Sei sulla pagina 1di 39

Teleflex PSO / PPAP Process

Part Name Part Number Engineering Change Level Engineering Change Level Date Supplier Contact Supplier Name Supplier Code Street Address City State Zip Phone Number Customer Name Division Application File Name

page 1/39

PRODUCT/PROCESS QUALITY CHECKLIST


Customer or Internal Part No.

Question
1 Is the assistance of the customer's quality assurance or product engineering activity needed to develop or concur to the control plan? 2 Has the supplier identified who will be the quality liaison with the customer? 3 Has the supplier identified who will be the quality liaison with its suppliers? 4 Has the quality assurance system been reviewed using the Teleflex Automotive Group Quality System Assessment? Are there sufficient personnel identified to cover: 5 / 6 / 7 /
l Problem resolution analysis? / Is there a documented training program that: 9 l Includes all employees? / 10 l Lists whose been trained? / 11 l Provides a training schedule? / Has training been completed for: l l l

Yes No

Comment / Action Required

Person Responsible

Due Date

Control plan requirements? Layout inspection? Engineering performance testing?

page 2/39

PRODUCT/PROCESS QUALITY CHECKLIST


Customer or Internal Part No.

Question
12 / 13 / 14 / 15 / 16 17 18 19
l Other topics as identified? / Is each operation provided with process instructions that are keyed to the control plan? Are standard operator instructions available at each operation? Were operator/team leaders involved in developing standard operator instructions? Do inspection instructions include: l Easily understood engineering performance specifications? l Test frequencies? / l Sample sizes? / l Reaction plans? / l Documentation? / Are visual aids: l l l l

Yes No

Comment / Action Required

Person Responsible

Due Date

Statistical process control? Capability studies? Problem solving? Mistake proofing?

20 21 22 23 24

page 3/39

PRODUCT/PROCESS QUALITY CHECKLIST


Customer or Internal Part No.

Question
25 / 26 / 27 / 28 / 29 30
l l l l

Yes No

Comment / Action Required

Person Responsible

Due Date

Easily understood? Available? Accessible? Approved?

31 32

33

34 35 36 37

l Dated and current? / Is there a procedure to implement, maintain, and establish reaction plans for statistical control charts? Is there an effective root cause analysis system in place? Have provisions been made to place the latest drawings and specifications at the point of the inspection? Are forms/logs available for appropriate personnel to record inspection results? Have provisions been made to place the following at the monitored operation: l Inspection gages? / l Gage instructions? / l Reference samples? / l Inspection logs? /

page 4/39

PRODUCT/PROCESS QUALITY CHECKLIST


Customer or Internal Part No.

Question

Yes No

Comment / Action Required

Person Responsible

Due Date

38 Have provisions been made to certify and routinely calibrate gages and test equipment? Have required measurement system capability studies been: 39 l Completed? / 40 l Acceptable? / 41 Are layout inspection equipment and facilities adequate to provide initial and ongoing layout of all details and components? Is there a procedure for controlling incoming product that identifies: 42 l Characteristics to be inspected? / 43 l Frequency of inspection? / 44 l Sample size? / 45 / 46 47
l Disposition of nonconforming products? / Is there a procedure to identify, segregate, and control nonconforming products to prevent shipment? Are rework/repair procedures available? Is there a procedure to requalify repaired/reworked material? Is there an appropriate lot traceability procedure? l

Designated location for approved product?

48 49 50

page 5/39

PRODUCT/PROCESS QUALITY CHECKLIST


Customer or Internal Part No.

Question
51 Are periodic audits of outgoing products planned and implemented? 52 Are periodic surveys of the quality system planned and implemented? 53 Has the customer approved the packaging specification?

Yes No

Comment / Action Required

Person Responsible

Due Date

Revision Date

Prepared By:

page 6/39

FLOOR PLAN CHECKLIST


Customer or Internal Part No.

Question
1 Does the floor plan identify all required process and inspection points? 2 Have clearly marked areas for all material, tools, and equipment at each operation been considered? 3 Has sufficient space been allocated for all equipment? Are process and inspection areas: l Of adequate size? 4 / l Properly lighted? 5 / 6 Do inspection areas contain necessary equipment and files? Are there adequate: l Staging areas? 7 / l Impound areas? 8 / 9 Are inspection points logically located to prevent shipment of nonconforming products? 10 Have controls been established to eliminate the potential for an operation, including outside processing, to contaminate or mix similar products? 11 Is material protected from overhead or air handling systems contamination? 12 Have final audit facilities been provided? 13 Are controls adequate to prevent movement of nonconforming incoming material to storage or point of use?

Yes No

Comment / Action Required

Person Responsible

Due Date

Revision Date

Prepared By:

page 7/39

PROCESS FLOW CHART CHECKLIST


Customer or Internal Part No.

Question
1 Does the flow chart illustrate the sequence of production and inspection stations? 2 Were all appropriate FMEA's (SFMEA, DFMEA) available and used as aids to develop the process flow chart? 3 Is the flow chart keyed to product and process checks in the control plan? 4 Does the flow chart describe how the product will move, i.e., roller conveyor, slide containers, etc.? 5 Has the pull system/optimization been considered for this process? 6 Have provisions been made to identify and inspect reworked product before being used? 7 Have potential quality problems due to handling and outside processing been identified and corrected?

Yes No

Comment / Action Required

Person Responsible

Due Date

Revision Date

Prepared By:

page 8/39

PROCESS FMEA CHECKLIST


Customer or Internal Part No.

