Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Frankfurt, 11/09/12
1
GAUFF CONSULTANTS
AGENDA 1. GENERAL 2. ACTIVITIES AND SERVICES 3. PROJECT EXPERIENCES 4. CONTACTS
ADB
WB
4
Gauff has been certified since 1996 according to DIN EN ISO 9001: 2008 Gauff owns also quality approvals from Siemens Deutsche Bahn
Afghanistan Algeria Austria Azerbaijan Burkina Faso Cambodia China Democratic Rep. of the Congo Denmark Ethiopia Germany Ghana Georgia Hungary Ivory Coast Kenya Libya Mali Nigeria Norway Poland Rep. of the Congo Russia Serbia Switzerland Tanzania Uganda USA Zambia
6
Geographical Distribution
2008:
2% 8% 41% Germany Europe 44% Africa Asia
80
70
60
America
50
5%
40
2012:
2% 17% 37% Germany Europe 33% 11% Africa Asia America
2007 2008 2009 2010 2011 2012
30
20
10
KfW
WB
Donor Organisations
Federal state
Public Authority
Private
Municipality
16% Private
10
INTERDISCIPLINARY ACTIVITIES
1%
7% 4%
COMPREHENSIVE SERVICES
2%
2% 18%
42%
32%
46%
46%
WATER, ENVIRONMENT
CONSULTING SERVICES / STUDIES PLANNING / DESIGN SITE SUPERVISION / PROJECT MANAGEMENT OPERATION & MAINTENANCE / PROCUREMENT
TRANSPORTATION
MOBILITY ENERGY
INFORMATION TECHNOLOGY
11
1)
2) 3) 4) 5)
WATER, ENVIRONMENT
TRANSPORTATION MOBILITY ENERGY INDUSTRIAL AND COMMERCIAL BUILDING
12
WATER SUPPLY Recovery Abstraction Treatment Storage Transportation, Transmission Distribution Control Panels
13
WASTEWATER DISPOSAL AND PURIFICATION Collection Abstraction Transportation Purification Reuse Control Panels
14
ENVIRONMENTAL PROTECTION Dumping Grounds for Domestic and Industrial Waste Material Soil Cleaning Recycling of Waste and Construction Material Protection of Water Bodies and Water Pollution Control Renovation and Restoration of Water Bodies
15
ROADS
Motorways
Highways / Urban, Rural and Federal Roads Structures
Emergency Relief
RAIL
Marshalling Facilities
RAIL Mechanical Signal Towers Electro-Mechanical Signal Towers Relay Stations Electronic Signal Towers Operations Control Centers
Telecommunication Equipment
CORE SYSTEMS Transportation System Engineering Track Work Signalling and Train Control Systems - Driverless and Conventional (ETCS Level 2)
MOBILITY CONSULTANCY
Master Planning Transport and Company Strategy
Renewable Energies
Hydropower Solar Energy - Photovoltaics Biogas Plants Geothermal Power Waste Utilization for Energy Generation Efficiency Improvement Pipelaying / Reconstruction
21
Regional Development
Land Allocation and Acquisition Establish Rights of Way Building Development Industrial Estates and Buildings Office Buildings, Banks Educational Centers
22
1)
2) 3) 4) 5)
23
Technical and Economic Consulting of Investment Projects as well as Operation and Maintenance Investment Studies Feasibility Studies / Socio-Economic Consulting Compatibility Studies Income Statements / Research Special Services Regarding Technical, Economic and Financial Requirements
24
25
SITE SUPERVISION
Hydrology, Hydrogeology
PROJECT CONTROL Clarification of the Assignment of Tasks and Preconditions for the Participation in Design and Execution of Investment Projects Summary and Monitoring of the Investment and Payment Planning Coordination and Control of the Involved and Concerned Parties of the Project (under Public and Private Law) Planning Update Continuous Information Flow to the Client
27
PROJECT MANAGEMENT Fiduciary Taking over of the Constructors Function Participation in Project Development including Public Relations Participation in Securing the Financing for the Investment Plan Controlling Technical and Economical Business Activities (Contract Management) of Project Financed Investments
28
Staff Training
Maintenance and Repair Management Rehabilitation Concepts
30
3. PROJECT EXPERIENCES
32
3. PROJECT EXPERIENCES
Mobility
Energy Industrial and Commercial Building Project Management
33
3. PROJECT EXPERIENCES
3.1 WATER - WATER SUPPLY (1)
REFERENCES WATER
34
3. PROJECT EXPERIENCES
3.1 WATER - WATER SUPPLY (2)
REFERENCES WATER
35
3. PROJECT EXPERIENCES
3.1 WATER - WATER SUPPLY (3)
36
3. PROJECT EXPERIENCES
3.1 WATER - WASTEWATER (1)
37
All rain overflow stayed open in order to guarantee the protection of the Rednitz river and the water protection area of the town
Services provided by Gauff included preliminary and final design and cost determination
