What is FMEA ?
Means to assure that potential failure modes and their associated cause and mechanism, have been addressed though earlier detection. A tool for design and process engineers. Before-the-event action NOT an After-the-fact exercise.
FMEA Application
Case 1 : New designs, new technology, or new process.
Evaluation mechanism
Purchasing
Use
Internal defect
Rs. 1000/-
Prevention cost
FMEA Stage
Product Concept Product Brief
Product Proto Design System, Sub system, Part Design
PFMEA - SEQUENCE
Application
Application
Design FMEA Purpose Meeting specification / Customer & Legal requirements. Design and development Avoiding design failures Process FMEA Production in compliance with drawing Production / Mfg Engg. Avoiding failures during process planning, production implementation
Responsibility Objective
FMEA STEPS
Step # Step details
1 2 3 4 5 6 7 8 9 10
Define Project Scope Brainstorm all potential failure modes Identify the potential effects of failures Determine severity rankings Identify the causes of failures Determine Occurrence rankings Identify the current controls Determine the detection rankings Evaluate Risk Priority Numbers(RPN) Prioritise corrective actions.
C
2 Bulb Assembly D
3
4
Housing A
5
Plate E +
Batteries B
Spring F --
Attaching Method 1. Skip Fit 4. Snap Fit 2. Rivets 5. Compressive Fit 3. Thread
Subsystem Level
Frame
Function1: * provide stable attachment for seat support Potential failure model(s): * Structural failure of seat support * Excessive deflection of seat support . Function 2: * Provide pleasing appearance. Potential failure model(s): * Finish (Shine ) deteriorates * Paint chips Handle bar assembly Front Wheel assembly Real wheel assembly Sprocket assembly Seat assembly Chain assembly
Component Frame
Upper Frame
Function 1: * Provide structural support Potential failure model(s): * Structural Failure * Excessive deflection Function 2: * Provide dimensional control for correct finished fame geometry Potential failure model(s): * Length of frame mounting point too long * Length of frame mounting point too short Function 3: * Support frame assembly production methods (welding) Potential failure model(s): Lower front tube Lower rear tube Sprocket tube
FMEA STEPS
Step # Step details
1 2 3 4 5 6 7 8 9 10
Define Project Scope Brainstorm all potential failure modes Identify the potential effects of failures Determine severity rankings Identify the causes of failures Determine Occurrence rankings Identify the current controls Determine the detection rankings Evaluate Risk Priority Numbers(RPN) Prioritise corrective actions.
Potential Failure Mode is defined as the manner in which a component, subsystem, or system could potentially fail to meet the design intent. The assumption is made that the failure could occur, but may not necessarily occur. A recommended starting point is a review of past things-gone-wrong, concern reports, and group brainstorming. Typical failure modes could be, cracked leaking, fractured, oxidized, no signal, drift, etc. ( Described in physical or technical terms, not as symptom noticed by the customer).
FMEA STEPS
Step # Step details
1 2 3 4 5 6 7 8 9 10
Define Project Scope Brainstorm all potential failure modes Identify the potential effects of failures Determine severity rankings Identify the causes of failures Determine Occurrence rankings Identify the current controls Determine the detection rankings Evaluate Risk Priority Numbers(RPN) Prioritise corrective actions.
FMEA STEPS
Step # Step details
1 2 3 4 5 6 7 8 9 10
Define Project Scope Brainstorm all potential failure modes Identify the potential effects of failures Determine severity rankings Identify the causes of failures Determine Occurrence rankings Identify the current controls Determine the detection rankings Evaluate Risk Priority Numbers(RPN) Prioritise corrective actions.
4. Determining Severity
Severity is an assessment of the seriousness of the effect of the potential failure mode to the next component, subsystem, system or customer if it occurs. Severity applies to the effect only. A reduction in Severity Ranking index can be effected only through a design change. Severity should be estimated
on a to scale.