Question
1 Was the Process FMEA prepared using the AIAG / PPAP guidelines? 2 Have all operations affecting fit, function, durability, governmental regulations and safety been identified and listed sequentially? 3 Were similar part FMEA's considered? 4 Have historical campaign and warranty data been reviewed? 5 Have appropriate corrective actions been planned or taken for high risk priority items? 6 Have appropriate corrective actions been planned or taken for high severity numbers? 7 Were risk priorities numbers revised when corrective action was completed? 8 Were high severity numbers revised when a design change was completed? 9 Do the effects consider the customer in terms of the subsequent operation, assembly, and product? 10 Was warranty information used as an aid in developing the Process FMEA? 11 Were customer plant problems used as an aid in developing the Process FMEA? 12 Have the causes been described in terms of something that can be fixed or controlled? 13 Where detection is the major factor, have provisions been made to control the cause prior to the next operation?

Yes No

Comment / Action Required

Person Responsible

Due Date

Revision Date

Prepared By:

page 9/39

CONTROL PLAN CHECKLIST


Customer or Internal Part No.

Question
1 Was the control plan methodology referenced in Section 6 used in preparing the control plan? 2 Have all known customer complaints been identified to facilitate the selection of special product/process characteristics? 3 Are all special product/process characteristics included in the control plan? 4 Were SFMEA, DFMEA, and PFMEA used to prepare the control plan? 5 Are material specifications requiring inspection identified? 6 Does the control pan address incoming (material/components) through processing/assembly including packaging? 7 Are engineering performance testing requirements identified? 8 Are gages and test equipment available as required by the control plan? 9 If required, has the customer approved the control plan? 10 Are gage methods compatible between supplier and customer?

Yes No

Comment / Action Required

Person Responsible

Due Date

Revision Date

Prepared By:

page 10/39

REVIEW DATE SUPPLIER PART NUMBER PART NAME

0 0 0

MODEL YEAR VEHICLE LINE SUPPLIER CODE

Initial Risk Evaluation Checklist


Item No. DESIGN CATEGORY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 - New Commodity For Selected Supplier? (RISK DRIVER*) - New Materials or Technology? (RISK DRIVER*) -New/Different Application of a Carry-Over Part? (RISK DRIVER*) - New Design Concept? - Are there Safety/Emissions/Noise Requirements? - Offshore Engineering Site? - Will Design Need To Be Coordinated With Mating Parts For Fit, Function, or Appearance? - Are There Other Car Line Applications Planned? - Any Historic Quality/Warranty Issues? -Is Program Timing An Issue? - Are Sample Submission Dates Too Late for MTS's? MANUFACTURING CATEGORY - New Manufacturing Facility? (RISK DRIVER*) - Is there a New Manufacturing Process? (RISK DRIVER*) - A Part or System With Historical Launch Problems? (RISK DRIVER*) - Offshore Manufacturing Site? - Will Supplier Need Source Evaluation? - Is New production Equipment Required? - Are Special Tools or Tooling Fixtures Required? - Are Gages or Check Fixtures Required to Ensure Dimensional Integrity? - Any Potential Handling or Shipping Issues? - Will Parts Ever Be Shipped From a Location Other Than The Primary Source (i.e. Warehouse, Offshore, etc.) 22 23 24 25 26 27 28 29 - Will Returnable Packaging Be Required? - Is JIT Delivery or Sequenced Part Delivery Required? ASSEMBLY CATEGORY - Is Part installation an Issue? - Are Special Tools/Fixtures Required to Install Part in Vehicle? SERVICE CATEGORY - Is part Serviceability a Problem? - Are Special Tools/Fixtures Required? OTHER CATEGORY - Other? - Other? Questions Levels of Concern Low Med. High Comments

page 11/39

REVIEW DATE SUPPLIER PART NUMBER PART NAME

0 0 0

MODEL YEAR VEHICLE LINE SUPPLIER CODE

NOTE: * INDICATES RISK DRIVER - PROCESS SPECIALIST ASSISTANCE MAY BE REQUIRED

Initial Risk Evaluation Summary


INITIAL RISK EVALUATION RATING (Select One Below) (Refer to Initial Risk Evaluation Checklist) LOW LEVEL OF CONCERN INITIAL RISK EVALUATION TEAM INDICATES A LOW LEVEL OF CONCERN REGARDING THE SUCCESS OF SUPPLYING THIS PRODUCT.

MEDIUM LEVEL OF CONCERN

INITIAL RISK EVALUATION TEAM INDICATES THAT THERE IS A MEDIUM LEVEL OF CONCERN REGARDING ONE OR MORE CATEGORIES ASSURING THE SUCCESS OF SUPPLYING THIS PRODUCT. INITIAL RISK EVALUATION TEAM INDICATES THAT THERE IS A HIGH LEVEL OF CONCERN REGARDING ONE OR MORE CATEGORIES, (OR ONE OR MORE RISK DRIVERS) ASSURING THE SUCCESS OF SUPPLYING THIS PRODUCT

HIGH LEVEL OF CONCERN

LIST HIGH CONCERN ITEMS

LIST MEDIUM CONCERN ITEMS

SIGNATURE TEAM MEMBERS ENGINEERING SUPPLIER QUALITY SUPPLIER MANAGEMENT ADVANCED MFG. SUPPLIER SERVICE

DATE

page 12/39

PRODUCT QUALITY PLANNING SUMMARY AND SIGN-OFF


DATE: PRODUCT NAME: CUSTOMER:

0 0

PART NUMBER: MANUFACTURING PLANT:

0 0

1. PRELIMINARY PROCESS CAPABILITY STUDY REQUIRED Ppk - SPECIAL CHARACTERISTICS 2. CONTROL PLAN APPROVAL (If Required) 3. INITIAL PRODUCTION SAMPLES CHARACTERISTIC CATEGORY SAMPLES DIMENSIONAL VISUAL LABORATORY PERFORMANCE 4. GAGE AND TEST EQUIPMENT MEASUREMENT SYSTEM ANALYSIS REQUIRED SPECIAL CHARACTERISTIC 5. PROCESS MONITORING APPROVED: YES / NO*

