing canal sides neatly on either side to required profile by line drilling and smooth blasting including removing under-cuts by chiselling / hammering, placing the excavated rock neatly in dump area or other place as directed, cost of all materials, machinery, labour etc., complete with lead upto 1 km and all lifts. i ) For excavation of canal below free board level combination of normal controlled blasting and line drilling and smooth blasting shall be adopted to obtain neat side slopes. For the purpose of payment 1 m width of excavation on either side shall be treated as excavation by line drilling and smooth blasting and remaining portion shall be treated as excavation by normal / controlled blasting as the case may be. ii ) The rate under this item shall be adopted for canals designed for carrying capacity of more than 15 cumecs or where the average depth of excavation in hard rock is more than 3 m. iii ) The rate includes controlling fly-rock wherever required. iv ) The rate under this item shall be paid only on ascertaining that the excavated face has come off neatly as per specifications or atleast 50 percent of smooth blast holes are visible for inspection and are spaced at specified interval. v ) In case, where the above criteria is not fulfilled payment shall be restricted to the rate provided for excavation by normal blasting or controlled blasting as the case may be. Labour Component (including contractor's profit) cum 269.90 cum 25.00

Check Box 220

IRR-CAW-13

98

cum

113.00

cum

27.60

Check Box 221

IRR-CAW-14

99

cum

73.40

Check Box 222

IRR-CAW-15

100

cum

170.80

cum

50.00

Check Box 223

IRR-CAW-16 (a)

101

cum

419.70

cum

106.70

Check Box 224

IRR-CAW-17 (b)

102

cum

528.40

cum

105.60

Check Box 225

IRR-CAW-18( c)

103

cum

903.80

cum

281.20

Check Box 226

IRR-CAW-19(a)

cum

33.40

Check Box 227

IRR-CAW-110(b)

105

cum

406.10

cum

38.30

Check Box 228

IRR-CAW-111(c)

106

cum

679.00

cum

86.40

Abstract of work items

IRR-CAW-2

EMBANKMENT WORKS USING BORROW AREA SOIL : Providing impervious hearting embankment with selected soil from approved borrow areas in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 98 percent or as stipulated by sheep / pad foot roller etc., complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit) Providing impervious hearting embankment with selected soil from approved borrow areas in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 95 percent or as stipulated by sheep / pad foot roller etc., complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit) Providing semi-pervious / pervious casing embankment using soil from approved borrow area in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sortingout, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting to density control of not less than 98 percent or as stipulated by sheep's / pad foot roller etc., complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit) Providing semi-pervious / pervious casing embankment using soil from approved borrow area in layers of 25cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sortingout, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting to density control of not less than 95 percent or as stipulated by sheep's / pad foot roller etc., complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit) Providing semi-pervious / pervious casing embankment using soil from approved borrow area in layers of 25cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sortingout, transporting, spreading in layer of specified thickness, breaking clods, sectioning, compacting each layer without watering to density control of not less than 95 percent or as stipulated by sheep's foot / pad foot roller etc., complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit) Providing hearting / casing embankment with homogeneous soil from approved borrow areas in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 98 percent or as stipulated by sheep / pad foot roller etc., complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit) Providing hearting / casing embankment with homogeneous soil from approved borrow areas in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 95 percent or as stipulated by sheep / pad foot roller etc., complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit) Providing casing embankment using homogeneous soil from approved borrow area in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sortingout, transporting, spreading in layer of specified thickness, breaking clods, sectioning, compacting each layer without watering to density control of not less than 95 percent or as stipulated by sheep's foot / pad foot roller etc., complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit)

Check Box 229

IRR-CAW-21

107

cum

202.50

cum

25.10

Check Box 230

IRR-CAW-22

108

cum

196.40

cum

24.60

Check Box 231

IRR-CAW-23

109

cum

202.20

cum

25.10

Check Box 232

IRR-CAW-24

110

cum

198.10

cum

26.30

Check Box 233

IRR-CAW-25

111

cum

186.80

cum

22.80

Check Box 234

IRR-CAW-26

112

cum

178.40

cum

20.60

Check Box 235

IRR-CAW-27

113

cum

173.10

cum

20.20

Check Box 236

IRR-CAW-28

114

cum

164.40

cum

18.70

IRR-CAW-3

EMBANKMENT WORKS USING DUMP AREA SOIL : Providing impervious hearting embankment with soil from approved dump areas in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as reexcavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting each layer to achieve density control of not less than 98 percent or as stipulated by sheep's / pad foot roller etc.,complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit) Providing impervious hearting embankment with soil from approved dump areas in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as reexcavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting each layer to achieve density control of not less than 95 percent or as stipulated by sheep's / pad foot roller etc.,complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit) Providing semi-pervious / pervious casing embankment using soil from approved dump area in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as re-excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 98 percent or as stipulated by sheep's foot / pad foot roller etc., complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit) Providing semi-pervious / pervious casing embankment using soil from approved dump area in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as re-excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 95 percent or as stipulated by sheep's foot / pad foot roller etc., complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit) Providing semi-pervious / pervious casing embankment using soil from approved dump area in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as re-excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, compacting each layer without watering to density control of not less than 95 percent or as stipulated by sheep's foot / pad foot roller etc., complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit) EMBANKMENT WORKS USING EXCAVATED SOIL :

Check Box 237

IRR-CAW-31

115

cum

159.30

cum

19.20

Check Box 238

IRR-CAW-32

116

cum

154.50

cum

18.90

Check Box 239

IRR-CAW-33

117

cum

155.50

cum

18.60

Check Box 240

IRR-CAW-34

118

cum

150.60

cum

18.20

Check Box 241

IRR-CAW-35

119

cum

143.00

cum

16.80

IRR-CAW-4

Abstract of work items


Providing impervious hearting embankment with soil collected in embankment area in heaps as part of disposal of excavated soil from canal including cost of all materials,machinery, labour, all operations such as sortingout, spreading in layer of 25 cm before compaction, breaking clods,sectioning, watering and compacting each layer to density control of not less than 98 percent or as stipulated by sheep's foot / pad foot roller etc., complete with lead upto 1 km for water. Labour Component (including contractor's profit) Providing impervious hearting embankment with soil collected in embankment area in heaps as part of disposal of excavated soil from canal including cost of all materials,machinery, labour, all operations such as sortingout, spreading in layer of 25 cm before compaction, breaking clods,sectioning, watering and compacting each layer to density control of not less than 95 percent or as stipulated by sheep's foot/ pad foot roller etc., complete with lead upto 1 km for water. Labour Component (including contractor's profit) Providing semi-pervious / pervious casing hearting embankment using soil collected in heaps in embankment area as part of disposal of excavated soil from canal including cost of all materials, machinery, labour, all operations such as sorting-out, spreading in layers of 25 cm before compaction, breaking clods, sectioning, watering and compacting each layer to density control of not less than 98 percent or as stipulated by sheep's foot / pad foot roller etc., complete with lead upto 1 km for water. Labour Component (including contractor's profit) Providing semi-pervious / pervious casing embankment using soil collected in heaps in embankment area as part of disposal of excavated soil from canal including cost of all materials, machinery, labour, all operations such as sorting-out, spreading in layers of 25 cm before compaction, breaking clods, sectioning, watering and compacting each layer to density control of not less than 95 percent or as stipulated by sheep's foot / pad foot roller etc., complete with lead upto 1 km for water. Labour Component (including contractor's profit) Providing semi-pervious / pervious casing embankment using soil collected in heaps in embankment area as part of disposal of excavated soil from canal including cost of all materials, machinery, labour, all operations such as sorting-out, spreading in layers of 25 cm before compaction, breaking clods, sectioning and compacting each layer without watering to density control of not less than 95 percent or as stipulated by sheep's foot / pad foot roller etc., complete. Labour Component (including contractor's profit) Providing compacted embankment for field irrigation channels with gravely soil from approved borrow area including sorting out, spreading in layers of 15 cm thickness, breaking clods, watering, compacting, dressing sides to required slopes etc.,complete with lead upto 50 m and all lifts. ( manual work with water pump) Labour Component (including contractor's profit) IRR-CAW-5
Check Box 248

Check Box 242

IRR-CAW-41

120

cum

85.30

cum

7.80

Check Box 243

IRR-CAW-42

121

cum

80.50

cum

7.90

Check Box 244

IRR-CAW-43

122

cum

85.30

cum

7.80

Check Box 245

IRR-CAW-44

123

cum

80.50

cum

7.90

Check Box 246

IRR-CAW-45

124

cum

71.60

cum

5.80

Check Box 247

IRR-CAW-46

125

cum

249.00

cum

220.50

FOUNDATION FILLING WORKS : 126 Providing rubble and sand filling in layers of 22.5 to 30 cm including cost of all materials, machinery, labour, watering, ramming etc., complete with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit) Providing rubble and Murum filling in layers of 22.5 to 30 cm including cost of all materials, machinery, labour, watering, ramming etc., complete with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit) Providing and laying 25 cm thick sand blanket below embankment including cost of all materials, machinery, labour, spreading to specified thickness etc., complete with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit) cum cum cum cum 498.20 114.00 579.30 114.00

IRR-CAW-51

Check Box 249

IRR-CAW-52

127

Check Box 250

IRR-CAW-53

128

sqm sqm

96.30 14.30

Check Box 251

IRR-CAW-53-A (New Item 3 -201112)

129

Providing and laying sand blanket below embankment including cost of all materials, machinery, labour, spreading to specified thickness etc., complete with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit) Providing and constructing dry rubble rock-toe using rubble and stone chips from approved source including cost of all materials, machinery, labour, hand packing rubble and stone chips, finishing top and sides to required slopes etc., complete with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit) Providing and constructing longitudinal and cross graded filter drains using sand and 20 mm down graded aggregates satisfying specified filter creteria in layers as per specifications including cost of all materials, machinery, labour, laying to required slopes, compaction etc., complete with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit) Laying Longitudinal Drains and Transverse drains of Size 600 x600 x750 mm in Bed and filling with 12 mm to 40 mm HG machine Crushed metal and sand in bed including excavation of drains and Cost of procuring of all materials 133 Laying and fixing of 100 mm Dia 300 mm long precast porus CC plugs in bed and sides using 1.181 Kgs of cement per each using 20 mm HG metal and placing in local filters of size 600x600x750 mm in size including excavation of drains and Cost of procuring of all materials Labour Component (including contractor's profit) Providing and constructing 0.50 m thick vertical or inclined graded filter media consisting of 15 cm thick sand layers and 20 cm thick 20 mm down coarse aggregate layer using approved materials satisfying specified filter creteria as per specifications including cost of all materials, machinery, labour, laying to required slope, compaction etc., complete with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit) Providing and constructing graded filter media below and behind rock-toe consisting of 20 cm thick sand, 15 cm thick 20 mm down and 15 cm thick 40 mm down size graded coarse aggregates satisfying filter creteria behind rock-toe and 15 cm thick sand, 20 cm thick 20 mm down coarse aggregate and 65 cm thick 40 mm down size coarse aggregate satisfying filter creiteria below rocktoe as per specifications including cost of all materials, machinery, labour, laying to required slope, compaction etc., complete with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit) Providing and laying filter media consisting of 2 layers of poly-propeline nonwoven filter fabric and 200 mm thick 20 mm down graded coarse aggregate for embankment including cost of all materials, machinery, labour, forming toe drain etc., complete with lead upto 50 m for aggregate and all leads for fabric and all lifts. Using 200 gsm filter fabric.

cum cum

385.30 57.00

Check Box 252

IRR-CAW-54

130

cum cum

472.80 80.40

Check Box 253

IRR-CAW-55

131

cum cum

699.90 106.00

Check Box 254

IRR-CAW-56

132

Rm Rm

347.00 20.20

Check Box 255

IRR-CAW-57

133

one plug one plug

287.50 85.50

Check Box 256

IRR-CAW-58

134

cum

820.30

cum

618.70

Check Box 257

IRR-CAW-59

135

cum

1015.20

cum

99.10

Check Box 258

IRR-CAW-510(a)

