Sei sulla pagina 1di 26

Load Bearing Capacity of Driven Pile Foundation

Project
: BV Project (Offsite Area)
Location
: Map Taphut, Rayong.
Boring No. : BH-1
Depth
: 0.00-20.00 m.
Soil Condition and Soil Parameters
Ground Water Level (m)=
Top of Pile Level (m) =
Layer
Depth (m)
No.
from
to
1
0.00
2.50
2
2.50
4.00
3
4.00
5.50
4
5.50
7.00
5
7.00
8.50
6
8.50
10.00
7
10.00
11.50
8
11.50
20.00

-1.00
-1.00
Thickness
(m)
2.50
1.50
1.50
1.50
1.50
1.50
1.50
8.50

Calculated by: Chinnawat


Date: 7 June 2012

Soil Type
Sand
Sand
Sand
Sand
Sand
Sand
Sand
Sand

Consistency
or Rel.Density
Very Loose
Medium Dense
Medium Dense
Medium Dense
Very Dense
Dense
Dense
Very Dense

SPT-N (blow/ft.)
Nfield Nadjusted
4
4
13
13
21
18
30
22.5
69
42
32
23.5
33
24
100
57.5

Su
(T/m2)
-

Total Unit

( o)
28
31
32.8
34.1
39.2
34.1
34.6
42.1

Weight (T/m3)
1.55
1.62
1.66
1.70
2.12
1.73
1.75
2.31

Pore Pressure and Overburden Pressure (Static Condition)


Ground Water Level (m)=
Depth at Mid.-Layer
(m.)

-1.00
Total Overburden
Pressure (T/m2)
TOP
1.94
5.09
7.54
10.06
12.92
15.81
18.41
29.55

1.25
3.25
4.75
6.25
7.75
9.25
10.75
15.75

Pore Pressure
(T/m2)
Uo
0.25
2.25
3.75
5.25
6.75
8.25
9.75
14.75

Effective Overburden
Pressure (T/m2)
EOP
1.69
2.84
3.79
4.81
6.17
7.56
8.66
14.80


.. 7487

Skin Friction Capacity on Pile


Clay
Layer
No.
1
2
3
4
5
6
7
8

Su
(T/m2)
-

Adhesion
Factor, a
-

fs = a*Su
(T/m2)
-

F
o

( )
28
31
32.8
34.1
39.2
34.1
34.6
42.1

EOP
(T/m2)
1.69
2.84
3.79
4.81
6.17
7.56
8.66
14.80

Sand
Ko=1-sinF

fs (T/m2)

0.531
0.485
0.458
0.439
0.368
0.439
0.432
0.330

KO*EOP*tan3/4F
0.344
0.591
0.795
1.010
1.279
1.589
1.822
2.998

Qf =fs * L
(T/m)
0.86
0.89
1.19
1.52
1.92
2.38
2.73
25.48

Sum of Qf
(T/m)
0.86
1.75
2.94
4.45
6.37
8.76
11.49
36.97

End Bearing Capacity of Pile


Layer Pile Tip
No. Depth ,D SPT-N
(m) (blow/foot)
1
1.25
2
3.25
3
4.75
4
6.25
5
7.75
6
9.25
7
10.75
8
15.75
-

Clay
Su
(T/m2)
-

NC
-

Sand
TOP
(T/m2)
1.94
5.09
7.54
10.06
12.92
15.81
18.41
29.55

qe=NC*SU+TOP
(T/m2)
-

SPT-N
(blow/foot)
4
13
18
22.5
42
23.5
24
57.5

Nq

(o)
28
31
32.8
34.1
39.2
34.1
34.6
42.1

6.5
13
20
27
79
27
30
115

Uo
(T/m2)
0.25
2.25
3.75
5.25
6.75
8.25
9.75
14.75

EOP qe=Nq*EOP
(T/m2)
(T/m2)
1.69
10.97
2.84
36.87
3.79
75.78
4.81
129.74
6.17
487.36
7.56
204.00
8.66
259.86
14.80 1500.00

End Bearing Capacity of Pile at Specify Tip


Pile Tip
Depth ,D
(m)
6.00
7.00
8.00

Clay
SPT-N
(blow/foot)
-

Su
(T/m2)
-

Sand

Nc

TOP

(T/m2)
9.63
11.33
13.45

qe=Nc*Su+TOP
(T/m2)
-

SPT-N
(blow/foot)
22.5
42
42

( o)
34.1
39.2
39.2

27
79
79

Uo
(T/m2)
5.00
6.00
7.00

Nq

EOP
(T/m2)
4.63
5.33
6.45

qe=Nq*EOP qe
(T/m2)
(T/m2)
125.01
125.01
421.07
421.07
509.45
509.45

Skin Friction Capacity on Pile at Specify Tip


Pile Tip
Depth, D
(m)
6.00
7.00
8.00

Clay
Sum of Qf
(T/m)
0.00
0.00
0.00

Sand
Ko=1-sinF

F of Tip EOP at Tip


o

( )
34.10
39.20
39.20

Layer(T/m )
4.21
5.33
5.39

Load Capacity of Single Pile ( from Boring No.


Pile Size
(m)
Pile Tip = 6.00
Square Pile
0.22
0.26
0.30
0.35
0.40
0.50
0.60
Pile Tip = 7.00
Square Pile
0.22
0.26
0.30
0.35
0.40
0.50
0.60
Pile Tip = 8.00
Square Pile
0.22
0.26
0.30
0.35
0.40
0.50
0.60

P
(m)

A
2

Sum of qf

fs (T/m2)

0.88
1.11
1.12

(T/m)
3.38
4.45
5.57

(T/m)
3.38
4.45
5.57

Qf

Qe

NF

Wp

Qu

Qa

KO*EOP*tan3/4F

0.439
0.368
0.368

Sum of Qf Total of Qf

BH-1 )
qe
2

(m )
-1.00

(T/m)
(T/m )
Factor of Safety (F.S.) = 2.5

(T)

(T)

(T)

(T)

(T)

(T)

Pile Top =
0.880
1.040
1.200
1.400
1.600
2.000
2.400
Pile Top =

0.0484
3.38
125.01
0.0676
3.38
125.01
0.09
3.38
125.01
0.1225
3.38
125.01
0.16
3.38
125.01
0.25
3.38
125.01
0.3600
3.38
125.01
-1.00 Factor of Safety (F.S.) = 2.5

3.0
3.5
4.1
4.7
5.4
6.8
8.1

6.1
8.5
11.3
15.3
20.0
31.3
45.0

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.6
0.8
1.1
1.5
1.9
3.0
4.3

9.0
12.0
15.3
20.0
25.4
38.0
53.1

3.0
4.0
5.0
6.5
8.2
12.2
16.9

0.880
1.040
1.200
1.400
1.600
2.000
2.400
Pile Top =

0.0484
4.45
421.07
0.0676
4.45
421.07
0.09
4.45
421.07
0.1225
4.45
421.07
0.16
4.45
421.07
0.25
4.45
421.07
0.3600
4.45
421.07
-1.00 Factor of Safety (F.S.) = 2.5

3.9
4.6
5.3
6.2
7.1
8.9
10.7

20.4
28.5
37.9
51.6
67.4
105.3
151.6

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.7
1.0
1.3
1.8
2.3
3.6
5.2

24.3
33.1
43.2
57.8
74.5
114.2
162.3

9.0
12.3
16.0
21.4
27.5
42.1
59.7

0.0484
0.0676
0.09
0.1225
0.16
0.25
0.36

4.9
5.8
6.7
7.8
8.9
11.1
13.4

24.7
34.4
45.9
62.4
81.5
127.4
183.4

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.8
1.1
1.5
2.1
2.7
4.2
6.0

29.6
40.2
52.5
70.2
90.4
138.5
196.8

11.0
15.0
19.5
26.0
33.5
51.2
72.7

0.880
1.040
1.200
1.400
1.600
2.000
2.400

5.57
5.57
5.57
5.57
5.57
5.57
5.57

509.45
509.45
509.45
509.45
509.45
509.45
509.45


.. 7487

End Bearing Capacity of Pile at Specify Tip


Pile Tip
Depth ,D
(m)
6.00
7.00
8.00

Clay
SPT-N
(blow/foot)
-

Su
2
(T/m )
-

Nc

(T/m )
9.63
11.33
13.45

Pile Tip
Depth, D

Clay
Sum of Qf F of Tip EOP at Tip

(m)
6.00
7.00
8.00

( )
34.10
39.20
39.20

Sand
Ko=1-sinF
2

Layer(T/m )
4.21
5.33
5.39

Load Capacity of Tension Pile ( from Boring No.


