BOILER PROJECTS

(170746-M)

Tenaga Tiub Sdn Bhd

PROJECT DATA SHEET

Re-heater tube panels ready for delivery

Removing of old re-heater outlet header

Installing the new re-heater tube panels

Installing the new Re-heater header

PROJECT
Contract Value Project Duration

:
: :

Unit 4 Boiler Rehabilitation Project TNBG Kapar Power Station


RM32,000,000.00 March / April 2004 Rehabilitation Work for one (1) unit 300MW IHI boiler. The scope involved tube bending, panel fabrication and site erection works for superheaters (20 panels), outlet re-heaters (500 panels) and one outlet steam header (20 tons). The reheater tubes were fabricated, acid washed, steam cleaned and painted at our factory in Nilai. The re-heater outlet header was supplied by the OEM. A 100% radiographic test was conducted on all weld joints. IHI was the OEM of the boiler and they provided engineering and technical supervision for the project. 300MW X 192Barg, IHI Utility Boiler, Unit 4
Page 9 of 27

Project Description :

Boiler Size

TTSB Company Profile (full set without cover & separator pages)

(170746-M)

Tenaga Tiub Sdn Bhd

PROJECT DATA SHEET

Steam separators

Interstage desuperheater with control valves

HP feed water piping

New expansion bellows

PROJECT
Contract Value Project Duration Project Description

:
: : :

Kuala Langat Power Station HRSG B16 Performance Improvement Project, Msia.
RM920,000.00 February 2004 The HRSG (Alstom-CE Design) located at the paper mill is coupled to one GE Fr5 and one GE Fr6 gas turbine. The upgrade would increase the superheated steam flow capacity by 3 kg/s. Tenaga Tiub was the sub-contractor responsible for fabrication, supply and installation of a new desuperheater, steam separators, pipe hangers, bellows, safety valves, process control valves, electrical works, and process control & instrumentation system. The engineering design and commissioning was undertaken by Alstom Power (Australia).

TTSB Company Profile (full set without cover & separator pages)

Page 10 of 27

(170746-M)

Tenaga Tiub Sdn Bhd

PROJECT DATA SHEET

Packaged Genset on site foundation

Air Radiator within enclosure

Inlet Silencer

PROJECT

415V 1600kW Packaged Diesel Genset for Malaysian Newsprint Industries Sdn Bhd RM1.3 billion Newsprint Plant, Mentakab, Pahang, Malaysia
RM1,650,000.00 July 1998 October 1998 EPCC Contractor for the design, procurement, manufacture and construction (including foundation plinth), testing and commissioning of a packaged self contained outdoor weatherproof type Mitsubishi diesel genset for the Newsprint Mill emergency services supply. Design aspects include synchronising and interfacing with the Mill power plant at 11kV. Of significance in this project is the short delivery time (to site) of 10 weeks for a large-sized diesel genset and a specially designed enclosure with enhanced sound attenuation of 80dBA at 1 metre.

Contract Value Project Duration Project Description

: : :

TTSB Company Profile (full set without cover & separator pages)

Page 11 of 27

(170746-M)

Tenaga Tiub Sdn Bhd

PROJECT DATA SHEET

Piperack and piping work c/w insulation

Thermal Oil Heater Plant

Pumps Installation

Process Piping

PROJECT
Contract Value Project Duration Project Description

:
: : :

MPI Polyester Sdn Bhd RM120,000,000 PETChip Plant, Shah Alam, Selangor
RM20,000,000.00 1995/1996 6 months (Installation Works) The MPI Polyester PETChip RM120,000,000 Plant was designed by John Brown Engineering, Germany with a capacity of 60 tones/day of PETChips. Tenaga Tiub was fully responsible for the supply and installation of all pressure vessels, reactor, tanks, process pumps, valves, piping and pipe-racks including testing/commissioning of the entire Chemical Plant.

TTSB Company Profile (full set without cover & separator pages)

Page 12 of 27

(170746-M)

Tenaga Tiub Sdn Bhd

PROJECT DATA SHEET

Replacement Of Superheater Tubes and Generating Tube Panels (Finned Tubes) For Waste Heat Boiler F4-761 At GPP4, Petronas Gas Berhad, Kerteh March 1999

Replacement of Generating Tube Panels For Waste Heat Boiler F4-771 At GPP4, Petronas Gas Berhad, Kerteh October 1998

Replacement Of 400 Nos Finned / Bare Tubes Of Sidewall, Rearwall, Furnace Tubes For Auxiliary Boiler F3-791 At GPP3, Petronas Gas Berhad, Kerteh - May 2000

TTSB Company Profile (full set without cover & separator pages)

Page 13 of 27

(170746-M)

Tenaga Tiub Sdn Bhd

PROJECT DATA SHEET

Supply And Fabrication Of Superheater To TNBG Perai Power Station October 2000

Supply, Fabrication And Installation Of 22 Panels Of Spaced And Hanger Platen Superheater Tubes For TNBG Prai Power Station 120 MW X 126 Barg Bharat Utility Boiler December 2000

Supply, Fabrication And Replacement of Upper Reheater Tubes SA 213 T22 Material for TNBG Kapar Power Stations Unit 3 IHI Boiler 300MW x 192 Barg April 2000

TTSB Company Profile (full set without cover & separator pages)

Page 14 of 27

(170746-M)

Tenaga Tiub Sdn Bhd

PROJECT DATA SHEET

Project Material Degradation Study For The Critical Waste Heat Boiler Components And The Life Assessment Technology Development TNB 58/2000 April 2000

Replacement Work For HP Heater #7 Unit 1, TNBG Kapar Power Station, Klang April 2000

Construction Of Underground Piping Works For BASF Integrated Chemical Site (ICS), Gebeng Industrial Estate, Phase III, Kuantan, Pahang August 1998

TTSB Company Profile (full set without cover & separator pages)

Page 15 of 27

(170746-M)

Tenaga Tiub Sdn Bhd

CONSTRUCTION EXPERIENCE

Installation, Testing and Commissioning of CW Pumps for Paka Power Station (1985 1986)

80TPH Boiler Erection Works for Sugar Mill

TTSB Company Profile (full set without cover & separator pages)

Page 16 of 27