3. PROJECT EXPERIENCES
3.1 WATER - WASTEWATER (2)
Turkey Isparta Wastewater Treatment Plant Initial Operation and Management Support
Client: Municipality of Isparta Project Value: 240 thousand EUR Connected population 362,100 P.E.; average dry weather flow Qd=37,872 m3/d; peak dry weather flow Qh=2,746 m3/h; total daily BOD5-Load Bd=19,546 kg/d, TSS-Load BTKN=25,337 kg/d Phase I: Development of operation concept, assistance in staffing and basic staff training, assistance in procurement of operation equipment, preparation of work plan and procedure documents
38
Phase II: Introduction of managerial/administrative and operation/environmental procedures, introduction of customized inhouse training, provision of complementary training and support, finalization of the divisions work plan and in-house training program
3. PROJECT EXPERIENCES
3.1 WATER - WASTEWATER (3)
39
3. PROJECT EXPERIENCES
3.2 TRANSPORTATION - ROAD (1)
40
3. PROJECT EXPERIENCES
3.2 TRANSPORTATION - ROAD (2)
41
3. PROJECT EXPERIENCES
3.2 TRANSPORTATION - ROAD (3)
Cambodia Open Program of Rural Rehabilitation and Complementary Infrastructure Measures (TRIP IV)
Client: MRD - Ministry of Rural Development / KfW funding Project value: 2.13 million EUR (overall project value) Expansion of previous Tertiary Road Improvement Program for promotion of pro-poor and sustainable rural growth Implementation: selection procedures for rehabilitation, planning, tender documentation, assistance in tendering, site supervision, maintenance management, socio-economic and environmental studies, assistance to the employer and construction supervision. Training: rural road management systems, organizational restructuring and further education of staff, development of road management units, on-the-job-training for management, councils and coordination of maintenance procedures
42
3. PROJECT EXPERIENCES
3.2 TRANSPORTATION - RAIL (1)
Germany, Bavaria New Construction / Rehabilitation Line Nuremberg - Ingolstadt - Munich, Section Ingolstadt - Munich
Client: DB ProjektBau GmbH Project Value: 180 million EUR Corridor Nuremberg - Munich newly developed and extended with a design speed of 330 km/h All design services for the complete rail engineering equipment (electrification, telecommunication, four electronic signal towers) provided for the 77 km long section between Ingolstadt and Munich Adaption of existing track plan signal towers to the electronic signal towers Complete operational design including all technologic procedures required to construct under operation
43
3. PROJECT EXPERIENCES
3.2 TRANSPORTATION - RAIL (2)
China Passenger Dedicated High-Speed Line BeijingTianjin Intercity Line Site Supervision at the 2nd Supervision Section
Client: Beijing Tianjin Intercity Railway Co., Ltd. Project Value: 40 million USD Subgrade (CFG piles, Drilled Piles, Soil Improvement) Bridges (Prefabricated Girders 32 m, Balance Cantilever Bridges up to 60+128+60 m Span)
44
3. PROJECT EXPERIENCES
3.2 TRANSPORTATION - RAIL (3)
45
3. PROJECT EXPERIENCES
3.3 MOBILITY (1)
Germany Research Project to Develop Management Systems for Airport Security in the context of Civil Security
Client: German Federal Ministry of Research and Education Project value: 4 million EUR Evaluation of security requirements in the interaction of public transport, rail and air transport Feasibility study for the possible implementation of security standards in air transport into other modes of transport Participation in the development of modern concepts for the security at airports
46
3. PROJECT EXPERIENCES
3.3 MOBILITY (2)
47
3. PROJECT EXPERIENCES
3.3 MOBILITY (3)
Guatemala Master Plan for the Development of the National Transport System
Client: Ministry of Telecommunication, Transport and Urban Development of Guatemala Project value: 0.5 million EUR Elaboration of the master plan for the development of the national transport system in Guatemala Determination of the future transport policy for all modes of transport Preparation of proposals for legislative and organizational measures, as well as for investments in the transport system to ensure the participation of the private sector Forecast for the volume of necessary vehicle fleet in connection with socio-economic parameters.