Pile Size

(m)

(m)

(m2)
-1.00

Pile Tip = 6.00 Pile Top =


Square Pile
0.22
0.880
0.26
1.040
0.3
1.200
0.35
1.400
0.40
1.600
0.50
2.000
0.60
2.400
Pile Tip = 7.00 Pile Top =
Square Pile
0.22
0.880
0.26
1.040
0.3
1.200
0.35
1.400
0.40
1.600
0.50
2.000
0.60
2.400
Pile Tip = 8.00 Pile Top =
Square Pile
0.22
0.880
0.26
1.040
0.3
1.200
0.35
1.400
0.40
1.600
0.50
2.000
0.60
2.400

qe=Nc*Su+TOP
2
(T/m )
-

Skin Friction Capacity on Pile at Specify Tip

(T/m)
0.00
0.00
0.00

Sand
TOP

fs (T/m2)
KO*EOP*tan3/4F

0.439
0.368
0.368

0.88
1.11
1.12

SPT-N
(blow/foot)
22.5
42
42

Nq

Uo
2
(T/m )
5.00
6.00
7.00

( )
34.1
39.2
39.2

27
79
79

qe=Nq*EOP
2
(T/m )
125.01
421.07
509.45

(T/m)
3.38
4.45
5.57

(T/m)
3.38
4.45
5.57

BH-1 )
Qf

Qe

NF

Wp

Qu

Qa

(T)

(T)

(T)

(T)

(T)

(T)

0.0484
3.38
0.00
0.0676
3.38
0.00
0.09
3.38
0.00
0.1225
3.38
0.00
0.16
3.38
0.00
0.25
3.38
0.00
0.3600
3.38
0.00
-1.00 Factor of Safety (F.S.) = 2.5

3.0
3.5
4.1
4.7
5.4
6.8
8.1

0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.6
0.8
1.1
1.5
1.9
3.0
4.3

3.0
3.5
4.1
4.7
5.4
6.8
8.1

1.2
1.4
1.6
1.9
2.2
2.7
3.2

0.0484
4.45
0.00
0.0676
4.45
0.00
0.09
4.45
0.00
0.1225
4.45
0.00
0.16
4.45
0.00
0.25
4.45
0.00
0.3600
4.45
0.00
-1.00 Factor of Safety (F.S.) = 2.5

3.9
4.6
5.3
6.2
7.1
8.9
10.7

0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.7
1.0
1.3
1.8
2.3
3.6
5.2

3.9
4.6
5.3
6.2
7.1
8.9
10.7

1.6
1.9
2.1
2.5
2.9
3.6
4.3

0.0484
0.0676
0.09
0.1225
0.16
0.25
0.36

4.9
5.8
6.7
7.8
8.9
11.1
13.4

0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.8
1.1
1.5
2.1
2.7
4.2
6.0

4.9
5.8
6.7
7.8
8.9
11.1
13.4

2.0
2.3
2.7
3.1
3.6
4.5
5.3

qe

(T/m)

5.57
5.57
5.57
5.57
5.57
5.57
5.57

(T/m )
4.63
5.33
6.45

Sum of Qf Total of Qf

(T/m2)
Factor of Safety (F.S.) = 2.5

Sum of qf

EOP

0.00
0.00
0.00
0.00
0.00
0.00
0.00


.. 7487

qe
2
(T/m )
125.01
421.07
509.45

TABLE 1.1a

RECOMMENDED ALLOWABLE LOAD FOR SINGLE SQUARE PILE (COMPRESSION)

Project : BV Project (Offsite Area), Map Taphut Industrial Estate, Rayong,Thailand


Hole
No.
BH-1

Pile Tip
Elevation
(m)
-6.00

-7.00

-8.00

Pile
Section
(mxm)
0.22x0.22
0.26x0.26
0.30x0.30
0.35x0.35
0.40x0.40
0.50x0.50
0.60x0.60
0.22x0.22
0.26x0.26
0.30x0.30
0.35x0.35
0.40x0.40
0.50x0.50
0.60x0.60
0.22x0.22
0.26x0.26
0.30x0.30
0.35x0.35
0.40x0.40
0.50x0.50
0.60x0.60

Pile
Length
(m)
5.00
5.00
5.00
5.00
5.00
5.00
5.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00

Ultimate
Ultimate
Skin friction End Bearing
(t)
(t)
3.0
6.1
3.5
8.5
4.1
11.3
4.7
15.3
5.4
20.0
6.8
31.3
8.1
45.0
3.9
20.4
4.6
28.5
5.3
37.9
6.2
51.6
7.1
67.4
8.9
105.3
10.7
151.6
4.9
24.7
5.8
34.4
6.7
45.9
7.8
62.4
8.9
81.5
11.1
127.4
13.4
183.4

Ultimate
Load
(t)
9.0
12.0
15.3
20.0
25.4
38.0
53.1
24.3
33.1
43.2
57.8
74.5
114.2
162.3
29.6
40.2
52.5
70.2
90.4
138.5
196.8

Pile
Weight
(t)
0.6
0.8
1.1
1.5
1.9
3.0
4.3
0.7
1.0
1.3
1.8
2.3
3.6
5.2
0.8
1.1
1.5
2.1
2.7
4.2
6.0

Allowable
Load
(t)
3.0
4.0
5.0
6.5
8.2
12.2
16.9
9.0
12.3
16.0
21.4
27.5
42.1
59.7
11.0
15.0
19.5
26.0
33.5
51.2
72.7

NOTE
1. SAFETY FACTOR = 2.5
2. ASSUMED PILE TOP AT 1.00M BELOW GROUND SURFACE.
3. PROPOSED PILE TIP ELEVATION IS BELOW EXISTING GROUND SURFACE OF 0.00M.


.. 7487

TABLE 1.1b

RECOMMENDED ALLOWABLE LOAD FOR SINGLE SQUARE PILE (TENSION)

Project : BV Project (Offsite Area), Map Taphut Industrial Estate, Rayong,Thailand


Hole
No.
BH-1

Pile Tip
Elevation
(m)
-6.00

-7.00

-8.00

Pile
Section
(mxm)
0.22x0.22
0.26x0.26
0.30x0.30
0.35x0.35
0.40x0.40
0.50x0.50
0.60x0.60
0.22x0.22
0.26x0.26
0.30x0.30
0.35x0.35
0.40x0.40
0.50x0.50
0.60x0.60
0.22x0.22
0.26x0.26
0.30x0.30
0.35x0.35
0.40x0.40
0.50x0.50
0.60x0.60

Pile
Length
(m)
5.00
5.00
5.00
5.00
5.00
5.00
5.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00

Ultimate
Ultimate
Skin friction End Bearing
(t)
(t)
3.0
0.0
3.5
0.0
4.1
0.0
4.7
0.0
5.4
0.0
6.8
0.0
8.1
0.0
3.9
0.0
4.6
0.0
5.3
0.0
6.2
0.0
7.1
0.0
8.9
0.0
10.7
0.0
4.9
0.0
5.8
0.0
6.7
0.0
7.8
0.0
8.9
0.0
11.1
0.0
13.4
0.0

Ultimate
Load
(t)
3.0
3.5
4.1
4.7
5.4
6.8
8.1
3.9
4.6
5.3
6.2
7.1
8.9
10.7
4.9
5.8
6.7
7.8
8.9
11.1
13.4

Pile
Weight
(t)
0.6
0.8
1.1
1
2
3
4
0.7
1.0
1.3
1.8
2.3
3.6
5.2
0.8
1.1
1.5
2.1
2.7
4.2
6.0

Allowable
Load
(t)
1.2
1.4
1.6
1.9
2.2
2.7
3.2
1.6
1.9
2.1
2.5
2.9
3.6
4.3
2.0
2.3
2.7
3.1
3.6
4.5
5.3

NOTE
1. SAFETY FACTOR = 2.5
2. ASSUMED PILE TOP AT 1.00M BELOW GROUND SURFACE.
3. PROPOSED PILE TIP ELEVATION IS BELOW EXISTING GROUND SURFACE OF 0.00M.


.. 7487

Load Bearing Capacity of Driven Pile Foundation


Project
: BV Project (Offsite Area)
Location
: Map Taphut, Rayong.
Boring No. : BH-1
Depth
: 0.00-20.00 m.
Soil Condition and Soil Parameters
Ground Water Level (m)=
Top of Pile Level (m) =
Layer
Depth (m)
No.
from
to
1
0.00
2.50
2
2.50
4.00
3
4.00
5.50
4
5.50
7.00
5
7.00
8.50
6
8.50
10.00
7
10.00
11.50
8
11.50
20.00

-1.00
-1.00
Thickness
(m)
2.50
1.50
1.50
1.50
1.50
1.50
1.50
8.50

Calculated by: Chinnawat


Date: 7-Jun-2012

Soil Type
Sand
Sand
Sand
Sand
Sand
Sand
Sand
Sand

Consistency
or Rel.Density
Very Loose
Medium Dense
Medium Dense
Medium Dense
Very Dense
Dense
Dense
Very Dense

SPT-N (blow/ft.)
Nfield Nadjusted
4
4
13
13
21
18
30
22.5
69
42
32
23.5
33
24
100
57.5

Su
(T/m2)
-

Total Unit

Weight (T/m3)
1.55
1.62
1.66
1.70
2.12
1.73
1.75
2.31

( )
28
31
32.8
34.1
39.2
34.1
34.6
42.1

Pore Pressure and Overburden Pressure (Static Condition)


Ground Water Level (m)=
Depth at Mid.-Layer
(m.)

