Sei sulla pagina 1di 9

LABOUR ESTIMATE FOR VARIOUS ITEMS OF WORKS

SN. 1. 2. ITEM DESCRIPTION Concrete in Foundation. R.C.C. M - 15 grade. QUANTITY 10 m3 10 m3 LABOUR ( 8 hours per day) Head Mason 1/4, Mason 2, Labour 20 Head Mason 1/2, Mason 3, Labour 23

Note: For each additional storey, the strength should be increased by 6 nos. for volume of 10 cu.m to lift the materials. 3. Supplying, fitting, fixing and removing shuttering & staging. Reinforcement for R.C.C. work including cutting, bending and placing in position. Damp proof course. First class brickwork in 1:6 in super structure. Brick on edge flooring with cement Mortar (1:3). Ironite flooring (40mm thk). C.G.I sheeting on roof 7 m2 Carpenter 1, Labour 2

4.

100 kg.

Bar binder (Black- smith/fitter) 1, Labour 1

5. 6. 7. 8. 9.

100 m2 10 m3 100 m2 100 m2 10 m2 9m 100 m2 100 m2 100 m2

Head Mason 1/2, Mason 5, Labour 6 Head Mason 1/2, Mason 9, Labour 18, Bhisti 2 Head Mason 1/2, Mason 10, Labour 14, Bhisti 1 Head Mason 1, Mason 24, Labour 27, Labour for Scrubbing 3 Carpenter 1, Fitter (Blacksmith) 1/2, Labour 2 Mason 1/2, Labour 2.5 Head Mason 1, Mason 10, Labour 14, Bhisti 1 Head mason 1/2, Mason 10, Labour 9, Bhisti 1 Painter 1/2, Labour 2

10. C.I. rain water pipe fixing. 11. 12mm thk cement plaster on brickwork in 1:6. 12. Ruled pointing (1:3). 13. White washing primer coat and 2 finished coats to new plaster. 14. Dry Distemper 15. Plastic Emulsion paint on new work.

100 m2 100 m2

Painter 8.5, Labour 5.5 Painter 5.5, Labour (Helper) 5.5 Painter 2.5, Labour (Helper) 2.5

16. Primer coat on wood work/ 100 m2 steel work.

17. Panting two coats over priming coat for new wood work/steel work. 18. Demolishing cement concrete (1:2:4/1:3:6) including lead upto 50m. 19. Demolishing R.C.C. work including lead upto 50m. 20. Demolishing Brickwork in cement mortar including stacking of serviceable material and disposal of unserviceable materials within a lead of 50m. 21. Removing mortar and cleaning bricks and stacking cleaned bricks.

100 m2

Painter 5.5, Labour (Helper) 5.5

10 m3

Labour 23

10 m3 10 m3

Labour 33.5 Labour 19.5

10 m3

Mason 6, Labour 25

22. Dismantling doors & 1 no. windows including framing, stacking of material. 23. Supplying and fixing 12mn/15mm dia G.I. pipe with G.I. fittings and M.S. clamps including cutting holes in walls and making good the same 100 r.m.

Mason 1, Labour 0.20

Fitter 7, Labour (Beldar) 6

24. Supplying, fitting and 100 r.m. laying 25mm G.I pipes with G.I. fittings including trenching and refilling of external work 25. Laying, fitting and fixing 100 mm dia G.I. pipes including testing of joint, trench cutting for pipe laying upto a depth of 90 cm. and refilling, dressing etc. 26. Supplying, laying, joining 100 dia stoneware pipes with cement mortar 1:1 (excluding earthwork etc.). 27. Wash Basin with C.I. brackets, brass taps, brass plug with brass chain, 20 r.m.

Fitter 1, Labour 8

Fitter 1.5, Labour 13

15 r.m..

Mason 1, Labour 2

1 no.