Or 100% of product may have to be scrapped or vehicle item repaired in department with a repair time greater than one hour Vehicle/item operable but at reduce level of Or product may have to be a stored and a performance customer very dissatisfied portion(less than 100% )of scrapped or vehicle item repaired in department with a repair time greater than one hour.
Low
Very low
Fit and finish/squeak and rattle item Or 100% of product may have to sorted, with no scrap does not conform. Defect noticed by and a portion (less than 100%) reworked. most customers. (greater than 75%) Fit and finish/ squeak and rattle item does not conform. Defect noticed by 50% of customers. Or a portion (less than 100%) of the product may have to be reworked, with no scrap, on-line but out-ofstation.
Minor
Very minor Fit and finish/ squeak and rattle item does not conform. Defect noticed by discriminating customers (less than 25%)
None No discernible effect.
Or a portion (less than 100%) of the product may have to be reworked, with no scrap, on-line but in-station.
FMEA STEPS
Step # Step details
1 2 3 4 5 6 7 8 9 10
Define Project Scope Brainstorm all potential failure modes Identify the potential effects of failures Determine severity rankings Identify the causes of failures Determine Occurrence rankings Identify the current controls Determine the detection rankings Evaluate Risk Priority Numbers(RPN) Prioritise corrective actions.
Potential Cause of Failure is defined as an indication of a design weakness, the consequence of which is the failure mode. Typical failure causes may include: Incorrect Material Specified. Inadequate Design Life Assumption Over-stressing. Insufficient Lubrication Capability. Poor Environment Protection. Incorrect algorithm. In progress tolerance specified. Typical failure mechanisms may include: Creep Fatigue Wear Corrosion
FMEA STEPS
Step # Step details
1 2 3 4 5 6 7 8 9 10
Define Project Scope Brainstorm all potential failure modes Identify the potential effects of failures Determine severity rankings Identify the causes of failures Determine Occurrence rankings Identify the current controls Determine the detection rankings Evaluate Risk Priority Numbers(RPN) Prioritise corrective actions.
6. Occurrence(O)
Occurrence is the likelihood that a specific cause/ mechanism will occur. Removing or controlling one or more of the causes/mechanism of the failure mode through a design change is the only way a reduction in the occurrence ranking can be effected. Estimate the likelihood of occurrence of potential failure cause mechanism on a 1 to 10 scale. Questions such as the following should be considered:
Contd
6. Occurrence(O) (contd)
- How significant are changes from a previous level component or subsystem? - Is component radically different from a previous level component ? - Is component completely new ? - Has the component application changed? - What are the environmental changes? - Has an engineering analysis been used to estimate the expected comparable occurrence rate for the application?
Ranking
10
50 per thousand vehicles/ item. High : Frequent failures 20 per thousand vehicles/ item. 10 per thousand vehicles/ item. Moderate :occasional failures 5 per thousand vehicles/ item. 2 per thousand vehicles/ item. 1 per thousand vehicles/ item. Low : Relatively few failure 0.5 per thousand vehicles/ item. 0.1 per thousand vehicles/ item. Remote : Failures is Unlikely 0.010per thousand vehicles/ item.
9 8 7 6 5 4 3 2 1
Probability
Very High: Persistent Failure
Ppk
< 0.55 0.55 0.78 0.86 0.94 1.00 1.10 1.20 1.30 1.67
Ranking
10 9 8 7 6 5 4 3 2 1
FMEA STEPS
Step # Step details
1 2 3 4 5 6 7 8 9 10
Define Project Scope Brainstorm all potential failure modes Identify the potential effects of failures Determine severity rankings Identify the causes of failures Determine Occurrence rankings Identify the current controls Determine the detection rankings Evaluate Risk Priority Numbers(RPN) Prioritise corrective actions.
List the preventing, design validation/verification (DV), or other activities which will assure the design adequacy for the failure mode and/or cause/ mechanism under consideration. Current controls are those that have been or are being used with the same or similar designs. Three types of Design Controls: - prevent the cause/mechanism of failure mode effect from occurring, or reduce their rate of occurrence. - detect the cause/mechanism and lead to corrective actions, and - detect the failure mode.
