FOUR LANING OF MEERUT - BULANDSHAHR OF NH-235 IN THE STATE OF UTTAR PRADESH UNDER NHDP PHASE 66.

48 k S No Description Unit Quantity Rate

Bill No. 1 : SITE CLEARANCE AND DISMANTLING Cutting of Trees, Branches and Removal of Stumps, 1.01 roots etc i Girth 300mm to 600m ii Girth 600mm to 900mm iv Girth 900mm to 1200mm iii Girth above 1800mm 1.02 1.03 a) b) c) i) ii) d) e) f) g) 1.04 1.05 Clearing and Grubbing Road Land. Dismantling including Disposal of Unserviceable material Brick / Stone Structures Flexible Pavement Plain Concrete structures RCC / PSC Concrete structures Km / 5th km stone including foundation cocnrete Pavement Edge Cutting Sign Boards / Bill Boards Guard Post / Hectometer Stone. Coordinating with Respective Service Provider / Authorities cutting of tress, shifting of utilities and Dismantling of Structurwes like Culvert, Bridges, Retaining wall andGrade structure below by manual Cement Concrete other M-10 and i) means. ii) RCC M15 and M 20

Each Each Each Each Hct

1550.000 900.000 500.000 35.000 130.745

Cum Cum Cum Cum No Sqm No No Km Cum Cum Cum Cum m m m m

743.461 322.560 408.002 155.575 31.000 0.000 10.000 91.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 242.000 0.000 0.000

iii) Rubble Stone Masonry in CM Wood work wrought and fixed in frames of trusses upto iv) a height of 5m. 1.06 Removing Hume Pipes and Stacking a) b) c) c) Upto 600mm Dia Above 600mm to 900 mm Dia Above 900 mm Dia Above 900 mm Dia

Bill No. 2 : EARTHWORK Excavation in all Types of Soil in Roadway, Shoulders, 2.01 verge etc 2.02 Loosening and Recompaction of subgrade Constrctions of Embankment with Roadway Excavated 2.03 Soil. 2.04 Constrctions of Embankment with Borrow Soil. 2.04a) 2.05 2.06 2.07 Constrctions of Embankment with Fly Ash Construction of SubGrade & Earthen Shoulder with Borrow Soil Filling in Median / Island with Borrow Soil Turfing of embankment slopes, verge earthen shoulders etc with rough grassing.

Cum Cum Cum Cum Cum Cum Cum Sqm

119834.374 154255.008 158398.126 540315.761 500000.000 665419.753 170416.141 526476.280

Bill No. 3 : BASES AND SUB-BASES 3.01 Providing Drainage Layer below GSB Cum 161219.705

3.02 3.03 3.04

Providing Granular Sub-Base Filter Media Proividing Wet Mix Macadam

Cum Cum Cum

131913.104 0.000 251613.212

Bill No. 4 : BITUMINOUS COURSES 4.01 4.02 Prime coat @ 9 Kg / 10sqm with Emulsion Tack Coat i) On Granular Surface @ 2.5 kg/10sqm ii) On Bituminous Surface @ 2 kg / 10sqm 4.03 (a) (b) 4.04 4.05 4.06 4.07 4.08 4.09 4.10 Fog Seal for Sealing of Cracks Slurry Seal for Sealing of Wider Cracks. Providing and Laying Profile Corrective Course with Dense Graded Bituminous Macadam Providing and Laying Dense Bituminous Macadam Providing and Laying Dense Bituminous Concrete Wearing Course using bitumen modifier. Scarifying / Removing the Existing Bituminous surface Construction of Foothpaths and Seperator Dry Lean concrete Pavement Quality Concrete Sqm Sqm Sqm Sqm Cum Cum Cum Sqm Sqm cum cum Sqm 1019334.566 0.000 1019334.566 2639831.156 0.000 0.000 26104.918 100097.210 59141.230 0.000 234.000 1834.380 3634.200

Bill No. 5 : BRIDGES 5.01 5.02 5.02 a) 5.03 5.04 a) b) 5.05 a) (i) (ii) b) Lm Cast in situ vertical piles of 1200 dia in RCC M-35 grade excluding reinf.including tests 5349.100 Earth work in Excavation for Foundation in Ordinary Cum 9144.599 Soil Providing and Laying Back Filling behind Abutment and Cum 6717.415 Wing wall and Laying Filter Media behind the Providing etc. Cum 3955.998 Abutment/wing wall etc Providing and Laying PCC in M 15 for Levelling Course 0.000 Below Foundations, Pipe bedding, Pile caps & Toe wall Cum 559.119 for Pitching. M 15 Below Approach Slabs. Cum 253.400 Providing and Laying RCC Concrete in Foundation M 30 Grade in Box culverts, U trough, Retaining Wall, Open Grade in Abutment, Pier,Curtain wallsOpen M 35 Foundation of Culverts, Return wall etc Foundation, Pile cap etc. Concrete in Substructure Cum Cum Cum Cum Cum Cum Cum Cum Cum m m MT MT cucm no. 2557.303 3351.240 1668.468 2280.901 2389.063 516.000 936.000 1344.720 302.400 0.000 2097.500 2534.400 2974.673 13.440 0.000 100.000