Plumber 1, Mason 1/2, Labour 1

waste pipe Including cutting walls and making good the same. 28. Sink. 29. 9" thick brick flat soling filled with local sand. 30. Earth work for roads including cutting, loading, unloading, carrying & dressing. 31. Stone soling for roads including packing with smaller stones manually. 32. Stone soling for roads including packing with smaller stones With steam roller. 33. Surface dressing/Bituminous carpeting on roads 1 no. 10 m2 10 m2 Plumber 1/2, Mason 1/2, Labour 1 Labour 1 Labour 4

10 m3

Labour 7

20 m3

Labour 7

100 m2

Labour (for one layer) 10, Labour (for two layers) 15

Analysis & Rates


The capacity of doing work by an artisan or skilled labour in the form of quantity of work per day is known as the task work or out turn of the labour. The out-turn of work per artisan varies to some extent according to the nature, size, height, situation, location, etc., In bigger cities where specialized and experienced labour is available the out-turn is greater than small towns and country sides. In well organized work less labour is required. The following may be taken as the approximate quantity of work or out turn or task for an average artisan per day.
SNo. 1. 2. 3. 4. 5. Particulars of items Br ic k wor k in l im e or c em ent m ort ar in f ou nd at i o n an d p l i nt h Br ic k wor k in l im e or c em ent m ort ar in s up er s tr uc t ur e Br ic k wo r k in m ud m o r tar in f ou n da t i on an d p l i nt h Br ic k wo r k in m ud m ortar in s up er s tr uc t ur e Br ic k i n c em en t or l im e m ort ar i n arc h es Quantity 1. 2 5c um 1. 0 0c um 1. 5 0c um 1. 2 5c um 0. 5 5 c um Perday (45c uf t) p er m as o n (35c uf t) p er m as o n (55c uf t) p er m as o n (45c uf t) p er m as o n (20c uf t) p er m as o n

6. 7. 8. 9. 10 . 11 . 12 . 13 . 14 . 15 . 16 . 17 . 18 . 19 . 20 . 21 . 22 . 23 . 24 . 25 . 26 . 27 . 28 . 29 . 30 . 31 .

Br ic k i n c em ent or l i m e m ortar in j ac k arc h es Ha lf br ic k wa l l i n p ar t i t i on Co ur s ed r ub b l e s to n e m as onr y i n l im e c em ent m or ta r i nc l u d i ng dres s i n g Ra n dom r u bb l e s to n e m as onr y i n l im e or c em en t m or t ar As hl ar s m as o nr y i n l im e or c em e nt m or tar St o ne ar c h wor k L im e c o nc r et e i n f o u n da t io n or f l o or L im e c o nc r et e i n r o of t er r ac i n g L im e c o nc r et e 1: 2 ;4 RB wor k RC C wor k 12m m ( 1/2) p las t er in g wi th c em en t or l im e m or tar P oi n ti n g wi t h c em en t o r l im e m ort ar W hite was h i ng o r c o lo ur was h i ng c oa ts W hite was h i ng o r c o lo ur was h i ng c oa ts P ai n ti n g or v ar n is h in g do ors o r wi n d o ws on e c o at Co a l t ar r i ng or s o l i g um pa in t in g o ne c oa t P ai n ti n g l ar ge s u r f ac e on e c o at Dis t em per in g o n e c oa t 2. 5c m ( 1) C C f lo or Fl ag s t or e f l o or la yi ng wit h l im e o r c em ent m or ta r ex c lu d i ng LC Br ic k o n ed g e in f l o o r l im e or c em e nt m or tar ex c lu d i ng LC Br ic k b at f l oor as i n a bo v e T im ber f r am in g s a l or te ak woo d T im ber f r am in g s a l or c ou n tr y woo d Do or a n d wi nd o w s h ut ters p an e l ed or g la ze d Do or a n d wi nd o w s h ut ters p an e l ed or ba tt e ne d S a wi ng har d wo o d S a wi ng s of t wo o d S in g l e al l a ha b ad t i l i ng or m ang a l ore ti l i ng Do u bl e a l l ah a ba d t i l in g Br eak i n g of br ic k b a ll es t 4 0m m (11 /2) ga u ge Br eak i n g of b r ic k b a ll es t 25m m (1) ga u ge Br eak i n g of s to n e b a l l es t 40m m (11/ 2) ga u ge Br eak i n g of s t on e b a ll es t 2 5m m (1) ga u ge