-1.00
Total Overburden
Pressure (T/m2)
TOP
1.94
5.09
7.54
10.06
12.92
15.81
18.41
29.55

1.25
3.25
4.75
6.25
7.75
9.25
10.75
15.75

Pore Pressure
(T/m2)
Uo
0.25
2.25
3.75
5.25
6.75
8.25
9.75
14.75

Effective Overburden
Pressure (T/m2)
EOP
1.69
2.84
3.79
4.81
6.17
7.56
8.66
14.80


.. 7487

Skin Friction Capacity on Pile


Clay
Layer
No.
1
2
3
4
5
6
7
8

Su
(T/m2)
-

Adhesion
Factor, a
-

fs = a*Su
(T/m2)
-

F
o

( )
28
31
32.8
34.1
39.2
34.1
34.6
42.1

EOP
(T/m2)
1.69
2.84
3.79
4.81
6.17
7.56
8.66
14.80

Sand
Ko=1-sinF

fs (T/m2)

0.531
0.485
0.458
0.439
0.368
0.439
0.432
0.330

KO*EOP*tan3/4F
0.344
0.591
0.795
1.010
1.279
1.589
1.822
2.998

Qf =fs * L
(T/m)
0.86
0.89
1.19
1.52
1.92
2.38
2.73
25.48

Sum of Qf
(T/m)
0.86
1.75
2.94
4.45
6.37
8.76
11.49
36.97

End Bearing Capacity of Pile


Layer Pile Tip
No. Depth ,D SPT-N
(m) (blow/foot)
1
1.25
2
3.25
3
4.75
4
6.25
5
7.75
6
9.25
7
10.75
8
15.75
-

Clay
Su
(T/m2)
-

NC
-

Sand
TOP
(T/m2)
1.94
5.09
7.54
10.06
12.92
15.81
18.41
29.55

qe=NC*SU+TOP
(T/m2)
-

SPT-N
(blow/foot)
4
13
18
22.5
42
23.5
24
57.5

(o)
28
31
32.8
34.1
39.2
34.1
34.6
42.1

Nq
6.5
13
20
27
79
27
30
115

Uo
(T/m2)
0.25
2.25
3.75
5.25
6.75
8.25
9.75
14.75

EOP qe=Nq*EOP
(T/m2)
(T/m2)
1.69
10.97
2.84
36.87
3.79
75.78
4.81
129.74
6.17
487.36
7.56
204.00
8.66
259.86
14.80 1500.00

End Bearing Capacity of Pile at Specify Tip


Pile Tip
Depth ,D
(m)
6.00
7.00
8.00

Clay
SPT-N
(blow/foot)
-

Su
(T/m2)
-

(m)
6.00
7.00
8.00

Clay
Sum of Qf

(T/m )
9.63
11.33
13.45

(T/m)
0.00
0.00
0.00

Sand
Ko=1-sinF

F of Tip EOP at Tip


o

( )
34.10
39.20
39.20

Layer(T/m )
4.21
5.33
5.39

Load Capacity of Single Pile ( from Boring No.


Pile Size
(m)
Pile Tip = 6.00
I Pile
0.22
0.26
0.30
0.35
0.40
0.45
0.525
7.00
I Pile
0.22
0.26
0.30
0.35
0.40
0.45
0.525
Pile Tip = 8.00
I Pile
0.22
0.26
0.30
0.35
0.40
0.45
0.525

P
(m)

A
2

qe=Nc*Su+TOP
(T/m2)
-

Skin Friction Capacity on Pile at Specify Tip


Pile Tip
Depth, D

Sand
TOP

Nc

Sum of qf

fs (T/m )

( )
34.1
39.2
39.2

27
79
79

Uo
(T/m2)
5.00
6.00
7.00

Nq

qe=Nq*EOP
(T/m )
(T/m2)
4.63
125.01
5.33
421.07
6.45
509.45
2

(T/m)
3.38
4.45
5.57

(T/m)
3.38
4.45
5.57

Qf

Qe

NF

Wp

Qu

Qa

BH-1 )
qe
2

(m )
-1.00

(T/m)
(T/m )
Factor of Safety (F.S.) = 2.5

(T)

(T)

(T)

(T)

(T)

(T)

Pile Top =
1.090
1.240
1.510
1.710
1.950
2.140
2.440
Pile Top =

0.033
0.048
0.060
0.080
0.107
0.150
0.205
-1.00

3.38
125.01
3.38
125.01
3.38
125.01
3.38
125.01
3.38
125.01
3.38
125.01
3.38
125.01
Factor of Safety (F.S.) = 2.5

3.7
4.2
5.1
5.8
6.6
7.2
8.2

4.1
6.0
7.5
10.0
13.3
18.8
25.6

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.4
0.6
0.7
1.0
1.3
1.8
2.5

7.8
10.2
12.6
15.7
19.9
26.0
33.9

2.7
3.5
4.3
5.3
6.7
8.6
11.1

1.090
1.240
1.510
1.710
1.950
2.140
2.440
Pile Top =

0.033
0.048
0.060
0.080
0.107
0.150
0.205
-1.00

4.45
421.07
4.45
421.07
4.45
421.07
4.45
421.07
4.45
421.07
4.45
421.07
4.45
421.07
Factor of Safety (F.S.) = 2.5

4.9
5.5
6.7
7.6
8.7
9.5
10.9

13.9
20.2
25.3
33.6
44.8
63.2
86.3

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.5
0.7
0.9
1.1
1.5
2.2
3.0

18.7
25.7
32.0
41.2
53.5
72.7
97.2

7.0
9.6
11.9
15.3
19.9
26.9
35.9

1.090
1.240
1.510
1.710
1.950
2.140
2.440

0.033
0.048
0.060
0.080
0.107
0.150
0.205

6.1
6.9
8.4
9.5
10.9
11.9
13.6

16.8
24.5
30.6
40.6
54.3
76.4
104.4

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.6
0.8
1.0
1.3
1.8
2.5
3.4

22.9
31.4
39.0
50.1
65.1
88.3
118.0

8.6
11.7
14.6
18.7
24.3
32.8
43.8

5.57
5.57
5.57
5.57
5.57
5.57
5.57

EOP

Sum of Qf Total of Qf

0.88
1.11
1.12

KO*EOP*tan3/4F

0.439
0.368
0.368

SPT-N
(blow/foot)
22.5
42
42

509.45
509.45
509.45
509.45
509.45
509.45
509.45


.. 7487

qe
(T/m2)
125.01
421.07
509.45

End Bearing Capacity of Pile at Specify Tip


Pile Tip
Depth ,D
(m)
6.00
7.00
8.00

Clay
SPT-N
(blow/foot)
-

Su
(T/m2)
-

Nc

TOP
(T/m2)
9.63
11.33
13.45

Skin Friction Capacity on Pile at Specify Tip


Pile Tip
Depth, D

Clay
Sum of Qf F of Tip EOP at Tip

(m)
6.00
7.00
8.00

(T/m)
0.00
0.00
0.00

( )
34.10
39.20
39.20

(m)

P
(m)

Pile Tip = 6.00 Pile Top =


I Pile
0.22
1.090
0.26
1.240
0.30
1.510
0.35
1.710
0.40
1.950
0.45
2.140
0.525
2.440
7.00 Pile Top =
I Pile
0.22
1.090
0.26
1.240
0.30
1.510
0.35
1.710
0.40
1.950
0.45
2.140
0.525
2.440
Pile Tip = 8.00 Pile Top =
I Pile
0.22
1.090
0.26
1.240
0.30
1.510
0.35
1.710
0.40
1.950
0.45
2.140
0.525
2.440

A
2

Layer(T/m )
4.21
5.33
5.39

Sum of qf

fs (T/m )

( )
34.1
39.2
39.2

27
79
79

Uo
(T/m2)
5.00
6.00
7.00

Nq

0.88
1.11
1.12

(T/m)
3.38
4.45
5.57

Qf

Qe

NF

Wp

Qu

Qa

BH-1 )
qe
2

(T/m )
Factor of Safety (F.S.) = 2.5

(T)

(T)

(T)

(T)

(T)

(T)