QUANTITY ACCEPTABLE PENDING*

DATE APPROVED

QUANTITY CHARACTERISTICS PER SAMPLE ACCEPTABLE PENDING*

QUANTITY ACCEPTABLE PENDING*

QUANTITY PROCESS MONITORING INSTRUCTIONS PROCESS SHEETS VISUAL AIDS 6. PACKAGING/SHIPPING REQUIRED PACKAGING APPROVAL SHIPPING TRIALS 7. SIGN-OFF QUANTITY ACCEPTABLE PENDING* REQUIRED ACCEPTABLE PENDING*

TEAM MEMBER/TITLE/DATE

TEAM MEMBER/TITLE/DATE

TEAM MEMBER/TITLE/DATE

TEAM MEMBER/TITLE/DATE

TEAM MEMBER/TITLE/DATE

TEAM MEMBER/TITLE/DATE

* REQUIRES PREPARATION OF AN ACTION PLAN TO TRACK PROGRESS.

page 13/39

TELEFLEX PROCESS SIGN-OFF CHECKLIST

ALL PROCESS SIGN-OFF ELEMENTS APPROVED:


SUPPLIER MFG. LOCATION PART NUMBER(S) CHANGE LEVEL(S) PROGRAM PART NAME(S) PSO PLANT VISIT DATE

YES

NO

PROCESS ELEMENTS TO BE VERIFIED DURING PLANT VISIT


DOCUMENTATION ACCEPT UNACCEPT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PART NUMBER, DESCRIPTION AND CHANGE LEVEL PROCESS FLOW DIAGRAM AND MANUFACTURING FLOOR PLAN PROCESS FMEA CONTROL PLAN SPECIAL PRODUCT AND PROCESS CHARACTERISTICS IDENTIFIED ENGINEERING STANDARDS IDENTIFIED TEST SAMPLE SIZES AND FREQUENCIES GAGE AND TEST EQUIPMENT EVALUATION PREVENTIVE MAINTENANCE PLANS TOOLING, EQUIPMENT, AND GAGES IDENTIFIED PROCESS MONITORING AND OPERATING INSTRUCTIONS INCOMING AND OUTCOMING MATERIAL QUALIF/CERT PLAN CONTAINMENT PLAN RAMP-UP PLAN PARTS PACKAGING AND SHIPPING SPECIFICATIONS LINE SPEED DEMONSTRATION (R@R) : see "EP07 - Run at Rate - Index A" PROCESS AUDIT (made by the supplier) CO-WORKER TRAINING PROCESS ACCEPT UNACCEPT

CORRECTIVE ACTION REQUIRED ON-SITE REVISIT REQUIRED

YES YES

NO NO

DATE DATE

Note: Open issues and required corrective actions are noted on sheet 2 of this report.

Teleflex Automotive Process Sign-Off Team

Supplier Sign-Off

Engineering

Print Name And Sign

Quality Assurance Manager

Print Name And Sign

Supplier Quality

Print Name And Sign

Manufacturing Manager

Print Name And Sign

Plant Manager

Print Name And Sign

page 14/39

TELEFLEX PROCESS SIGN-OFF Comments And Required Corrective Actions


ITEM # ISSUE
Corrective Action Required YES

Note: All corrective actions plans must be submitted to the Teleflex Supplier Quality Engineer within (5) business days of the signature date below.

Authorized Customer Signature

Title

Date

Supplier Signature

Title

Date

page 15/39

page 16/39

SIT
UNACCEPT

Print Name And Sign

Print Name And Sign

Print Name And Sign

page 17/39

NO

page 18/39

PROCESS / INSPECTION FLOWCHART


Product Program Supplier Name Supplier Location Legend: Operation Transportation Operation or Event Inspection Description of Operation or Event Receiving of raw material Delay Storage Evaluation and Analysis Methods 0 0 0 Issue Date Part Name Part Number 6/16/2001 0 0 ECL 0

10

10

Receiving inspection of raw material

Review / verify certs and melt flow results and file under customer / program

20

30

Transport material

30

Store material until trial day

40

Blend raw material and concentrate

50

Transport material to press

60

Mold parts

70

In-process inspection

100% visual inspection for short shots, warp, sink marks, excess splay, contamination, stress, flash, color match

80

Degate parts

Inspection
90

100% visual verification of all above Allow parts to cool before packing

100

Cool Parts

110

Wrap parts in foam and pack parts

100% visual inspection

120

Label box

100% visual inspection

130

Transport to storage / shipping

Dock audit
140

100% visual inspection for correct part/label 100% review of documentation

150

Ship parts to customer

page 19/39

PROCESS / INSPECTION FLOWCHART


Product Program Supplier Name Supplier Location Legend: Operation Transportation Operation or Event Inspection Description of Operation or Event Delay Storage Evaluation and Analysis Methods 0 0 0 Issue Date Part Name Part Number 6/16/2001 0 0 ECL 0

page 20/39

CHARACTERISTIC MATRIX
Part Number Engineering Change Level Part Name

0 C = Characteristic at an operation used for clamping L = Characteristic at an operation used for locating X = Characteristic created or changed by this operation should match the process flow diagram form

DIMENSION NUMBER

OPERATION NUMBER DESCRIPTION TOLERANCE

page 21/39

Print # Item: Model Year(s)/Vehicle(s) Team:

0 0 0 0

Rev.

POTENTIAL FAILURE MODE AND EFFECTS ANALYSIS (PROCESS FMEA) Process Responsibility: Key Date 0 6/16/2001

FMEA Number: Prepared by: Date (Orig.) Date (Rev.)