136

sqm

527.60

10

Abstract of work items

Labour Component (including contractor's profit) Providing and laying filter media consisting of 2 layers of poly-propeline nonwoven filter fabric and 200 mm thick 20 mm down graded coarse aggregate for embankment including cost of all materials, machinery, labour, forming toe drain etc., complete with lead upto 50 m for aggregate and all leads for fabric and all lifts. Using 250 gsm filter fabric. Labour Component (including contractor's profit) IRR-CAW-6 ROCK FILL WORKS : Providing and constructing rockfill casing to canal embankment with graded stones and spalls from approved quarry including cost of all materials, machinery, labour, spreading stones and spalls in layers, hand packing, wedging, finishing surface to required slopes etc., complete with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit) Providing and constructing rockfill casing to canal embankment with graded stones and spalls available in dump yard including cost of all materials, machinery, labour, spreading stones and spalls in layers, hand packing, wedging, finishing surface to required slopes etc., complete with initial lead upto 50 m and all lifts. Stones and spalls available in dump yard will be issued at specified issue rate. Labour Component (including contractor's profit) IRR-CAW-7 CANAL LINING WORKS : Providing cohesive non-swelling ( CNS ) soil lining to canals using soil from approved borrow area including spreading soil in layers of thickness not more than 15 cm, breaking clods, watering, compacting to density control of not less than 98 percent or as stipulated, dressing to required profile etc., complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit) Providing cohesive non-swelling ( CNS ) soil lining to canals using soil from approved borrow area including spreading soil in layers of thickness not more than 15 cm, breaking clods, watering, compacting to density control of not less than 95 percent or as stipulated, dressing to required profile etc., complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit) Providing cohesive non-swelling ( CNS ) soil lining to canal using soil collected in heaps along the edge of canal requiring CNS soil lining as part of the disposal of excavated soil from canal excavation in CNS soil reach including spreading in layers of thickness not more than 15 cm, breaking clods, watering, compacting to density control of not less than 95 percent or as stipulated, dressing to required profile etc., complete with lead upto upto 50 m and all lifts. Labour Component (including contractor's profit) IRR-CAW-74 Providing and fixing 20 x 20 x 75 cm size top surface neatly dressed canal bed level stones including cost of all materials, labour, excavation, fixing in position to correct level etc., complete with lead upto 50 m and all lifts. Labour Component (including contractor's profit) Providing, fabricating and placing in position reinforcement steel bars for RCC works including cleaning, straightening, cutting, bending, hooking, lapping, tying with 1.25 mm dia.soft annealed steel wire, welding wherever required including cost of all materials, machinery, labour etc., complete with initial lead upto 50 and all lifts.(1.05 tonne/tonne of steel) Labour Component (including contractor's profit) Providing and laying 75 mm thick in-situ M-15 ( 28 days cube compressive strength not less than 15 N / sqmm ) grade cement concrete with 20 mm down size approved, clean, hard, graded aggregates for canal lining using vibrating cylinder type mechanical paver including cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position,finishing, forming contraction joints, fixing PVC joint sealing strips, curing, shifting of paver from one side to other side of canal etc., complete with initial lead upto 1 km and all lifts. ( 43 Gr Cement content: (300kg /cum) 22.5 kg / sqm for use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum, equivalent concrete volume:79.2 cum including the extra quantity of concrete for curvatures and bends etc.,) Labour Component (including contractor's profit) Providing and laying 80 mm thick in-situ M-15 ( 28 days cube compressive strength not less than 15 N / sqmm ) grade cement concrete with 20 mm down size approved, clean, hard, graded aggregates for canal lining using vibrating cylinder type mechanical paver including cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position, finishing, forming contraction joints, fixing PVC joint sealing strips, curing, shifting of paver from one side to other side of canal etc., complete with initial lead upto 1 km and all lifts. ( 43 Gr Cement content: (300kg /cum) 24 kg / sqm for use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum, equivalent concrete volume:84.48 cum including the extra quantity of concrete for curvatures and bends etc.,) Labour Component (including contractor's profit) Providing and laying 100 mm thick in situ M-15 (28 days cube compressive strength not less than 15 N /Sqmm ) grade cement concrete with 20 mm down size approved, clean, hard, graded aggregates for canal lining using, vibrating, cylinder type mechanical paver including cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position, finishing, forming contraction joints, fixing PVC joint sealing strips, curing, shifting of paver from one side to othere side of canal etc., complete with initial lead upto 1 Km and all lifts. ( 43 Gr Cement content: (300kg /cum) 30 kg / sqm for use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum, equivalent concrete volume:88 cum including the extra quantity of concrete for curvatures and bends etc.,) Labour Component (including contractor's profit) Dismantling, shifting and re-erecting mechanical concrete paver and DG set with all accessories across canal CD work or other locations wherever shifting and re-erecting is necessary including aligning paver correctly for continuing canal lining work, cost of all materials, machinery, labour etc., complete with all leads and lifts. Note: Local shifting and re-erection of paver for LH and RH side lining included in concrete lining rates under items IRR-CAW-7-7 and IRR-CAW-7-8 and saperate rate for shifting shall not be allowed. Labour Component (including contractor's profit) Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for bed and side lining of canal(150mm thick) including finishing the junction of bed and sides to required curveture, cost of all materials, machinery, labour, formwork including supports, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. ( 43 Gr Cement content: 250 kg / cum for use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) (Only forManually operated)

sqm

23.40

Check Box 259

IRR-CAW-511(b)

137

sqm

582.70

sqm

23.40

Check Box 260

IRR-CAW-61

138

cum cum

433.90 42.30

Check Box 261

IRR-CAW-62

139

cum

290.80

cum

54.50

Check Box 262

IRR-CAW-71

140

cum cum

210.10 50.40

Check Box 263

IRR-CAW-72

141

cum cum

206.10 49.80

Check Box 264

IRR-CAW-73

142

cum

113.10

cum

38.40

Check Box 265

143

Each Each

74.90 51.00

Check Box 266

IRR-CAW-75

144

kg kg

60.00 5.40

Check Box 267

IRR-CAW-76

145

sqm

371.10

sqm

22.70

Check Box 268

IRR-CAW-77

146

sqm

387.10

sqm

22.70

Check Box 269

IRR-CAW-78

147

sqm

469.20

sqm

26.30

Check Box 270

IRR-CAW-79

148

shifting

7396.20

shifting

5010.50

Check Box 271

IRR-CAW-710

149

cum

3928.20

11

Abstract of work items

Labour Component (including contractor's profit) Providing and laying insitu vibrated M-10 (28 days cube compressive strength not less than 10 N/sqm) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregade for bed and side lining of canal(100 mm thick) including, finishing the junction of bed and sides to required curveture, cost of all materials, machinery, labour, formwork including supports cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead up to 50 m and all lifts ( 43 Gr Cement content: 250 kg / cum for use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) Labour Component (including contractor's profit) Providing and laying 100mm thick insitu vibrated M-10 (28 days cube compressive strength-not less than 10.00 N / sq mm) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for bed and side lining of canal lining using vibrating cylindertype mechanical paver including cost of all materials mechinery labour batching mixing placing in position forming contraction joints fixing pvc joint seiling strips shifting of paver from one side of canal to other side etc.complete with all leads & lifts. (Cement content: 250 kg / cum for use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) Labour Component (including contractor's profit) Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N /sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for bed and side lining of canal including finishing the junction of bed and sides to required curveture, cost of all materials, machinery, labour, formwork including supports, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 250 kg / cum for use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) Labour Component (including contractor's profit) Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for bed and side lining(150 mm thick) of canal including finishing the junction of bed and sides to required curveture, cost of all materials, machinery, labour, formwork including supports, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 290 kg / cum for use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) Labour Component (including contractor's profit) Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N /sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for bed and side lining(of thickness 100 mm) of canal including finishing the junction of bed and sides to required curveture, cost of all materials, machinery, labour, formwork including supports, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 300 kg / cum for use of super plasticiser(0.4% by wt. of cement),CA : 0.80 cum, Blending Ratio of CA--65:35, FA : 0.45 cum) Labour Component (including contractor's profit) Providing and laying 150mm thick insitu vibrated M-15 (28 days cube compressive strength-not less than 15.00 N / sq mm) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for bed and side lining of canal lining using vibrating cylindertype mechanical paver including cost of all materials mechinery labour batching mixing placing in position forming contractiom joints fixing pvc joint seiling strips shifting of paver from one side of canal to other side etc.complete with all leads & lifts. (Cement content: 300 kg / cum for use of super plasticiser(0.4% by wt. of cement),CA : 0.80 cum, Blending Ratio of CA--65:35, FA : 0.44 cum) (Paver) Labour Component (including contractor's profit) Providing and fixing pre-cast RCC template walls consisting of 0.05 cum M-15 grade concrete using 20 mm down size coarse aggregates and 10 kg reinforcement steel moulded as per specifications and drawing in CM 1:4 proportion including cost of all materials, machinery, labour, formwork, fabricating and placing reinforcement steel, mixing, laying, conveying and fixing in position including necessary excavation for seating, finishing joints in CM 1:4, curing etc., complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit) Providing and fixing 50 mm dia perforated GI pressure relief pipes 12.50 cm long with one end closed with perforated GI plate and other end provided with alluminium lid hinged to pipe including cost of all materials, labour, drilling 8 mm dia holes etc., complete with all leads and lifts. Labour Component (including contractor's profit) Providing and fixing 50 mm dia perforated GI pressure relief pipes 22.50 cm long with one end closed with perforated GI plate and other end provided with alluminium lid hinged to pipe including cost of all materials, labour, drilling 8 mm dia holes etc., complete with all leads and lifts. Labour Component (including contractor's profit) Providing and fixing 50 mm dia perforated GI pressure relief pipes 30 cm long with one end closed with perforated GI plate and other end provided with alluminium lid hinged to pipe including cost of all materials, labour, drilling 8 mm dia holes etc., complete with all leads and lifts. Labour Component (including contractor's profit) Providing and fixing 50 mm dia perforated GI pressure relief pipes 45 cm long with one end closed with perforated GI plate and other end provided with alluminium lid hinged to pipe including cost of all materials, labour, drilling 8 mm dia holes etc., complete with all leads and lifts. Labour Component (including contractor's profit) Providing and fixing 50 mm dia perforated GI pressure relief pipes 75 cm long with one end closed with perforated GI plate and other end provided with alluminium lid hinged to pipe including cost of all materials, labour, drilling 8 mm dia holes etc., complete with all leads and lifts. Labour Component (including contractor's profit) IRR-CAW-723 Providing and fixing 100 mm dia perforated PVC pipes 40 cm long for Weep holes including cost of all materials, labour, drilling 8 mm dia holes etc. complete with all leads and lifts. Labour Component (including contractor's profit) IRR-CAW-724 Drilling 32 mm dia pressure relief hole below pressure relief pipe for bed and side lining of canal laid on rock including cost of all materials, machinery, labour etc., complete with all leads and lifts. Labour Component (including contractor's profit)