0.033
0.048
0.060
0.080
0.107
0.150
0.205
-1.00

3.38
0.00
3.38
0.00
3.38
0.00
3.38
0.00
3.38
0.00
3.38
0.00
3.38
0.00
Factor of Safety (F.S.) = 2.5

3.7
4.2
5.1
5.8
6.6
7.2
8.2

0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.4
0.6
0.7
1.0
1.3
1.8
2.5

3.7
4.2
5.1
5.8
6.6
7.2
8.2

1.5
1.7
2.0
2.3
2.6
2.9
3.3

0.033
0.048
0.060
0.080
0.107
0.150
0.205
-1.00

4.45
0.00
4.45
0.00
4.45
0.00
4.45
0.00
4.45
0.00
4.45
0.00
4.45
0.00
Factor of Safety (F.S.) = 2.5

4.9
5.5
6.7
7.6
8.7
9.5
10.9

0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.5
0.7
0.9
1.1
1.5
2.2
3.0

4.9
5.5
6.7
7.6
8.7
9.5
10.9

1.9
2.2
2.7
3.0
3.5
3.8
4.3

6.1
6.9
8.4
9.5
10.9
11.9
13.6

0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.6
0.8
1.0
1.3
1.8
2.5
3.4

6.1
6.9
8.4
9.5
10.9
11.9
13.6

2.4
2.8
3.4
3.8
4.3
4.8
5.4

5.57
5.57
5.57
5.57
5.57
5.57
5.57

EOP qe=Nq*EOP
(T/m2)
(T/m2)
4.63
125.01
5.33
421.07
6.45
509.45

Sum of Qf Total of Qf
(T/m)
3.38
4.45
5.57

KO*EOP*tan3/4F

0.439
0.368
0.368

SPT-N
(blow/foot)
22.5
42
42

(m )
-1.00

0.033
0.048
0.060
0.080
0.107
0.150
0.205

(T/m)

qe=Nc*Su+TOP
(T/m2)
-

Sand
Ko=1-sinF

Load Capacity of Tension Pile ( from Boring No.


Pile Size

Sand

0.00
0.00
0.00
0.00
0.00
0.00
0.00


.. 7487

qe
(T/m2)
125.01
421.07
509.45

TABLE 1.2a

RECOMMENDED ALLOWABLE LOAD FOR SINGLE I-SHAPE PILE (COMPRESSION)

Project : BV Project (Offsite Area), Map Taphut Industrial Estate, Rayong,Thailand


Hole
No.
BH-1

Pile Tip
Elevation
(m)
-6.00

-7.00

-8.00

Pile
Section
(mxm)
I 0.22x0.22
I 0.26x0.26
I 0.30x0.30
I 0.35x0.35
I 0.40x0.40
I 0.45x0.45
I 0.525x0.525
I 0.22x0.22
I 0.26x0.26
I 0.30x0.30
I 0.35x0.35
I 0.40x0.40
I 0.45x0.45
I 0.525x0.525
I 0.22x0.22
I 0.26x0.26
I 0.30x0.30
I 0.35x0.35
I 0.40x0.40
I 0.45x0.45
I 0.525x0.525

Pile
Length
(m)
5.00
5.00
5.00
5.00
5.00
5.00
5.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00

Ultimate
Ultimate
Skin friction End Bearing
(t)
(t)
3.7
4.1
4.2
6.0
5.1
7.5
5.8
10.0
6.6
13.3
7.2
18.8
8.2
25.6
4.9
13.9
5.5
20.2
6.7
25.3
7.6
33.6
8.7
44.8
9.5
63.2
10.9
86.3
6.1
16.8
6.9
24.5
8.4
30.6
9.5
40.6
10.9
54.3
11.9
76.4
13.6
104.4

Ultimate
Load
(t)
7.8
10.2
12.6
15.7
19.9
26.0
33.9
18.7
25.7
32.0
41.2
53.5
72.7
97.2
22.9
31.4
39.0
50.1
65.1
88.3
118.0

Pile
Weight
(t)
0.4
0.6
0.7
1.0
1.3
1.8
2.5
0.5
0.7
0.9
1.1
1.5
2.2
3.0
0.6
0.8
1.0
1.3
1.8
2.5
3.4

Allowable
Load
(t)
2.7
3.5
4.3
5.3
6.7
8.6
11.1
7.0
9.6
11.9
15.3
19.9
26.9
35.9
8.6
11.7
14.6
18.7
24.3
32.8
43.8

NOTE
1. SAFETY FACTOR = 2.5
2. ASSUMED PILE TOP AT 1.00M BELOW GROUND SURFACE.
3. PROPOSED PILE TIP ELEVATION IS BELOW EXISTING GROUND SURFACE OF 0.00M.


.. 7487

TABLE 1.2b

RECOMMENDED ALLOWABLE LOAD FOR SINGLE I-SHAPE PILE (TENSION)

Project : BV Project (Offsite Area), Map Taphut Industrial Estate, Rayong,Thailand


Hole
No.
BH-1

Pile Tip
Elevation
(m)
-6.00

-7.00

-8.00

Pile
Section
(mxm)
I 0.22x0.22
I 0.26x0.26
I 0.30x0.30
I 0.35x0.35
I 0.40x0.40
I 0.45x0.45
I 0.525x0.525
I 0.22x0.22
I 0.26x0.26
I 0.30x0.30
I 0.35x0.35
I 0.40x0.40
I 0.45x0.45
I 0.525x0.525
I 0.22x0.22
I 0.26x0.26
I 0.30x0.30
I 0.35x0.35
I 0.40x0.40
I 0.45x0.45
I 0.525x0.525

Pile
Length
(m)
5.00
5.00
5.00
5.00
5.00
5.00
5.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00

Ultimate
Ultimate
Skin friction End Bearing
(t)
(t)
3.7
0.0
4.2
0.0
5.1
0.0
5.8
0.0
6.6
0.0
7.2
0.0
8.2
0.0
4.9
0.0
5.5
0.0
6.7
0.0
7.6
0.0
8.7
0.0
9.5
0.0
10.9
0.0
6.1
0.0
6.9
0.0
8.4
0.0
9.5
0.0
10.9
0.0
11.9
0.0
13.6
0.0

Ultimate
Load
(t)
3.7
4.2
5.1
5.8
6.6
7.2
8.2
4.9
5.5
6.7
7.6
8.7
9.5
10.9
6.1
6.9
8.4
9.5
10.9
11.9
13.6

Pile
Weight
(t)
0.4
0.6
0.7
1
1
2
2
0.5
0.7
0.9
1.1
1.5
2.2
3.0
0.6
0.8
1.0
1.3
1.8
2.5
3.4

Allowable
Load
(t)
1.5
1.7
2.0
2.3
2.6
2.9
3.3
1.9
2.2
2.7
3.0
3.5
3.8
4.3
2.4
2.8
3.4
3.8
4.3
4.8
5.4

NOTE
1. SAFETY FACTOR = 2.5
2. ASSUMED PILE TOP AT 1.00M BELOW GROUND SURFACE.
3. PROPOSED PILE TIP ELEVATION IS BELOW EXISTING GROUND SURFACE OF 0.00M.


.. 7487

Load Bearing Capacity of Driven Pile Foundation


Project
: BV Project (Offsite Area)
Location
: Map Taphut, Rayong.
Boring No. : BH-1
Depth
: 0.00-20.00 m.
Soil Condition and Soil Parameters
Ground Water Level (m)=
Top of Pile Level (m) =
Layer
Depth (m)
No.
from
to
1
0.00
2.50
2
2.50
4.00
3
4.00
5.50
4
5.50
7.00
5
7.00
8.50
6
8.50
10.00
7
10.00
11.50
8
11.50
20.00

-1.00
-1.00
Thickness
(m)
2.50
1.50
1.50
1.50
1.50
1.50
1.50
8.50

Calculated by: Chinnawat


Date: 7-Jun-2012

Soil Type
Sand
Sand
Sand
Sand
Sand
Sand
Sand
Sand

Consistency
or Rel.Density
Very Loose
Medium Dense
Medium Dense
Medium Dense
Very Dense
Dense
Dense
Very Dense

SPT-N (blow/ft.)
Nfield Nadjusted
4
4
13
13
21
18
30
22.5
69
42
32
23.5
33
24
100
57.5

Su
(T/m2)
-

( o)
28
31
32.8
34.1
39.2
34.1
34.6
42.1

Total Unit
Weight (T/m3)
1.55
1.62
1.66
1.70
2.12
1.73
1.75
2.31

Pore Pressure and Overburden Pressure (Static Condition)

Ground Water Level (m)=


Depth at Mid.-Layer
(m.)