0. 5 5 c um 5. 0 0s qm 0. 8 0c um 1. 0 0c um 0. 4 0c um 0. 4 0c um 8. 5 0c um 6. 0 0c um 5. 0 0c um 1. 0 0c um 3. 0 0c um 8. 0 0s qm 10 . 00s qm 70 . 00s qm 20 0 .0 0s qm 25s qm 35 . 00s qm 35 . 00s qm 35 . 00s qm 7. 5 0s qm 10 . 00s qm 7. 0 0s qm 8. 0 0s qm 0. 0 7c um 0. 1 5c um 0. 1 5s qm

(20c uf t) p er m as o n (50s qf t) p er m as o n (30 c uf t)p er m as on (35c uf t) p er m as o n (15c uf t) p er m as o n (15c uf t) p er m as o n (30 0c uf t) per m as o n (20 0c uf t) per m as o n (17 5c uf t) per m as o n (35c uf t) p er m as o n (12 5c uf t) per m as o n (80s qf t) p er m as o n (10 0s qf t) per m as o n (70 0s qf t) per wh it e was h er (20 0 0s qf t)p er wh it e was h er (25 0s qf t) per pa i nt er (35 0s qf t) per pa i nt er (35 0s qf t) per pa i nt er (35 0s qf t) per pa i nt er (75s qf t) p er p ai n ter (10 0s qf t) per pa i nt er (70s qf t) p er p ai n ter (80s qf t) p er p ai n ter (2. 5c uf t)p erc ar pe nt er (5c uf t )p er c ar p en te r (7s qf t ) per c arp e nt er

32 . 33 . 34 . 35 . 36 . 37 . 38 . 39 . 40 .

0. 8 0s qm 4. 0 0s qm 6. 0 0s qm 6. 0 0s qm 4. 0 0s qm 0. 7 5c um 0. 5 5c um 0. 4 0c um 0. 2 5c um

(0. 8 0s qf t) p erc arp e nt er (40s qf t) p er p a ir of s a wers (60s qf t) p er p a ir of s a wers (60s qf t) p er t i l e l a yer (40s qf t) p er t i l e l a yer (35c uf t) p er l a bo ur er or br eak er (20c uf t) p er l a bo ur er or br eak er (10c uf t) p er l a bo ur er or br eak er (10c uf t) p er l a bo ur er or br eak er

41 . 42 . 43 . 44 . 45 . 46 . 47 .

As hl ar s t o ne d r es s i ng Fl ag s t o ne dr es s i n g E ar t h wor k i n ex c a v at i o n i n or di n ar y s o i l E ar t h wor k i n ex c a v at i o n i n h ard s oi l Ex c a va t io n i n s o i l Num ber of br ic k s l ai d b y a m as o n in br ic k wor k up to a he i g ht of 3m (10) Am ou nt of wo r k do n e b y a m a zd o or he l p er p er da y M ix De l i v er br ic k De l i v er m or t ar Sc af f ol d in g c os t bu i l d in g

0. 7 0c um 1. 5 0s qm 3. 0 0c um

(25c uf t) p ers t o nec ut t er (25s qf t) p ers t o nec ut t er (10 0c uf t) per b e ld er m azd oo r 2. 0 0c um (75c uf t) p er b e ld er m azd oo r 1. 0 0c um (35c uf t) p er b e ld er m azd oo r 60 0 br ic k s p er m as on

3. 0 0c um

48 .

for

s in g l e

s tor e y

(10 0c uf t)m ort ar p er m azd oo r 40 0 0 n os t o a d is t a nc e of 15m (50 ) pe r m a zd o or 5. 5c um (20 0c uf t) p er m a zd o or Re .0 . 50 p er (Res t. 1. 5 %c uf t) of c um br ic k work .

Items 46,47 and 48 are based on the committee report on rates and cost government of India.