Design control
Specify P & D controls in separate columns. If one column is used for current design control, specify P or D before each control.
Affects
Occurrence Ranking
FMEA STEPS
Step # Step details
1 2 3 4 5 6 7 8 9 10
Define Project Scope Brainstorm all potential failure modes Identify the potential effects of failures Determine severity rankings Identify the causes of failures Determine Occurrence rankings Identify the current controls Determine the detection rankings Evaluate Risk Priority Numbers(RPN) Prioritise corrective actions.
8. Detection (d)
Detection is an assessment of the ability of the current design controls, to detect a potential cause /mechanism (design weakness), or The ability of the current design controls to detect the subsequent failure mode, before the component, subsystem Or system is released for production. In order to achieve a lower ranking generally the planned design control has to be improved.
8. Detection Ranking
Suggested Evaluation Criteria: For Design detection
Detection
Absolute uncertainty
Very Remote
Ranking
10
9
Remote
Very low Low Moderate Moderate High High Very High Almost Certain
Remote chance the Design Control will detect a potential causes /mechanism and subsequent failure mode .
Very low chance the Design Control will detect a potential causes /mechanism and subsequent failure mode . Low chance the Design Control will detect a potential causes /mechanism and subsequent failure mode . Moderate chance the Design Control will detect a potential causes /mechanism and subsequent failure mode . Moderate High chance the Design Control will detect a potential causes /mechanism and subsequent failure mode . High chance the Design Control will detect a potential causes /mechanism and subsequent failure mode . Very high chance the Design Control will detect a potential causes /mechanism and subsequent failure mode . Design Control will almost certainly detect a potential causes /mechanism an subsequent failure mode .
8
7 6 5 4 3 2 1
8. Detection Ranking
Suggested PFMEA Detection Evaluation Criteria
Detection Criteria Inspection Suggested Range of Detection Method Types A B C X Cannot detect or is not checked X Control is achieved with indirect or Random check only X Control is achieved with Visual inspection only X Control is achieved with double visual inspection only. X X Control is achieved with charting methods, such as SPC. Control is based on variable gauging after parts have left the station, or Go/No Go gauging performed on 100% of the parts after parts have left the station. Error detection in subsequent operation, or gauging performed on setup and first-piece check( for set-up causes only). Error detection in-station, or error detection in subsequent operations by multiple layers of acceptance : supply, select, install, verify. Cannot accept discrepant part. Error detection in station ( automatic gauging with automatic stop feature). Cannot pass discrepant part. Discrepant parts cannot be made because item has been error proofed by process/product design. C. Manual Inspection Rank Almost Absolute certainty of non detection Impossible Very remote Control will probably not detect Remote Very low Low Moderate Control have poor chance of detection Control have poor chance of detection Control may detect Controls may detect 10 9 8 7 6 5
Controls have a good chance to detect Controls have a good chance to detect Controls almost certain to detect. Controls certain to detect.
X X
2 1
B. Gauging
FMEA STEPS
Step # Step details
1 2 3 4 5 6 7 8 9 10
Define Project Scope Brainstorm all potential failure modes Identify the potential effects of failures Determine severity rankings Identify the causes of failures Determine Occurrence rankings Identify the current controls Determine the detection rankings Evaluate Risk Priority Numbers(RPN) Prioritise corrective actions.
FMEA Model
Potential Failure Mode
Cause of Failure
Effect of failure
Frequency of Failure
Severity Rating
Occurrence Rating
Detection Rating
FMEA STEPS
Step # Step details
1 2 3 4 5 6 7 8 9 10
Define Project Scope Brainstorm all potential failure modes Identify the potential effects of failures Determine severity rankings Identify the causes of failures Determine Occurrence rankings Identify the current controls Determine the detection rankings Evaluate Risk Priority Numbers(RPN) Prioritise corrective actions.