ESTIMATED PROJECTION
APPAREL PRODUCTION UNDER ONE ROOF
By Dipankar Dutta
2012
Estimated Projection
The Estimated Projection is based on an approximately estimated cost.
The entire project compound will be divided virtually in three parts i.e. the Constructed Area, Area for Future Expansion & Green Area and the ratio will be 20:20:60. The Green area will consists of water body which maintain water level of the Land.
Initially we will implement only the Phase-I of the project on the very first years.
The basic infrastructure facilities will require for implementation of Phase-I of the project as follows: 1) Land / Site development for the Project. a) Soil & pilling of Land b) Construction for Sanitation & Drainage c) Construction for boundary wall and roadways 2) Knitting Unit a) Construction of Factory Shed for Knitting. b) Machineries for Knitting c) Necessary Furniture & Fixture for Knitting. 3) Dyeing Unit Construction of Factory Shed for Dyeing. Machineries for Dyeing Necessary Furniture & Fixture for Dyeing Unit. 4) Development of Office Building The Office building is consists of Store, Logistics, Laboratory, Canteen and Power House Construction of Office Building Interior Decoration, Furniture & Fixture c) Office Equipment, Computers & Stationary etc. 5) Development of Dormitory Construction of Dormitory for Labors Lodging Furniture for Dormitory. 6) Motor Vehicles for Transportation & Delivery 7) Connectivity of Electricity, Water supply, Telecom and Internet 8) Safety & Security Measures 9) Fees for Consultancy and Licensing 10) Miscellaneous Expenses
a) b) c) a) b) a) b)
Knitting Unit
Total Knitting capacity of the project will be 1.6 Ton/ day.
The Knitting project consists of three basic requirements 1) Required Constructed Area 2) Machineries for Production 3) Furniture & Fixture 1) Required Constructed Area Constructed facilities required for Knitting Unit: A. Knitting Shed B. Stock Room C. Compressor Room D. Oil Room Total: 2000 sq /ft 1000 sq /ft 200 sq /ft 200 sq /ft 3400 sq /ft
Specification
A. Reversible Circular Machine B. Interlock Circular Machine C. Rib knitting Machine D. Compressor E. Electric thread winder F. Fabric Inspection Machine Total:
Qty.
02 02 01 01 01 01
Price/Lac
30.00( 15.00 Lac each) 30.00( 15.00 Lac each) 12.00 0.70 0.85 1.50 75.25 Lac
Dyeing Unit
Total Dyeing capacity of the project will be 3.0 Ton/ day. The Dyeing project consists of four basic requirements: 1) Required Constructed Area 2) Machineries for Production 3) Furniture & Fixture 1) Required Constructed Area
Constructed facilities required for Dyeing project: a) Dyeing Shed b) Stock Room c) Water Treatment and Boiler Room d) Salt Room e) Soda Room f) Dyes Room Total 5000 sq /ft 2000 sq /ft 2000 sq /ft 200 sq /ft 200 sq /ft 200 sq /ft 9600 sq /ft
Office Building
The Office Building comprises of an Official Staff area, a Management Area, a Meeting cum Conference Room, a Designing Studio, a Guest House and a Show Room for New Product Display. Building the Office requires three basic things:
1) Required Constructed Area 2) Interior Decoration, Furniture & Fixture 3) Office Equipment & Stationary 1) Construction of office Building
The office building will consists of office area cum store, a laboratory, a logistics cum packaging dept., a generator room, a canteen. Constructed facilities required for Office Building: 1. Office cum Store 500 sq/ft 2. Laboratory 500 sq/ft 4. Logistics cum packaging dept. 1000 sq/ft. 5. Generator Room 200 sq/ft 6. Canteen 500 sq/ft 7. Toilet 100 sq/ft Total: 2800 sq/ft
Dormitory
Development of Dormitory for Labors Lodging needs two basic things
1) Required Construction Area
2) Furniture & Fixture for Dormitory An approximate budget for Dormitory Furniture has been assumed. Dormitory Furniture 01.00 Lakhs
Total
02.60 Lakhs
Miscellaneous Expenses
An approximate amount for Miscellaneous Expenses has been assumed. Miscellaneous Expenses 05.00 Lakhs
Phase -I
Lets draw a table to calculate the estimated investment required for Phase I Of the project. Construction Area (Sq/ft.) Knitting Dyeing Office Building Dormitory Total 3400 9600 2800 1000 16800 Machineries & Equipment and Stationary (Rs/- Lakhs) 75.25 109.50 24.25 NA 209.00 Furniture & Fixture (Rs/- Lakhs) 01.00 05.00 10.00 01.00 17.00
So now we have to find i.e. 33600 sq/ft constructed area is the 40% of how much land:
So first convert 33600 sq/ft areas to Bighas and Kattha. = = = = 33600sq.ft/720sq.ft 46.66 katha/20 kattha 2.33 Bigha 2 Bigha and 6 Kattha approx
So, as we said earlier the ratio of construction area and green land will be 40:60.
So, if 2 bigha-6 kattha will be 40% of total area then the entire campus will be: 2.33 bigha 40 Total Land 5.82 bigha 5 bigha and 16 kattha 100
So, investment required for Phase I of the project will be: =Land + Total construction + complete Machineries & Equipment +
Furniture & Fixture + Motor Vehicles + Connectivity of Water, Electricity, Telecom etc. + Safety & Security + Fees for Consultancy & Licensing + Miscellaneous = 5bigha, 16 kattah + 16800 sq/ft + 209.00 Lakhs + 17.00 Lakhs + 12.50 Lakhs + 1.60 Lakhs + 2.6 Lakhs + 2.50 Lakhs + 5.0 Lakhs =5bigha, 16 kattah + 16800 sq/ft + 250.20 Lakhs Now, if we assume an approximate cost of land will be: Say Rs/- 5.0 Lakhs/ Bigha, so total cost of land will be: = = 05.00 6 Bigha( in round figure) 30.00 Lakhs
So, total investment required for Phase I of the project will be:
= cost of land + cost of construction + 250.20 Lakhs = 30 Lakhs + Cost of 16800 sq/ft construction + 250.20 Lakhs