Work Progress as well as Man Power Strength Record of FF for balance underground piping

Pipe welding in No of joints Total Scope Execut ed Scope Executed Scope Exec uted Bends/fla nge joints

Date

22July' 2012

Man Power Strength Sr No

Hydrotest in RM

Wrapping coating in RM

Laying & finishing and Front Details Cum Bal.in Mtrs. against Avl. Front 0 0 0 0 Cum. Bal. in Mtrs. against total Today's Planning

Remarks

Area

Location

Wrappi Super Welder Fitter Rigger Unskilled Grinder ng/ visior Coating

Total Available Executed Work (in front (in in Mtrs. Mtrs.) Mtrs)

1 Switch Yard 200NB 150NB 100NB Total 2 DM Plant 300NB 300NB Total 3 Transformer 200NB 150NB 80NB Total 4 FO 250NB 200NB Total 5 Boiler 300NB 250NB 200NB 150NB 80NB Total 6 ESP 100NB 80NB Total 7 From JNT#1 to Crusher House 250NB 250NB Grand Total Constrains: Sl. No. 1 2 3 Description 1 1 2 1 0 0 Remarks 1 1 6 6 Status reducing nozzle welding & extended branch errection u/p. (f-1,w-1,g-1,r-2,h-2) support welding & branch erection under progress,(f-1,w-1,r-2,g-1) MVW and detection system completed upto DV. 94 61 565 370 565 180 0 0 0 0 0 0 0 0 0 0 0 0 0 0 20 24 0 0 120 146 0 0 120 146 0 0 6 12 18 3 180 0 0 0 0 4 120 146 266 565 5169 60 80 140 340 4112 0 0 0 340 3654 60 80 140 0 458 120 146 266 225 1515 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 37 35 86 2 0 0 21 21 0 50 225 214 521 14 50 0 0 0 0 50 225 214 521 14 50 0 0 0 0 3 12 14 20 2 51 0 0 0 0 0 0 50 225 214 521 14 1024 50 0 127 127 14 318 0 0 0 0 0 0 50 0 127 127 14 318 50 225 214 521 14 1024 0 0 41 76 41 62 249 456 176 356 249 456 200 250 3 33 36 0 0 0 249 313 562 249 313 562 249 313 562 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 22 46 3 20 46 0 137 278 20 140 278 0 137 278 20 74 240 0 12 22 0 34 0 0 0 0 137 278 30 445 137 278 30 445 137 278 30 445 0 0 30 0 0 0 0 0 0 S5 Sleeper S4 Sleeper 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 25 64 25 64 0 0 0 0 NA NA NA NA 5 4 9 0 4 4 155 389 544 155 389 544 155 389 544 0 0 0 0 0 0 0 0 L&T store yard Ring header Branches for SH 0 0 0 85 168 40 85 168 40 515 1008 240 515 1008 240 515 1008 240 515 1008 240 9 16 4 29 0 0 0 0 515 1008 240 1763 515 1008 240 1763 515 1008 240 1763 0 0 0 0 0

MCR -1.5M MVWS for BLU (Oyster) MCR 7.5M MVWS for BLU (SFS) FO Pump house MVWS for BLU (SFS)

MVWS LDO /HFO Tanks

LDO tank ring erection completed

no work in progress due to rain

5 6 7 8

Foam System LDO/HFO Station Transformer HVWS for BLU (Oyster) Boiler Burner Front HVWS for BLU (SFS) UCR 11M BLU FEH system- Boiler, ESP

LDO tank foam system completed. No work in progress due to rain U/P(F-1,W1,R-2,H-1). HVW and detection system completed upto DV. elv24m ring completed. Elv 27m ring erection Completed. No work in progress due to rain(F-1,W-1,g-1,R-3,H-2) Branch erection & riser errection completed

Boiler riser piping work completed and valves fixing balance.

10 11 12 13 14

Fire water pump house switch yard s4 Sleeper, s5 Sleeper painting 300 nb pipe Main oil tank CD bay pipe trench (civil work)

no work in progress due to rain. (f-2,r-2,h-3) civil work for valve pit U/P(man power-5) painting completed ring Fabrication under ,pilon errection u/p(f-1,w-1,g-1,r-2,h-3) PCC completed(man power- 6)

W-welder

F-fitter R-riger G-grinder G.C-gas cutter T.W-tack welder H-helper