Process Function/ Requirements

Potential Failure Mode

Potential Effect(s) of Failure

S e v

C l a s s

Potential Cause(s)/ Mechanism(s) of Failure

O c c u r

Current Process Controls

D e t e c

R. P. N.

Recommended Actions

Responsibility & Target Date

Actions Taken

Action Results S O e c v c

D e t

R. P. N.

10 Receiving of Raw Materials

Incorrect/sub -standard material

Unable to mold loss of physical properties Unable to mold loss of physical properties Poor appearance / wrong color parts after molding Poor appearance after molding operation Loss of Material Can not make parts / Shut down customer Part will not meet specifications Delay in production

Incorrect material shipped

Supplier Cert.

42

None

None

Incorrect Melt Flow Incorrect concentrate

7 7

Incorrect physical properties Incorrect material shipped Incorrect blending of material from supplier Forklift Damage / Spillage/ Contamination Material improperly tagged or stored, operator training Operator Error/Dirty mixer

2 2

Supplier Cert. / Melt flow index review Incoming inspection / Supplier certs

3 3

42 42

None None

None None

Concentrate off color 20 Transportation 30 Warehouse/Storage 40 Color Mixing 50 Transportation Handling Damage Lost material

6 6

2 3

Incoming inspection / Supplier certs Trained material handler Designated location for material

4 2

48 36

None None None

None None None

2 1) Mixing instructions from supplier 2) Operator training 3) Mixing procedure 4) Scale and mixer certification Trained material handler 1) 100% Visual inspection 2) Process verification 3) Process parameter sheets from material supplier 4) PM schedule 1) 100% Visual inspection 2) Process verification 3) Process parameter sheets from material supplier 4) PM schedule 1) 100% Visual inspection 2) Process verification 3) Process parameter sheets from material supplier 4) PM schedule 1) 100% Visual inspection 2) Process verification 3) Process parameter sheets from material supplier 4) PM schedule 1) 100% Visual inspection 2) Process verification 3) Process parameter sheets from material supplier 4) PM schedule 1) 100% Visual inspection 2) Process verification 3) Process parameter sheets from material supplier 1) 100% Visual inspection 2) Process verification 3) Process parameter sheets from material supplier 4) PM schedule 1) 100% Visual inspection 2) Process verification 3) Process parameter sheets from material supplier 4) PM schedule

28 None None None

Improper Color Mix Handling Damage

6 2 Forklift Damage / Spillage/ Contamination 1) Incorrect molding parameters and set-up 2) Equipment failure

3 2

4 1

72 4 None

60 Molding Operation

Short shot

Poor fit and function 7 1) Poor fit and function 2) Poor assembly Poor Appearance 3 1) Poor appearance 2) Loss of strength 3) Shearing of material 1) Poor appearance 2) Loss of strength 1) Poor fit and function 2) Poor appearance 1) Poor fit and function 3

None 2 28

None

Warp

1) Incorrect molding parameters and set-up 2) Equipment failure 1) Incorrect molding parameters and set-up 2) Equipment failure 1) Irregular heat and/or moisture 2) color change 1) Contamination in mold

None 3 48 None 4 48 None 4 48 None 4 48 None 4 48 None 4 48

None

Sink Marks

None

Excess splay on "A" surface

None

Contamination

None

3 1) Improper demolding of part 3 1) Incorrect molding parameters 2) Tool wear 1) Improper set-up of concentrate feeder 2) Improper hand mix of concentrate

Stress

None

Flash

None

Off color

1) Poor appearance 6

None 4 72

None

page 22/39

Print # Item: Model Year(s)/Vehicle(s) Team:

0 0 0 0

Rev.

POTENTIAL FAILURE MODE AND EFFECTS ANALYSIS (PROCESS FMEA) Process Responsibility: Key Date 0 6/16/2001

FMEA Number: Prepared by: Date (Orig.) Date (Rev.)

Process Function/ Requirements

Potential Failure Mode

Potential Effect(s) of Failure

S e v

C l a s s

Potential Cause(s)/ Mechanism(s) of Failure

O c c u r

Current Process Controls

D e t e c

R. P. N.

Recommended Actions

Responsibility & Target Date

Actions Taken

Action Results S O e c v c

D e t

R. P. N.

70 In-process Inspection

Short shot, warp, sink, splay, contamination, stress, flash Off color

1) Poor part quality and appearance 2) Poor fit and function Poor appearance

1) Incorrect molding parameters and set-up 2) Equipment failure 1) Improper set-up of concentrate feeder 2) Improper hand mix of concentrate Incorrect / Dull knife

1) Visual Inspection 2) PM Schedule 4 1) Visual Inspection 2) PM Schedule 4 1) Operator instructions 2) Customer approval 3 60 3 84

None

None

None

None

5 80 Degate Part Uneven cut No short shots, warp, sink marks, splay, contamination, stress, flash, color match Warped parts 1) Poor appearance 2) Poor fit and function 1) Poor appearance 2) Poor fit and function 1) Poor appearance 2) Poor fit and function 1) Loose parts in transit to customer 2) Un-safe internal transit 1) Parts warped due to over packing 2) Bar code label wrong 1) Parts warped due to packing 1) Shipped wrong parts 2) Shortage of parts at customer

36

None

None

90 Inspection

1) Incorrect molding parameters and set-up 2) Equipment failure 1) Incorrect molding parameters 2) Inadequate cooling time

1) Visual Inspection 2) PM Schedule 3 1) Visual Inspection 2) Parts allowed to cool on table 3 63

None

None

100 Cooling

None 3 63

None

110 Packaging

Broken box

1) High-lo damage 2) Wear and tear 1) Availability of correct packaging 1) Availability of correct packaging 1) Wrong label applied to carton

1) Operator instructions 2) Visual inspection at shipping 1) Production control ordering correct box

None 4 32 None 3 24 None None 3 72 None

None

Expendable

Box too big Box too small

None None None

2 2 6

4 4 4 1) Production control ordering correct box 1) Dock audit to verify label and contents match 1) Operator instructions for Hi-Lo drivers

24

120 Labeling

Wrong Label

130 Transportation 140 Dock Audit 150 Shipping

Handling damage

Misidentified parts Label does not match part

1) Parts damaged 2) Parts lost 1) Overshipement 2) Undershipment Shipped wrong parts

1) Hi-Lo damages box 2) Parts put in wrong area

3 48 2) Trained material handler 1) Label verification 1) Dock audit to verify label and contents match

None

4 4

1) Wrong label applied to carton 1) Wrong label applied to carton 2) Shortage of parts at customer

4 4

3 48

None None

None None

3 48

page 23/39

CONTROL PLAN
Prototype Control Plan Number Pre-Launch Production Key Contact/Phone Date (Orig.) Date (Rev.)