-1.00
Total Overburden
Pressure (T/m2)
TOP
1.94
5.09
7.54
10.06
12.92
15.81
18.41
29.55

1.25
3.25
4.75
6.25
7.75
9.25
10.75
15.75

Pore Pressure
(T/m2)
Uo
0.25
2.25
3.75
5.25
6.75
8.25
9.75
14.75

Effective Overburden
Pressure (T/m2)
EOP
1.69
2.84
3.79
4.81
6.17
7.56
8.66
14.80


.. 7487

Skin Friction Capacity on Pile


Clay
Layer
No.
1
2
3
4
5
6
7
8

Su
(T/m2)
-

Adhesion
Factor, a
-

fs = a*Su
(T/m2)
-

(o)
28
31
32.8
34.1
39.2
34.1
34.6
42.1

EOP
(T/m2)
1.69
2.84
3.79
4.81
6.17
7.56
8.66
14.80

Sand
Ko=1-sinF

fs (T/m )

0.531
0.485
0.458
0.439
0.368
0.439
0.432
0.330

KO*EOP*tan3/4F
0.344
0.591
0.795
1.010
1.279
1.589
1.822
2.998

Qf =fs * L
(T/m)
0.86
0.89
1.19
1.52
1.92
2.38
2.73
25.48

Sum of Qf
(T/m)
0.86
1.75
2.94
4.45
6.37
8.76
11.49
36.97

End Bearing Capacity of Pile


Layer Pile Tip
No. Depth ,D SPT-N
(m) (blow/foot)
1
1.25
2
3.25
3
4.75
4
6.25
5
7.75
6
9.25
7
10.75
8
15.75
-

Clay
Su
(T/m2)
-

NC
-

Sand
TOP
(T/m2)
1.94
5.09
7.54
10.06
12.92
15.81
18.41
29.55

qe=NC*SU+TOP
(T/m2)
-

SPT-N
(blow/foot)
4
13
18
22.5
42
23.5
24
57.5

(o)
28
31
32.8
34.1
39.2
34.1
34.6
42.1

Nq
6.5
13
20
27
79
27
30
115

Uo
(T/m2)
0.25
2.25
3.75
5.25
6.75
8.25
9.75
14.75

EOP qe=Nq*EOP
(T/m2)
(T/m2)
1.69
10.97
2.84
36.87
3.79
75.78
4.81
129.74
6.17
487.36
7.56
204.00
8.66
259.86
14.80 1500.00

End Bearing Capacity of Pile at Specify Tip


Pile Tip
Depth ,D
(m)
6.00
7.00
8.00

Clay
SPT-N
(blow/foot)
-

Su
(T/m2)
-

Nc

Sand
TOP
(T/m2)
9.63
11.33
13.45

qe=Nc*Su+TOP
(T/m2)
-

SPT-N
(blow/foot)
22.5
42
42

Nq

( o)
34.1
39.2
39.2

27
79
79

Uo
(T/m2)
5.00
6.00
7.00

EOP qe=Nq*EOP
(T/m2)
(T/m2)
4.63
125.01
5.33
421.07
6.45
509.45

Skin Friction Capacity on Pile at Specify Tip


Pile Tip

Clay

Depth, D

Sum of Qf

(m)
6.00
7.00
8.00

(T/m)
0.00
0.00
0.00

Sand
F of Tip EOP at Tip
o

( )
34.10
39.20
39.20

Layer(T/m )
4.21
5.33
5.39

Load Capacity of Single Pile ( from Boring No.


Pile Size
(m)
Pile Tip = 6.00
Spun Pile
0.30
0.35
0.40
0.45
0.50
0.60
0.80
Pile Tip = 7.00
Spun Pile
0.30
0.35
0.40
0.45
0.50
0.60
0.80
Pile Tip = 8.00
Spun Pile
0.30
0.35
0.40
0.45
0.50
0.60
0.80

A
2

Sum of qf

fs (T/m )

0.88
1.11
1.12

(T/m)
3.38
4.45
5.57

(T/m)
3.38
4.45
5.57

Qf

Qe

NF

Wp

Qu

Qa

KO*EOP*tan3/4F

0.439
0.368
0.368

Sum of Qf Total of Qf

BH-1 )
qe
2

(m)
Pile Top =

(T)

(T)

(T)

(T)

(T)

(T)

-1.00

(T/m )
(T/m)
Factor of Safety (F.S.) = 2.5

0.942
1.099
1.256
1.413
1.570
1.884
2.512
Pile Top =

0.0452
3.38
125.01
0.0582
3.38
125.01
0.0766
3.38
125.01
0.0930
3.38
125.01
0.1159
3.38
125.01
0.1571
3.38
125.01
0.2563
3.38
125.01
-1.00 Factor of Safety (F.S.) = 2.5

3.2
3.7
4.2
4.8
5.3
6.4
8.5

5.7
7.3
9.6
11.6
14.5
19.6
32.0

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.5
0.7
0.9
1.1
1.4
1.9
3.1

8.8
11.0
13.8
16.4
19.8
26.0
40.5

3.0
3.7
4.6
5.4
6.5
8.5
13.1

0.942
1.099
1.256
1.413
1.570
1.884
2.512
Pile Top =

0.0452
4.45
421.07
0.0582
4.45
421.07
0.0766
4.45
421.07
0.0930
4.45
421.07
0.1159
4.45
421.07
0.1571
4.45
421.07
0.2563
4.45
421.07
-1.00 Factor of Safety (F.S.) = 2.5

4.2
4.9
5.6
6.3
7.0
8.4
11.2

19.0
24.5
32.3
39.2
48.8
66.2
107.9

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.7
0.8
1.1
1.3
1.7
2.3
3.7

23.2
29.4
37.8
45.5
55.8
74.5
119.1

8.6
10.9
14.0
16.8
20.6
27.6
44.0

0.0452
0.0582
0.0766
0.0930
0.1159
0.1571
0.2563

5.2
6.1
7.0
7.9
8.7
10.5
14.0

23.0
29.7
39.0
47.4
59.0
80.0
130.6

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.8
1.0
1.3
1.6
1.9
2.6
4.3

28.3
35.8
46.0
55.3
67.8
90.5
144.6

10.6
13.3
17.1
20.5
25.2
33.6
53.5

0.942
1.099
1.256
1.413
1.570
1.884
2.512

(m )

Ko=1-sinF

5.57
5.57
5.57
5.57
5.57
5.57
5.57

509.45
509.45
509.45
509.45
509.45
509.45
509.45


.. 7487

qe
(T/m2)
125.01
421.07
509.45

End Bearing Capacity of Pile at Specify Tip


Pile Tip
Depth ,D
(m)
6.00
7.00
8.00

Clay
SPT-N
(blow/foot)
-

Su
(T/m2)
-

Nc

Sand
TOP
(T/m2)
9.63
11.33
13.45

qe=Nc*Su+TOP
(T/m2)
-

SPT-N
(blow/foot)
22.5
42
42

( o)
34.1
39.2
39.2

Nq
27
79
79

Uo
(T/m2)
5.00
6.00
7.00

EOP qe=Nq*EOP
(T/m2)
(T/m2)
4.63
125.01
5.33
421.07
6.45
509.45

Skin Friction Capacity on Pile at Specify Tip


Pile Tip

Clay

Depth, D

Sum of Qf

(m)
6.00
7.00
8.00

(T/m)
0.00
0.00
0.00

Sand
F of Tip EOP at Tip
o

( )
34.10
39.20
39.20

Layer(T/m )
4.21
5.33
5.39

Load Capacity of Tension Pile ( from Boring No.


Pile Size
(m)
Pile Tip = 6.00
Spun Pile
0.30
0.35
0.40
0.45
0.50
0.60
0.80
Pile Tip = 7.00
Spun Pile
0.30
0.35
0.40
0.45
0.50
0.60
0.80
Pile Tip = 8.00
Spun Pile
0.30
0.35
0.40
0.45
0.50
0.60
0.80

A
2

Sum of qf

fs (T/m )

0.439
0.368
0.368

Sum of Qf Total of Qf

0.88
1.11
1.12

(T/m)
3.38
4.45
5.57

(T/m)
3.38
4.45
5.57

Qf

Qe

NF

Wp

Qu

Qa

KO*EOP*tan3/4F

BH-1 )
qe
2

(m)
Pile Top =

(T)

(T)

(T)

(T)

(T)

(T)

-1.00

(T/m )
(T/m)
Factor of Safety (F.S.) = 2.5

0.942
1.099
1.256
1.413
1.570
1.884
2.512
Pile Top =

0.0452
3.38
0.00
0.0582
3.38
0.00
0.0766
3.38
0.00
0.0930
3.38
0.00
0.1159
3.38
0.00
0.1571
3.38
0.00
0.2563
3.38
0.00
-1.00 Factor of Safety (F.S.) = 2.5