cum

899.90

Check Box 272

IRR-CAW-711

150

cum

4056.10

cum

926.50

Check Box 273

IRR-CAW-712

151

sqm

447.10

sqm

26.30

Check Box 274

IRR-CAW-713

152

cum

3962.00

cum

926.50

Check Box 275

IRR-CAW-714

153

cum

4270.80

cum

980.10

Check Box 276

IRR-CAW-715

154

cum

4390.60

cum

1034.90

Check Box 277

IRR-CAW-716

155

sqm

626.40

sqm

26.30

Check Box 278

IRR-CAW-717

156

Rm

932.10

Rm

200.40

Check Box 279

IRR-CAW-718

157

Each Each

118.60 34.20

Check Box 280

IRR-CAW-719

158

Each Each

170.10 34.20

Check Box 281

IRR-CAW-720

159

Each Each

203.10 34.20

Check Box 282

IRR-CAW-721

160

Each Each

265.10 34.20

Check Box 283

IRR-CAW-722

161

Each Each

384.80 34.20

Check Box 284

162

Each Each

196.10 17.10

Check Box 285

163

Each Each

223.90 70.50

12

Abstract of work items


Providing and forming 35 x 35 x 40 cm deep filter drain consisting of 75 mm thick 10 mm down coarse aggregate around pressure relief pipe and 75 mm thick sand around coarse aggregate filter including cost of all materials, labour, excavation of pit etc., complete with lead upto 50 m and all lifts. Labour Component (including contractor's profit) Providing and fixing 25 to 40 mm thick Shahabad / Talikota / other similar stone slabs with pointing and finishing joints neatly in CM 1:3 proportion for canal / field channel lining including cutting slabs to required size, mixing mortar, finishing joints neatly, curing etc., complete with lead upto 50 m and all lifts. Labour Component (including contractor's profit) Fixing PCC slabs of various sizes in CM 1 : 3 proportion to the side slopes of canal including preparing bed, flush pointing joints in CM 1 : 3 propn, cost of all materials ( excluding PCC slabs ), labour, finishing, curing etc., complete with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit) Fixing PCC lug slabs of various sizes in CM 1 : 3 proportion for supporting PCC slab lining including necessary excavation, refilling, flush pointing joints in CM 1 : 3 propn, cost of all materials ( excluding PCC lug slabs ), labour, finishing, curing etc., complete with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit) Fixing 30 cm height pre-cast drops for field channels as directed including excavation, etc., complete with all leads and lifts. Labour Component (including contractor's profit) Providing and fixing LDPE sheet for bed and sides of canal including cost of all materials, labour, laying, joining etc., complete with all leads and lifts. Using 500 micron thick LDPE sheet. Labour Component (including contractor's profit) If the surface on which the LDPE sheet is to be laid is too rough and undulating provide 75 mm thick sand backing to LDPE sheet. For providing 75 mm thick Sand for backing add Labour Component (including contractor's profit) Providing and fixing LDPE sheet for bed and sides of canal including cost of all materials, labour, laying, joining etc., complete with all leads and lifts. Using 750 micron thick LDPE sheet. Labour Component (including contractor's profit) Providing and fixing LDPE sheet for bed and sides of canal including cost of all materials, labour, laying, joining etc., complete with all leads and lifts. Using 1000 micron thick LDPE sheet. Labour Component (including contractor's profit) IRR-CAW-733 Providing and fixing 12 mm thick 380 mm depth tarfelt expansion joint filler boards for stone masonry lining of canal including cost of all materials, labour etc., complete with all leads and lifts. Labour Component (including contractor's profit) IRR-CAW-734 Providing and fixing 20 mm thick 100 mm depth tarfelt expansion joint filler boards for cement concrete lining of canal including cost of all materials, labour etc., complete with all leads and lifts. Labour Component (including contractor's profit) IRR-CAW-735 Providing and fixing 20 mm thick 150 mm depth tarfelt expansion joint filler boards for cement concrete lining of canal including cost of all materials, labour etc., complete with all leads and lifts. Labour Component (including contractor's profit) IRR-CAW-736 Providing and forming 35 mm wide and 10 mm thick construction / contraction joints for concrete lining by mastic filler including cost of all materials, labour etc., complete with all leads and lifts. Labour Component (including contractor's profit) Manufacturing 550 x 550 x 55 mm size PCC lining slabs in M-15 grade ( 28 days cube compressive strength not less than 15 N /sqmm ) cement concrete using 20 mm down graded coarse aggregate including cost of all materials, machinery, labour, batching, mixing, laying, compacting, formwork, finishing, curing etc.,complete with initial lead upto 50 m and all lifts. ( Cement content : 300 kg / cum with super plastcizer (0.4% by wt. of cement), CA : 0.80 cum, Blending Ratio of CA : 65:35, FA : 0.45cum) Labour Component (including contractor's profit) Manufacturing 550 x 300 x 55 mm size PCC lug slabs in M-15 grade ( 28 days cube compressive strength not less than 15 N / sqmm ) cement concrete using 20 mm down graded coarse aggregate including cost of all materials, machinery, labour, batching, mixing, laying, compacting, formwork, finishing, curing etc.,complete with initial lead upto 50 m and all lifts. ( Cement content : 300 kg / cum with super plastcizer (0.4% by wt. of cement), CA : 0.80 cum, Blending Ratio of CA : 65:35, FA : 0.45cum) Labour Component (including contractor's profit) Manufacturing 450 x 300 x 30 mm size PCC lining slabs in M-15 grade ( 28 days cube compressive strength not less than 15 N / sqmm ) cement concrete using 10 mm down graded coarse aggregate including cost of all materials, machinery, labour, batching, mixing, laying, compacting, formwork, finishing, curing etc.,complete with initial lead upto 50 m and all lifts. ( Cement content : 300 kg / cum with super plastcizer (0.4% by wt. of cement), CA : 0.68 cum, FA : 0.43cum) Labour Component (including contractor's profit) Manucturing 450 x 150 x 30 mm size PCC lug slabs in M-15 grade ( 28 days cube compressive strength not less than 15 N / sqmm ) cement concrete using 10 mm down graded coarse aggregate including cost of all materials, machinery, labour, batching, mixing, laying, compacting, formwork, finishing, curing etc.,complete with initial lead upto 50 m and all lifts. ( Cement content : 300 kg / cum with super plastcizer (0.4% by wt. of cement),CA : 0.68 cum, FA : 0.43cum) Labour Component (including contractor's profit) Manufacturing 600 x 300 x 100mm size PCC lining slabs in M-15 grade (28 days cube compressive strength not less than 15 N/Sqmm) cement concrete using 20 mm down grades coarse aggregate including cost of all materials, machinery, labour, batching, mixing, laying, compacting, formwork, finishing, curing etc., complete with initial lead upto 50 m and all lifts. ( Cement content : 300 kg / cum with super plastcizer (0.4% by wt. of cement), CA : 0.80 cum, FA : 0.45cum, Blending Ratio of CA--65:35) Labour Component (including contractor's profit)

Check Box 286

IRR-CAW-725

164

Each Each

34.50 6.20

Check Box 287

IRR-CAW-726

165

sqm sqm

306.80 52.70

Check Box 288

IRR-CAW-727

166

sqm sqm

66.50 49.00

Check Box 289

IRR-CAW-728

167

Rm Rm Each Each

37.40 32.70 136.00 136.00

Check Box 290

IRR-CAW-729

168

Check Box 291

IRR-CAW-730

169

sqm sqm sqm sqm

108.50 10.00 31.50 6.80

Check Box 292

Check Box 293

IRR-CAW-731

170

sqm sqm

156.40 14.00

Check Box 294

IRR-CAW-732

171

sqm sqm

220.70 19.40

Check Box 295

172

Rm Rm

169.50 15.70

Check Box 296

173

Rm Rm

71.10 6.20

Check Box 297

174

Rm Rm

105.50 6.20

Check Box 298

175

Rm Rm

19.50 4.40

Check Box 299

IRR-CAW-737

176

Each

84.60

Each

19.20

Check Box 300

IRR-CAW-738

177

Each

57.80

Each

19.20

Check Box 301

IRR-CAW-739

178

Each

29.50

Each

12.30

Check Box 302

IRR-CAW-740

179

Each

21.70

Each

12.30

Check Box 303

IRR-CAW-741

180

Each

71.70

Each

12.30

13

Abstract of work items

Check Box 304

IRR-CAW-742

181

Manucturing 400 x 400 x 30 mm size PCC lining slabs in M-15 grade ( 28 days cube compressive strength not less than 15 N / sqmm )cement concrete using 10 mm down graded coarse aggregate including cost of all materials, machinery, labour, batching, mixing, laying, compacting, formwork, finishing, curing etc.,complete with initial lead upto 50 m and all lifts. ( Cement content : 300 kg / cum with super plastcizer (0.4% by wt. of cement), CA : 0.68 cum, FA : 0.43cum) Labour Component (including contractor's profit) Manufacturing 400 x 150 x 30 mm size PCC lug slabs in M-15 grade ( 28 days cube compressive strength not less than 15 N /sqmm ) cement concrete using 10 mm down graded coarse aggregate including cost of all materials, machinery, labour, batching, mixing, laying, compacting, formwork, finishing, curing etc.,complete with initial lead upto 50 m and all lifts. ( Cement content : 300 kg / cum with super plastcizer (0.4% by wt. of cement), CA : 0.68 cum, FA : 0.43cum) Labour Component (including contractor's profit) Providing and laying uncoursed rubble stone masonry in CM 1 : 5 proportion for canal side lining using stones and chips from approved quarry including cost of all materials, machinery, labour, forming weep holes at specified intervals, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Thickness of the masonry assumed: 0.3 m, rubble stones : 0.96 cum, Stone Chips : 0.15cum,Through Stones 20 x 20 x 30cm : 1/sqm) Labour Component (including contractor's profit) Providing and laying uncoursed rubble stone masonry in CM 1:5 proportion for canal side lining using stones from approved quarry including cost of all materials, machinery, labour, forming weep holes at specified intervals, finishing, curing etc., complete with initial lead upto 50m and all lifts.(with no pin headers)(Thickness of the Masonry assumed:0.3 m, rubble stones : 1.1 cum) Labour Component (including contractor's profit) Providing and laying uncoursed rubble stone masonry in CM 1 : 5 proportion for canal side lining using stones and chips from canal excavation including cost of all materials, machinery, labour, forming weep holes at specified interval, finishing, curing etc., complete with initial lead upto 50 m and all lifts.( rubble stones : 0.96 cum, Stone Chips : 0.15cum, Through Stones 20 x 20 x 30cm : 1/sqm) Labour Component (including contractor's profit) Providing and laying uncoursed rubble stone masonry in CM 1:5 proportion for canal side lining using stones from canal excavation including cost of all materials, machinery, labour, forming weep holes at specified intervals, finishing, curing etc., complete with initial lead upto 50m and all lifts.(with no pin headers)( rubble stones : 1.1cum, cement : 98kg, sand 0.34 cum) Labour Component (including contractor's profit)

Each

31.50

Each

12.30

Check Box 305

IRR-CAW-743

182

Each

21.20

Each

12.30

Check Box 306

IRR-CAW-744

183

cum

1810.10

cum

472.40

Check Box 307

IRR-CAW-745

184

cum

2697.10

cum

1561.70

Check Box 308

IRR-CAW-746

185

cum

1716.60

cum

533.40

Check Box 309

IRR-CAW-747

186

cum

2553.30

cum

1561.70

IRR-CAW-8

ROCK PITCHING Providing and constructing 25 cm thick dry rubble stone pitching with pin headers at 2 per sqm including cost of all materials, labour, hand packing, finishing etc., complete with initial lead upto 50 m and all lifts.( rubble stones : 0.23 cum/sqm, Stone Chips : 0.0375cum/sqm, Pin Headers 30cm : 2/sqm) Labour Component (including contractor's profit) If 15 cm thick murum bed is to be provided below pitching add Labour Component (including contractor's profit) Providing and constructing 22.5 cm thick dry rubble stone pitching with pin headers at 2 per sqm including cost of all materials, labour, hand packing, finishing etc., complete with initial lead upto 50 m and all lifts.( rubble stones : 0.207 cum/sqm, Stone Chips : 0.3375cum/sqm, Pin Headers 30cm : 2/sqm) (For Maintenance Works) Labour Component (including contractor's profit) Providing and constructing 25 cm thick dry rubble stone pitching including cost of all materials, labour, hand packing, finishing etc., complete with initial lead upto 50 m and all lifts.(with no pin headers)( rubble stones : 0.33 cum/sqm) Labour Component (including contractor's profit) Providing and constructing 225 mmm thick dry rubble stone pitching including cost of all materials, labour, hand packing, finishing etc., complete with initial lead upto 50 m and all lifts.(with no pin headers)( rubble stones : 0.2475 cum/sqm) (For Maintenance Works) Labour Component (including contractor's profit) Providing and constructing 30 cm thick dry rubble stone pitching with pin headers at 2 per sqm including cost of all materials, labour, hand packing, finishing etc., complete with initial lead upto 50 m and all lifts.( rubble stones : 0.275 cum/sqm, Stone Chips : 0.045cum/sqm, Pin Headers 30cm : 2/sqm) Labour Component (including contractor's profit) Providing and constructing 30 cm thick dry rubble stone pitching including cost of all materials, labour, hand packing, finishing etc., complete with initial lead upto 50 m and all lifts.(with no pin headers)( rubble stones : 0.33 cum/sqm) Labour Component (including contractor's profit) Providing and constructing 45 cm thick dry rubble stone pitching with pin headers at 2 per sqm including cost of all materials, labour, hand packing, finishing etc., complete with initial lead upto 50 m and all lifts.( rubble stones : 0.40 cum/sqm, Stone Chips : 0.0675cum/sqm, Pin Headers 45cm : 2/sqm) Labour Component (including contractor's profit) Providing and constructing 45 cm thick dry rubble stone pitching including cost of all materials, labour, hand packing, finishing etc., complete with initial lead upto 50 m and all lifts.(with no pin headers)( rubble stones : 0.495 cum/sqm) Labour Component (including contractor's profit) Providing and constructing 30 cm thick rubble stone pitching set in CM 1: 5 proportion with pin headers at 2 per sqm in including cost of all materials, labour, packing chips and mortar, finishing, curing etc., complete with initial lead upto 50 m and all lifts.( rubble stones : 0.275 cum/sqm, Stone Chips : 0.045cum/sqm, Pin Headers 30cm : 2/sqm) Labour Component (including contractor's profit) Providing and Constructing 30 cm thick rubble stone pitching set in CM 1:5 Proportion including cost of all materials,labour, packing chips and mortar ,finishing etc.,complete( rubble stones : 0.33 cum/sqm ) Labour Component (including contractor's profit) Providing and constructing 30 cm thick dry khandki stone pitching using 20 to 25 cm size khandki stones with pin headers at 2 per sqm including cost of all materials, labour, hand packing, finishing etc., complete with initial lead upto 50 m and all lifts.( Khandki stones 20- 25 cm height : 1200 Nos/sqm, Stone Chips : 0.045cum/sqm, Pin Headers 30cm : 2/sqm) Labour Component (including contractor's profit)