0
Part Number/Latest Change Level Core Team

0 0
Supplier/Plant Approval/Date Supplier Code Other Approval/Date (If Req'd.) CHARACTERISTICS SPECIAL CHAR. PROCESS CLASS Material content Material content Material to be stored in warehouse until needed Store until needed Mix Ratio Loading system Raw material initial process parameters Check for visual defects first piece and start-up Check for visual defects first piece and start-up 50 to 1

6/16/2001

6/16/2001

Customer Engineering Approval/Date (If Req'd.) Customer Quality Approval/Date (If Req'd.) Other Approval/Date (If Req'd.) METHODS PRODUCT/PROCESS SPECIFICATION/ TOLERANCE EVALUATION/ MEASUREMENT TECHNIQUE Supplier Certs and incoming inspection Supplier Certs and incoming inspection Visual inspection Visual inspection Calibrated Scale Loading system must fill at appropriate intervals 100 % visual inspection All SAMPLE SIZE FREQ. REACTION PLAN

0
Part Name/Description

0
Supplier/Plant

MACHINE, PART/ PROCESS NAME/ DEVICE, PROCESS OPERATION JIG,TOOLS, NUMBER DESCRIPTION FOR MFG. Receiving Inspection Raw Materials

NO.

PRODUCT Color Concentrate PC-GE Lexan EM3110 Raw material /concentrate Material Color + PC Raw material /concentrate

CONTROL METHOD

1 2

1 1 Each Each

Per lot Per lot All All Per lot Each run

Receiving Log Reject to Supplier Receiving Log Reject to Supplier Visual Visual Supplier Material Cert. Segregation of material Contact supplier

10

20 30 40 50

Transport Warehouse/Storag e Color Mixing operation Transport

HI-Lo

1 1 1 1

Segregate and adjust ratio Trained material P.M. Schedule handler

60

Molding Operation

Injection molding machine 75 ton

Process Set-up Sheet

Visual inspection

100%

Continuous

100% inspection

Evaluate and requality

70

In-process Inspection

Short Shot

Free of short shots

Visual inspection

100%

100% Continuous inspection

Adjust and document machine parameters

Warp

Free of warp

Visual inspection

100%

100% Continuous inspection

Adjust and document machine parameters

page 24/39

CONTROL PLAN
Prototype Control Plan Number Pre-Launch Production Key Contact/Phone Date (Orig.) Date (Rev.)

0
Part Number/Latest Change Level Core Team

0 0
Supplier/Plant Approval/Date Supplier Code Other Approval/Date (If Req'd.) CHARACTERISTICS SPECIAL CHAR. PROCESS CLASS Check for visual defects first piece and start-up Check for visual defects first piece and start-up Check for visual defects first piece and start-up Check for visual defects first piece and start-up Check for visual defects first piece and start-up

6/16/2001

6/16/2001

Customer Engineering Approval/Date (If Req'd.) Customer Quality Approval/Date (If Req'd.) Other Approval/Date (If Req'd.) METHODS PRODUCT/PROCESS SPECIFICATION/ TOLERANCE EVALUATION/ MEASUREMENT TECHNIQUE SAMPLE SIZE FREQ. REACTION PLAN

0
Part Name/Description

0
Supplier/Plant

MACHINE, PART/ PROCESS NAME/ DEVICE, PROCESS OPERATION JIG,TOOLS, NUMBER DESCRIPTION FOR MFG.

NO.

PRODUCT

CONTROL METHOD

Sink Marks

Free of sink marks

Visual inspection

100%

Continuous

100% inspection

Adjust and document machine parameters

Excess Splay

Free of excessive splay

Visual inspection

100%

100 % Continuous inspection

Adjust and document machine parameters

Contamination

Free of contamination

Visual inspection

100%

100 % Continuous inspection

Adjust and document machine parameters

6 In- process Inspection con't

Stress

Free of stress

Visual inspection

100%

100% Continuous inspection

Adjust and document machine parameters

Flash

Free of flash

Visual inspection

100%

100% Continuous inspection

Adjust and document machine parameters

page 25/39

CONTROL PLAN
Prototype Control Plan Number Pre-Launch Production Key Contact/Phone Date (Orig.) Date (Rev.)

0
Part Number/Latest Change Level Core Team

0 0
Supplier/Plant Approval/Date Supplier Code Other Approval/Date (If Req'd.) CHARACTERISTICS SPECIAL CHAR. PROCESS CLASS

6/16/2001

6/16/2001

Customer Engineering Approval/Date (If Req'd.) Customer Quality Approval/Date (If Req'd.) Other Approval/Date (If Req'd.) METHODS PRODUCT/PROCESS SPECIFICATION/ TOLERANCE Color master EVALUATION/ MEASUREMENT TECHNIQUE Visual inspection SAMPLE SIZE FREQ. REACTION PLAN Adjust and document machine parameters 100% inspection

0
Part Name/Description

0
Supplier/Plant

MACHINE, PART/ PROCESS NAME/ DEVICE, PROCESS OPERATION JIG,TOOLS, NUMBER DESCRIPTION FOR MFG.

