POWER PROCESS DESSIMINATION PROCESS UTILITIES CHECK ESCALATION PROCESS PLANT ASSESSMENT MAN POWER SUPPORT POWER TRANSFER PROCESS GENSET REPAIR PROCESS SYNCH REPAIR PROCESS CDA COOLING PUMP PROCESS COMPRESSOR PROCESS AHU PROCESS EXHAUST PROCESS COOLING TOWER PROCESS CHW (PUMPS) PROCESS CHILLER PROCESS SUB-STATION PROCESS UPS PROCESS PCW PROCESS DRYER PROCESS VACUUM PROCESS WATER PROCESS PCT PROCESS COLD STORAGE PROCESS UPCW PROCESS BULK GAS PROCESS
STATUS
DONE DONE DONE DONE DONE DONE DONE
DONE
Power Interruption
Unscheduled power interruption
Total Power Loss Start Proceed to power loss procedure Manpower deployment Genset start-up
Power Shifting
Stabilize utilities
End
Substation ok?
Load ok?
Voltage/Freq. stable
Manpower deployment
Utilities start-up
Stabilize system
End
TOTAL POWER FAILURE Unscheduled power interruption affecting F2, F3, F4 || PP1, FCL Tech
Start
Shift Leader
Genset ok?
Substation ok?
Utilities ok?
(Yes) End
FCL Tech
Start Check voltage/ freq. stability of main substation ( 69 KV ) Voltage/ freq. stability of main substation ( 69 KV ) OK? (Yes) Check voltage/ freq. stability of internal substation (No) Continue Genset Operation Internal substation voltage/ freq. stable? (Yes)Check UPS status (No)Escalate Genset Operation OK? UPS status OK? (Yes) Plant Assessment Shift to UPS mode Shifting OK? Assessment OK? (Yes) Check fuel Fuel OK? (Yes) Red Alert PO Fuel (Yes) Check Manpower Support
Shift Leader
Manpower sufficient? (Yes) Notify / approval Manpower approved? Check UPS status Cooldown Genset for 15 Minutes End
Normal to Genset
FCL Tech
Start Check load requirements / capacity Met requirements? (Yes) Check fuel (No) Assess Status Fuel Sufficient? (No) Refuel (Yes) Check Genset Status Genset Ok? (No) Proceed to genset repair process (Yes) Run Genset Ok?
Shift Leader
(Yes) Synchronize Genset syncronized? (No) Proceed to synch. repair process (Yes) Manual close totalizer Totalizer closed? (Yes) Communicate with shift leader (No) Manually close breaker Shift leader informed? Breaker closed? (No) Escalate (Yes) Initiate power transfer End
Shift Leader
Shift Leader
Start S/L to escalate problem to SME Problem escalated to SME? (Yes) Send update / advise facilitator (No) Advise facilitator End
Dessimination process
Manufacturing
FCL Tech
Start Ready communication process based on assessment Seek approval
Shift Leader
Proceed
End
Facilities
FCL Tech
Start
Shift Leader
Assign manpower
Manpower ok?
(No) Escalate
(Yes) Deploy
End
FCL Tech
Start
Shift Leader
Check Substation D
Substation D ok?
Substation Db ok?
Substation Da ok?
Substation C ok?
Substation Cb ok?
Utilities check
End
CDA Process
FCL Tech
Start
Shift Leader
Check pumps
Pumps ok?
Check pump 1 / IR # 2
Pump 1 / IR # 2 ok?
Pump 2 / IR # 4 ok?
ZR-400-1 ok?
ZR-400-2 ok?
Kobelko ok?
(Yes) Check IR # 1 - 4 - 2
IR # 1 - 4 - 2 ok?
(Yes) Dryer - IR
Dryer - IR ok?
(Yes) End
HVAC Process
FCL Tech
Start
Shift Leader
Check power
(No) Check Condenser process (Yes) Chilled water pump 1 2-3-4 Chilled water pump 1 - 2 - 3 4 ok? (Yes) Check Check CT ( 1 to 8)
CT ( 1 to 8 ) ok?
Chiller 1 - 2 - 3 - 4 ok?
(Yes) End
Vacuum Process
FCL Tech
Start
Shift Leader
Check power
(Yes) Ene
FCL Tech
Start
Shift Leader
(No) Escalate
Genset Synchronized?
Totalizer Ok?
Check Utilities
End
Substation Procedure
FCL Tech
Start
Shift Leader
Check voltage
Voltage ok?
(No) Back to Genset process (Yes) Check breaker status if normally "off"
Breaker on?
(No) Escalate
End
Feeder 5
Priorities: - Power - HVAC Start
Chillers ok?
AHU ok?
(Yes) End
Feeder 2
Priorities:
-Power
-PCW
FCL Tech
Start
Shift Leader
Check S/S H, G, E, F, Eg
S/S H, G, E, F, Eg ok?
UPS ok?
(No) Proceed to UPS process (Yes) Check PCW pumps for Fusion ckt 1-5 PCW pumps for Fusion ckt 1-5 ok? (No) Proceed to PCW process (Yes) Check PCW pumps for Polaris ckt 1-6
AHU ok?
(No) Proceed to AHU process (Yes) Verify stability of exhausts FA Lab & Burn-in Exhausts, FA Lab and Burnin stable? (No) Proceed to Exhaust Process (Yes) Check vacuum pumps serving cryogenic Vacuum pumps serving cryogenic ok? (No) Procees to vacuum process
(Yes) End
Feeder 3
Priorities:
-Power
-CDA -HVAC
FCL Tech
Start
Shift Leader
Check S/S Q, R, S, P
S/S Q, R, S, P ok?
UPS ok?
(No) Proceed to UPS process Check comp cooling pumps #1&2 Comp cooling pumps # 1 & 2? (No) Proceed to Pump process (Yes) Check compressor 1, 2, 3, 4
Compressor 1, 2, 3, 4 ok?
Dryer 1, 2, 3, 4 ok?
Chillers ok?
AHU ok?
Vacuum ok?
(Yes) End
Feeder 4
Priorities:
-Power
-CDA -water
FCL Tech
Start
Shift Leader
Check S/S Q, R, S, P
S/S Q, R, S, P ok?
UPS ok?
(No) Proceed to UPS process Check comp cooling pumps # 1 , 2, 3 & 4 Comp cooling pumps # 1 , 2, 3 & 4? (No) Proceed to Pump process (Yes) Check compressor 1, 2, 3, 4
Compressor 1, 2, 3, 4 ok?
(No) Proceed to compressor process (Yes) Check dryer BD1050# 1, 2, 3, IR # 3, 5, 6 DryerBD1050# 1, 2, 3 ; IR # 3, 5, 6 ok?
EDI ok?
RODI ok?
Check vacuum
Vacuum ok?
Chiller ok?
(No) Proceed to cold storage process (Yes) verify recovery rate of UPCW tank