Check Box 310

IRR-CAW-81

187

sqm sqm sqm sqm

175.90 36.80 34.00 11.40

Check Box 311

IRR-CAW-81-A (New Item4 - 201112)

188

sqm sqm

166.80 36.80

Check Box 312

IRR-CAW-82

189

sqm sqm

180.30 88.50

Check Box 313

IRR-CAW-82 - A (New Item5 - 201112)

190

sqm sqm

139.70 79.60

Check Box 314

IRR-CAW-83

191

sqm sqm

193.80 36.80

Check Box 315

IRR-CAW-84

192

sqm sqm

216.30 106.10

Check Box 316

IRR-CAW-85

193

sqm sqm

291.20 51.90

Check Box 317

IRR-CAW-86

194

sqm sqm

324.50 159.10

Check Box 318

IRR-CAW-87

195

sqm sqm

443.40 63.20

Check Box 319

IRR-CAW-88

196

sqm sqm

362.40 14.00

Check Box 320

IRR-CAW-89

197

sqm sqm

266.10 36.80

14

Abstract of work items


Providing and constructing 45 cm thick dry khandki stone pitching using 25 to 30 cm size khandki stones with pin headers at 2 per sqm including cost of all materials, labour, hand packing, finishing etc., complete with initial lead upto 50 m and all lifts.( Khandki stones 25- 30 cm height : 1200 Nos/sqm, Stone Chips : 0.0675cum/sqm, Pin Headers 45cm : 2/sqm) Labour Component (including contractor's profit) Providing and constructing 30 cm thick khandki stone pitching using 20 to 25 cm size khandki stones with pin headers at 2 per sqm set in CM 1 : 5 proportion with pointing joints in CM 1:3 proportion including cost of all materials, labour, packing chips and mortar, finishing, curing etc.complete with initial lead upto 50 m and all lifts.( Khandki stones 20- 25 cm height : 1200 Nos/sqm, Stone Chips : 0.045cum/sqm, Pin Headers 30cm : 2/sqm) Labour Component (including contractor's profit) Providing and constructing 45 cm thick khandki stone pitching using 25 to 30 cm stones with pin headers at 2 per sqm set in CM 1 : 5 proportion with pointing joints in CM 1 : 3 proportion including cost of all materials, labour, packing chips and mortar, finishing, curing etc., complete with initial lead upto 50 m and all lifts.( Khandki stones 25- 30 cm height : 730 Nos/sqm, Stone Chips : 0.0675cum/sqm, Pin Headers 45cm : 2/sqm) Labour Component (including contractor's profit) Providing 10 cm thick approved type grass turfing to the side slopes of canal icluding cost of all materials, labour, watering for minimum 15 days etc.,complete with lead 50 m and all lifts.(FA : 2 cum/sqm) Labour Component (including contractor's profit) Providing 10 cm thick approved type grass turfing to the side slopes of canal icluding cost of all materials, labour, watering for minimum 15 days etc.,complete with lead 50 m and all lifts. with no sand Labour Component (including contractor's profit) Chapter IV IRR-CCDW IRR-CCDW1 sqm 27.50

Check Box 321

IRR-CAW-810

198

sqm sqm

274.10 51.90

Check Box 322

IRR-CAW-811

199

sqm

502.90

sqm

60.30

Check Box 323

IRR-CAW-812

200

sqm

606.50

sqm

82.90

Check Box 324

IRR-CAW-813

201

sqm sqm

82.80 47.80

Check Box 325

IRR-CAW-814

202

sqm

56.00

CANAL CROSS DRAINAGE WORKS

EXCAVATION & FOUNDATION TREATMENT WORKS : (manual means of excavation and conveyance) 203 Excavation in all kinds of soil including boulders upto 0.30 m dia. for foundations of canal cross drainage and other appurtenant structures and placing the excavated stuff neatly in specified dump area or disposing off the same as directed etc., complete with initial lead upto 50 m and initial lift upto 3 m. Labour Component (including contractor's profit) Excavation for Structures- Mechanical Means ( Data adopted from MORTH) cum 14603.40 cum 179.60

Check Box 326

IRR-CCDW1-1

cum

179.60

Check Box 327

IRR-CCDW1-2

204

Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. ( depth upto 3 meters) Labour Component (including contractor's profit) (manual means of excavation and conveyance)

cum

8.00

Check Box 328

IRR-CCDW1-3

205

Excavation in ordnary rock (including HDR) without blasting including boulders above 0.3 m upto 0.60 m dia. for foundations of canal cross drainage and other appurtenant structures and placing the excavated stuff neatly in specified dump area or disposing off the same as directed etc., complete with initial lead upto 50 m and initial lift upto 3 m. Labour Component (including contractor's profit) ( Data adopted from MORTH) (manual means of excavation and conveyance)

cum

260.80

cum

260.80

Check Box 329

IRR-CCDW1-4

206

Excavation in ordnary rock (including HDR) without blasting for foundations of canal cross drainage and other appurtenant structures and placing the excavated stuff neatly in specified dump area or disposing off the same as directed etc., complete with initial lead upto 50 m and initial lift upto 3 m. Labour Component (including contractor's profit) (manual means of excavation after blasting and conveyance)

cum

0.00

cum

6.00

Check Box 330

IRR-CCDW1-5

207

Excavation in hard rock requiring blasting including boulders above 0.6 m upto 1.2 m dia. for foundations of canal cross drainage and other appurtenant structures and placing the excavated stuff neatly in specified dump area or disposing off the same as directed etc., complete with initial lead upto 50 m and initial lift upto 3 m. Labour Component (including contractor's profit) (manual means of excavation after blasting and conveyance)

cum

275.60

cum

202.80

Check Box 331

IRR-CCDW1-6

208

Excavation in hard rock of all toughness by blasting including boulders above 1.2 m dia. for foundations of canal cross drainage and other appurtenant structures and placing the excavated rock neatly in specified dump area or stack yard as directed etc., complete with initial lead upto 50 m and initial lift upto 3 m. Labour Component (including contractor's profit) (manual means of excavation after controlled blasting and conveyance) Hard Rock ( blasting prohibited ) ( Data adopted from MORTH)

cum

435.30

cum

251.40

Check Box 332

IRR-CCDW1-7

209

Excavation in hard rock with blasting ( blasting prohibited )prohibited for foundations of canal cross drainage and other appurtenant structures and placing the excavated rock neatly in or stack yard as directed etc., complete with specified dump area initial lead upto 50 m and initial lift upto 3 m. Labour Component (including contractor's profit) Providing and fixing 25 mm dia 2.50 m long cold twisted deformed steel anchor rods with 1.25 m length driven into 32 mm dia hole drilled in bed rock and remaining length embedded in concrete / masonry including cost of all materials, machinery, labour, drilling and cleaning hole, driving anchor rod, grouting hole with thick cement slurry etc., complete with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit)

cum

0.00

cum

0.20

Check Box 333

IRR-CCDW1-8

210

Each

831.00

Each

151.10

IRR-CCDW2

STEEL AND CEMENT CONCRETE WORKS : Providing, fabricating and placing in position reinforcement steel bars for RCC works including cleaning, straightening, cutting, bending, hooking, lapping, welding wherever required,tying with 1.25 mm dia soft annealed steel wire, including cost of all materials, machinery, labour etc., complete with initial lead upto 50 and all lifts. Labour Component (including contractor's profit)

Check Box 334

IRR-CCDW2-1

211

kg kg

60.00 5.70

15

Abstract of work items


Providing, fabricating and fixing in position structural steel cutting edge consisting of 100 x 100 x 10 mm angle and 250 x 12 mm plate for sinking 4.50 m outer diameter foundation wells foundation wells including cost of all materials, machinery, labour, bending, welding, providing anchors etc., complete with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit) Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 260 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) Labour Component (including contractor's profit) Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 80 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 250 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.98cum, Blending Ratio of CA--35:30:20:15, FA : 0.35 cum) Labour Component (including contractor's profit) Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 220 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) Labour Component (including contractor's profit) Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N / sq mm ) grade cement concrete using 80 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 220 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.98cum, Blending Ratio of CA--35:30:20:15, FA : 0.35 cum) Labour Component (including contractor's profit) Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 310 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) Labour Component (including contractor's profit) Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 320 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) Labour Component (including contractor's profit) Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) Labour Component (including contractor's profit) Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) Labour Component (including contractor's profit) Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 220 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) Labour Component (including contractor's profit) Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for well kerb including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 350 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) If water is to be brought from other place add only lead charges @ 500 ltr / cum. Labour Component (including contractor's profit) Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for well steining including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 320 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) If water is to be brought from other place add only lead charges @ 500 ltr / cum. Labour Component (including contractor's profit) cum 1254.80

Check Box 335

IRR-CCDW2-2

212

kg kg

70.90 7.10

Check Box 336

IRR-CCDW2-3

213

cum

4037.20

cum

932.50

Check Box 337

IRR-CCDW2-4

214

cum

4005.30

cum

971.20

Check Box 338

IRR-CCDW2-5

215

cum

3758.30

cum

891.30

Check Box 339

IRR-CCDW2-6

216

cum

3824.50

cum

965.00

Check Box 340

IRR-CCDW2-7

217

cum

4383.20

cum

980.20

Check Box 341

IRR-CCDW2-8

218

cum

4787.90

cum

976.80

Check Box 342

IRR-CCDW2-9

219

cum

4792.30

cum

1037.70

Check Box 343

IRR-CCDW2-10

220

cum

4507.30

cum

1039.60

Check Box 344

IRR-CCDW2-11

221

cum

4073.10

cum

966.40

Check Box 345

IRR-CCDW2-12

222

cum

5935.90

Check Box 346

IRR-CCDW2-13

223

cum

5364.20

cum

1146.80

16

Abstract of work items


Providing and laying insitu M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for well bottom plug by tremie or skip box method including cost of all materials, complete with initial lead upto 50 m and all lifts.(Cement content: 350 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) Labour Component (including contractor's profit) Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for well top plug including cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) If water is to be brought from other place add only lead charges @ 500 ltrs / cum Labour Component (including contractor's profit) Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for well cap including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) If water is to be brought from other place add only lead charges @ 500 ltr / cum. Labour Component (including contractor's profit) Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 80 mm down size approved, clean, hard, graded aggregates for piers and abutments including cost of all materials, labour, machinery, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 250 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.98cum, Blending Ratio of CA--35:30:20:15, FA : 0.35 cum) If water is to be brought from other place add only lead charges @ 500 ltr / cum. Labour Component (including contractor's profit) Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N / sq mm ) grade cement concrete using 80 mm down size approved, clean, hard, graded aggregates for piers and abutments including cost of all materials, labour, machinery, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 220 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.98cum, Blending Ratio of CA--35:30:20:15, FA : 0.35 cum) If water is to be brought from other place add only lead charges @ 500 ltr / cum. Labour Component (including contractor's profit) Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for piers and abutments including cost of all materials, labour, machinery, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 220 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) If water is to be brought from other place add only lead charges @ 500 ltr / cum. Labour Component (including contractor's profit) Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for cantiliver / counterfort retaining walls including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 320 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) If water is to be brought from other place add only lead charges @ 500 ltr / cum. Labour Component (including contractor's profit) Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates with placing and sinking plums of size 150 to 80 mm upto 15 percent for gravity type retaining walls / piers / abutments etc., including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete with initial lead upto 50 m and all lifts. (Cement content: 260 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.765cum, Blending Ratio of CA--50:30:20, FA : 0.34 cum, plums of size 150 to 80 mm : 0.25cum ) If water is to be brought from other place add only lead charges @ 500 ltr / cum. Labour Component (including contractor's profit) Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard,graded aggregates for cast in-situ pipes including cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 260 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) If water is to be brought from other place add only lead charges @ 500 ltr / cum. Labour Component (including contractor's profit) Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 80 mm down size approved, clean, hard, graded aggregates for cast in-situ pipes including cost of all materials, labour, machinery, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 250 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.98cum, Blending Ratio of CA--35:30:20:15, FA : 0.35 cum) If water is to be brought from other place add only lead charges @ 500 ltr / cum. Labour Component (including contractor's profit) cum 887.40