3.2
3.7
4.2
4.8
5.3
6.4
8.5

0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.5
0.7
0.9
1.1
1.4
1.9
3.1

3.2
3.7
4.2
4.8
5.3
6.4
8.5

1.3
1.5
1.7
1.9
2.1
2.5
3.4

0.942
1.099
1.256
1.413
1.570
1.884
2.512
Pile Top =

0.0452
4.45
0.00
0.0582
4.45
0.00
0.0766
4.45
0.00
0.0930
4.45
0.00
0.1159
4.45
0.00
0.1571
4.45
0.00
0.2563
4.45
0.00
-1.00 Factor of Safety (F.S.) = 2.5

4.2
4.9
5.6
6.3
7.0
8.4
11.2

0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.7
0.8
1.1
1.3
1.7
2.3
3.7

4.2
4.9
5.6
6.3
7.0
8.4
11.2

1.7
2.0
2.2
2.5
2.8
3.4
4.5

0.0452
0.0582
0.0766
0.0930
0.1159
0.1571
0.2563

5.2
6.1
7.0
7.9
8.7
10.5
14.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.8
1.0
1.3
1.6
1.9
2.6
4.3

5.2
6.1
7.0
7.9
8.7
10.5
14.0

2.1
2.4
2.8
3.1
3.5
4.2
5.6

0.942
1.099
1.256
1.413
1.570
1.884
2.512

(m )

Ko=1-sinF
2

5.57
5.57
5.57
5.57
5.57
5.57
5.57

0.00
0.00
0.00
0.00
0.00
0.00
0.00


.. 7487

qe
(T/m2)
125.01
421.07
509.45

TABLE 1.3a

RECOMMENDED ALLOWABLE LOAD FOR SINGLE SPUN PILE (COMPRESSION)

Project : BV Project (Offsite Area), Map Taphut Industrial Estate, Rayong,Thailand


Hole
No.
BH-1

Pile Tip
Pile
Elevation
Section
(m)
(Diameter, m.)
-6.00
0.30
0.35
0.40
0.45
0.50
0.60
0.80
-7.00
0.30
0.35
0.40
0.45
0.50
0.60
0.80
-8.00
0.30
0.35
0.40
0.45
0.50
0.60
0.80

Pile
Length
(m)
5.00
5.00
5.00
5.00
5.00
5.00
5.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00

Ultimate
Ultimate
Skin friction End Bearing
(t)
(t)
3.2
5.7
3.7
7.3
4.2
9.6
4.8
11.6
5.3
14.5
6.4
19.6
8.5
32.0
4.2
19.0
4.9
24.5
5.6
32.3
6.3
39.2
7.0
48.8
8.4
66.2
11.2
107.9
5.2
23.0
6.1
29.7
7.0
39.0
7.9
47.4
8.7
59.0
10.5
80.0
14.0
130.6

Ultimate
Load
(t)
8.8
11.0
13.8
16.4
19.8
26.0
40.5
23.2
29.4
37.8
45.5
55.8
74.5
119.1
28.3
35.8
46.0
55.3
67.8
90.5
144.6

Pile
Weight
(t)
0.5
0.7
0.9
1.1
1.4
1.9
3.1
0.7
0.8
1.1
1.3
1.7
2.3
3.7
0.8
1.0
1.3
1.6
1.9
2.6
4.3

Allowable
Load
(t)
3.0
3.7
4.6
5.4
6.5
8.5
13.1
8.6
10.9
14.0
16.8
20.6
27.6
44.0
10.6
13.3
17.1
20.5
25.2
33.6
53.5

NOTE
1. SAFETY FACTOR = 2.5
2. ASSUMED PILE TOP AT 1.00M BELOW GROUND SURFACE.
3. PROPOSED PILE TIP ELEVATION IS BELOW EXISTING GROUND SURFACE OF 0.00M.


.. 7487

TABLE 1.3b

RECOMMENDED ALLOWABLE LOAD FOR SINGLE SPUN PILE (TENSION)

Project : BV Project (Offsite Area), Map Taphut Industrial Estate, Rayong,Thailand


Hole
No.
BH-1

Pile Tip
Pile
Elevation
Section
(m)
(Diameter, m.)
0.30
-6.00
0.35
0.40
0.45
0.50
0.60
0.80
-7.00
0.30
0.35
0.40
0.45
0.50
0.60
0.80
-8.00
0.30
0.35
0.40
0.45
0.50
0.60
0.80

Pile
Length
(m)
5.00
5.00
5.00
5.00
5.00
5.00
5.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
7.00
7.00
7.00
7.00
7.00
7.00
7.00

Ultimate
Ultimate
Skin friction End Bearing
(t)
(t)
3.2
0.0
3.7
0.0
4.2
0.0
4.8
0.0
5.3
0.0
6.4
0.0
8.5
0.0
4.2
0.0
4.9
0.0
5.6
0.0
6.3
0.0
7.0
0.0
8.4
0.0
11.2
0.0
5.2
0.0
6.1
0.0
7.0
0.0
7.9
0.0
8.7
0.0
10.5
0.0
14.0
0.0

Ultimate
Load
(t)
3.2
3.7
4.2
4.8
5.3
6.4
8.5
4.2
4.9
5.6
6.3
7.0
8.4
11.2
5.2
6.1
7.0
7.9
8.7
10.5
14.0

Pile
Weight
(t)
0.5
0.7
0.9
1
1
2
3
0.7
0.8
1.1
1.3
1.7
2.3
3.7
0.8
1.0
1.3
1.6
1.9
2.6
4.3

Allowable
Load
(t)
1.3
1.5
1.7
1.9
2.1
2.5
3.4
1.7
2.0
2.2
2.5
2.8
3.4
4.5
2.1
2.4
2.8
3.1
3.5
4.2
5.6

NOTE
1. SAFETY FACTOR = 2.5
2. ASSUMED PILE TOP AT 1.00M BELOW GROUND SURFACE.
3. PROPOSED PILE TIP ELEVATION IS BELOW EXISTING GROUND SURFACE OF 0.00M.


.. 7487

Qu(t/m2) Su
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

Reduc
0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
5
5.5
6
6.5
7
7.5
8
8.5
9
9.5
10

N
1
0.99
0.98
0.96
0.95
0.94
0.92
0.9
0.87
0.85
0.82
0.79
0.76
0.72
0.69
0.66
0.64
0.61
0.59
0.57
0.55

PHI
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42

Nq
27
28
28.7
29.5
30.2
31
31.6
32.2
32.8
33.5
34.1
34.6
35.3
35.7
36.2
37
37.3
37.7
38.4
39
39.2

6.5
6.5
7
7.5
11
13
15
17.5
20
23
27
30
33
38
43
47.5
52
59
66
74
79

Very Loose
Loose
Medium Dense
Dense
Very Dense
Very Soft
Soft
Medium Stiff
Stiff
Very Stiff
Hard

Page 16

21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42

10.5
11
11.5
12
12.5
13
13.5
14
14.5
15
15.5
16
16.5
17
17.5
18
18.5
19
19.5
20
20.5
21

0.53
0.52
0.5
0.49
0.48
0.47
0.46
0.45
0.441
0.44
0.438
0.43
0.428
0.422
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.42

44
46
48
50
52
54
56
58
60
62
64
66
68
70

39.6
40.2
40.6
41
41.4
41.8
42.1
42.5
42.8
43.1
43.4
43.7
44
44.2

85.5
92.5
98
102
110
115
115
115
115
115
115
115
115
115

Page 17

43
44
45
46
47
48
49
50
52
54
56
58
60
62
64
66
68

21.5
22
22.5
23
23.5
24
24.5
25
26
27
28
29
30
31
32
33
34

0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.42
0.42

Page 18

Load Bearing Capacity of Bored Pile Foundation


Project
: BV Project (Offsite Area)
Location
: Map Taphut, Rayong.
Boring No. : BH-1
Depth
: 0.00-20.00 m.
Soil Condition and Soil Parameters
Ground Water Level (m)=
Top of Pile Level (m) =
Layer
Depth (m)
No.
from
to
1
0.00
2.50
2
2.50
4.00
3
4.00
5.50
4
5.50
7.00
5
7.00
8.50
6
8.50
10.00
7
10.00
11.50
8
11.50
20.00

Calculated by: Chinnawat


Date: 7 June 2012

-1.00
-1.00
Thickness Soil Type
(m)
2.50
Sand
1.50
Sand
1.50
Sand
1.50
Sand
1.50
Sand
1.50
Sand
1.50
Sand
8.50
Sand

Consistency
or Rel.Density
Very Loose
Medium Dense
Medium Dense
Medium Dense
Very Dense
Dense
Dense
Very Dense