NO.

PRODUCT

CONTROL METHOD

Color

Verify color

100%

100% Continuous inspection

80

Degate

Trim Knife

Trim and degate parts Verification of all the above Cool parts Proper packing Proper labeling

Gates to be flush without gouges and white marks

Visual inspection

100%

Continuous

Operator instructions Operator instructions

90 100 110 120

Inspection Cooling Time Packaging Labeling

1 1 1 1

Visual defects, appearance, Visual inspection color match to master Allow parts to cool on table before packing Pack in box Label box inside and out/Loose label on inside of box Transport molded part to storage/shipping Visual inspection Visual Inspection Visual inspection

100% 100% 100% 100%

Continuous Continuous

100% inspection 100% inspection 100% inspection Operator instructions Storage Procedure / shipping procedure Notify production control for instructions Shipping instructions

Operator instructions Operator Continuous instructions Continuous 100% inspection Trained material handler

130

Transport

HI-Lo

Molded part

Visual inspection

100%

Each container

140

Dock Audit

Identification

Proper barcode label to contents

Visual inspection

100%

Each container

Label verification

150

Shipping

Shipping to paint source

Invoice to JCI

100%

Each container

page 26/39

Prototype Control Plan Number

Pre-Launch

Production Key Contact/Phone

CONTROL PLAN SPECIAL CHARACTERISTICS


Date (Orig.) Date (Rev.)

0
Part Number/Latest Change Level

0
Core Team

0
Customer Engineering Approval/Date (If Req'd.) Customer Quality Approval/Date (If Req'd.) Other Approval/Date (If Req'd.)

0
Part Name/Description

0
Supplier/Plant Approval/Date Supplier Code Other Approval/Date (If Req'd.)

0
Supplier/Plant

0 No.

0 Description/Rationale

Specification/Tolerance

Class

Illustration/Pictorial

page 27/39

Production Part Approval Dimensional Results


SUPPLIER PART NUMBER

0
NAME OF INSPECTION FACILITY PART NAME

0 0

ITEM

DIMENSION/SPECIFICATION

SUPPLIER MEASUREMENT RESULTS

OK

NOT OK

SIGNATURE

TITLE

DATE

page 28/39

Production Part Approval Material Test Results


SUPPLIER PART NUMBER

0
NAME OF LABORATORY TYPE OF TEST PART NAME

0 0
MATERIAL SPEC. NO./DATE/SPECIFICATION SUPPLIER TEST RESULTS OK NOT OK

SIGNATURE

TITLE

DATE

page 29/39

Production Part Approval Performance Test Results


SUPPLIER PART NUMBER

0
NAME OF LABORATORY REF. NO. PART NAME

0 0
REQUIREMENTS TEST QTY. FREQ. TESTED SUPPLIER TEST RESULTS AND TEST CONDITIONS OK NOT OK

SIGNATURE

TITLE

DATE

page 30/39

APPEARANCE APPROVAL REPORT


PART NUMBER PART NAME SUPPLIER NAME REASON FOR SUBMISSION DRAWING APPLICATION (VEHICLES) E/C LEVEL DATE SUPPLIER

0 0 0
PART SUBMISSION WARRANT PRE TEXTURE LOCATION

NUMBER BUYER CODE MANUFACTURING SPECIAL SAMPLE FIRST PRODUCTION SHIPMENT

0 0 0 0
RE-SUBMISSION ENGINEERING CHANGE

CODE OTHER

APPEARANCE EVALUATION
CUSTOMER

SUPPLIER SOURCING AND TEXTURE INFORMATION

PRE-TEXTURE EVALUATION CORRECT AND PROCEED CORRECT AND RESUBMIT APPROVED TO TEXTURE

REPRESENTATIVE SIGNATURE AND DATE

COLOR EVALUATION
COLOR COLOR SUFFIX DL* Da* Db* DE* CMC TRISTIMULUS DATA MASTER MASTER MATERIAL MATERIAL NUMBER DATE TYPE SOURCE
RED YEL GRN BLU LIGHT DARK GRAY CLEAN HIGH LOW

HUE

VALUE

CHROMA

GLOSS

METALLIC SHIPPING BRILLIANCE SUFFIX


HIGH LOW

PART DISPOSITION

COMMENTS

SUPPLIER SIGNATURE

PHONE NO.

DATE

CUSTOMER REPRESENTATIVE SIGNATURE

DATE

page 31/39

GAGE REPEATABILITY AND REPRODUCIBILITY REPORT SHORT FORM ATTRIBUTE RESULTS


Part Number Gage Name Gage Number Gage Type Appraiser A Appraiser B Date Performed

0
Part Name

0
Characterisitic/Specification

APPRAISER A
PART # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 TRIAL #1 TRIAL #2

APPRAISER B
PART # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 TRIAL #1 TRIAL #2

All measurement decisions agree?

Yes
No

Accept Gage
Reject Gage

Remarks

page 32/39

GAGE REPEATABILITY AND REPRODUCIBILITY REPORT LONG FORM ATTRIBUTE RESULTS


Part Number Gage Name Gage Number Gage Type Upper Limit Appraiser Date Performed Lower Limit

0
Part Name

0
Characterisitic

# 1 2 3 4 5 6 7 8 9

ATTRIBUTE DATA XT P'a a 0.000 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025

After "Press for Graph" : 1) Copy "X Variable 1 Line Fit Plot" from the data sheet to here. 2) Size and and add gridlines. 3) Label as follows: X Variable Line Fit Plot to Gage Performance Curve X Variable 1 to Xt Y to Probability 4) Click the Chart and double click a predicted Y point and change the line pattern to automatic. 5) Estimate the points below from the graph. 6) Move the chart to cover these instructions. NOTE: If an error occurs see page 60 of the manual.