(i) M 30 Grade in Piers, Abutments of Bridges & Flyovers M 35 Grade in Pier Caps, Abutment Caps, Pedestals of (ii) Bridges & Flyovers c) In Superstructure M 35 Grade in Top Slabs of Box type structures, RC T(i) BeamGrade Concrete in RCC Girders, RC T-Beam of M 40 & Solid Slab Type Superstructure of Bridges and (ii) Bridges and Concrete in PSC Girders, PSC T-Beam of M 40 Grade Flyovers. (iii) Bridges and Flyovers. (iv) M 35 Grade in Slab Type Superstructure. 5.06 5.07 a) b) 5.08 a 5.08 b 5.09 a 5.09 b Providing and Laying RCC in M 30 for Approach Slab Providing and Laying RCC in M 40 for Crash Barrier Crash Barrier on Bridge Deck Crash Barrier on Ground Providing HYSD Steel Reinforcment High Tensile Strands Providing Elastomeric Bearings POT / PTFE Bearings

5.10 5.11

Providing and Installing Strip Seal Expansion Joint

m Sqm Sqm Cum Sqm Nos Cum Cum No Cum m No No No Mt No

769.000 173.250 0.000 8178.500 327.140 8178.500 160.167 0.000 0.000 0.000 472.000 0.000 0.000 0.000 19.000 19.000 19.000 600.000 11.000

Providing Tar Paper Bearing on Abutments / Piers etc. Providing and Laying Bituminous wearing course of 5.12 (a) 25mm thick Mastic Asphalt including 40 mm BC (i) Tack Coat (b) 5.13 5.14 5.15 (b) 5.16 5.17 5.18 (b) 5.19 5.20 5.21 5.22 5.23 (ii) 40 thick Bituminous concrete Providing and Laying 25 mm Mastic Asphalt Wearing Coarse on Deck Slab. Providing Drainage Spout for new Structure Providing and Laying Filter Material underneath the Stone Pitching Pitching on Slopes Precast Cement Concrete Block of Grade M 15 fixed with 1:4 CM Providing Weep Holes in Abutment/Wing wall/Return wall with 100mm dia Ac pipe Sand Filling in Foundation in Trenches Providing and Fixing of PVC / UPVC Rigid Pipe 150 mm dia Initial Load test on Pile Vert Routine Pile Load Test Lateral Ingrety test on Pile MS 'I' Girders Load test of Bridge

Bill No. 6 : CULVERTS 6.01 6.02 6.03 Earthwork in Excavation in Soil in Foundation Providing and Laying Back Filling behind Abutment and Wing wall and Laying Filter Media behind the Abutment Providing etc. Cum Cum Cum Cum 2748.390 3255.225 736.980 0.000 1677.332 0.000 0.000 Cum Cum Cum Cum Cum m m MT m Sqm Cum Sqm Nos Cum Cum 1494.935 552.680 0.000 853.138 731.234 355.110 0.000 0.000 345.553 0.000 5784.078 375.965 0.000 12.000 0.000 754.093 0.000

/ Wing wall etc 6.04 Providing and Laying PCC in M 15 for Levelling Course Below Foundations, Pipe bedding Pile Caps & Toe wall a) for Pitching. 6.05 Providing and Laying RCC in Concrete in Foundation a) M 25 Grade in Base Slab of Box Culverts, U trough, (i) Retaining Wall,Walls of Box Culverts, U-Trough, Return M 25 Grade in Open Foundation of Culverts, Curtain (iI) walls, Wing Walls, Dirt Walls etc Concrete In Superstructure b) (i) M 20 grade concrete in head wall, bracket etc M 25 Grade in Top Slabs of Box Type Structures & (ii) Solid Slab Type Superstructure of Culverts 6.06 Providing and Laying RCC in M 30 for Approach Slab 6.07 a) b) 6.08 6.09 6.10 Providing and Laying RCC in M 40 for Crash Barrier Crash Barrier on Bridge Deck Crash Barrier on Ground Providing HYSD Steel Reinforcemnt Providing and Installing Single Strip Seal Expansion Joint Providing and Laying Bituminous wearing course of 25mm thick Mastic Asphalt a) Tack Coat

b) 65 Thick Bituminous Concrete Providing and Laying 25 mm Mastic Asphalt wearing course on Deck Slab. 6.12 Providing Drainage Spout for new Structure 6.11 6.13 a) b) Providing and Laying Apron 300 th Dry Stone Pitching Precast Cement Concrete Block of Grade M 15 fixed with 1:4 CM

c) 6.14 6.15 6.16 6.17 (b) 6.18

M 15 Grade Cement Concrete Flooring including Cut off walls Weep Holes in Abutment / Wing wall / Return Providing wall with 100mm Dia Ac Pipe Providing 20 mm thick Compressible Fiber Board type Expansion joint for Slab Culvert. Sand Filling in Foundation in Trenches Providing and Fixing of PVC / UPVC Rigid Pipe 150mm dia Providing, fixing & jointing NP4 Hume Pipe 1200 dia