48
3. PROJECT EXPERIENCES
)4( 3.3 MOBILITY
4930'0"E
4936'0"E
4942'0"E
4948'0"E
4954'0"E
500'0"E
506'0"E
5012'0"E
2648'0"N
Al Taqseem
2642'0"N
>
Abo Maan
/ Client: Client: Saudi Ministry of Municipalities and Rural Affairs Government of the Ad-Dammam Region Value: 1.9 million EUR Development of a Traffic & Transport Master Plan for the corresponding infrastructure and connections in the Ad-Dammam 3202 region up to Provision of a set of working tools to the responsible regional departments in the planning administrations that allows them to define the basic structure and the necessary phases of development of the strategic planning of transport infrastructure and to identify methods to control urban growth and traffic volumes .Development of the traffic & transport model based on the U.S software TransCAD .Training of staff for regional planning
2636'0"N
Al Khatrashiah
Al Thoraiah Al Reef
Al Zahraa
2636'0"N
Al Zor - Al Narjes - Narjes- Al Jamayeen Al Al Awamiah Al Bawadi - Al Senayah Al Jawaher Sanabess Al Jamaeah Al Moroj - Al Jawhrah - Al Wahah - Al Lo'a Lo'a - Al Rawdah Al Naserah Al Yamamah Al Huseen Al Rabiyiah Jabal Al Fateh Al Al Qadeeh Al Mashtel - Al Bahr - Al Sawari - Khozama Al Bahara Al - Sadafah Al Manakh Al Redah Al Al Shateea Al Raba'a Al Shahbaa Al Khamesah Al Toba Al Raihan Al Khowailidiah Al Ezdehar- Al Zomorrod
Awgam
4930'0"E
Al Mjediah Al Jarodiah Al Mostawda'at Hallet Maheesh Al Yaqoot Al Badeeah - Al Aqiq - Al Bahr Al Anwar Anak Om Al Hamam - Al Eskan - Al Bostan Al Gash Al Raiah
2630'0"N
Al Melaha
Al Badr - Al Naseem - Qurtobah Al Khassab Al Gadeer Al Taf - Al Muntazah Al - Noor Al - Kawthar-naqa Al Al Deerah
Al Remal
>
2630'0"N
Al Nabiah
- Al Jawhrah
Al Aziziah Al Mohammadyah Al Khodaryah - Al Zohoor - Al Senayah Badeea- Al Salam Al Amammrah- Khaleej Al Anood Al Al Al mazroyah Al Dawaser Al Sooq- Al Nakheel
- Al Naseem
- Al Fayhaa
Mohammed Ben Mas'ood Qazzazz Al Jalawyah Al Al Atheer Tubeshy Al Adamah Al Al Badyah - Madynat Al Umal - Ghurnatah Al Naseryah Ibn Khuldoon - Al Eskan Al Al Khaldyah Al Shmalyah Murykebat Al Etsalat Al Shefaa Al Ryan - Al Rawdah Al Fysalyah Al Khaldyah Al Jnubyah KFUH Al Bsateen 1 Al Manteqah Al Senayah - Al Jamayeen Al Nozhah Al Husam Al Seef - Al Safa
2624'0"N
Al Qadesyah
Al Nawras
Al Fanar
2624'0"N
Al Nada
Al Shorook
Teebh Al shooalah
Al Forsaan
Al Kurnich - Al Andalus - Al Bostan Hezam Al Thahaby Al Doohah Al Jnubyah Al Al Yarmouk KFUPM Al Huda Al Bandryah KFUPM Al Hezam Al Akhdar
2618'0"N
2618'0"N
2612'0"N
Al Jesser - Al Khozama
2612'0"N
Eshbilia
Al- Rajaa
Al Sheraa
- Al Kawthar Al Amwaj
266'0"N 266'0"N
- Al Aqiq
260'0"N
-
260'0"N
4936'0"E 4942'0"E 4948'0"E 4954'0"E 500'0"E 506'0"E 5012'0"E
: -
>
o
2 1 0
94
3. PROJECT EXPERIENCES
3.4 ENERGY - HYDROELECTRIC POWER
Tanzania Kikuletwa/Tosamaganga
Client: Government of the Republic of Tanzania
Iringa
50
3. PROJECT EXPERIENCES
3.5 INDUSTRIAL AND COMMERCIAL BUILDING (1)
Germany Reconstruction and Rebuild of the Terminal Building at the Nuremberg Airport
51
Client: Flughafen Nrnberg GmbH Project Value: 21.5 million EUR Project control for the new build and reconstruction of the terminal building Summarization of existing planning and awarding information Involvement at performance of obligations from the contract Proposal evaluation from a technical-economical point of view Participation on awarding negotiations until contract signature Recording and updating of financial and accounting information
3. PROJECT EXPERIENCES
3.5 INDUSTRIAL AND COMMERCIAL BUILDING (2)
52
3. PROJECT EXPERIENCES
3.5 INDUSTRIAL AND COMMERCIAL BUILDING (3)
53
3. PROJECT EXPERIENCES
3.6 PROJECT MANAGEMENT (1)
54
3. PROJECT EXPERIENCES
3.6 PROJECT MANAGEMENT (2)
Germany Development Design for the Former Herzo, Base of the US-Army in Herzogenaurach
GEV Grundstcksgesellschaft Herzogenaurach mbH & Co. KG, adidas-Salomon AG Project Value: 27 million EUR Involvement in feasibility studies, development design for traffic facilities Rain water and foul water supply, water supply, gas/district heat, electricity, street lighting, IT and telecommunication Tendering, construction supervision, site management and local construction supervision
55
4. CONTACTS
56
4. CONTACTS
H.P. Gauff Ingenieure GmbH & Co. KG -JBGBerner Strae 45 60437 Frankfurt am Main Telefon: +49 69 5 00 08-0 Telefax: +49 69 5 00 08-111 Email: gauff@gauff.com
57
58