Check Box 347

IRR-CCDW2-14

224

cum

4121.50

cum

905.70

Check Box 348

IRR-CCDW2-15

225

cum

3774.50

Check Box 349

IRR-CCDW2-16

226

cum

4238.40

cum

903.20

Check Box 350

IRR-CCDW2-17

227

cum

4850.70

cum

1199.50

Check Box 351

IRR-CCDW2-18

228

cum

4669.90

cum

1192.80

Check Box 352

IRR-CCDW2-19

229

cum

4593.80

cum

1103.40

Check Box 353

IRR-CCDW2-20

230

cum

5285.40

cum

1142.30

Check Box 354

IRR-CCDW2-21

231

cum

4653.90

cum

1070.00

Check Box 355

IRR-CCDW2-22

232

cum

4404.30

cum

1010.30

Check Box 356

IRR-CCDW2-23

233

cum

4367.10

cum

1048.30

17

Abstract of work items

Check Box 357

IRR-CCDW2-24

234

Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for deck slab & kerb including cost of all materials,machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) If water is to be brought from other place add only lead charges @ 500 ltr / cum. Labour Component (including contractor's profit) Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for columns and beams including cost of all materials, labour, machinery, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete with initial lead upto 50 m and all lifts. (Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) If water is to be brought from other place add only lead charges @ 500 ltr / cum. Labour Component (including contractor's profit) Providing and laying insitu M- 20 ( 28 days cube compressive strength not less than 20 N / sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting, finishing, curing, packing joints with asphalt mortar etc., complete with initial lead upto 50 m and all lifts. (Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA-65:35, FA : 0.45 cum) If water is to be brought from other place add only lead charges @ 500 ltr / cum. Labour Component (including contractor's profit) Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for troughs including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position,levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) If water is to be brought from other place add only lead charges @ 500 ltr / cum. Labour Component (including contractor's profit)

cum

7242.40

cum

1502.00

Check Box 358

IRR-CCDW2-25

235

cum

6321.70

cum

1371.10

Check Box 359

IRR-CCDW2-26

236

cum

4148.90

cum

926.10

Check Box 360

IRR-CCDW2-27

237

cum

5756.00

cum

1272.20

IRR-CCDW3

FOUNDATION WELL SINKING WORKS : Sinking RCC wells vertically for foundation of piers and abutments in all kinds of soil, sand and soft rock by approved well sinking method including cost of all materials, machinery, labour, kent - ledge arrangements, disposal of excavated material as disposal of excavated material as directed etc., complete with lead upto 50 m for disposal of excavated material.(diameter of well 6.00m) (Data adopted from MORTH) Labour Component (including contractor's profit) for 3 to 10 meters for each running meter Labour Component (including contractor's profit) Filling foundation wells with sand in layers of 25 to 30 cm and compacting by watering, ramming as directed including cost of all materials, machinery, labour etc., complete with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit)

Check Box 361

IRR-CCDW3-1

238

*Rm

3186.20

*Rm *Rm *Rm

1169.80 4537.20 1512.60

Check Box 362

IRR-CCDW3-2

239

cum cum

426.40 81.70

IRR-CCDW4

MASONRY WORKS : Providing and constructing un-coursed rubble stone masonry with approved stones in CM 1 : 4 proportion for sub-structure portions of return walls / abutments etc., including cost of all materials, machinery, labour, scaffolding, cleaning, packing cement mortar, wedging stone chips, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 143 kg / cum of masonry, rubble stones : 0.85cum, FA : 0.40 cum,Stone Chips : 0.15 cum) Labour Component (including contractor's profit) Providing and constructing un-coursed rubble stone masonry with approved stones in CM 1 : 4 proportion for super-structure portions of return walls / abutments etc., including cost of all materials, machinery, labour, scaffolding, cleaning, packing cement mortar, wedging stone chips, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 143 kg / cum of masonry, rubble stones : 0.85cum, FA : 0.40 cum,Stone Chips : 0.15 cum) Labour Component (including contractor's profit) Providing and constructing coursed rubble masonry second sort in CM 1:4 proportion with stones from approved source including cost of all materials, machinery, labour, scaffolding, ramps, cleaning, packing mortar, wedging stone chips, finishing, curing etc., complete with initial lead upto 50 m and initial lift upto 3 m.(Cement content: 133 kg / cum of masonry, rubble stones : 0.45cum, FA : 0.35 cum,Stone Chips : 0.15 cum, Khandki stones 25 x 25 x 30 cm : 180 Nos, Header stones 25 x 25x 45 cm : 60 Nos) Labour Component (including contractor's profit) Providing and constructing coursed rubble masonry first sort in CM 1:4 proportion with stones from approved source including cost of all materials, machinery, labour, scaffolding, ramps, cleaning, packing mortar, wedging stone chips, finishing, curing etc., complete with initial lead upto 50 m and initial lift upto 3 m.(Cement content: 133 kg / cum of masonry, rubble stones : 0.45cum, FA : 0.35 cum,Stone Chips : 0.15 cum, Khandki stones 25 x 25 x 30 cm : 180 Nos, Header stones 25 x 25x 45 cm : 60 Nos) Labour Component (including contractor's profit) Providing cement mortar pointing to coursed rubble face stone masonry in CM 1 : 2 proportion by volume including raking and cleaning joints for 50 mm depth, pressing cement mortar into joints, cost of all materials, labour, scaffolding, finishing, curing etc., complete with initial lead upto 50 m and all lifts. 246 Providing cement mortar pointing to coursed rubble face stone masonry in CM 1 : 3 proportion by volume including raking and cleaning joints for 50 mm depth, pressing cement mortar into joints, cost of all materials, labour, scaffolding, finishing, curing etc., complete with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit) Providing 12 mm thick plastering in cement mortar 1:3 proportion by volume including cost of all materials, machinery, labour, scaffolding, cleaning joints, smooth finishing, curing etc., complete with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit)

Check Box 363

IRR-CCDW4-1

240

cum

1999.80

cum

580.40

Check Box 364

IRR-CCDW4-2

241

cum

2047.80

cum

595.00

Check Box 365

IRR-CCDW4-3

242

cum

2437.10

cum

665.60

Check Box 366

IRR-CCDW4-4

243

cum

2537.00

cum

765.50

Check Box 367

IRR-CCDW4-5

244

sqm sqm

97.50 67.80

Check Box 368

IRR-CCDW4-6

245

sqm sqm

90.00 67.80

Check Box 369

IRR-CCDW4-7

246

sqm sqm

138.90 96.30

18

Abstract of work items


Providing 12 mm thick plastering in cement mortar 1:4 proportion by volume including cost of all materials, machinery, labour, scaffolding, cleaning joints, smooth finishing, curing etc., complete with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit) Providing 20 mm thick plastering in cement mortar 1:3 proportion by volume including cost of all materials, machinery, labour, scaffolding, cleaning joints, smooth finishing, curing etc., complete with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit) Providing 20 mm thick plastering in cement mortar 1:4 proportion by volume including cost of all materials, machinery, labour, scaffolding, cleaning joints, smooth finishing, curing etc., complete with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit)

Check Box 370

IRR-CCDW4-8

247

sqm sqm

130.20 96.30

Check Box 371

IRR-CCDW4-9

248

sqm sqm

199.60 128.60

Check Box 372

IRR-CCDW4-10

249

sqm sqm

185.00 128.60

IRR-CCDW5

COPING & RAILING WORKS : Providing and fixing 10 cm thick roughly dressed burnt stone slabs for coping set in CM 1: 6 proportion by volume with pointing to joints in CM 1 : 3 proportion by volume including cost of all materials, machinery, labour, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 7.5 kg / sqm, FA : 0.030 cum/sqm, Burnt stone slab 10 cm thick 1.05 sqm/ sqm) Labour Component (including contractor's profit) Providing and fixing 10 cm thick one line dressed burnt stone slabs for coping set in CM 1: 6 proportion by volume with pointing to joints in CM 1 : 3 proportion by volume including cost of all materials, machinery, labour, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 7.5 kg / sqm, FA : 0.030 cum/sqm, Burnt stone slab 10 cm thick 1.05 sqm/ sqm) Labour Component (including contractor's profit) Providing and fixing 10 cm thick two line dressed burnt stone slabs for coping set in CM 1: 6 proportion by volume with pointing to joints in CM 1 : 3 proportion by volume including cost of all materials, machinery, labour, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 7.5 kg / sqm, FA : 0.030 cum/sqm, Burnt stone slab 10 cm thick 1.05 sqm/ sqm) Labour Component (including contractor's profit) Providing and laying insitu M-15 ( 28 days cube compressive strength not less than 15 N / sqmm ) grade cement concrete using 20 mm down size approved clean, hard, graded aggregates for coping slab including cost of all materials, machinery, labour, formwork, cleaning surface, batching, mixing, placing in position, levelling, compacting, finishing, curing etc., complete with initial lead upto 50 m and initial lift upto 3 m. (Cement content: 300 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) Labour Component (including contractor's profit) Providing and constructing protective railing consisting of in-situ railing posts of size 15 x 15 cm at bottom, 10 x 10 cm at top and 75 cm height at 2 m centre to centre in M-20 grade concrete using 20 mm down size graded aggregates and with each post reinforced by 4 Nos. of 8 mm dia main bars embedded in kerb concrete for a depth of 40 cm and 5 Nos. of 6 mm dia. stirrups including fixing 3 rows of 40 mm dia. GI pipes with one coat of red oxide primer and two coats of synthetic enamel paint, cost of all materials, machinery, labour, formwork, finishing, curing etc., complete with lead upto 50 m and all lifts. Labour Component (including contractor's profit)

Check Box 373

IRR-CCDW5-1

250

sqm

499.40

sqm

139.10

Check Box 374

IRR-CCDW5-2

251

sqm

610.50

sqm

250.20

Check Box 375

IRR-CCDW5-3

252

sqm

754.20

sqm

393.90

Check Box 376

IRR-CCDW5-4

253

cum

5532.50

cum

1207.00

Check Box 377

IRR-CCDW5-5

254

Rm

1235.50

Rm

130.00

IRR-CCDW6

HUME PIPE LAYING & JOINTING WORKS : Laying and jointing 300 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes and collars ), machinery, labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 9.9 kg / joint, FA : 0.01cum/joint, Hemp Yarn : 0.091kg/joint) Labour Component (including contractor's profit) Laying and jointing 450 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes and collars ), machinery, labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 17.4 kg / joint, FA : 0.022cum/joint, Hemp Yarn : 0.127kg/joint) Labour Component (including contractor's profit) Laying and jointing 600 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes and collars ), machinery, labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 24.8 kg / joint, FA : 0.025cum/joint, Hemp Yarn : 0.22kg/joint) Labour Component (including contractor's profit) Laying and jointing 700 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes and collars ), machinery, labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 32.1 kg / joint, FA : 0.031cum/joint, Hemp Yarn : 0.25kg/joint) Labour Component (including contractor's profit) Laying and jointing 800 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes and collars ), machinery, labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 39.6 kg / joint, FA : 0.039cum/joint, Hemp Yarn : 0.31kg/joint) Labour Component (including contractor's profit) Laying and jointing 900 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes and collars ), machinery, labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 44.6 kg / joint, FA : 0.045cum/joint, Hemp Yarn : 0.34kg/joint) Labour Component (including contractor's profit) Laying and jointing 1000 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes and collars ), machinery, labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 49.5 kg / joint, FA : 0.05cum/joint, Hemp Yarn : 0.377kg/joint) Labour Component (including contractor's profit)

Check Box 378

IRR-CCDW6-1

255

Joint

250.80

Joint

184.70

Check Box 379

IRR-CCDW6-2

256

Joint

300.80

Joint

184.70

Check Box 380

IRR-CCDW6-3

257

Joint

394.30

Joint

229.50

Check Box 381

IRR-CCDW6-4

258

Joint

439.50

Joint

229.50

Check Box 382

IRR-CCDW6-5

259

Joint

533.90

Joint

274.20

Check Box 383

IRR-CCDW6-6

260

Joint

566.60

Joint

274.20

Check Box 384

IRR-CCDW6-7

261

Joint

627.30

Joint

302.70

19

Abstract of work items

Check Box 385

IRR-CCDW6-8

262

Laying and jointing 1100 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes and collars ), machinery, labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 56.9 kg / joint, FA : 0.058cum/joint, Hemp Yarn : 0.415kg/joint) Labour Component (including contractor's profit) Laying and jointing 1200 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes and collars ), machinery, labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 66.8 kg / joint, FA : 0.069cum/joint, Hemp Yarn : 0.453kg/joint) Labour Component (including contractor's profit)