LABOUR (MAZDOOR) REQUIRED FOR DIFFERENT WORKS

Extracts from the report on productivity projects in building industries issued by National Building Organisation are given below:a) E a rthw or k pe r 2 8. 3 0 cu m ( 12 0 0 0cu ft) 1) Ex c a v at i on in f o u nd a ti o ns , tr e nc h es e tc ., i n or d i nar y s o i l inc l u d in g d is pos a l up to 3 0m ( 1 00 ) an d l if t of 1 .5m (5f t) 5 b e ld ars an d 4 m a zd o or s c an do 28 . 30 c um ( 1 0 00c uf t) per da y. 2) R ef i l li n g ex c a v at e d e ar t h in f o un d at i ons , p o i nt h e tc , inc l u di n g c ons o l id a tion i n 1 5c m ( 6 ) l a yer s - 3 be l d ars , 2 m a zd o ors an d b h is t i c a n d o 28 . 30 c um ( 10 0 0c uf t) pe r da y. 3) D is p os al of s ur p l us ear th wit h i n a le a d of 3 0m (10 0 ) - 1 m a zd o or c a n do 2. 8 3c um ( 1 0 0 c uf t) p er d a y. b) C em ent con c ret e w ork pe r 2 .8 3 cu m ( 1 00 cuft ) l a yi n g c em e nt c onc r e t e 2 be l da rs , 3 m a zd oors , b h is t i a nd m as on, c a n d o 2. 8 3 c um ( 10 0 c uf t) pe r d a y. c) R C C w or k: 1) L a yi n g r e i nf or c ed c onc r e te 3 b e ld ars , 3 m a zdo ors , 1 B h is t i an d m as o n c an do 2 . 83 c um ( 1 0 0c uf t) p er d a y. 2) Ce nt er i ng a n d s hu t ter i ng f or f la t s urf ac e s 4 b el d ars an d 4 c arp e nt ers ( II c l as s ) c an do 9. 6s qm ( 96s qf t) p er d a y. 3)R e i nf or c em e nt wor k f or R C C 1 b l ac k s m ith or f i tt er a nd 1 b e l dar c an be n d

an d p l ac e in pos i t io n 1 q u in t al ( 2 c wt) of s t ee l p er d a y. d) Ston e w o rk p e r 2. 8 3 cu m ( 10 0 cuft) Ra n dom r ub b l e m as on r y wi t h b l ue s to n e in f ou n da t io ns - 3 m as o ns , 3 b e ld ars , 2 m azd oo r s an d 1 /4 b h is t i c a n d o 2. 8 3 c um (10 0c uf t 0 p er d a y e) B ri ck w or k p e r 2 .8 3 cu m ( 10 0 cuft) Firs t c las s br ic k wor k i n 1: 4 c em ent m ort a r i n s up ers truc t ure p art i ti o n wa l ls , j unc t io ns of r o of , p ar ap e t wa l ls a n d s tr in g c ours e 2m as ons ,4 m a zd oo rs an d 1 /2 bh is ti c an d o 2. 8 3 c um (10 0c uf t) p er d a y. F) W oo d w or k : F or th e f r am es of do or s a n d wi n d o ws 2 c ar p en te rs an d 1 b e l dar c an work 0. 1 8 c um ( 6 . 40c uf t) of wo od e qu i v a le n t t o d oor f r am es 7. 5c m x 1 0 m of 1 . 2m x 2 .1m ( 3 x 4 of 3 x 11 x 7 )s i ze p er d a y. 2) F or p an e l ed , g l a z ed , e tc , s h u tt ers - 15 c arp e nt ers a n d 4 b e ld ars c a n m ak e an d f ix 4 s h ut t er s 4 0 m m thic k of s i ze 2 . 00 m x 1.1 5m (1 t hic k of s i ze of 6 - 9x 3 - 9 ) p er d a y. Q u an t it y of wo o d p er s hu tt er 0 . 07 5 c um , ie 2. 6 6 c uf t. g) I ron w o rk : 1) F ix i n g 4 0m m x 3m m =38c m (1 x x 15 0 f l a t ir o n h o ldf as t s - 1 b l ac k s m ith ( II c l as s ) , I m as o n a nd I b e ld ar c a n f ix 3 6 h ol df as ts per d a y. 2) Fix i ng 1 6m m di a. 5/ 3 d ia ) M S r o ds 1 b lac k s m ith ( II c l as s ), 2 c a rp e nt ers ( II c l as s ) a n d 3 m a zd o ors c a n f ix 16 .5m ( 54rf t) pe r da y. 1) h) Floo r ing: 4c m th ic k ( 1 1/ 2 ) t h i c k c em ent c onc r e te f l oor i n g of 4 0s qm (40 0 s qf t) r e qu ir e 5 m as ons , 4 be l d ar s , 3 m a zdo ors a n d 1 b h i s ti per da y f o r m ix i n g l a yi n g a n d f in is hi n g.

