More than Fourteen (18) years of diversified experience primarily within the infrastructure, project management, investment, assess and identify environmental, health and safety risks, provide recommendations for action plan in the project development process; Supervise the environmental performance of a portfolio of allocated projects, across all subsectors, power, transport, utilities, and renewable energy; water and wastewater. Assist in the development and implementation of an annual supervision work plan including definition of resource requirements and coordination with others Departments; and - Facilitate communication among various investment project stakeholders to promote environmentally sound project implementation with sustainable development outcomes. Identify and solve complex environmental and social problems, and to find value-added opportunities in their business operations. Experience in environmental assessment and management, pollution prevention and abatement, and occupational health and safety to collaborate with other specialists of the Department in support of investments in the infrastructure sector.

CORE COMPETENCE
Management Project Business Development Project Control & Supervision Site Survey and Investigation Feasibly Study and DED Water Supply ( Surface & Ground Water) Wastewater & Solid Waste Management Cost & Benefit Project Analysis Expense Analytical & Operation Control Environmental Protection EIA & ESIA EPC Process Tender Evaluation Acid Main Drainage Bio Remediation

PROFESIONAL EXPERIENCE
Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned 1 Name of Assignment or project Year Location Client Main Project Features : : : : : Bulk Water PPP Project 2011 -2012 East Java, Indonesia IFC , International Financial Cooperation Due diligence findings input to project design/technical specifications, cost estimates, contractual documentation/RFP, and financial model Will impact proposed volumes and tariff to the PDAMs or required subsidy

Position held

: Expert Water Supply and Environmental Mott Mac Donald 1

Activities Performed

: Collecting and Review all the data realated with project including pipe alignment alternative and program monitoring and Environmental Evaluation : : : : : EIA Wastewater Treatment Losari 2010 -2011 Makasar, Indonesia Indii Ausaid Environmental Impact Analysis of Municipal Wastewater Treatment Plant for Losari Makasar,Sulawesi : Expert Water & Sanitation MLD ( Subsidiary DHV ) : Review DED, Effluent assessment, make alternative for Municipal WWTP ,Develop program monitoring and Environmental Evaluation

Name of Assignment or project Year Location Client Main Project Features Position held Activities Performed

Name of Assignment or project Year Location Client Main Project Features

: Evaluation of Infrastructure Enhancement Grant for Solid Waste and Sanitation for 8 Town in Indonesia : 2010 : Indonesia : Indii Ausaid : The Government of Australia is supporting the Go I by providing Infrastructure Enhancement Grants (IEGs) to help Local Government accelerate sanitation programs, Grants allocation can be used to invest in wastewater sewerage and treatment, connections to sewerage systems, communal septic tanks, public toilets, solid waste collection-transfer-disposal, and solid waste recycle and reuse facilities : Investigation and Verification program : Analysis of Problems and Issues in the Water Supply and sanitation Sector, verification and help Local government to budget preparation : Pre Feasibility Study of The Umbulan Water Supply for Sidoarjo Surabaya And Adjacent Town (Utilization Spring Water Produce 4000 litter/second : 2009 : Sidoarjo, East Jawa,Indonesia : PT.Amerta Bumi Capital : Pre Feasibility Study Water Supply : Team Leader : Conduct Pre FS regional water supply, estimate costs for water related in infrastructure, estimated economic benefits due to development of Spring Water Transmission Pipe, complete final report Pre FS Water supply : Review and Evaluation Water Sanitation Program Small Towns Phase 1 and make Recommendation for Phase 2 Program for 8 Province and 39 Small Town in Vietnam. 2

Position held Activities Performed

Name of Assignment or project

Year Location Client Main Project Features Position held Activities Performed

Name of Assignment or project

Year Location Client Main Project Features Position held Activities Performed

: : : : : :

2009 Vietnam WSP Finland Review and Evaluation Water Sanitation International Consultant Review all data project, site visit, communication with local Vietnam government and WSP Finland base on Finding during site visit program. Evaluate all program achievement and make recommendation report