SPT-N (blow/ft.)
N
N
4
4
13
13
21
18
30
22.5
69
42
32
23.5
33
24
100
57.5
field

adjusted

Su
(T/m2)
-

Total Unit

( ) Weight (T/m3)
27
1.55
31
1.62
32.8
1.66
34.1
1.70
39.2
2.12
34.1
1.73
34.6
1.75
42.1
2.31

Pore Pressure and Overburden Pressure (Static Condition)


Ground Water Level (m)=
Depth at Mid.-Layer
(m.)
1.25
3.25
4.75
6.25
7.75
9.25
10.75
15.75

-1.00
Total Overburden
Pressure (T/m2)
TOP
1.94
5.09
7.54
10.06
12.92
15.81
18.41
29.55

Pore Pressure
(T/m2)
Uo
0.25
2.25
3.75
5.25
6.75
8.25
9.75
14.75

Effective Overburden
Pressure (T/m2)
EOP
1.69
2.84
3.79
4.81
6.17
7.56
8.66
14.80


.. 7487

Skin Friction Capacity on Pile


Layer
No.
1
2
3
4
5
6
7
8

Su
2
(T/m )
-

Clay
Adhesion
Factor, a
-

fs = a*Su
2
(T/m )
-

F
o

( )
27
31
32.8
34.1
39.2
34.1
34.6
42.1

EOP
2
(T/m )
1.69
2.84
3.79
4.81
6.17
7.56
8.66
14.80

Sand
Ko=1-sinF

fs (T/m2)

0.546
0.485
0.458
0.439
0.368
0.439
0.432
0.330

KO*EOP*tan3/4F
0.340
0.591
0.795
1.010
1.279
1.589
1.822
2.998

Qf =fs * L
(T/m)
0.85
0.89
1.19
1.52
1.92
2.38
2.73
25.48

Sum of Qf
(T/m)
0.85
1.74
2.93
4.44
6.36
8.75
11.48
36.96

End Bearing Capacity of Pile


Layer Pile Tip
No. Depth ,D SPT-N
(m) (blow/foot)
1
1.25
2
3.25
3
4.75
4
6.25
5
7.75
6
9.25
7
10.75
8
15.75
-

Clay
Su
2
(T/m )
-

NC
-

Sand
TOP
2
(T/m )
1.94
5.09
7.54
10.06
12.92
15.81
18.41
29.55

qe=NC*SU+TOP
2
(T/m )
-

SPT-N
(blow/foot)
4
13
18
22.5
42
23.5
24
57.5

Nq

( )
27
31
32.8
34.1
39.2
34.1
34.6
42.1

6.5
10.4
16
21.6
63.2
21.6
24
92

Uo
2
(T/m )
0.25
2.25
3.75
5.25
6.75
8.25
9.75
14.75

EOP
2
(T/m )
1.69
2.84
3.79
4.81
6.17
7.56
8.66
14.80

qe=Nq*EOP
2
(T/m )
10.97
29.50
60.62
103.79
389.88
163.20
207.89
1000.00

End Bearing Capacity of Pile at Specify Tip


Pile Tip
Depth ,D
(m)
6.00
7.00
8.00

Clay
SPT-N
(blow/foot)
-

Su
2
(T/m )
-

Sand
TOP

Nc

qe=Nc*Su+TOP
2
(T/m )
-

(T/m )
9.63
11.33
13.45

SPT-N
(blow/foot)
22.5
42
42

( )
34.1
39.2
39.2

21.6
63.2
63.2

Uo
2
(T/m )
5.00
6.00
7.00

Nq

EOP
2

(T/m )
4.63
5.33
6.45

qe=Nq*EOP
2
(T/m )
100.01
336.86
407.56

Skin Friction Capacity on Pile at Specify Tip


Pile Tip
Depth, D
(m)
6.00
7.00
8.00

Clay
Sand
Sum of Qf F of Tip EOP at Tip Ko=1-sinF
(T/m)
0.00
0.00
0.00

( )
34.10
39.20
39.20

(m)
Pile Tip = 6.00
Bore Pile
0.35
0.50
0.60
0.80
1.00
1.20
1.50
Pile Tip = 7.00
Bore Pile
0.35
0.50
0.60
0.80
1.00
1.20
1.50
Pile Tip = 8.00
Bore Pile
0.35
0.50
0.60
0.80
1.00
1.20
1.50

A
2

Sum of Qf Total of Qf

0.88
1.11
1.12

(T/m)
3.37
4.44
5.56

(T/m)
3.37
4.44
5.56

Qf

Qe

NF

Wp

Qu

Qa

(T/m)
(T)
(T/m )
Factor of Safety (F.S.) = 2.5

(T)

(T)

(T)

(T)

(T)

Layer(T/m )
4.21
5.33
5.39
-

Load Capacity of Single Pile ( from Boring No.


Pile Size

fs (T/m2)

Sum of qf

KO*EOP*tan3/4F

0.439
0.368
0.368

BH-1 )
qe
2

(m)
Pile Top =

(m )
-1.00

1.099
1.570
1.884
2.512
3.140
3.768
4.710
Pile Top =

0.0962
3.37
100.01
0.1963
3.37
100.01
0.2826
3.37
100.01
0.5024
3.37
100.01
0.7850
3.37
100.01
1.1304
3.37
100.01
1.7663
3.37
100.01
-1.00 Factor of Safety (F.S.) = 2.5

3.7
5.3
6.4
8.5
10.6
12.7
15.9

9.6
19.6
28.3
50.2
78.5
113.0
176.6

0
0
0
0
0
0
0

1.2
2.4
3.4
6.0
9.4
13.6
21.2

13.3
24.9
34.6
58.7
89.1
125.8
192.5

4.2
7.6
10.5
17.5
26.2
36.7
55.8

1.099
1.570
1.884
2.512
3.140
3.768
4.710
Pile Top =

0.0962
4.44
336.86
0.1963
4.44
336.86
0.2826
4.44
336.86
0.5024
4.44
336.86
0.7850
4.44
336.86
1.1304
4.44
336.86
1.7663
4.44
336.86
-1.00 Factor of Safety (F.S.) = 2.5

4.9
7.0
8.4
11.2
14.0
16.7
20.9

32.4
66.1
95.2
169.2
264.4
380.8
595.0

0
0
0
0
0
0
0

1.4
2.8
4.1
7.2
11.3
16.3
25.4

37.3
73.1
103.6
180.4
278.4
397.5
615.9

13.5
26.4
37.4
64.9
100.1
142.7
220.9

0.0962
0.1963
0.2826
0.5024
0.7850
1.1304
1.7663

6.1
8.7
10.5
14.0
17.5
21.0
26.2

39.2
80.0
115.2
204.8
319.9
460.7
719.9

0
0
0
0
0
0
0

1.6
3.3
4.7
8.4
13.2
19.0
29.7

45.3
88.7
125.7
218.7
337.4
481.7
746.0

16.5
32.2
45.5
79.1
121.8
173.7
268.7

1.099
1.570
1.884
2.512
3.140
3.768
4.710

5.56
5.56
5.56
5.56
5.56
5.56
5.56

407.56
407.56
407.56
407.56
407.56
407.56
407.56


.. 7487

qe
2
(T/m )
100.01
336.86
407.56

End Bearing Capacity of Pile at Specify Tip


Pile Tip
Depth ,D
(m)
6.00
7.00
8.00

SPT-N
(blow/foot)
-

Su
(T/m2)
-

Nc

Clay

TOP
(T/m2)
9.63
11.33
13.45

qe=Nc*Su+TOP
(T/m2)
-

SPT-N
(blow/foot)
22.5
42
42

Nq

Sand

( o)
34.1
39.2
39.2

21.6
63.2
63.2

Uo
(T/m2)
5.00
6.00
7.00

EOP
(T/m2)
4.63
5.33
6.45

qe=Nq*EOP
(T/m2)
100.01
336.86
407.56

Skin Friction Capacity on Pile at Specify Tip


Pile Tip
Depth, D
(m)
6.00
7.00
8.00

Clay

Sand

Sum of Qf F of Tip EOP at Tip Ko=1-sinF


(T/m)
0.00
0.00
0.00

( )
34.10
39.20
39.20

Layer(T/m )
4.21
5.33
5.39
-

Load Capacity of Tension Pile ( from Boring No.