I) F in ish ing : 1) P l as t er in g wi t h an y m or tar 1 2m m (5) t h i c k 3 m as o ns , 3 m azd o ors a nd 1 bh is t i c an pl as ter 40s q m ( 400 a f t) p er d a y. 2)W hite was h in g or c o lo ur wa s h i n g ( 3 c o at s ) 1 wh it e wa s h er a nd 1 m a zd oor c an do 6 0s qm ( 60 0s qf t ) p er d a y. 3) P a i nt i ng t wo c oa ts s uc h as c h oc ol a te , r e d, gr e y, etc o n wo od a re s te e l 3 P ai n ter s an d 2 m a zdo or s c a n pa i n t 10s qm (10 0s qf t) p er d a y. LO AD FO R A T W O B ULLO CK S C ART Quantity or Number On K ac hc ha Roa d 27 5 nos 0. 8 5 c um (30c uf t) 0. 7 0 c um ( 25 c uf t) 0. 8 5 c um (30c uf t)

Sl # 1. 2. 3. 4.

P art i cul a rs of m at er i al s Br ic k 1 9 c m x 9c m x 9 c m Br ic k b a ll as t St o ne ba l l as t K ank ar

O n Pu cc a Ro ad 40 0 nos 1. 1 0 (40c uf t) 1. 0 0 (35c uf t) 1. 1 0 (40c uf t)

c um c um c um

5. 6. 7. 8. 9.

S an d s ur k h i L im e T il es A l la h ab a d or M a ng a l ore Cem en t St e e l

0. 8 5 c um (30c uf t) 1. 1 0 c um (40c uf t) 27 5 nos 15 b ags 0. 7 5 to n ne

1. 1 0 (40c uf t) 1. 4 0 (50c uf t) 40 0 nos 20 ba gs 1 to n ne

c um c um

No te ; A b ul l oc k .. c ar r y a b ou t o n e to n n e l o ad . T h e a v er ag e s p e ed f or a b u l loc k c art m a y b e t ak en as 3. 2 0k m ( 2 u n its ) p er h our a n d ho ur m a y b e al l o we d f or lo a di n g an d u n l oa d in g . T ak in g 8 h o ur s wo rk in g p er d a y, th e n um ber of tr i ps p er d a y, c a n b e c a lc u l at e d.

LOAD FOR TRUCKS O N P UC C A M ET A LL E D RO AD T ruc k s Br ic k or Al l a hb a d ti l es or Ma n ga l or e t il es Cem en t, s t e e l an d o th er He a v y m at er i als O th er m ater i a ls B al l as t , K a nk ar , gr i t S an d c o a l, e tc . , 3 to n ners 5 to n ners 8 to n ners d ies e l truc k

10 0 0n os

15 0 0n os

20 0 0n os

3 to n ne

5 to n ne

8 to n ne

2. 8c um ( 10 0c uf t)

4. 2 0c um (15 0c uf t)

5. 6c um (20 0c uf t)

O n k ac hc h a e ar th e n r o ad t h e l oa d wi l l b e l es s b y 3 3 p er c e nt .

