KG - NRC CONSORTIUM

CIKAMPEK PALIMANAN
TOLL ROAD PROJECT

JOINT MEASUREMENT SHEET (JMS)


REF: CIPAL/JMS/01_____________
We request your attendance to Joint Measurement to the following works:Subject: Site Clearing
Scope/Location/Structure: STA 91+700 ~ STA 97+700
Description / Remarks / Sketch

Date: 02 March 2012 to 10 March 2012

Summary Measurement of Site Clearing


Pay Item No :
2.01.(01) Clearing and grubbing classified dense field free area and rubber plantation

STA 92+500 ~ 92+850 = 350 m =


14,933.157 Sq.m

STA 93+000 ~ 93+200 = 200 m =


12,639.822 Sq.m

STA 93+200 ~ 93+900 = 700 m =


44,685.564 Sq.m
Subtotal = 1.250 m =
72,258.543 Sq.m

2.01.(02) Clearing and grubbing classified scattered free area and village area
2.01.(03) Clearing and grubbing classified rice field swampy area, cultivated area and grass field

STA 91+700 91+800 = 100 m =


4,952.095 Sq.m

STA 91+800 92+250 = 450 m =


34,885.834 Sq.m

STA 92+300 92+500 = 200 m =


18,654.622 Sq.m

STA 93+900 ~ 94+250 = 350 m =


15,463.449 Sq.m

STA 95+300 ~ 95+400 = 100 m =


4,762.884 Sq.m

STA 95+400 ~ 96+000 = 600 m =


42,262.822 Sq.m

STA 96+000 ~ 96+700 = 700 m =


52,918.471 Sq.m

STA 96+700 ~ 97+400 = 700 m =


103,391.590 Sq.m

STA 97+400 ~ 97+700 = 300 m =


35,318.853 Sq.m
Subtotal = 3.500 m =
312,610.620 Sq.m

Please tick () where necessary;

With Attachment

Without Attachment

Jointly Measured By

Verified By:
Checked By:
CONSULTANT

Prepared By:
KGNRC

PMC

Signature

Signature

Signature

Name

Name

Name

Designation :

Designation

Designation

Date

Date

Date

* The JMSs running no. shall be controlled, recorded and maintain by KGNRC.
CIPAL/FORM/JMS/NOV 2011/REV.0

CIKAMPEK PALIMANAN
TOLL ROAD PROJECT
JOINT MEASUREMENT SHEET (JMS)
REF: CIPAL/JMS/01_____________
We request your attendance to Joint Measurement to the following works:Subject: Site Clearing
Scope/Location/Structure: STA 91+700 ~ STA 97+700
Description / Remarks / Sketch

Date: 02 March 2012 to 10 March 2012

Summary Measurement of Site Clearing


Pay Item No :
2.01.(01) Clearing and grubbing classified dense field free area and rubber plantation

STA 92+500 ~ 92+850 = 350 m =


14,933.157 Sq.m

STA 93+000 ~ 93+200 = 200 m =


12,639.822 Sq.m

STA 93+200 ~ 93+900 = 700 m =


44,685.564 Sq.m
Subtotal = 1.250 m =
72,258.543 Sq.m

2.01.(02) Clearing and grubbing classified scattered free area and village area
2.01.(03) Clearing and grubbing classified rice field swampy area, cultivated area and grass field

STA 91+700 91+800 = 100 m =


4,952.095 Sq.m

STA 91+800 92+250 = 450 m =


34,885.834 Sq.m

STA 92+300 92+500 = 200 m =


18,654.622 Sq.m

STA 93+900 ~ 94+250 = 350 m =


15,463.449 Sq.m

STA 95+300 ~ 95+400 = 100 m =


4,762.884 Sq.m

STA 95+400 ~ 96+000 = 600 m =


42,262.822 Sq.m

STA 96+000 ~ 96+700 = 700 m =


52,918.471 Sq.m

STA 96+700 ~ 97+400 = 700 m =


103,391.590 Sq.m

STA 97+400 ~ 97+700 = 300 m =


35,318.853 Sq.m
Subtotal = 3.500 m =
312,610.620 Sq.m

Please tick () where necessary;

With Attachment

Without Attachment

Jointly Measured By
Prepared By:
SUBCON

Verified By:

Checked By:
KG (SITE SUPERVISOR/ENGINEER)

KG (PM)

Signature

Signature

Signature

Name

Name

Name

Designation :

Designation

Designation

Date

Date

Date

* The JMSs running no. shall be controlled, recorded and maintain by KGNRC.
CIPAL/FORM/JMS/NOV 2011/REV.0

CIKAMPEK PALIMANAN
TOLL ROAD PROJECT

JOINT MEASUREMENT SHEET (JMS)