Cum Nos m Cum m Lm

0.000 526.720 736.400 424.045 0.000 0.000 1160.000

Bill No. 7 : RETAINING WALL 7.01 7.02 Earthwork in Excavation in Soil in Foundation Cum Cum 0.000 0.000 0.000 0.000 0.000 Cum Cum MT No Cum 0.000 0.000 0.000 0.000 0.000 0.000 Providing and Laying PCC in M 15 for Levelling Course below Foundations, Pipe bedding Pile caps & toe wall a) for Pitching. 7.03 Providing and Laying RCC Concrete in Foundation a) M25 Grade in base slab of Box culverts, U trough, (i) Retaining Wall, Open Foundation of Culverts, Curtain Concrete In Subrstructure b) M 25 Grade in Retaining wall, Piers, Abutments of (v) bridges & flyovers 7.04 Providing HYSD Steel Reinforcemnt Providing Weep Holes in Abutment/Wing wall/Return 7.05 wall with 100mm dia Ac Pipe 7.06 Sand Filling in Foundation in Trenches

Bill No. 8 : TRAFFIC SIGNS, MARKING AND ROAD APPURTENANCES 8.01 a) b) 8.02 a) b) c) 8.03 8.04 a) b) 8.05 (a) b) c) Construction of PCC Kerb M 15 Grade Kerb Kerb & Channel Providing RCC M 20 Grade Kilometer Stone 5th Kilometer Stone Ordinary Kilometer Stone Hectometer Stones Providing Boundary Pillar in M 15 Providing Pavement Marking with hot applied Thermoplastic line / Edge line / Transverse Marking and Lane / Centre Paints Other Markings Directional Arrows,lettering etc Retro Reflectorised Traffic Sign Informatory Signs,Facility Signs,Directional Signs,Advance Direction etc Cautionary, 900 mm Triangle Mandatory Signs i) Circular 600mm Dia ii) Octagon 900mm height iii) Triangular 900 mm side Providing and Fixing Rectro-Reflectorised Road 8.06 Delineators a) Cluster of Red Reflectors b) c) d) 8.07 8.08 Road Way Delineators One way Hazard Marker Two way Hazard Marker Providing Overhead sign LED Beacons No No No No No No No Nos Nos No No No No Sqm Sqm Sqm No m m 122120.420 0.000 0.000 8.000 38.000 217.000 863.000 0.000 38219.940 565.600 0.000 83.280 312.000 0.000 304.000 95.000 13.000 0.000 36.000 304.000 26.000 0.000 2.000 86.000

8.09

Providing New Jersy Barrier in road side in M 20 Grade concrete

0.000

Bill No. 9 : MAINTENANCE,PROTECTIVE WORKS,DUCTS & OTHER SERVICES Carrying out Routine Maintenance of Existing Shoulder Sqm 9.01 along the Right of Way Cum 9.02 Filter Material underneath Stone Pitching in Slopes 9.03 9.04 9.05 9.05 a 9.06 9.06.1 9.06.2 9.06.3 9.06.4 9.06.5 9.06.6 9.06.7 9.07 9.08 9.09 Providing and Laying Stone Pitching on slopes Construction of unlined Surface Drains in Soil at Toe Construction of concrete M-25 Drains with both side gully Pit Construction of gully Pit M-25 at both side of concrete drain Construction of Chute Drain / Catch Pit Excavation for Prefabricated chute drain in high Embankment area PCC / RCC in Open Foundation PCC Grade M 15 Square Rubble Coursed Stone masonry in CM 1:3 in Foundation complete Stone masonry in CM 1:3 for Substructure complete Plastering 12 mm thick with CM 1:3 in Substructure Back filling in trenches behind Abutment and wing wall etc. Guard Post Metal Beam Crash Barrier MS Railings Bus Shelter Cum m m m Rm Cum Cum Cum Sqm Cum No Lm Lm No

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 12320.000 2580.000 30.000

Bill No. 10 : REINFORCED EARTH WALL Providing & erecting precast concrete facia panels of M-35 grade sqm 10.01 10.02 10.03 10.04 10.05 10.06 10.07 Excavation below RE walls Filter media behind RE walls Filling of selected earth PCC M-15 below friction slab etc RCC friction slab, levelling pad & coping beam M-20 Providing HYSD Steel Reinforcemnt cum cum cum MT cum

12038.400 0.000 0.000 63771.048 638.352 3252.649 640.372

Bill No. 11 : STREET LIGHTING High Mast 11.01 11.02 11.03 11.04 11.05 Double Arm Single Arm Normal Light fittings in Pedestrian Crossing Cabling & Wiring

No. No. No. No. Lump sum

4.000 25.000 0.000 16.000 1.000

Bill No. 12 : LANDSCAPING & TREE PLANTATION Busshes in Median 12.01 12.02 Trees Plantation at side of ROW

No. No.

121899.920 4308.200

Bill No. 13 : TOLL PLAZA Toll Plaza Building & Systems etc 13.01

No.

1.000

Total Amount

UNDER NHDP PHASE 66.48 kms Amount

Potrebbero piacerti anche