Pile Size
(m)
Pile Tip = 6.00
Bore Pile
0.35
0.50
0.60
0.80
1.00
1.20
1.50
Pile Tip = 7.00
Bore Pile
0.35
0.50
0.60
0.80
1.00
1.20
1.50
Pile Tip = 8.00
Bore Pile
0.35
0.50
0.60
0.80
1.00
1.20
1.50

KO*EOP*tan3/4F

0.439
0.368
0.368

0.88
1.11
1.12

Sum of Qf Total of Qf
(T/m)
3.37
4.44
5.56

(T/m)
3.37
4.44
5.56

Qe
(T)

NF
(T)

Wp
(T)

Qu
(T)

Qa
(T)

BH-1 )

P
(m)
Pile Top =

(m )
-1.00

1.099
1.570
1.884
2.512
3.140
3.768
4.710
Pile Top =

0.0962
3.37
0.00
0.1963
3.37
0.00
0.2826
3.37
0.00
0.5024
3.37
0.00
0.7850
3.37
0.00
1.1304
3.37
0.00
1.7663
3.37
0.00
-1.00 Factor of Safety (F.S.) = 2.5

3.7
5.3
6.4
8.5
10.6
12.7
15.9

0.0
0.0
0.0
0.0
0.0
0.0
0.0

0
0
0
0
0
0
0

1.2
2.4
3.4
6.0
9.4
13.6
21.2

3.7
5.3
6.4
8.5
10.6
12.7
15.9

1.5
2.1
2.5
3.4
4.2
5.1
6.4

1.099
1.570
1.884
2.512
3.140
3.768
4.710
Pile Top =

0.0962
4.44
0.00
0.1963
4.44
0.00
0.2826
4.44
0.00
0.5024
4.44
0.00
0.7850
4.44
0.00
1.1304
4.44
0.00
1.7663
4.44
0.00
-1.00 Factor of Safety (F.S.) = 2.5

4.9
7.0
8.4
11.2
14.0
16.7
20.9

0.0
0.0
0.0
0.0
0.0
0.0
0.0

0
0
0
0
0
0
0

1.4
2.8
4.1
7.2
11.3
16.3
25.4

4.9
7.0
8.4
11.2
14.0
16.7
20.9

2.0
2.8
3.3
4.5
5.6
6.7
8.4

0.0962
0.1963
0.2826
0.5024
0.7850
1.1304
1.7663

6.1
8.7
10.5
14.0
17.5
21.0
26.2

0.0
0.0
0.0
0.0
0.0
0.0
0.0

0
0
0
0
0
0
0

1.6
3.3
4.7
8.4
13.2
19.0
29.7

6.1
8.7
10.5
14.0
17.5
21.0
26.2

2.4
3.5
4.2
5.6
7.0
8.4
10.5

1.099
1.570
1.884
2.512
3.140
3.768
4.710

fs (T/m2)

Sum of qf
qe
Qf
2
(T/m)
(T)
(T/m )
Factor of Safety (F.S.) = 2.5

5.56
5.56
5.56
5.56
5.56
5.56
5.56

0.00
0.00
0.00
0.00
0.00
0.00
0.00


.. 7487

qe
(T/m2)
100.01
336.86
407.56

TABLE 1.4a RECOMMENDED ALLOWABLE LOAD FOR SINGLE BORED PILE (COMPRESSION)
Project : BV Project (Offsite Area), Map Taphut Industrial Estate, Rayong,Thailand
Hole
Pile Tip
Pile
Pile
Ultimate
Ultimate
Ultimate
Pile
Allowable
No.
Elevation
Section
Length Skin friction End Bearing
Load
Weight
Load
(m)
(Diameter, m.)
(m)
(t)
(t)
(t)
(t)
(t)
BH-1
-6.00
0.35
5.00
3.7
9.6
13.3
1.2
4.2
0.50
5.00
5.3
19.6
24.9
2.4
7.6
0.60
5.00
6.4
28.3
34.6
3.4
10.5
0.80
5.00
8.5
50.2
58.7
6.0
17.5
1.00
5.00
10.6
78.5
89.1
9.4
26.2
1.20
5.00
12.7
113.0
125.8
13.6
36.7
1.50
5.00
15.9
176.6
192.5
21.2
55.8
-7.00
0.35
6.00
4.9
32.4
37.3
1.4
13.5
0.50
6.00
7.0
66.1
73.1
2.8
26.4
0.60
6.00
8.4
95.2
103.6
4.1
37.4
0.80
6.00
11.2
169.2
180.4
7.2
64.9
1.00
6.00
14.0
264.4
278.4
11.3
100.1
1.20
6.00
16.7
380.8
397.5
16.3
142.7
1.50
6.00
20.9
595.0
615.9
25.4
220.9
-8.00
0.35
7.00
6.1
39.2
45.3
1.6
16.5
0.50
7.00
8.7
80.0
88.7
3.3
32.2
0.60
7.00
10.5
115.2
125.7
4.7
45.5
0.80
7.00
14.0
204.8
218.7
8.4
79.1
1.00
7.00
17.5
319.9
337.4
13.2
121.8
1.20
7.00
21.0
460.7
481.7
19.0
173.7
1.50
7.00
26.2
719.9
746.0
29.7
268.7
NOTE
1. SAFETY FACTOR = 2.5
2. ASSUMED PILE TOP AT 1.00M BELOW GROUND SURFACE.
3. PROPOSED PILE TIP ELEVATION IS BELOW EXISTING GROUND SURFACE OF 0.00M.


.. 7487

Hole
No.
BH-1

TABLE 1.4b RECOMMENDED ALLOWABLE LOAD FOR SINGLE BORED PILE (TENSION)
Project : BV Project (Offsite Area), Map Taphut Industrial Estate, Rayong,Thailand
Pile Tip
Pile
Pile
Ultimate
Ultimate
Ultimate
Pile
Allowable
Elevation
Section
Length Skin friction End Bearing
Load
Weight
Load
(m)
(Diameter, m.)
(m)
(t)
(t)
(t)
(t)
(t)
-6.00
0.35
5.00
3.7
0.0
3.7
1.2
1.5
0.50
5.00
5.3
0.0
5.3
2.4
2.1
0.60
5.00
6.4
0.0
6.4
3.4
2.5
0.80
5.00
8.5
0.0
8.5
6.0
3.4
1.00
5.00
10.6
0.0
10.6
9.4
4.2
1.20
5.00
12.7
0.0
12.7
13.6
5.1
1.50
5.00
15.9
0.0
15.9
21.2
6.4
-7.00
0.35
6.00
4.9
0.0
4.9
1.4
2.0
0.50
6.00
7.0
0.0
7.0
2.8
2.8
0.60
6.00
8.4
0.0
8.4
4.1
3.3
0.80
6.00
11.2
0.0
11.2
7.2
4.5
1.00
6.00
14.0
0.0
14.0
11.3
5.6
1.20
6.00
16.7
0.0
16.7
16.3
6.7
1.50
6.00
20.9
0.0
20.9
25.4
8.4
-8.00
0.35
7.00
6.1
0.0
6.1
1.6
2.4
0.50
7.00
8.7
0.0
8.7
3.3
3.5
0.60
7.00
10.5
0.0
10.5
4.7
4.2
0.80
7.00
14.0
0.0
14.0
8.4
5.6
1.00
7.00
17.5
0.0
17.5
13.2
7.0
1.20
7.00
21.0
0.0
21.0
19.0
8.4
1.50
7.00
26.2
0.0
26.2
29.7
10.5

NOTE
1. SAFETY FACTOR = 2.5
2. ASSUMED PILE TOP AT 1.00M BELOW GROUND SURFACE.
3. PROPOSED PILE TIP ELEVATION IS BELOW EXISTING GROUND SURFACE OF 0.00M.


.. 7487

Su

Reduc
0

1.00

1.00

0.95

0.80

0.67

0.54

0.46

0.43

0.40

0.40

10

0.40

11

0.39

12

0.39

13

0.39

14

0.38

15

0.38

16

0.38

17

0.38

18

0.37

19

0.37

20

0.37

21

0.37

22

0.36

23

0.36

24

0.36

25

0.36

26

0.35

27

0.35

28

0.35

29

0.34

30

0.34

PHI
2
6
8
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
44
46
48
50
52
54
56
58
60
62
64

Nq
27
28.7
29.5
30.2
31
31.6
32.2
32.8
33.5
34.1
34.6
35.3
35.7
36.2
37
37.3
37.7
38.4
39
39.2
39.6
40.2
40.6
41
41.4
41.8
42.1
42.5
42.8
43.1
43.4

6.5
7
7.5
8.8
10.4
12
14
16
18.4
21.6
24
26.4
30.4
34.4
38
41.6
47.2
52.8
59.2
63.2
68.4
74
78.4
81.6
88
92
92
92
92
92
92

Very Loose
Loose
Medium Dense
Dense
Very Dense
Very Soft
Soft
Medium Stiff
Stiff
Very Stiff
Hard

31

0.34

32

0.33

33

0.33

34

0.33

35

0.32

36

0.32

37

0.32

38

0.31

39

0.31

40

0.31

41

0.31

42

0.30

43

0.30

44

0.30

45

0.30

46

0.29

47

0.29

48

0.29

49

0.28

50

0.28

66
68
70

43.7
44
44.2

92
92
92

Very Loose
Medium Dense
Very Dense