FROM THE GRAPH ENTER THE FOLLOWING: XT (P=.5) = XT (P=.995) = XT (P=.005) =

Measurement Unit Analysis


Bias B = = Repeatability R = =

t Statistic t = = = 31.3 IBI / R t0.025,19 = 2.093

Result

Reviewed Title

page 33/39

GAGE REPEATABILITY AND REPRODUCIBILITY DATA SHEET VARIABLE DATA RESULTS


Part Number Gage Name Gage Number Gage Type Trials Parts Appraiser A Appraiser B Appraiser C Appraisers Date Performed

GAGE REPEATABILITY AND REPRODUCIBILITY DATA SHEET VARIABLE DATA RESULTS


Part Number Gage Name Gage Number Gage Type Trials Parts Appraiser A Appraiser B Appraiser C Appraisers Date Performed

0
Part Name

0
Part Name

0
Characteristic/Specification Characteristic Classification

0
Characteristic/Specification Characteristic Classification

0 APPRAISER/ TRIAL # 1. A 2. 3. 4. 5. 6. B 7. 8. 9. 10. 11. C 12. 13. 14. 15. 1 2 3 AVE R 1 2 3 AVE R 1 2 3 AVE R PART 1 2 3 4 5 6

0 AVERAGE 7 8 9 10 EV = = = Xa= Ra=

Measurement Unit Analysis


Repeatability - Equipment Variation (EV) R x K1 Trials 2 3 K1 4.56 3.05

% Total Variation (TV)


% EV = = = % AV = = 100 (AV/TV) 100 (EV/TV)

Reproducibility - Appraiser Variation (AV) 2 2 1/2 {(XDIFF x K2) - (EV /nr)} AV = = =


Appraisers

2 3.65 Parts 2 3 4 5 6 7 8 9 10

3 2.70 K3 3.65 2.70 2.30 2.08 1.93 1.82 1.74 1.67 1.62 % PV % R&R

= n = number of parts r = number of trials

K2 Xb= Rb= Repeatability & Reproducibility (R & R) {(EV2 + AV2)}1/2 R&R = = = Xc= Rc= X= Rp= R= XDIFF= UCLR= LCLR= Part Variation (PV) RP x K3 PV = = = Total Variation (TV) TV = = = {(R&R2 + PV2)}1/2

= = = = = =

100 (R&R/TV)

100 (PV/TV)

16. PART AVE ( Xp ) 17. 18. 19. 20. (Ra + Rb + Rc) / (# OF APPRAISERS) = (Max X - Min X) = R x D4* = R x D3* =

All calculations are based upon predicting 5.15 sigma (99.0% of the area under the normal distribution curve). K1 is 5.15/d2, where d2 is dependent on the number of trials (m) and the number if parts times the number of operators (g) which is

* D4 =3.27 for 2 trials and 2.58 for 3 trials; D3 = 0 for up to 7 trials. UCLR represents the limit of individual R's. Circle those that are beyond this limit. Identify the cause and correct. Repeat these readings using the same appraiser and unit as originally used or discard values and re-average and recompute R and the limiting value from the remaining observations. Notes:

assumed to be greater than 15. AV - If a negative value is calculated under the square root sign, the appraiser variation (AV) defaults to zero (0). K2 is 5.15/d2, where d2 is dependent on the number of operators (m) and (g) is 1, since there is only one range calculation. K2 is 5.15/d2, where d2 is dependent on the number of parts (m) and (g) is 1, since there is only one range calculation. d2 is obtained from Table D3, "Quality Control and Industrial Statistics", A.J. Duncan.

page 34/39

GAGE REPEATABILITY AND REPRODUCIBILITY DATA SHEET VARIABLE DATA RESULTS - INCLUDING WITHIN-PART VARIATION
Part Number Gage Name Gage Number Gage Type Trials Parts Appraiser A Appraiser B Appraiser C Appraisers Date Performed Part Number

GAGE REPEATABILITY AND REPRODUCIBILITY DATA SHEET VARIABLE DATA RESULTS


Gage Name Gage Number Appraiser A Appraiser B Appraiser C Parts Appraisers Date Performed

0
Part Name Part Name

0 0
Characteristic/Specification Characteristic Classification Gage Type Trials

0
Characteristic/Specification Characteristic Classification

PART APPRAISER/ 1 2 3 4 5 APPRAISER TRIAL # MAX MIN RGE MAX MIN RGE MAX MIN RGE MAX MIN RGE MAX MIN RGE AVERAGE 1. A 2. 3. 4. 5. 6. B 7. 8. 9. 10. 11. C 12. 13. 14. 15. 1 2 3 AVE R 1 2 3 AVE R 1 2 3 AVE R Xc= Ro = Rp = RXwiv= RREP= XDIFF= UCLR= LCLR= Xb= Xa=

Measurement Unit Analysis


Repeatability - Equipment Variation (EV) R x K1 EV = = = Reproducibility - Appraiser Variation (AV) AV = = =
Appraisers

% Total Variation (TV)


K1 4.56 3.05 % AV % EV = = = = = 2 3 2.70 = n = number of parts r = number of trials 100 (AV/TV) 100 (EV/TV)

Trials 2 3

{(XDIFF x K2) - (EV /nr)}

1/2

K2 Repeatability & Reproducibility (R & R) {(EV2 + AV2)}1/2 R&R = = = Part Variation (PV) PV = = = Within-Part Variation (WIV) WIV = = XWIV = = WIV = # APPRAISERS, r = # TRIALS EVWIV = = Total Variation (TV) TV = = {(R&R2 + PV2 + WIV2)}1/2 SXWIV(LINE 17)/# XWIV READINGS RP x K 3