MATERIALS FOR DIFFERENT ITEMS OF WORKS T he r e qu ir em ent of m ater i a ls f or dif f er e nt i t e m s of work s is as g i ve n b el o w: Sl # 1. P art i cul a rs Br ic k s ( 9 x 4 x 3 or 2 0 c m x 10c m x 10c m nom i na l s i ze ) f or br ic k wor k Dr y m or t ar f or br ic k wor k 3 0% St o ne f or r u bb l e s t on e m as o nr y 12 5% Dr y m or t ar f or r ub b l e s t o ne m as onr y 4 2% Br ic k s f or br ic k b a l l as t f or l im e c onc r e te Br ic k ba ts o r br ic k b a l las t f or l im e c onc r e te Br ic k b a ll as t f or l im e c onc r e te Q uant it y 13 5 0 n os 10 0c uf t

f or

2. 3. 4. 5. 6. 7.

30c uf t f or 1 00 c uf t 12 5c uf t f or 100 c uf t 42c uf t f or 1 00 c uf t 10 5 0c uf t f or c uf t 15 0c uf t f or c uf t 10 0c uf t f or c uf t 100 100 100

50 0 00 n os per % c um (50 0n os .p er c um ) 30c um f or 10 0 c um 12 5c um f or 10 0 c um 42c um f or 10 0 c um 37 0 00c um f or 10 0 c um 15 0c um f or 10 0 c um 10 0c um f or 10 0 c um

Sl # 8. 9. 10 .

P art i cul a rs Dr y m or t ar f o r l im e c o nc r et e I f ou nd at i o n an d f l oor 3 5% Dr y m or t ar f or l im e c o nc r e t e in ro of ter r ac i ng 4 5 % Ma t er ia ls f or c em en t c onc r e te 1 : 2: 4 B al l as t or gr it 88 % S an d 4 4% Cem en t 2 2%

Q uant it y 35c uf t f or 1 00c uf t 45c uf t f or 1 00c uf t

35c um c um 45c um c um

f or f or

10 0 10 0

88c uf t f or 1 00c uf t 44c uf t f or 1 00c uf t 22c uf t f or 1 00c uf t

88c um f or 10 0 c um 44c um f or 10 0 c um 22c um (6 0 ba gs )f or 10 0 c um

11 .

Ma t er ia ls f or f lo or St o ne gr it S an d Cem en t

2. 5c m

( 1)c c

1: 2: 4 8c uf t f or 1 0 0s qf t 4c uf t f or 1 0 0s qf t 2 c uf t ( 2 b a gs ) f or 1 0 0c uf t 12 0 0 n os f or 10 0c uf t 45c uf t f or 1 00c uf t 6c uf t f or 1 0 0s qf t 2c uf t f or 1 0 0s qf t 1k g f or 1 0 0s qf t 0. 6 5 k g f or 10 0s qf t 0. 5 0 k g f or 10 0s qf t 3k g f or 1 0 0s qf t 2k g f or 1 0 0s qf t 1/ 3 gl .f or 1 0 0s qf t 1k g f or 1 0 0s qf t 50 0 nos f or 10 0s qf t 12c uf t f or 1 00s qf t 35 0 nos f or 10 0s qf t 8c uf t f or 1 0 0s qf t 32 5 nos f or 10 0s qf t 8c uf t f or 1 0 0s qf t 2. 4 0c um f or 10 0 c um 1. 2 0c um f or 10 0 c um 0. 0 8c um (2 4 ba gs )f or 10 0 c um 42 0 00 n os / % c um (42 0 m ps .[ er c i,) 45c um f or 10 0 c um 2. 0 0c um f or 10 0 s qm 0. 6 0c um f or 10 0 s qm 10k g f or 1 00 s qm 6 k g f or 10 0 s qm 5k g f or 1 0 0 s qm 30k g f or 1 00 s qm 20k g f or 1 00 s qm 10 l tr f o r 10 0 s qm 10k g f or 1 00 s qm 50 0 0n os .f or 10 0s qm 3. 2 0 c um f or 10 0 s qm 35 0 0n os .f or 10 0s qm 2. 2 5c um f or 10 0 c um 32 5 0 nos .f or 10 0s qm 2. 5c um f or 10 0 c um

12 .