Nam6e of Assignment or project Year Location Client Main Project Features Position held Activities Performed

: Infrastructure for Tsunami Recovery Management Program : 2007-2009 : Banda Aceh : UNDP : Implementation Infrastructure housing, water & sanitation : Senior Consultant Enviro Solution Pte.Ltd Singapore : Responsible for pre feasibility study, acted as the liaise officer for the sanitary landfill site assignment in Aceh, Indonesia between the Government ,UNDP and consultants as well as engineer in several designs of the project; Participated in the evaluation of potable water systems, water supply and sanitation systems, and solid waste management projects; Involved in a number of Environmental Impact Assessment s (EIA) of various projects including sanitary landfill In the 9 District province Aceh , Tsunami Recovery Waste Management Program : Various Environment program, Risk Assessment, Due Diligent, HSE audit : 2005 2007 : Singapore : Various Company : Project Implementation Agency Assignment : Project Manager Glowtec Environmental Pte.Ltd : Project Design and Construction for Water and Wastewater Treatment; Designing effective Project Operational procedures to ensure the smooth running of all operations; Responsible for Environmental assessment and management for the project construction; Investigating and understanding weekly shrinkage issues, construction a user friendly guide, and subsequently testing and commissioning and completion of the project. : : : : : Water Treatment Plant capacity 20 m3/hour January 2006 July 2006 Jakarta PT Damai Indah Golf, Kapuk Engineering, Procurement, Construction Water treatment 3

Name of Assignment or project Year Location Client Main Project Features Position held Activities Performed

Name of Assignment or project Year Location Client Main Project Features

Position held Activities Performed

: Project Manager : Participate in bidding ,implementation requirement from tender document plan resources and budged for implementation and manage the construction project : : : : : : : Water Treatment Plant , with UF Capacity 40 m3/hour July 2005 December 2005 Jakarta PT United Can Engineering, Procurement, Construction Water treatment Project Manager Lead for civil, Mechanical and Electrical, infrastructure project, construction, test and commissioning the system.

Name of Assignment or project Year Location Client Main Project Features Position held Activities Performed

10 Name of Assignment or project Year Location Client Main Project Features Position held Activities Performed

: : : : :

Medco Ethanol Lampung 2004 July 2005 Lampung Medco Ethanol Lampung Infrastructure for Ethanol Factory ,Engineering, Procurement, Construction : Project Manager : Pre feasibility study for the Medco Ethanol Lampung, Capacity 180 klpd, location Kota Bumi, Lampung; Communicate the Project Schedule to construct Civil Work together with Consultant; Review the Detail Engineering Design Wastewater Treatment with the Principal and consultant; Serve as project Manager.

11 Name of Assignment or project Year Location Client Main Project Features Position held Activities Performed

: : : : : : :

2003 2004 2002 2003 2001 - 2002

Various Infrastructure Project 1996 - 2004 Jakarta Various Company Infrastructure,Engineering,Procurement,Construction Project Manager PT.Sarana Adiniagatam Project Design and Construction for Water and Wastewater Treatment; Process Design, Include design of various water, wastewater and sewage treatment plant, tender preparation and technical proposal and equipment procurement; Provides day today leadership and works with staff to ensure a high-performance, customer service oriented work environment that supports achieving the departments and the Districts mission, objectives and values regarding team building and employee empowerment Waste Water Treatment Plant, Capacity 600 m3/day PT.Bimoli Palm Oil,Bitung North Sulawesi Waste Water Treatment Plant, Capacity 750 m3/day PT.Indo Sentra Pelangi, Semarang Waste Water Treatment Plant, Capacity 800 m3/day 4