Joint

674.70

Joint

302.70

Check Box 386

IRR-CCDW6-9

263

Joint

798.40

Joint

363.70

IRR-CCDW7 IRR-CCDW7-1

BACK FILLING & OTHER WORKS : Providing rubble / boulder and sand filling behind abutment and return walls in layers including cost of all materials, machinery, labour, watering, ramming etc., complete with initial lead upto 50 m and initial lift upto 3 m. Labour Component (including contractor's profit) Providing and filling murrum / gravely soil ( CNS soil ) for foundation or around pipes including breaking clods, spreading in layers of 10 to 15 cm, watering, compaction by earth masters to achieve density control of not less than 95 percent etc., complete with lead upto 50 m and all lifts. Labour Component (including contractor's profit) Providing and filling murum / gravely soil ( CNS soil ) for foundation or above pipes including breaking clods, spreading in layers of 10 to 15 cm, watering, compaction by power roller to achieve density control of not less than 98 percent etc., complete with lead upto 50 m and all lifts. Labour Component (including contractor's profit) Providing and fixing one line dressed 111x35x25 cm thick IRC standard kilometre stone in cement concrete M-10 grade with 40 mm down size aggregates including excavating pit of size 70x45x40 cm, embedding the stone by 30 cm in concrete, providing 2 coats synthetic enamel paint of approved quality and colour to exposed surfaces and lettering as directed, cost of all materials, labour, finishing, curing etc., complete with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit) Providing and fixing one line dressed 65x15x10 cm thick IRC standard hectometre stone in cement concrete M-10 grade with 40 mm down size aggregates including excavating pit of size 50x45x40 cm, embedding the stone by 30 cm in concrete, providing 2 coats synthetic enamel paint of approved quality and colour to exposed surfaces and lettering as directed, cost of all materials, labour, finishing, curing etc., complete with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit)

Check Box 387

264

cum cum

628.90 163.60

Check Box 388

IRR-CCDW7-2

265

cum cum

357.40 206.90

Check Box 389

IRR-CCDW7-3

266

cum cum

247.00 81.60

Check Box 390

IRR-CCDW7-4

267

Each

1163.10

Each

337.80

Check Box 391

IRR-CCDW7-5

268

Each

843.80

Each

287.90

Chapter V IRR-GAW

GATES / HOISTS AND ALLIED WORKS SPILLWAY RADIAL GATES E.M Parts and anchorages fabrication, supply, erection, testing and commissioning of embedded parts for radial gate consists of sill beam, wall plates, anchor girders , yoke girders, tie flats, trunnion supports etc., including cost of all materials, machinery, labour, welding, finishing, with leads and lifts &all accessories (without painting on sand-blasted or mechanical cleaning surfaces which are added extra as per scedule of rates under itemsinthis chapter and add as applicable separately) Labour Component (including contractor's profit)

Check Box 392

IRR-GAW-11

269

tonne

94503.00

tonne

15366.90

Check Box 393

IRR-GAW-12

270

RADIAL GATES fabrication, supply, erection, testing and commissioning of radial gate consisting of skin plate, stiffeners, horizontal girders, radial arms, trunnion assemblies, tie beam, pulley supports, bracings, rubber seals, clamps etc., with all accessories for spillway/canals including cost of all materials, machinery, labour, seal fixing etc., complete as per specifications and approved drawings (without painting on sand-blasted or mechanical cleaning surfaces which are added extra as per scedule of rates under itemsinthis chapter and add as applicable separately) Labour Component (including contractor's profit) RADIAL GATES-ROPE DRUM HOISTS WITH HOIST BRIDGES fabrication, supply, erection, testing and commissioning of electrically operated rope drum hoist of adequate capacity consisting of base frames, rope drums,connecting shaft, gear system, brake system, electric motor, wire ropes, gate position indicator, manual operation arrangement etc., with all accessories for spillway radial gate including cost of all materials, machinery, labour,, greasing, providing hand railing and approach staircase with gate to hoist platform, , complete as per specifications and approved drawings (without painting on sand-blasted or mechanical cleaning surfaces which are added extra as per scedule of rates under itemsinthis chapter and add as applicable separately) Labour Component (including contractor's profit)

tonne

118921.80

tonne

14305.40

Check Box 394

IRR-GAW-13

271

tonne capacity

37177.80

tonne capacity

1549.50

Check Box 395

IRR-GAW-14

272

RADIAL GATES Walk way(cat walk) Design, fabrication, supply, erection and commissioning of 1 metre wide walkway connecting spillway piers / abutments at trunnion platform level including cost of all materials, machinery, labour, cutting, etc., complete as per specifications and approved drawings (without painting on sand-blasted or mechanical cleaning surfaces which are added extra as per scedule of rates under items in this chapter and add as applicable separately) Labour Component (including contractor's profit)

Rm

18998.80

Rm

1460.50

Check Box 396

IRR-GAW-21

273

VERTICAL LIFT GATES-EM PARTS Design, fabrication, supply, erection and commissioning of embedded parts consisting of sill beam, slide tracks, seal seats, guide rails, dogging sets for storage of stoplog elements etc., with all accessories for spillway stop log gates and other vertical lift elements including cost of all materials, machinery, labour, etc., complete as per specifications and approved drawings (without painting on sand-blasted or mechanical cleaning surfaces which are added extra as per scedule of rates under items in this chapter and add as applicable separately) Labour Component (including contractor's profit)

tonne

157621.90

tonne

28235.70

20

Abstract of work items


vertical lift gates and stop log gate elements ( SLIDING GATES) Design, fabrication, supply, erection, testing and commissioning of vertical lift gates and stoplog gate elements, consisting of skin plate, horizontal and vertical girders, stiffeners, lifting pins, bronze padded slide blocks/bearings, guide shoes, rubber seals, clamps etc., with all accessories including cost of all materials, machinery, labour, seal fixing etc.,complete as per specifications and approved drawings (without painting on sand-blasted or mechanical cleaning surfaces which are added extra as perscedule of rates under items in this chapter and add as applicable separately)2 Labour Component (including contractor's profit) STOP LOGS-automatic lifting beam fabrication, supply, erection, testing and commissioning of automatic lifting beam with all accessories for handling, lowering and lifting of spillway stop log gate elements including cost of all materials, machinery, labour, cutting, aligning, welding, finishing, etc., complete as per specifications and drawings with all leads and lifts. (without painting on sand-blasted or mechanical cleaning surfaces which are added extra as per scedule of rates under items in this chapter and add as applicable separately) Labour Component (including contractor's profit)

Check Box 397

IRR-GAW-22

274

tonne

74559.60

tonne

6758.80

Check Box 398

IRR-GAW-23

275

tonne

103964.20

tonne

11295.60

Check Box 399

IRR-GAW-24

276

MOVING GANTRY CRANE-CLASS II fabrication, supply, erection, testing and commissioning of adequate capacity Class- II type moving gantry crane consisting of rail mounted gantry frame, top platform with hand railing, long / cross travel arrangements, rope drums, gear systems, electric motors, electro-magnetic brake system, cabin, control panel, wire rope, ladder, motorised cable reeling drum etc., with all accessories for operating spillway stop log gate elements and river sluice / canal sluice emergency gates including cost of all materials, machinery, labour, etc., complete with all leads and lifts. (without painting on sand-blasted or mechanical cleaning surfaces which are added extra as per scedule of rates under items in this chapter and add as applicable separately) Labour Component (including contractor's profit) RAIL TRACK FOR GANTRY CRANE Design, fabrication, supply, erection and commissioning of rail track using 45 kg / m standard rails on spillway bridge for movement of gantry crane for handling and operating spillway stoplog gate elements / river sluice / canal sluice emergency gate including cost of all materials, machinery, labour, complete as per specifications (without painting on sand-blasted or mechanical cleaning surfaces which are added extra as per scedule of rates under items in this chapter and add as applicable separately) Labour Component (including contractor's profit)

tonne capacity

208842.10

tonne capacity

11374.40

Check Box 400

IRR-GAW-25

277

Rm

6788.40

Rm

278.70

Check Box 401

IRR-GAW-26

278

VERTICAL LIFT GATES/STOP LOGS - ROLLER MOUNTED Design, fabrication, supply, erection, testing and commissioning of fixed wheel type vertical lift service gate consisting of skin plate, vertical and horizontal girders, wheels, stiffeners, lifting brackets, guide rollers, ballast blocks, teflon claded rubber seals etc., with all accessories for river sluice / canal sluice vent including cost of all materials, machinery, labour,welding ,aligning finishing seal fixing etc.with all leads and lifts, complete as per specifications and approved drawings (without painting on sand-blasted or mechanical cleaning surfaces which are added extra as per scedule of rates under items in this chapter and add as applicable separately) Labour Component (including contractor's profit)

tonne

112592.50

tonne

6887.10

Check Box 402

IRR-GAW-27

279

VERTICAL LIFT GATES-ROPE DRUM HOIST UPTO 30 TON CAP. POWER OPERATED Design, fabrication, supply, erection, testing and commissioning of adequate capacity rope drum hoist consisting of hoist platform, rope drum, gear system, electric motor, electro-magnetic brake system, hand operation assembly, control panel, wire rope, pulleys, ladder etc., with all accessories for operating river sluice / canal sluice service gate including cost of all materials, machinery, labour, , complete as per specifications and drawings with all leads and lifts (without painting on sand-blasted or mechanical cleaning surfaces which are added extra as per scedule of rates under items in this chapter and add as applicable separately) Labour Component (including contractor's profit) HOIST BRIDGE/ WITH TRESSELS Design, fabrication, supply, erection and commissioning of structural steel hoist bridge consisting of columns, beams, bracings, stiffeners, ties, chequered plate covering, hand railing, ladder etc., with all accessories for supporting rope drum hoist for operating barrage gates including cost of all materials, machinery, labour, welding, finishing, etc., complete complete as per specifications and drawings with all leads and lifts (without painting on sand-blasted or mechanical cleaning surfaces which are added extra as per scedule of rates under items in this chapter and add as applicable separately) Labour Component (including contractor's profit)

tonne capacity

62885.00

tonne capacity

1475.20

Check Box 403

IRR-GAW-28

280

tonne

78545.80

tonne

9714.40

Check Box 404

IRR-GAW-29

281

ROPE DRUM HOIST WITHOUT HOIST BRIDGE FOR BARRAGE GATES Design, fabrication, supply, erection, testing and commissioning of adequate capacity rope drum hoist consisting of rope drum, pulleys, gear system, electric motor, electro-magnetic brake system, manual operation assembly, position indicator, control panel, wire rope etc., with all accessories for operating vertical lift roller gates for barrage including cost of all materials, machinery, labour, cutting, bending, aligning, anchoring, welding, finishing etc., complete with all leads and lifts. (without painting on sand-blasted or mechanical cleaning surfaces which are added extra as per scedule of rates under items in this chapter and add as applicable separately) Labour Component (including contractor's profit) SCREW GEAR HOISTS INCLUDING PLATFORM ( UPTO 10 TON CAP) Design, fabrication, supply, erection, testing and commissioning of adequate capacity screw gear type hoist consisting of supporting structure, platform, ladder etc., with all accessories for operating canal escape / regulator gate including cost of all materials, machinery, labour, cutting, bending, aligning, anchoring, welding,finishing etc.,complete with all leads and lifts. (without painting on sand-blasted or mechanical cleaning surfaces which are added extra as per scedule of rates under items in this chapter and add as applicable separately) Labour Component (including contractor's profit)

tonne capacity

31208.50

tonne capacity

624.50

Check Box 405

IRR-GAW-210

282

tonne capacity

28544.50

tonne capacity

2825.80

Check Box 406

IRR-GAW-211

283

MANUAL OPERATED ROPE DRUM HOISTS Design, fabrication, supply, erection, testing and commissioning of adequate capacity manually operated rope drum hoist consisting of hoist platform, rope drum, gear system, brake system, wire rope, ladder etc., with all accessories for operating canal regulator radial gate including cost of all materials, machinery, labour, welding, finishing, cleaning, ., complete with all leads and lifts (without painting on sand-blasted or mechanical cleaning surfaces which are added extra as per scedule of rates under items in this chapter and add as applicable separately) Labour Component (including contractor's profit)

tonne capacity

66626.60

tonne capacity

3785.60

IRR-GAW-3

SAND BLASTING AND PAINTING

21

Abstract of work items

Check Box 407

IRR-GAW-31

284

Cleaning gates / hoists / embedded parts/lifting beams etc, to expose fresh metal surface for painting by sand blasting method as per specifications including cost of all materials, labour, machinery, scaffolding, etc., complete with initial lead for sand upto 1 km and all lifts. Labour Component (including contractor's profit) painting of embedded metal parts and all types of gates, stoplogs,etc, on sand blasted surfaces with one coat of inorganic zinc silicate (airless spray preferred)70 +/- 5 and two super coats with a total thickness of 300 microns (each 150+/- 5) of solventless coaltar epoxy paint each coat 150 microns ( total 300 microns) cost of all materials, labour, scaffolding etc., complete with all leads and all lifts Labour Component (including contractor's profit) painting of Lifting beams,cat walks and other similar structures-painting hoist machinery, on sand blasted surfaces with two coats of zinc phosphate primer (airless spray preferred) 40microns/coat and twocoats of alkyd based micaccous iro oxide paint , 65 microns/coat cost of all materials, labour, scaffolding etc., complete with all leads and all lifts Labour Component (including contractor's profit) HOISTS:STRUCTURAL COMPONENTS painting structurals on sand blasted surfaces with two coats of zinc phosphate primer (airless spray preferred) 40microns/coat and one coat 65+/-5 of alkyd based micaccous iron oxide paint followed by two coats of synthetic enamel paint 25 microns/coat cost of all materials, labour, scaffolding etc., complete with all leads and all lifts Labour Component (including contractor's profit)