Br ic k s f or R B wor k

13 . 14 . 15 . 16 . 17 . 18 . 19 . 20 . 21 . 22 . 23 . 24 . 25 . 26 . 27 . 28 . 29 .

Dr y m or t ar f or R B wor k 45% Dr y m or t ar f or 12m m (1/2) p las ter i n g Dr y m or t ar f or po i n ti n g i n br ic k work L im e f or wh i te was h in g o ne c o a t Dr y d is t em per f or is t c oa t Dr y d is t em per f or 2 c oa t S no w- C em f or Is t c o at nd S no w- C em f or 2 c o at P ai n t r e ad y m ix e d f or p a i nt i ng on e c oa t P ai n t ( s t if f ) f or pa i nt i n g o ne c o a t Br ic k s ( 2 0 x 1 0 x 1 0 c m ) f or bric k f lo or or h a lf b r ic k wa l l Dr y m or t ar f or br ic k f lo or or h a lf br ic k wa l l Br ic k s ( 9 x 4 x 3 ) f or br ic k f l at wor k Dr y m or t ar f or br ic k f l at f l oor Br ic k s ( 9 x 4 x 3 ) r eq u ir ed f or ho n e y c om b wa l l Dr y m or t ar f or ho n e y c om b wa l l Ma t er ia ls f or 2c m ( 3 / 4 ) t h ic k d am p pr o of c ou r s e of 1 :2 c e m ent m ort ar Cem en t
nd

3c uf t ( 2 .5 b ags ) f or 10 0s qf t

0. 9 0c um (2 7 ba gs )f or 10 0 c um

S an d Com po u nd or im p er m o @ 1k g pe r ba g of c em ent Ma t er ia ls f or 2 . 5c m ( 1 ) c c 1: 1 : 3 dam p pr oof c o ur s e St o ne gr it S an d c o ar s e Cem en t

6c uf t f or 1 0 0s qf t 2. 5k g f or 1 0 0s qf t

1. 8 0c um f or 10 0 c um 27k g f or 1 00 s qm

30 .

8c uf t f or 1 0 0s qf t 4c uf t f or 1 0 0s qf t 2 c uf t ( 2 ba gs ) f or 1 00s qf t 21 / 2 k g f or 10 0s qf t 15 k g f or 1 0 0s qf t 10 k g f or 1 0 0s qf t 12 8s qf t f or 10 0s qf t 11 5s qf t f or 10 0s qf t 15c uf t f or 1 00s qf t 13c uf t f or 1 00s qf t 11c uf t f or 1 00s qf t 8c uf t f or 1 0 0s qf t

31 .

Com po u nd or im p er m o @ 1k g pe r ba g of c em ent B it um en or as p ha l t f o r p a in t in g o n st D P C or o n r o of 1 c oa t nd 2 c oa t G G I s h ee t f o r r o of A G c or r ug at e d s h ee t f or r o of T im ber f or p a ne l e d do or s h ut ter 4c m ( 1 ) t h ic k T im ber f or ba tt e nd do or s h u tt er 4c m ( 1 ) t h ic k T im ber f or p a ne l ed & gl a ze d s hu tt er 4c m ( 1 ) th i c k T im ber f or f u l l y g la ze d s hu tt er 4c m (1 ) t h ic k

32 . 33 . 34 . 35 . 36 .

2. 2 5c um f or 10 0 c um 1. 1 3c um f or 10 0 c um 0. 7 5c um f or (22 1 /2 b ags )f or1 0 0 c um 22 k g f or 10 0 s qm 15 0 k g f or 10 0 s qm 10 0 k g f or 10 0 s qm 12 8 s qm f or 10 0s qm 11 5 s qm f or 10 0s qm 4. 5 c um f or 10 0 c um 4. 0 c um f or 10 0 c um 3. 0 c um f or 10 0 c um 2. 0 c um f or 10 0 c um

Potrebbero piacerti anche