3.65

% R&R Parts 2 3 4 5 K3 3.65 2.70 2.30 2.08 % PV

= = = = = =

100 (R&R/TV)

100 (PV/TV)

16. Part Ave ( Xp ) 17. Ave of Xwiv 18. 19. 20. 21. RREPEAT = (SRANGE(LINES 5, 10, & 15))/(#RANGE READINGS) (MAX/MIN ONLY)= Xdiff = [ Max X ] - [Min X ] = UCLR = R x D4* = LCLR = R x D3* = D4 =

((XWIV + (RXwiv x K3)2 - (EVWIV)2/(nWIVr))1/2)/2

% WIV

= = =

100 (WIV/TV)

K1 x SRRGE(LINES 5,10, & 15)/# RRGE READINGS

* D4 =3.27 for 2 trials and 2.58 for 3 trials; D3 = 0 for up to 7 trials. UCLR represents the limit of individual R's. Circle those that are beyond this limit. Identify the cause and correct. Repeat these readings using the same appraiser and unit as originally used or discard values and re-average and recompute R and the limiting value from the remaining observations.

Notes:

page 35/39

REPEATABILITY RANGE CONTROL CHART


PLANT DEPT. DATES OF STUDY APPRAISER A OPERATION CHARACTERISTIC APPRAISER B DATE CONTROL LIMITS CALCULATED ENGINEERING SPECIFATION PART NAME PART NO.

0
MACHINE NO. NUMBER OF APPRAISERS SAMPLE SIZE FREQUENCY APPRAISER C

0 0
X= UCL = LCL =

AVERAGES (X BAR CHART)

1.20

1.00

0.80

0.60

0.40

0.20

0.00 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

R=

UCL =

LCL =

RANGES (R CHART)

1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

D U A R L

NUMBER DATE/TIME

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

R E A D I N G S

1 2 3 4 5
SUM

X R

SUM NUM HIGHLOW ** = POINT OUT OF CONTROL

page 36/39

PART APPRAISER AVERAGE CHART


PLANT DEPT. DATES OF STUDY APPRAISER A OPERATION CHARACTERISTIC APPRAISER B DATE CONTROL LIMITS CALCULATED ENGINEERING SPECIFATION PART NAME PART NO.

0
MACHINE NO. NUMBER OF APPRAISERS SAMPLE SIZE FREQUENCY APPRAISER C

0 0
X= UCL = LCL =

AVERAGES (X BAR CHART)

1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 0.00 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

R=

UCL =

LCL =

RANGES (R CHART)

1.20

1.00

0.80

0.60

0.40

0.20

0.00 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

NUMBER DATE/TIME

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

R E A D I N G S

1 2 3 4 5
SUM

X R

SUM NUM HIGHLOW ** = POINT OUT OF CONTROL

page 37/39

Part Submission Warrant


Part Name Safety and/or Government Regulation Yes

0
No Engineering Drawing Change Level

Part Number

0 0
Dated Dated

Additional Engineering Changes Shown on Drawing Number Checking Aid Number Purchase Order No. Engineering Change Level SUBMISSION INFORMATION

Weight (kg) Dated

SUPPLIER MANUFACTURING INFORMATION

0
Supplier Name

Dimensional

Materials/Function

Appearance

0
Street Address

Customer Name/Division Teleflex Buyer/Buyer Code

Automotive Group

0
City REASON FOR SUBMISSION Initial submission Engineering Change(s)

0
State

00000
Zip Application

Change to Optional Construction or Material Sub-Supplier or Material Source Change Change in Part Processing Parts produced at Additional Location

Tooling: Transfer, Replacement, Refurbishment, or additional Correction of Discrepancy Other - please specify REQUESTED SUBMISSION LEVEL (Check one)

Level 1 - Warrant, Appearance Approval Report (for designated appearance items only). Level 2 - Warrant, Parts, Drawings, Inspection Results, Laboratory and Functional Results, Appearance Approval Report Level 3 - At Customer Location - Warrant, Parts, Drawings, Inspection Results, Laboratory and Functional Results, Appearance Approval Report, Process Capability Results, Capability Study, Process Control Plan, Gage Study, FMEA. Level 4 - Per level 3, but without parts. Level 5 - At Supplier Location - Warrant, Parts, Drawings, Inspection Results, Laboratory and Functional Results, Appearance Approval Report, Process Capability Results, Capability Study, Process Control Plan, Gage Study, FMEA. SUBMISSION RESULTS The results for material and functional tests YES These results meet all drawing and specification requirements: DECLARATION I affirm that the samples represented by this warrant are representative of our parts and have been made to the applicable customer drawings and specifications and are made from specified materials on regular production tooling with no operations other than the regular production process. I have noted any deviations from this declaration below. EXPLANATION/COMMENTS: Print Name Supplier Authorized Signature FOR CUSTOMER USE ONLY Part Disposition Customer Name Approved Rejected Customer Signature Other Date Title Phone No. Date dimensional measurements appearance criteria statistical process package NO (If "NO" - Explanation Required)

page 38/39

CUSTOMER LIST
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 ACTIVE # IN DOCUMENT Teleflex Automotive Group 1

FMEA RPN CRITERIA


SEVERITY SCALE 10 Hazardous - w/o warning 9 Hazardous - w/ warning 8 Very High 7 High 6 Moderate 5 Low 4 Very Low 3 Minor 2 Very Minor 1 None OCCURENCE SCALE 10 >1 in 2 9 1 in 3 8 1 in 8 7 1 in 20 6 1 in 80 5 1 in 400 4 1 in 2,000 3 1 in 15,000 2 1 in 150,000 1 1 in 1,500,000 DETECTION SCALE 10 Absolute Uncertainty 9 Vey Remote 8 Remote 7 Very Low 6 Low 5 Moderate 4 Moderately High 3 High 2 Very High 1 Almost Certain

page 39/39