2000 - 2001 1999 2000 1996 - 1999 1995-1996

PT. Indofood Sukses Makmur Waste Water Treatment Plant, 200 m3/day PT.Saritama, Narogong, Bogor Waste Water Treatment Plant, 1500 m3/day PT.Indolakto, Sukabumi Waste Water Treatment Plant , Capacity 10500 m3/day PT.Bataminto, Batam Wastewater Treatment Plant, Capacity 5400 m3/day PT. Bukit Indah City ,Cikampek, Indonesia : Quality Engineering Manager PT.Pacific Indonesia : 1994 1995 : Cikampek,Indonesia : Engineering Manufacturing : To manage day to day operation of Engineering for ensuring all aspect of the production operation work efficiency and effectively; Involve in project management for plastic injection molding, maintenance and repair of production machine; Work closely with design/ product engineer providing technical support in areas of production; Prepare corrective measurement technical system. Technical operation (achieving planned engineering, maintenance schedules, inventory management, assets and equipment management, quality management : Engineering Manager PT. Indoroc Manufacturing : 1992 - 1994 : Cileungsi, Bogor : Manufacturing : Developing and Implementation production, Responsible in monitoring the process of projects to ensure timely delivery of assignments while maintaining standards and cost effectiveness, Analyze & execute project based on contract, ensure the quality, cost, and time management for the project : Product Engineer PT.Mattel Indonesia : 1990 - 1992 : Cikarang Industrial Estate : Manufacturing : Developing Product and improvement Quality, Promoted to Develop and implement policies and management system in product safety, Supported quality and laboratories, analyzed processes for potential modifications, functioned as primary liaison between company and buyer regulatory agencies

12 Name of Assignment Year Location Type Company Activities Performed

13 Name of Assignment Year Location Type Company Activities Performed

14 Name of Assignment Year Location Type Company Activities Performed

15 Name of Assignment Year Location Type Company Activities Performed

: Research & Development PT. Panasonic Matsushita Electronic : 1989-1990 : Jakarta : Electronic Manufacturing : R & D work closely with management production to ensure they get all the support they need to enable them to support new design release and easy in the applications when the product running with standard and specification. : Research & Development Engineering PT.YKK Alumico Indonesia : 1988 : Tangerang, West Jawa : Aluminium Extrusion : Responsible for monitoring design progress, checking structural analysis from consultant, Fully Support Engineering Department; Ensure, upon completion of repairs, that equipment is in good operating condition, ready to meet operational requirements, fully inspected, tested, clean and safe

16 Name of Assignment Year Location Type Company Activities Performed

17 Name of Assignment Year Location Type Company Activities Performed

: Quality & Product Control PT. Siemens Indonesia : 1988 : Cilegon,West Jawa : Manufacturing : Provide mechanical design, correction based on standardized plant or customer requirement. Manage Complaint and Part Data Based. Preparing/ Updating Offering Tools; Ensure that all the necessary materials are available for the planned operations and meet the required quantity and quality timely.

EDUCATION
Graduated ( S2) Master Degree in Environmental Science from University of Indonesia 2004 Graduated ( S1) Bachelor in Economic from University of Indonesia 1996 Graduated in Mechanical Engineering from Polytechnic University of Indonesia, 1989

PUBLICATION
The implementation of industrial liquid Waste Management (Study on the implementation of Wastewater Treatment Plant in Tugurejo Sub District, Semarang, Central Java Indonesia) Library University of Indonesia Cost and Benefit to Built Wastewater Treatment Plant for Environmental Sustainability; Library University of Indonesia. 6

Soft Loan for Environmental Protection, Minister Environmental Digital Publishers

TRAINING & CERTIFICATE


Environmental Impact Assessment-Level A ,2003 Purchasing Course, PT.National Gobel Panasonic, 1989 Technical Calculation Water Resources, Ministry of Public Work-JICA 1994 Review of Project Management Manual for Urban Water Sanitation Project, Ministry of Public Work-World Bank 2007

ADDITIONAL INFORMATION Computer Skills, AutoCAD, Microsoft project, Primavera, Excel, Word, Power Point, Water Supply program Epanet, Process Design & Calculation Water Wastewater