sqm sqm

400.10 70.70

Check Box 408

IRR-GAW-32

285

sqm

268.80

sqm

88.40

Check Box 409

IRR-GAW-33

286

sqm sqm

156.90 65.60

Check Box 410

IRR-GAW-34

287

sqm

236.60

sqm

108.30

Check Box 411

IRR-GAW-35

288

HOISTS:MACHINERY COMPONENTS painting hoist machinery, on sand blasted surfaces with one coats of zinc phosphate primer (airless spray preferred) 50microns/coat and three coats of aluminium paint or synthetic enamel , 25 microns/coat cost of all materials, labour, scaffolding etc., complete with all leads and all lifts Labour Component (including contractor's profit) PAINTING WITHOUT SAND BLASTING E.M PARTS OF ALL TYPES OF GATES Surface cleaning of metal surfaces by chemical cleaners and then by hand and power tool cleaners and removing dust. After cleaning,applying primary coat with one coat of Zinc rich epoxy primer to a thickness of 40 microns ,followed by finishing coats 4 coats with coal tar epoxy with material, labour,and all accessories with all leads and lifts Labour Component (including contractor's profit) ALL TYPES OF GATES Surface cleaning of metal surfaces by chemical cleaners and then by hand and power tool cleaners and removing dust. After cleaning,applying primary coat with one coat of Zinc rich epoxy primer to athickness of 40 microns ,followed by finishing coats 3 coats with coal tar epoxy with material, labour,and all accessories with all leads and lifts Labour Component (including contractor's profit)

sqm

212.70

sqm

118.00

IRR-GAW-4

Check Box 412

IRR-GAW-41

289

sqm

412.90

sqm

161.70

Check Box 413

IRR-GAW-42

290

sqm

371.90

sqm

137.80

Check Box 414

IRR-GAW-43

291

HOIST BRIDGES ,HOISTING EQUIPMENT AAND CRANES,Etc, Surface cleaning of metal surfaces by chemical cleaners and then by hand and power tool cleaners and removing dust. After cleaning,applying primary coat with two coats of Zinc chromite red oxide primer ,followed by finishing coats 3 coats with synthetic enamel paint with material, labour,and all accessories with all leads and lifts where surface cleaning by sand blasting is not feasible and based on specific recommendations of designers, it is to adopt surface preperation done manually by hand and power tool after cleaning by chemical treatment to remove grease, rust, scaling etc., and to form phasphate coating to prevent further rusting, before applying primer painting. Labour Component (including contractor's profit) WALK WAYS( CAT WALKS), LIFTING BEAMS,etc, Surface cleaning of metal surfaces by chemical cleaners and then by hand and power tool cleaners and removing dust. After cleaning,applying primary coat with one coat of Zinc rich epoxy primer to a thickness of 40 microns ,followed by finishing coats 2 coats with coal tar epoxy with material, labour,and all accessories with all leads and lifts Labour Component (including contractor's profit)

sqm

284.20

sqm

161.70

Check Box 415

IRR-GAW-44

292

sqm

254.20

sqm

80.00

Chapter VI IRR-PMW IRR-PMW-1


Check Box 416

PRELIMINARY AND MAINTENANCE WORKS JUNGLE CLEARANCE : Clearing thin jungle growth ( more than 50 percent open space ) including bushes upto 30 cm / parthenium and other weeds including burning or disposing off the same as directed etc., complete. Labour Component (including contractor's profit) Clearing thick jungle growth ( less than 50 percent open space ) including bushes upto 30 cm / parthenium and other weeds including burning or disposing off the same as directed etc., complete. Labour Component (including contractor's profit) Removing stumps, tree roots, roots of bamboo clusters etc., upto 1.50 m girth including excavation, stacking the materials neatly and levelling the surface etc., complete with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit)

IRR-PMW-11

293

sqm sqm

1.00 1.00

Check Box 417

IRR-PMW-12

294

sqm sqm

1.60 1.60

Check Box 418

IRR-PMW-13

295

Each Each

36.40 36.40

Check Box 419

IRR-PMW-14

296

Removing stumps, tree roots, roots of bamboo cluster etc., with girth above 1.50 m and upto 3.0 m including excavation, stacking the materials neatly and levelling the area etc., complete with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit) Removing stumps, tree roots, roots of bamboo cluster etc., with girth above 3.0 m and upto 5.0 m including excavation, stacking the materials neatly and levelling the area etc., complete with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit) Additional rate for every 0.5 m increase in girth of tree stump/stumps of bamboo cluster beyond 5 m Labour Component (including contractor's profit)

Each Each

81.90 82.00

Check Box 420

IRR-PMW-15

297

Each Each Each Each Each Each

262.20 262.20 46.40 46.40 10.60 10.60

Check Box 421

IRR-PMW-16

298

Check Box 422

IRR-PMW-17

299

Cutting and stacking bamboos excluding removing stumps and roots etc., complete with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit) Cutting and removing jauliflora bushes upto 1.5 m girth excluding removal of stumps and including burning or disposing off the materials as directed with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit)

Check Box 423

IRR-PMW-18

300

Each Each

10.30 10.30

22

Abstract of work items

Check Box 424

IRR-PMW-19

301

Cutting and removing jauliflora bushes above 1.5 m upto 3.0 m girth excluding removal of stumps and including burning or disposing off the materials as directed with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit) Cutting trees above 0.3 m and upto 0.6 m girth excluding removal of stumps and including stacking the materials neatly as directed with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit) Cutting trees above 0.6 m and upto 1.2 m girth excluding removal of stumps and including stacking the materials neatly as directed with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit) Cutting trees above 1.2 m and upto 1.8 m girth excluding removal of stumps and including stacking the materials neatly as directed with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit) Cutting trees above 1.8 m and upto 2.4 m girth excluding removal of stumps and including stacking the materials neatly as directed with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit) Cutting trees above 2.4 m and upto 3.0 m girth excluding removal of stumps and including stacking the materials neatly as directed with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit) For every 0.5 m increase in girth of tree beyond 3 m add

Each Each Each Each Each Each Each Each Each Each Each Each

20.50 20.50 69.80 67.10 244.40 235.20 488.80 470.30 977.60 940.50 1584.60 1510.50

Check Box 425

IRR-PMW-110

302

Check Box 426

IRR-PMW-111

303

Check Box 427

IRR-PMW-112

304

Check Box 428

IRR-PMW-113

305

Check Box 429

IRR-PMW-114

306

Check Box 430

IRR-PMW-115

307 Additional rate for cutting tree for every 0.5 m increase in girth of tree beyond 3 m. Labour Component (including contractor's profit) 308 Cutting and burning or disposing off Apu / Jondu from marshy areas as directed with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit) PRELIMINARY WORKS : Earthwork excavation for trial pits / borrow pits and other investigation works in all kinds of soil including boulders upto 30 cm dia and disposing off excavated soil as directed with lead upto 10 m and lift upto 3 m. Labour Component (including contractor's profit)

Each Each sqm sqm

555.20 533.00 3.80 3.80

Check Box 431

IRR-PMW-116

IRR-PMW-2 IRR-PMW-21

Check Box 432

309

cum cum

188.10 188.10

Check Box 433

IRR-PMW-22

310

Earthwork excavation for trial pits / borrow pits and other investigation works in soft rock including disposing off the excavated rock as directed with lead upto 10 m and lift upto 3 m. Labour Component (including contractor's profit)

cum cum

263.30 263.30

Check Box 434

IRR-PMW-23

311

Conducting geophysical investigation studies by electrical resistivity method in stages of 5m for sub-surface details such as depth of formations, shear zones, classification of strata, depth of water table etc., including cost of all materials, equipments, labour, analysing and reporting the details of field studies conducted etc., complete excluding cost of transportation arrangements. Labour Component (including contractor's profit)

stage

246.40

stage

179.60

Check Box 435

IRR-PMW-24

312

Drilling 80 mm dia hole through over-burden using casing shoe bit vertical or inclined upto 10 degrees to vertical as directed including cost of all materials, machinery, labour, water charges, reaming, collection of wash samples at suitable intervals, logging and lebelling, supplying honne wood core box, fixing casing pipes ( excluding cost of casing pipes ) etc., complete for depth upto 30 m from surface.

Rm

1024.80

1. For driiling through over-burden beyond 30 m from surface increase the rate per Rm by 10 percent. 2. For providing HDPE or light black MS casing pipe add the cost of pipe per Rm. Labour Component (including contractor's profit) Rm cost of hdpe/light black MS casing pipe Rm Drilling 76 mm dia ( NX ) core hole in hard rock using diamond core bit vertical / inclined upto 10 degree to vertical as directed including cost of all materials, machinery, labour, water charges, collection of core samples, logging and lebelling, supplying honne wood core box including cement grouting ( excluding cost of cement for grouting ) and redrilling in case of collapse of sides etc., complete for depth upto 30 m from surface. 1. For driiling in hard rock beyond 30 m upto 60 m from surface increase the rate per Rm by 25 percent. 2. For driiling in hard rock beyond 30 m upto 60 m from surface increase the rate per Rm by 40 percent. Labour Component (including contractor's profit) Drilling 47 mm (BX )dia core hole in hard rock using diamond core bit vertical / inclined upto 10 degree to vertical as directed including cost of all materials, machinery, labour, water charges,collection of core samples,logging, lebelling, supplying honne wood core box including cement grouting ( excluding cost of cement for grouting ) and redrilling in case of collapse of sides etc., complete for depth upto 30 m from surface. 1. For driiling in hard rock beyond 30 m upto 60 m from surface increase the rate per Rm by 25 percent. 2. For driiling in hard rock beyond 30 m upto 60 m from surface increase the rate per Rm by 40 percent. Labour Component (including contractor's profit)
Check Box 438

325.60 200.00

Check Box 436

IRR-PMW-25

313

Rm

5232.80

Rm

1275.00

Check Box 437

IRR-PMW-26

314

Rm

5080.80

Rm

1275.00

IRR-PMW-27

315

Providing and fixing 20 x 20 x 75 cm size roughly dressed boundary / demarcation / chainage / arrow stones including cost of all materials, labour, engraving marks, fixing in position, murum filling etc., complete with lead upto 50 m and all lifts. Labour Component (including contractor's profit) Providing and fixing 20 x 20 x 75 cm size temporary bench mark stone in CC 1 : 4 : 8 using 40 mm down size graded coarse aggregate including cost of all materials, labour, dressing top surface, engraving BM data etc.,complete with lead upto 50 m and all lifts. Labour Component (including contractor's profit) For providing 30 cm thick compacted murum bed in B.C soil area including additional excavation for thickness of murum bedding add per Providing and fixing 20 x 20 x 75 cm size permanent bench mark stone in CC 1 :3 : 6 block of size 90 x 90 x 120 cm using 40 mm down size graded coarse aggregate and providing 35 cm thick 30 cm high UCR masonry in CM 1 : 5 proportion protective wall alround the BM stone, including cost of all materials, labour, dressing top surface of stone, engraving BM data Labour Component (including contractor's profit) MAINTENANCE WORKS :

Each Each

117.40 86.40

Check Box 439

IRR-PMW-28 NOTE:

316

Each Each Each

396.50 255.90 4.00

Check Box 440

IRR-PMW-29

317

Each Each

5204.40 2271.50

IRR-PMW-3
Check Box 441

IRR-PMW-31

318

Removing dry stone rock-toe / rivetment and filter layers below rock-toe/ rivetment including stacking all materials separately as directed with initial lead upto 50 m and all lifts.

