Sei sulla pagina 1di 7

CURRICULUM VITAE

Personal details

Objective

Name : SATHISH KUMAR K Date of Birth: 19.06.1987 Nationality Sex : Indian : Male

With

an

experience

in

the

field

of

Testing

and

Commissioning of power system products, I look forward for an opportunity to display my skills in the field of Testing & commissioning , Maintenance and Execution of projects related to power systems.

Marital Status: Single Mobile Email Id :08754587281 : Professional Details Professional Qualification: Completed B.E Of The Stream Electrical and Electronics engineering from St Peters Engineering college, Avadi With An Aggregate of 73.4% in the year 2009.

sathishvenkatraj007@gmail.com Languages Known: English, Hindi , Tamil and Telugu.

Passport Details: Passport No. : H9103121 Place of Issue: CHENNAI Date of Issue : 10/03/2010 Expiry Date Address: #6/28,Ranga Pillai Garden St Kondithope , Chennai-600079. : 09/03/2020

Working Experience Designation :Testing & Commissioning Engineer

Experience

: 1Year 5 months(Domestic)& 6 months overseas

Present DELHI.

: VOLTECH ENGINEERS PVT LTD. NEW

Skill Set Having an experience and knowledge in Testing,

Commissioning and Maintenance of power plant, substation and process plant.

Page 1 of 7

Nature of work

Testing and commissioning of all Electrical equipment from 415 volts to 400 KV System.

Inspection of control and relay panel, preparation of Test Report and cable schedule for sub-station.

Testing and commissioning of control & relay panel for Bus Coupler and Line feeder.

Transformer,

Testing and commissioning of power control centre and motor control centre.

Testing of Protective Relays for various needs. Experience with relays. Over current and earth fault relays Knowledge of Transformer protection, Transformer Differential

Protection & Testing of Transformers from 63KVA to 100MVA. Testing of CT, P.T, Circuit breaker, switch gear and Power Transformer from 63KVA to 100MVA. Trouble shooting of all Electrical circuits, control and protection circuits Co-ordination with client in As Built Scheme drawing submission, test report submission, As build cable schedule submission and all site activity to satisfy the customer.

Page 2 of 7

Domestic Experience 1. Project Client Scheme : : : ASH WATER RECYCLING UNIT ,NTPC KHALGAON M/S CONTROLS & SWITCH GEAR(C&S) M/S CONTROLS & SWITCH GEAR(C&S)

Executed Testing & Commissioning of 2. Testing of Electrical Equipments Testing of Air Circuit Breakers Testing of CT Testing of VT Intertrip checking Testing of Cable Hi Voltage Test Transformer stability : : : 33/11KV Substation,Torrent Power (chipitola) M/S ADROID M/S SIEMENS

Project Client Scheme

Executed Testiong & Commissioning of 3. Testing of Electrical Equipments Scheme checking Transformer 63 KVA Transformer 5 MVA Testing of Breakers Testing of CT Testing of VT Testing of Cable Hi Voltage Test Intertrip checking Transformer stability : : : HINDUSTAN ZINC LIMITED (S.K MINES) M/S MCNALLY BHARAT LIMITED M/S ABB

Project Client Scheme

Executed Testiong & Commissioning of Page 3 of 7

Testing of Electrical Equipments Scheme checking Testing of CT Commissioning of HT MOTOR Operation of Belt Sway Switch & Pull Cord Switch

4.

Project Client Scheme

: : :

33/11KV ,DELHI METRO RAIL CORPORATION LTD M/S ABB M/S ABB

Executed Testiong & Commissioning of Testing of Electrical Equipments Scheme checking Indoor Dry Type Transformer 630 KVA Testing of Breakers Testing of CT Testing of VT Testing of Cable Hi Voltage Test Testing of Busbar Hi Volotage Intertrip checking

5.

Project Client Scheme

: : :

33/11 KV substation Kirti Nagar Indoor Grid M/S NEW DELHI POWER LTD M/S SIEMENS

Executed Testiong & Commissioning of Testing of Electrical Equipments Scheme checking Transformer 315 KVA Testing of Breakers Testing of CT Testing of VT Testing of Cable Hi Voltage Test Testing of Busbar Hi Volotage Intertrip checking

Page 4 of 7

6.

Project Client Scheme

: : :

20MW STG,INDIAN OIL CORPORATION LTD,BARAUNI M/S ARUN CONSTRUCTION PVT LTD M/S BHEL

Executed Testiong & Commissioning of Testing of Electrical Equipments Scheme checking Testing of Breakers Testing of CT Testing of VT Testing of Cable Hi Voltage Test Testing of Breaker Hi Voltage Intertrip checking Cable Differential Test Reactor Differential Test Cable schedule Preparation Interpanel cable schedule preparation

7.

Project

+ 500 KV,2500 MW HVDC Ballia-Bhiwadi Bipole

terminal package Client Scheme : : M/S PGCIL M/S SIEMENS

Executed Testiong & Commissioning of Testing of Electrical Equipments Scheme checking Transformer 315 MVA Testing of Breakers Testing of CT Testing of Cable Hi Voltage Test Testing of Busbar Hi Volotage Intertrip checking

8.

Project Client

: :

M/S LG Electronics India Pvt. Ltd., Gr. Noida, U.P M/S SIEMENS

Page 5 of 7

Scheme

M/S BHEL

Executed Testiong & Commissioning of Testing of Electrical Equipments Scheme checking Indoor Dry Type Transformer 630 KVA Testing of Breakers Testing of CT Testing of VT Testing of Cable Hi Voltage Test Testing of Busbar Hi Voltage Test Intertrip checking

Experience with AREVA RELAYS Micom P121,111- O/C & E/F Protection

Experience with ABB Relays SPAJ 140C- O/C & E/F Protection REM 615 REF 615

Experience with SIEMENS Relays 7SJ6225-O/C & E/F Protection 7UT612- Transofrmer Diff.Protection

Overseas experience: Factory testing in MITSUIBISHI FACTORY JAPAN Duration: 3 weeks

1.Project

NEW HARIPUR POWER PLANT DEVELOPMENT PROJECT BANGLADESH

Client

MITSUIBISHI ELECTRIC CORPORATION,Japan Page 6 of 7

GCP &GRP Panel Thickness Measurement Scheme Checking Transducer Calibration Jemstar Revenue Meter Test Auto Synchronizer Function Test Relay Parameter Setting For M 3425,M 3310 BECKWITH RELAY M 3425 TESTED

2. Project

SINGAPORE SENOKO POWER STATION STAGE II REPOWERING

Duration : 3 months Client : MITSUIBISHI ELECTRIC CORPORATION,Japan

VT/CT Phase Relation Test Generator Temperature Rise Test Generator Vibration Test Sound Level Measurement

DECLARATION To Whom So Ever It May Concern: I hereby declare that all the above-furnished information is true to the best of my knowledge and belief. Date: Place: (SATHISH KUMAR K) Yours sincerely

Page 7 of 7

Potrebbero piacerti anche