A truly international solar project developer realized 391 MWp of B2B & B2I and B2R projects in 11 countries to date presence in over 16 countries across Europe, North America and Asia over > 200 employees globally
Belgium 45.6%
Italy 15.5%
Realized 108MW in 2010 and 207 MWp in 2011 respectively, of which for 2011 25 MW in B2B 80 MW in B2I 44 MW B2R 59 MW Power business
USA 6.5%
Canada 8.6%
UK Belgium Czech Republic Canada US France Spain Italy Greece UAE India Thailand Vietnam Malaysia Bulgaria China South Korea
North America
Europe 47 33 149 27
Grid connected MW(a) 2012 pipeline MW, inc. under construction(a) 2013 14 pipeline MW No of employees
Grid connected MW(a) 2012 pipeline MW, inc. under construction(a) 2013 14 pipeline MW No of employees
Grid connected MW(a) 2012 pipeline MW, inc. under construction(a) 2013 14 pipeline MW No of employees
35 128 3,749 56
B2B refers to the sale of solar installations to corporate customers Enfinity is responsible for project development, construction and O&M The Company has substantial experience in the creation and development of B2B projects for a wide range of business clients (multi-national clients)
B2B
Business to Business
B2I
Business to Investors
B2I refers to the sale of solar projects to external financial investors Development, financing, construction, operation and administration carried out by Enfinity Historically has been the main driver of Enfinitys sales
B2R refers to the sale of solar systems to residential clients via resellers Enfinity is responsible for providing PV systems as well as training and marketing support to the resellers In certain cases, Enfinity sells PV systems directly to the end-customer
B2R
Business to Retail
Multiple sources of revenue and customers enhance competitiveness and reduce risk
4
Source: PHOTON consulting, LLC. Note: All data are rought estimates. Estimates based on MW DC of completed construction/system installations, not MW interconnected.
PV market: GLOBAL
10
Opportunities for solar PV in ASIA - Indonesia Fast growing demand for electricity production majority of people have no access today
Considering the vast areas of unused space such as roofs, building and deserts, the potential is almost inexhaustible
12
Very weak correlation between the solar adoption and the amount of sunlight in area. E.g. The southern part of China has about 50% radiation MORE than Germany the largest solar market. Average annual energy received in Europe ~1000 kWh per m Compares with ~1850 kWh in Bombay.
13
Permanent Cost Distribution & Transmission Fuel Costs CO Costs Fixed Cost ROCE
Installed capacity Construction cost Plant life Load factor Production Expected ROCE Required return USD per MWh produced Fixed Costs Fixed O&M USD per MWh produced CO Costs Tot. Cost USD per MWh produced Fuel Costs Fuel Price Heat Rate USD per MWh produced Total Generation Cost Distribution & Transmission Permanent Cost Total Electricity Cost
0.0
0.0
Grid Parity
Average retail power price (USD/KWh)
0.16 0.14 0.12 0.10 0.08 0.06 0.04 0.02
China Canada Germany Japan Czech Republic IL South Korea France United Kingdom NY NJ Spain TX Italy CA 2010E
FL AZ
2014E
0.00 2.0 2.5 3.0 3.5 4.0 4.5 5.0 5.5 6.0 Average insolation (KWh/m2/day) (Kw h/m^2day)
Opportunities for Solar PV in remote areas of ASIA Case study Philippines 17.500 islands in Indonesia majority are running on diesel generators
17
Opportunities for Solar PV in remote areas in ASIA Case study Philippines yearly, an increasing 162 mio$ losses by national power company responsible for these areas We are studying 9 islands in the case study Findings
total generation 39 GWh/year 6 - 8 pesos/kWh paid by consumer 6 18 pesos/kWh paid by electrification fund rest of cost is born by national utility responsible for off-grid islands total cost/kWh is 0.33$ -1.41$/kWh in 2010 2011 - 30% increase in fuel cost Cost 0.39$ - 1.49$/kWh
18
Opportunities for Solar PV in remote areas in ASIA Case study Philippines Our solution for the case study of 9 islands Replace 50% of diesel generators by solar parks:
50% of Energy/Daytime
Avoid buying more Generator sets Savings on fuel cost year 1 : 4.4 million us$ assuming price increase of fuel of 5%/year (30% increase between 2010 2011) Savings on fuel cost in year 25 : 14 million us$ Savings over period of 25 years : 211 million us$ We need to install 12 MWp of solar to cover 50% current consumption Cost of 12 MWp = 36 million us$ + 9 million O&M = 56 million us$ SAVINGS of 150 mio us$
19
Opportunities for Solar PV in remote areas in ASIA Case study Philippines There is more ... Figures on 150 areas with 290 diesel generators
Savings on fuel cost year 1 : 53 mio us$ Assuming price increase of fuel of 5%/year Savings on fuel cost in year 25 : 172 mio us$ Savings over period of 25 years : 2.5 bio us$ We need to install 168 MWp of solar to cover 50% of consumption or run same gensets to increase daily coverage from 9-12 hours to 12-16 hours Cost of 168 MWp = 504 mio us$ + 126 mio O&M = 630 mio us$ WE CAN SAVE 2 BIO us$ Or 1% of the GDP in philipinnes
20
Opportunities for solar PV in remote areas in ASIA Case study Philippines Solution 1 government raise money to invest Solution 2 IPP model
Sign bankable PPA with islands for 25 years
PPA is guaranteed by government Collecting of money done by government institution Equity and debt can be raised to cover the capex operation by IPP
21
22
23