cum

152.10

23

Abstract of work items

Labour Component (including contractor's profit) Re-constructing 60 cm thick hand packed rough stone revetment with through stones at 1.5 m c / c over a backing of 45 cm thick graded filter media consisting of sand, 10 mm and 40 mm size graded aggregates satisfying filter criteria laid in layers of 15 cm thick each using sand from approved quarry and stones and filter aggregates obtained from revetment removed for re-construction including cost of all machinery, labour, laying filter and stones to specified slopes, wedging with chips, finishing etc. complete with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit) Re-constructing dry rubble rock-toe and filter media for rock-toe consisting of sand 20 mm and 80 mm size graded aggregates satisfying filter criteria laid in layers of 15 cm thick each using sand from approved quarry and stones and filter aggregates obtained from rock-toe removed for reconstruction including cost of all machinery, labour, laying filter and stones to specified slopes, wedging with chips, finishing etc. complete with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit) IRR-PMW-34 Removing and resetting disturbed Yarguntla / Shahabad / Talikot / PCC / Other types of slab lining set in CM 1 : 3 including flush cement mortar pointing in CM 1 : 3 with lead upto 50 m and all lifts. Labour Component (including contractor's profit) Removing and resetting disturbed dry rubble / khandki stone pitching 25 to 45 cm thick including packing, wedging, finishing etc., complete with all leads and lifts. Labour Component (including contractor's profit) Removing and refixing disturbed chainage / demarcation / hectometre / guard stones including excavation, back filling etc., complete with all leads and lifts. Labour Component (including contractor's profit) Removing and refixing disturbed km stone / sign board / hecto-metre stone etc., including excavation, back filling with available stuff after refixing, forming base platform of size 90 x 90 x 7.5 cm including watering, ramming etc complete with all leads and lifts. Labour Component (including contractor's profit) Providing impervious hearting for breached / damaged portion of embankment with soil from approved borrow areas in layers of 10 to 15 cm before compaction including cost of all materials, machinery, labour, all operations such as collection of soil, sorting out, spreading soil to specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 98 percent or as stipulated by rolling or by using mechanical tampers etc., complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit) Providing pervious/semi-pervious casing for breached / damaged portion of embankment with soil from approved borrow areas in layers of 10 to 15 cm before compaction including cost of all materials, machinery, labour, all operations such as collection of soil, sorting out, spreading soil to specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 98 percent or as stipulated by rolling or by using mechanical tampers etc., complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit) Providing impervious hearting for breached / damaged portion of embankment with soil from approved dump areas in layers of 10 to 15 cm before compaction including cost of all materials, machinery, labour, all operations such as collection of soil,sorting out, spreading soil to specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 98 percent or as stipulated by rolling or by using mechanical tampers etc., complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit) Providing pervious /semi-pervious casing for breached /damaged portion of embankment with soil from approved dump areas in layers of 10 to 15 cm before compaction including cost of all materials, machinery, labour, all operations such as collection of soil, sorting out, spreading soil to specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 98 percent or as stipulated by rolling or by using mechanical tampers etc., complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit) Repairing rain cuts / resectioning canal slopes to required lines and grades as directed using available soil including dressing, clod breaking, packing, tamping etc., complete with all leads and lifts. Labour Component (including contractor's profit) Cleaning drainage gallery, adits, instrumentation galleries etc., by scrubbing / brushing including chiselling and removing leached lime deposit and disposing off all the waste material out side adits in specified location etc., complete with all leads and lifts. Labour Component (including contractor's profit) Cleaning dam parapet inner face and top using oxalic acid and water by scrubbing / brushing and washing to remove all surface coatings etc., complete . Labour Component (including contractor's profit)
Check Box 455

cum

152.10

Check Box 442

IRR-PMW-32

319

sqm

179.10

sqm

113.80

Check Box 443

IRR-PMW-33

320

cum

204.90

cum

163.00

Check Box 444

321

sqm sqm sqm sqm Each Each

45.30 38.60 40.00 40.00 50.70 50.60

Check Box 445

IRR-PMW-35

322

Check Box 446

IRR-PMW-36

323

Check Box 447

IRR-PMW-37

324

Each Each

114.00 114.00

Check Box 448

IRR-PMW-38

325

cum

191.70

cum

22.70

Check Box 449

IRR-PMW-39

326

cum

215.70

cum

27.10

Check Box 450

IRR-PMW-310

327

cum

175.80

cum

21.70

Check Box 451

IRR-PMW-311

328

cum

196.90

cum

25.70

Check Box 452

IRR-PMW-312

329

sqm sqm

2.60 2.60

Check Box 453

IRR-PMW-313

330

Rm Rm

31.00 23.60

Check Box 454

IRR-PMW-314

331

Rm Rm

28.30 17.10

IRR-PMW-315

332

Cleaning gates / hoists / embedded parts for re-painting by removing rust, old paint, grease etc., by using wire brush, scrubber, rust remover and applying a coat of rust inhibitive compound etc., complete. Labour Component (including contractor's profit) Cleaning gates / hoists / embedded parts to expose fresh metal surface for repainting by sand blasting method as per specifications including cost of all materials, labour, machinery, scaffolding, applying a coat of rust inhibitive etc., complete with initial lead for sand upto 1 km and all lifts. Labour Component (including contractor's profit) Providing two coats of painting to hoist supporting structures / hoists / moving gantry cranes / railings etc., with zinc chromate alluminium primer paint of approved quality including removing rust, cleaning surface, cost of all materials, labour, scaffolding etc., complete with all leads and all lifts. Labour Component (including contractor's profit)

sqm sqm

52.60 45.60

Check Box 456

IRR-PMW-316

333

sqm sqm

354.60 70.70

Check Box 457

IRR-PMW-317

334

sqm sqm

82.60 48.50

Check Box 458

IRR-PMW-318

335

Providing two coats of painting 100 micron dry film thickness each coat to embedded parts / gates with cold applied coal tar epoxy paint of approved quality including removing rust, cleaning surface, cost of all materials, labour, scaffolding etc., complete with all leads and all lifts. Labour Component (including contractor's profit) Providing two coats of painting to hoist supporting structures / hoists / moving gantry cranes / railings etc., with first quality synthetic enemel paint of approved colour including cleaning surface, cost of all materials, labour, scaffolding etc., complete with all leads and all lifts. Labour Component (including contractor's profit)

sqm sqm

143.10 61.60

Check Box 459

IRR-PMW-319

336

sqm sqm

95.40 48.50

24

Abstract of work items


Excavation and removal of silt and silt mixed with sand from canal bed in dry condition including disposing off the same in spoil bank or on the canal embankment in layers as directed etc., complete with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit) Excavation and removal of silt or silt mixed with sand in slussy condition from canal bed including disposing off the same in spoil bank or on the canal embankment in layers as directed etc., complete with initial lead upto 50 m and all lifts. Labour Component (including contractor's profit) Providing homogeneous embankment using soil from approved borrow area in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transportation, spreading soil in layer of specified thickness, breaking clods, sectioning,etc.,complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit) Providing homogeneous embankment using soil from approved borrow area in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all operations such as watering, compactingto density control of not less than 95 percent or as stipulated using 8T roller etc., complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit) Providing homogeneous embankment using soil from approved borrow area in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all operations such as compactingto density control of not less than 90 percent or as stipulated using 2T roller etc., complete with initial lead upto 1 km and all lifts. Labour Component (including contractor's profit)

Check Box 460

IRR-PMW-320

337

cum cum

114.00 114.00

Check Box 461

IRR-PMW-321

338

cum cum

142.50 142.50

Check Box 462

IRR-PMW-322 (new Item5 201011)

339

cum cum

111.00 10.70

Check Box 463

IRR-PMW-323 (new Item6 201011)

340

41.10 5.10

Check Box 464

IRR-PMW-324 (new Item7 201011)

341

cum cum

5.90 0.90

Check Box 465 Check Box 466

Check Box 467


Check Box 468 Check Box 469 Check Box 470

IRR-PMW-325 (new Item 3 2012-13) IRR-PMW-325(a) IRR-PMW-325(b) IRR-PMW-325(c) IRR-PMW-325(d) IRR-PMW-325(e) IRR-PMW-325(f)

Weed Removal by Manual Means 342 343 344 345 346 347 Sqm Sqm Sqm Sqm Sqm Sqm 4.60 6.30 4.20 3.60 4.20 1.30

Removal of Water Hyacinth up to 30 cm thick Removal of Water Hyacinth beyond 30 cm thick Clearing Alchi Tilla Removal of Jammu Removal of Imponea, Cornea Removal of Natchu, goobi, thooti, etc.

New extra items-- common item for all earth works using only manual labour for allother works COM-MWRK without involving contractors (Manual)Excavation in all kinds of soil including boulders upto 0.30 m dia. for foundations of canal cross drainage and other appurtenant structures and placing excavated stuff neatly in specified dump area or disposing off the same as directed etc., complete with initial lead upto 10 m and initial lift upto 1.5 m. (WIthout involving the contractors for specified works ) With 3 Cum per day output (Manual)Excavation in all kinds of soil/HDR including boulders upto 0.30 m dia. for foundations of canal cross drainage and other appurtenant structures and placing excavated stuff neatly in specified dump area or disposing off the same as directed etc., complete with initial lead upto 10 m and initial lift upto 1.5 m. (WIthout involving the contractors for specified works ) With 2.5 Cum per day output (Manual)Excavation in soft rock (including F&F rock) without blasting, including boulders upto 0.30 m dia. for foundations of canal cross drainage and other appurtenant structures and placing excavated stuff neatly in specified dump area or disposing off the same as directed etc., complete with initial lead upto 10 m and initial lift upto 1.5 m. (WIthout involving the contractors for specified works ) Soft rock 1.33 Cum/Day (Manual)Excavation in hard rock, including boulders upto 0.30 m dia. for foundations of canal cross drainage and other appurtenant structures and placing excavated stuff neatly in specified dump area or disposing off the same as directed etc., complete with initial lead upto 10 m and initial lift upto 1.5 m. (WIthout involving the contractors for specified works ) Hard rock 0.67Cum/ day

Check Box 471

COM-MWRK1

348

cum

83.30

Check Box 472

COM-MWRK2

349

cum

100.00

Check Box 473

COM-MWRK3

350

cum

188.00

Check Box 474

COM-MWRK4

351

cum

373.10

25

ABSTRACT ESTIMATE Name of the Work:- FDR works to the existing tank, vizianagaram
Sl. No:
1

Item No:

Qty

unit

Description of Item

Rate (Rs.)

Per

Amount (Rs.)

LS LS LS LS LS LS LS

Estimate Cost Value(Rs.) Provison towards VAT @ Provison towards Insurance Premium @ Provison towards Labour cess @

5% 0.44% 1% 0% 0% 0% 0%

Total Amount (Rs.) or say (Rs.) 0

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Executive Engineer Dam Maintenance Division NSRS Srisailam Project Kurnool Dist.,

Dy.Executive Engineer Dam Maintenance Sub Division-I NSRS Srisailam Project Kurnool Dist.,

Assistant Executive Engineer Spillway Section NSRS Srisailam Project Kurnool Dist.,

DETAILED ESTIMATE
Name of the Work:- FDR works to the existing tank, vizianagaram

Sl. Description of Item No:


1

Nos

Length (m)

Breadth (m)

Height (m)

Quantity

Executive Engineer Dam Maintenance Division NSRS Srisailam Project Kurnool Dist.,

Dy.Executive Engineer Dam Maintenance Sub Division-I NSRS Srisailam Project Kurnool Dist.,

Assistant Executive Engineer Spillway Section NSRS Srisailam Project Kurnool Dist.,

IRR-DAW

50

IRR-TAW

113

IRR-CAW

140

IRR-CCDW

222

IRR-GAW

274

IRR-PMW

297

(Common to all Departments) Index_code COM_MWRK A. Manual Works New extra items-- common item for all earth works using only manual labour for all other works without involving contractors

COM_MWRK(Manual)Excavation in all kinds of soil including boulders upto 0.30 m dia. for 1 foundations of canal cross drainage and other appurtenant structures and placing excavated stuff neatly in specified dump area or disposing off the same as directed etc., complete with initial lead upto 10 m and initial lift upto 1.5 m. (WIthout involving the contractors for specified works ) With 3 Cum per day output COM_MWRK(Manual)Excavation in all kinds of soil/ HDR including boulders upto 0.30 m dia. for 2 foundations of canal cross drainage and other appurtenant structures and placing excavated stuff neatly in specified dump area or disposing off the same as directed etc., complete with initial lead upto 10 m and initial lift upto 1.5 m. (WIthout involving the contractors for specified works ) With 2.5 Cum per day output

per cum

83.30

per cum

100.00

COM_MWRK(Manual)Excavation in soft rock (including F&F) without blasting, including boulders upto 0.30 m dia. for 3 foundations of canal cross drainage and other appurtenant structures and placing excavated stuff neatly in specified dump area or disposing off the same as directed etc., complete with initial lead upto 10 m and per cum initial lift upto 1.5 m. (WIthout involving the contractors for specified works ) Soft rock 1.33 Cum/Day COM_MWRK(Manual)Excavation in hard rock, including boulders upto 0.30 m dia. for 4 foundations of canal cross drainage and other appurtenant structures and placing excavated stuff neatly in specified dump area or disposing off the same as directed etc., complete with initial lead upto 10 m and initial lift upto 1.5 m. (WIthout involving the contractors for specified works ) Hard rock 0.67Cum/ day

188.00

per cum

373.10

327