REF: CIPAL/JMS/01_____________
We request your attendance to Joint Measurement to the following works:Subject: Site Clearing
Scope/Location/Structure: STA 91+700 ~ STA 97+975
Date: 02 March 2012 to 10 March 2012
Description / Remarks / Sketch

Summary Measurement of Site Clearing


Pay Item No :
2.01.(01) Clearing and grubbing classified dense field free area and rubber plantation
14,395.628 Sq.m

STA 92+500 ~ 92+850 = 350 m =


13,373.088 Sq.m

STA 93+000 ~ 93+200 = 200 m =


50,736.334 Sq.m

STA 93+200 ~ 93+900 = 700 m =


Subtotal = 1.250 m =
78,505.050 Sq.m

14,933.157
12,639.822
44,685.564
72,258.543

2.01.(02) Clearing and grubbing classified scattered free area and village area
2.01.(03) Clearing and grubbing classified rice field swampy area, cultivated area and grass field
5,190.502 Sq.m

STA 91+700 91+800 = 100 m =


4,952.095
39,048.549 Sq.m

STA 91+800 92+250 = 450 m =


34,885.834
17,569.597 Sq.m

STA 92+300 92+500 = 200 m =


18,654.622
16,340.403 Sq.m

STA 93+900 ~ 94+250 = 350 m =


15,463.449
4,722.993 Sq.m

STA 95+300 ~ 95+400 = 100 m =


4,762.884
43,315.653 Sq.m

STA 95+400 ~ 96+000 = 600 m =


42,262.822
54,198.032 Sq.m

STA 96+000 ~ 96+700 = 700 m =


52,918.471
103,675.447 Sq.m

STA 96+700 ~ 97+400 = 700 m =


103,391.590
50,410.315 Sq.m

STA 97+400 ~ 97+700 = 300 m =


35,318.853
Subtotal = 3.500 m =
334,471.491 Sq.m
312,610.620

Please tick () where necessary;

With Attachment

Without Attachment

Jointly Measured By
Prepared By:
SUBCON
Signature
Name
Designation
Date

:
:
:
:

Checked By:
KG (SITE SUPERVISOR/ENGINEER)
Signature
:
Signature
Name
:
Name
Designation :
Designation
Date
:
Date

* The JMSs running no. shall be controlled, recorded and maintain by KGNRC.
CIPAL/FORM/JMS/NOV 2011/REV.0

Verified By:
KG (PM)
:
:
:
:

CIKAMPEK PALIMANAN
TOLL ROAD PROJECT

JOINT MEASUREMENT SHEET (JMS)


REF: CIPAL/JMS/01_____________
We request your attendance to Joint Measurement to the following works:Subject: Site Clearing
Scope/Location/Structure: STA 91+700 ~ STA 97+975
Date: 02 March 2012 to 10 March 2012
Description / Remarks / Sketch

Summary Measurement of Site Clearing


Pay Item No :
2.01.(01) Clearing and grubbing classified dense field free area and rubber plantation
14,395.628 Sq.m

STA 92+500 ~ 92+700 = 200 m =


6,529.877 Sq.m

STA 92+700 ~ 92+850 = 150 m =


13,373.088 Sq.m

STA 93+000 ~ 93+200 = 200 m =


50,736.334 Sq.m

STA 93+200 ~ 93+900 = 700 m =


Subtotal = 1.100 m =
85,034.927 Sq.m

2.01.(02) Clearing and grubbing classified scattered free area and village area
2.01.(03) Clearing and grubbing classified rice field swampy area, cultivated area and grass field
5,190.502 Sq.m

STA 91+700 91+800 = 100 m =


39,048.549 Sq.m

STA 91+800 92+250 = 450 m =


17,569.597 Sq.m

STA 92+300 92+500 = 200 m =


16,340.403 Sq.m

STA 93+900 ~ 94+285 = 385 m =


4,722.993 Sq.m

STA 95+300 ~ 95+400 = 100 m =


43,315.653 Sq.m

STA 95+400 ~ 96+000 = 600 m =


54,198.032 Sq.m

STA 96+000 ~ 96+700 = 700 m =


103,675.447 Sq.m

STA 96+700 ~ 97+400 = 700 m =


50,410.315 Sq.m

STA 97+400 ~ 97+975 = 575 m =


Subtotal = 3.810 m =
334,471.491 Sq.m

Please tick () where necessary;

With Attachment

Without Attachment

Jointly Measured By
Prepared By:
SUBCON
Signature
Name
Designation
Date

:
:
:
:

Checked By:
KG (SITE SUPERVISOR/ENGINEER)
Signature
:
Signature
Name
:
Name
Designation :
Designation
Date
:
Date

* The JMSs running no. shall be controlled, recorded and maintain by KGNRC.
CIPAL/FORM/JMS/NOV 2011/REV.0

Verified By: