Sei sulla pagina 1di 14

N

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

e et Sr s t uu Lp

Keyplan:

City of Westminster
This drawing

S hi n gl e

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Local authority boundary
Mud Mud Shingle

Order limits

Shingle

Shingle

a od R r eo vn rs Go
Mud

Tunnel

Shingle

Mud
Si h g nl e

Shaft
Mud

Mud

Mean low water

Shingle

Main tunnel

Shingle

Mean low water

Main tunnel

Shingle

Shingle

Shingle

Mud

Mud Shingle

Shingle

Heathwall Pumping Station


e n a L s m l E e n i N

Heathwall SWSR connection tunnel

Kirtling Street Battersea Power Station

London Borough of Wandsworth


o a d

100m

100m

Wa n d w s ot rh R

Scale 1:2500 at A1 1:5000 if reproduced at A3

FOR INFORMATION

Location

London Borough of Lambeth

Heathwall Pumping Station London Borough of Wandsworth


Document Information

Section 48 publicity Location plan


Battersea Park

Book of plans - section 14


S48-PP-14X-HEAPS-000159
Battersea Park
4.5m
4.2m

RO

O RO

TH

CR

E C N I R P

4.3m

T S R U H D A

GO

D A O R

A N N U R O C

L DS BO R

Car Park

I M SW

W OF

N E GD A P

D A O R

OR

2.0m

AN

S E L A

DR

E V I R D

T E E R T S
H LO E V A

EW

4.2m

AD

3.2m

July 2012

PL AC

AD

W D A

C K R TE R C A E

H U R T S R O

t c adu Vi

D A

C OW T H OR P E R OA D

4.4m

A R SE LY D RV IE

ST
O J PH SE T EE

R ST

3.0m
S

NS E RD A G NE I L UR L

1.9m

D A R SE LY D RV IE

CW

1.8m

4.3m

W AR

DS

DR
R

Post

I VE

T H O R P A R C HR O A D
H T

LO C N I K G O T N

LY A S S E

S Ga ty nr

AL L EN

ED

2.6m

A E S R E T T A B

K R A P

D A O R

BP

2.7m

HA RTI NG

TO

N RO

c Thames Water Utilities Ltd 2008


RAC E

AD

M TH EA
ET RE ST
TC PA M HA
TER

R
O D A

O
D A

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

l e an hn e c s id hr u o At

tr ae ww o nl a e M

This drawing

East elev. North elev. Barge berths

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Limits of land to be acquired or used (LLAU) Authorised channel Thames Path + 105.40m Existing levels (shown in metres above tunnel datum) Proposed levels (shown in metres above tunnel datum) Thames Water land

Elm Quay

105.40

Thames Water buildings / structures Approximate position of CSO outlet Nine Elms Pier Battersea Barge Tideway Village community boats Existing trees within surveyed area

Heathwall South Western PS CSO storm relief CSO

Jetty

Thames Water access

Notes:: Notes
1. All dimensions and levels are approximate.

+ 104.43m

+ 104.35m + 103.91m Middle Wharf (safeguarded wharf)

2. Any discrepancy between the location of structures and the parameters marked on + 103.21m the drawings are due to differences between the Ordnance Survey base and the topographic survey base, both of which have been used

+ 104.57m Heathwall Pumping Station

in the preparation of this drawing.

+ 103.71m
e n a L s

Substation

Bentley Service Centre

e n i N

m l E

+ 103.26m

+ 103.55m

10m

40m

Scale 1:500 at A1 1:1000 if reproduced at A3 + 103.75m Former TSO printing works

FOR INFORMATION
Tideway Industrial Estate (Riverlight development site)

Location

Heathwall Pumping Station London Borough of Wandsworth


Document Information

Section 48 publicity
+ 103.72m

As existing site features plan Book of plans - section 14


Royal Mail sorting office S48-PP-14X-HEAPS-000160 July 2012

+ 103.45m

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

d Un

Keyplan:

Authorised channel

This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Limits of land to be acquired or used (LLAU) Existing public right of way Provision of permanent permissive right of way

Ap Ac Notes:

Access to permanent works

Access to construction works

1. This plan does not show stopping up and diversions of limited duration (eg hoarding erection, minor utility diversions and minor highway works).
6 2. Only rights of way in or close to worksites 7 o t 1 y are shown. a

m l E

Qu

0 5 o t 2 2

The full extents of rights of way are not shown where they cease to be relevant to the project.

Jetty Crane Mud

M S

Prescot Wharf
Hopper

M d l Wh r i e d af
MH & MLW Navigation Light (fixed red) MP

Mud
Tank

Thames Path

s n o r g ot M oi P s

MP

Capstan MPs

s n o r g ot M oi P s Jetty

2 5

Pumping Station

Ap Ac/Ap
4 5
1 5

g a M e n Hi h W tr ae

6 5

Ap

10m

40m

Thames Path
f 1

Scale 1:500 at A1 1:1000 if reproduced at A3

a 1

FOR APPROVAL
Ac/Ap
t a te a r ut l s dsi E d i w yn T ea I
y r n o s a m g n i p o l S

Location

Heathwall Pumping Station London Borough of Wandsworth


d 2

Document Information
Warehouse

Section 48 publicity Access plan Book of plans - section 14


S48-AC-14X-HEAPS-000013

a 2

E N I N

M L E

E N A L
d n o P l l i

July 2012
e g d i r B

Sorting
c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:
9 3 . 8 9
t a 0 3 . 1 1

Culvert to be abandoned

W
0 4 . 8 9

e n i L r e t a

n o

0 1 / 1 0 / 9 1

w o L

Metal Pillar

9 8 . 4 6

River Thames
98.50
1 2 . 8 9

7 9 . 7 9

This drawing

98.42

0 8 5 9.

9. 7 1 9

3 8 9 9.
98.40

9. 84 3

.0 84 9
99.15
9 83 .9

99.24

98.60

9. 8 3 4

0 8 3 9.

3 8 9 9.

98.81
9. 8 4 5

L wWa r i o 2 / / a 1 . o t L e n 0 1 0 t 2 0 e n 0 1 0

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
99.90

98.73 98.87 98.34

98.76
9. 8 1 7

99.21 Metal Pillar 98.93 98.93

Key:
99.73

98.70

0 9 9 9.

98.85

99.52
99.16 97.27

98.70 99.23

98.92

Limits of land to be acquired or used (LLAU) Above ground structures to be removed


100.40

Mean low water


99.14 99.91

98.55
97.32

99.39

99.38
99.50 98.97

e oc e upr C n rt S p ot

8 9 2 9.
99.68 98.75

100.01

99.95
99.83

Below ground structures to be removed or infilled


Prescot Wharf

99.54 99.95

t r ee lf Pa om L v l 5 0. 15 7

98.60 99.92 99.93 99.82

99.75

101.05
98.34

Prescot Wharf
l l a gW n i n ti ea eR rt ce n o C

Structure to be removed and relocated or reinstated

98.42

100.19

Concrete culvert below foreshore


100.22 Deck Level
1 0. 10 5
103.58

yO t et J

w o L

0 3 . 2 1 t a 0 1 / 1 0 / 1 2 n o e n i L r e 98.39 t a

98.39

98.71

Notes:
1. Existing ventilation columns to be replaced. 2. Minor items to be removed (e.g. barriers, bollards etc.) are not shown. 3. General activities of site clearance such as

d a re eh v

99.99
99.71 98.75 100.46 Mud Rough Concrete Base

Metal Pillar
Shingle Deck Level 103.41

.0 10 0 1
t l e B f i Le

h c n e B

98.34

98.52

Mud

Top 1.5m sections of concrete river walls only


100.78

Ladder

100.24 100.67

Jetty
100.42 (Approximate Position)

98.57

.9 08 0 1

98.11

98.35

99.46 100.80

98.42

Concrete culvert below foreshore


Middle Wharf

.0 56 0 1 .9 41 0 1

.5 42 0 1

Deck Level
103.42

100.50

.6 42 0 1

5 8 0. 15

removal of hardstanding and foundations, stripping of topsoil and clearance of minor Brick stairs
104.23
h c n Be

100.73 100.10 100.69

100.84

6 8 0. 15 .4 45 0 1
l l a eW t ce nr o C

CS

.0 49 0 1

yO t et J d a re eh v

h 5 9 0 .m 0 . 1 3 s8 e e Tr ig gn n ra eh Ov

98.69

vegetation not shown.

99.39

100.84
100.57 101.47 Ladder Sign
W n R o C m 5 h . F2 / CL 7 8 0. 15

.5 58 0 1 .8 43 0 1

100.48
98.86

10 0. 7 5

h .m 20 rs ea H
.8 42 0 1

Gravel

34 4. 10

.5 58 0 1
CL /F 25 .m ho nC R W
.2 54 0 1

103.98 Concrete foundation


104.02

6 2 . 4 0 1 WP

15 9 C 0. 3 oc t 1 nr e 0 e 5 0 . 4

99.32
98.79 98.98

99.38
100.18 99.59

101.39

1 58 0 .4

5 8 0. 15

CS
9 3 0. 14

IC CL 105.39 UTL IC CL 105.40 UTL IC

.6 58 0 1
10 0. 9 7
.2 47 0 1

9 0 0. 14

98.89

101.66 Concrete 100.01

C/ F 2 2 L .mh

3 4 0. 14

m 1 h . R1 H

BW 0 5 h .m

CS H R1 .m 1 h

106.49

104.00
1 9 0. 13

15 0. 4 1

15 0. 8 6
1 43 0 .3

1618

9 0. 13 3 Concrete foundation

.3 47 0 1

105.44
.1 39 0 1

Unknown g 0.5 h 7.0

1 54 0 .0

98.86
99.24

99.47

99.27

1 43 0 .4

99.67
100.29

t a o B t n e n a r em P

1 58 0 .4

Cobbles
2 7 0. 15 .9 49 0 1

H 1 m R . h 1
CS

W O T

IC CL 105.39 UTL
MPS

CL 105.39 UTL MPS

Cobbles

Cobbles

104.35

Concrete

104.12

.6 39 0 1

.4 57 0 1

H 1 m R . h 1
104.45

101.50
e rt ce n o C .9 56 0 1 W O T

1 4 3C W 0. 2 R

H 1 m R . h 1

15 9 0. 3
15 0 0. 4

0. 4 IC 1 5 0

14 6 0. 5
99.54 Vessel Battersea Barge 99.18 99.38
99.96 IC
.0 50 0 1

CL 105.55 UTL

H 1 m R . h 1 CS
1 43 0 .5

Reinforced concrete roof slab of existing riser shaft and flap valve chamber only
103.87

103.97

.5 38 0 1

CL 105.23

.9 08 0 1

1619
s e e Tr ig gn n ra eh Ov
104.39

UTL
Rm a p

IC CL 105.55 UTL
Cn oc FL 1 5 9 105.40 0. 3

.4 46 0 1

99.62

.2 50 0 1
10 10 4. 4. 39 32

e n i .7 t 39 ul 0 1 eO rt ce n o C

WP

h .m 18 PF M/

h 0 .m h e5 g .m d 05 He W nB o

Access shafts
103.87 103.75

R /F &M

14 9 0. 7
Sh d e

CP

CP

Tarmac

.8 39 0 1

CP

104.54

BP

h .m 04

99.55

99.69

100.08

100.47

99.90

1 47 0 .7

99.89

1 43 0 .4

100.19
99.98

1 44 0 .3

W ig nn ti ea eR t r ce n o C
.9 13 0 1

l al

OW T

.8 14 0 1 .0 59 0 1 .1 52 0 1

CP
Se hd

3.1m high brick vent shaft ( See note 1 ) 0.225m Internal dia. 6m high ventilation column ( See note 1 )
103.64

.0 45 0 1

W B/

h .m 50 1

&C h .m 12 L /F

1616

Tarmac

CP
CP CP

d e h S

.3 37 0 1

2.2m High brick wall


Concrete Chamber CL 106.41 UTL

W nB o

Concrete Steps

CP

103.53

14 9 0. 2

.8 35 0 1

h .m 30

MP

.5 55 0 1
104.57

103.44
.8 34 0 1

150 PIG Wall Mounted 104.30


.9 43 0 1

100.12

1 47 0 .9

6 9 .7 59 0. 0 10 1 W O T .5 56 0 1

.0 56 0 1

2m to 3m high brickps e t wall S l FL a t 103.67 to be replaced Me


.7 37 0 1
Brick

103.51

MP MG

.0 33 0 1

100.13

1615

e n i t ul eO t ce nr o C

Building

8 4 . 3 0 1
h

52 3. 10

Tarmac
W B

h .m 05 MP

HEATHWALL PUMPING STATION


BW 2 2 h .m

1 40 0 .0

3 7 . 3 0 1
W B

BP

m 0 . 3

Wall Mounted
7 5 . 3 0 1

DK

Ov r a g n Tr e h n ig e s e 1 .mh 00

MTS
Cabins on Brick Supports
MG
Se hd
m 0 . 3 h

5 2 . 3 0 1
DK
6 0 . 3 0 1

1 0 6 1

1 12 0 .6

1 56 0 .7

M/ F 20 ho R .m n

1 44 0 .5

Concrete Steps

100.08

Reinforced concrete chamber


Tarmac

W B

9 6 . 3 0 1

Tarmac
8 0 . 3 0 1

10m

10m

.0 38 0 1

Co c e e St p n rt e

104.56

1 48 0 .3

13 0 0. 9

9 6 . 3 0 1

100.46

MG 103.78
.6 36 0 1
h m 0 . 3 W B 8 5 7 7 . . 3 3 0 0 1 1

WP 9 3 . 3 0 1

100.06

100.49

d e h S

Tarmac
31 3. 10
4 2 . 3 0 .2 1 31 0 1

Scale 1:200 at A1 1:400 if reproduced at A3

1 56 0 .8

13 0 0. 8

6 4 . 3 0 1
103.71

1 44 0 .1

1 54 0 .2

Concrete Steps IC Brick Steps CL 104.12 UTL

1 5 . 3 0 1
Concrete

100.65

100.80

1 47 0 .8

1 47 0 .0

100.87

0 .1 1 06

3 4 . 3 0 1
MG
49 3. 10

DK

59 0 .7 TOW 1

0 .5 1 57

5 i f 1 45 ft 0 . c De k So 4 l 0 .7 e e 1 1 s Ba e L v

9 4 . 3 0 1
104.57 103.98

Tarmac

15 9 0. 3

14 9 0. 7

14 9 0. 8
W B

8 4 . 3 0 1
h m 0 . 3

3 3 . 3 0 1
DK

4 1 . 3 0 1

FL 104.33

3 1 . 3 0 1
9 4 . 3 0 1

E N I N
4 2 . 3 0 1

S M L mac E Tar

E N A L

FOR APPROVAL
3 2 . 3 0 1

34 3. 10

Location
4 0 . 3 0 .5 1 31 0 1

14 4 0. 8

Valve CL 104.16 UTT

Heathwall Pumping Station London Borough of Wandsworth


8 2 . 3 0 1

1 4 . 4 0 1

IC CL 104.77 UTL IC 104.56 CL 104.78 UTL Cobbles FL 104.78


47 4. 10
0 .1 1 57

59 0 .6 TOW 1

0 .9 1 06

6 2 . 3 0 1
F L 14 7 0. 4
14 7 0. 4 Sa le t

Document Information

1 5 . 3 0 1
s e l b b W o R C B

Tarmac

8 2 . 3 0 1

7 0 . 3 0 1

Steps

9 1 . 3 0 1

Section 48 publicity Demolition and site clearance

14 9 0. 7
14 1 0. 8

13 6 0. 7
S P C 5 5 . 3 0 1

100.95 Cobbles IC CL 104.78 IC CL 104.77 UTL UTL MPS MPS

UTL

1 47 0 .0

100.69

Tarmac

14 8 0. 7

IC CL 104.79

1
P B / S P C

Single storey Portacabin offices on concrete support 3 3 blocks . 3 0


1 1 . 3 0 1 5 2 . 3 0 1
9 2 . 3 0 1

7 2 . 3 0 1

Book of plans - section 14


S48-PP-14X-HEAPS-000161 July 2012

20 5. 10 . 9 2 4 10

100.83
0 .7 1 10

C n rt oc e e

100.81 101.04

c n o C

5 5 . 3 0 1

0 .4 1 56

W BR

IC

h m 0 . 3 W B

5 i f 1 45 ft 0 . c De k So 0 l 0 .9 e e 1 3 s Ba e L v

1620
c n o C
Area Not Surveyed (Private Access)

CL 104.78 UTL
C D C

7 3 . 3 0 1

l l in a i Wa tn g e oc e e C n rt R

6 0. 10 7
5 0. 15 4

5 5 . 3 0 1 c n o C
C D M G M

4 8 . 4 0 1

9 4 . 3 0 1

9 3 . 3 0 1

9 1 . 3 0 1 0 3 . 3 0 1

gn i S

7 9 0. O T W 15 5 0. 15 7

9 4 . 3 0 1

6 4 . 3 0 1

1614
h m 0 . 3

3 5 . 3 0 1

BP
4 4 . 3 0 1

6 4 . 3 0 1

7 3 . 3 0 1

2 4 . 3 0 1
DK

W B

7 5 . 3 0 1

1 2 . 3 0 1 4 3 . 3 0 1
W

h m 2 . 2 g n i d r a o H n e d o o

c Thames Water Utilities Ltd 2008

Maximum extent of top of river/parapet wall

Table 1
Above ground permanent structure Maximum height above finished ground level (Minimum heights are in brackets where applicable) 8.0m (4.0m)

Top of river/parapet wall 105.85m maximum 105.41m minimum

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

Ventilation column(s) serving the shaft

Ventilation column(s) serving the SWSR interception chamber Ventilation column(s) serving the Heathwall CSO interception chamber SWSR Interception and flap valve chamber

8.0m (4.0m) This drawing 6.0m Fenders Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

1.5m Maximum extent of top of river/parapet wall (See Typical Section A) Foreshore structure

River foreshore (level varies)

(SWSR denotes the South West Storm Relief Sewer)

Key:
Limits of land to be acquired or used (LLAU) Zone within which all permanent site structures would be located Zone within which the shaft would be located

w o l n a e M

r e t a w

Typical Section A
(Not to scale)

Zone within which permanent above ground structures would be located (those listed in Table 1) Zone within which required landscaping would be located Maximum extent of top of river/ parapet wall

Zone within which Work No. 14c would be located

6 7 o t 1 y a

Notes:
1. The Site Works Parameter Key Plan identifies each zone independently. 2. The zone within which the shaft would be located would include all permanent works including shaft walls (including appropriate allowances for construction tolerances) and if applicable under-reaming. Shaft construction temporary works may be located within or outside this zone provided they are located within the Limits of land to be acquired or used.

m l E

Qu

0 5 o t 2 2

Jetty Crane

Zone within which ventilation column(s) serving the Heathwall CSO interception chamber may be located

Mud

M S

Prescot Wharf
Hopper

M d l Wh r i e d af
MH & MLW Navigation Light (fixed red) MP

Mud
Tank

s n o r g ot M oi P s

MP

Capstan MPs

s n o r g ot M oi P s Jetty

2 5
Pumping Station

Zone within which ventilation column(s) serving the shaft and the SWSR interception chamber may be located
6 5

Zone within which Work No. 14a would be located

f 1

t a te a r ut l s dsi E d i w yn T ea I

y r n o s a m g n i p o l S

Warehouse

E N I N

M L E

E N A L
d n o P l l i

e g d i r B

Sorting Office

g n i t r

e c i f f

1 5

d 2

g a M e n Hi h W
tr ae

4 5

10m

40m

Scale 1:500 at A1 1:1000 if reproduced at A3


4

FOR APPROVAL

Location

Heathwall Pumping Station London Borough of Wandsworth

a 2

Document Information

Section 48 publicity Site works parameter plan Book of plans - section 14


S48-PP-14X-HEAPS-000162 July 2012

M S

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This drawing Zone within which Work No. 14c would be located Zone within which Work No. 14a would be located

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Jetty Crane Mud Crane Jetty Crane Jetty

M S

Prescot Wharf
Hopper

Mud

M S

Prescot Wharf
Hopper

Mud

M S

Prescot Wharf
Hopper

Limits of land to be acquired or used (LLAU) Zone within which all permanent site structures would be located Zone within which the shaft would be located Zone within which permanent above ground structures would be located (those listed in Table 1) Zone within which required landscaping would be located Maximum extent of top of river/ parapet wall

M d l Wh r i e d af
Mud
Navigation Light (fixed red) MP Tank MP Navigation Light (fixed red) MP

M d l Wh r i e d af
Mud
Tank MP Navigation Light (fixed red) MP

M d l Wh r i e d af
Mud
Tank

MP

Capstan MPs

Capstan MPs

Capstan MPs

2 5
Pumping Station Pumping Station

2 5
Pumping Station

2 5

g a M e n Hi h W

g a M e n Hi h W

1f
4

1f

1f

y r n o s a m g n i p o l S

y r n o s a m g n i p o l S

y r n o s a m g n i p o l S

Warehouse

Warehouse

Warehouse

E N I N

M L E

E N A L
d n o P l l i

e g d i r B

E N I N
Sorting Office

M L E

E N A L
d n o P l l i

e g d i r B

E N I N
Sorting Office

M L E

E N A L
d n o P l l i

e g d i r B

Sorting Office

Zone within which ventilation column(s) serving the Heathwall CSO interception chamber may be located

Zone within which ventilation column(s) serving the shaft and the SWSR interception chamber may be located

Jetty Crane Mud Crane

Jetty

M S

Prescot Wharf
Hopper

Mud

M S

Prescot Wharf
Hopper

M d l Wh r i e d af
Mud
Navigation Light (fixed red) MP Tank MP Navigation Light (fixed red) MP

M d l Wh r i e d af
Mud
Tank

MP

Capstan MPs

Capstan MPs

2 5

2 5

Pumping Station

Pumping Station

4 5

4 5

1f
4

1f
4

y r n o s a m g n i p o l S

y r n o s a m g n i p o l S

Warehouse

Warehouse

E N I N

M L E

E N A L
d n o P l l i

e g d i r B

E N I N
Sorting Office

M L E

E N A L
d n o P l l i

e g d i r B

Sorting Office

1 5

d 2

1 5

6 5

6 5

1 5

d 2

1 5

d 2

1 5

d 2

d 2

g a M e n Hi h W
tr ae

4 5

4 5

4 5

6 5

6 5

6 5

tr ae

tr ae

Notes:
1. The Site Works Parameter Key Plan identifies each zone independently. 2. The zone within which the shaft would be located would include all permanent works including shaft walls (including appropriate allowances for construction tolerances) and if applicable under-reaming. Shaft construction temporary works may be located within or outside this zone provided they are located within the Limits of land to be acquired or used.

FOR INFORMATION

Location

Heathwall Pumping Station London Borough of Wandsworth


Document Information

g a M e n Hi h W

g a M e n Hi h W
tr ae

tr ae

Section 48 publicity Site works parameter key plan Book of plans - section 14
S48-PP-14X-HEAPS-000163 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

River Thames

Existing South Western Storm Relief outfall culvert (to be retained) Mean low water

Keyplan:

Work No. 1c. 7.2m internal dia main tunnel to KIrtling Street

Outfall apron This drawing Tidal flap valves Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Proposed river wall with low parapet and railing

Heathwall Pumping Station interception and valve chamber

Work No. 14b. 4m internal dia connection tunnel

Key:
Proposed access for safeguarded wharf Limits of land to be acquired or used (LLAU) Existing sewers Scour protection 104.50 Proposed access cover Proposed level (shown in metres above tunnel datum) Zone within which all permanent site structures would be located Zone within which the shaft would be located Zone within which permanent above ground structures would be located

Heathwall Drop Shaft (10m internal dia) Scour protection Zone within which Work No. 14c would be located Existing valve chamber Local control pillar 0.3m x 0.7m x 1.2m high 105.41

2.2m internal dia connection culvert

Sliding gate to shut off riverside walk when operational access to jetty is required

Proposed access for maintenance vehicles Zone within which the ventilation columns and local control pillar serving the Heathwall CSO interception chamber may be located Battersea Barge returned to approximately existing position Stairs 0.6m internal dia ventilation column of 4m minimum to 8m maximum height Existing Heathwall Pumping Station building 104.50

Work No. 14a. CSO Drop Shaft (16m internal dia)

Notes:
1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and topographical survey base, both of which have been used in the preparation of this drawing. 3. This drawing shows permanent site structures only. Landscaping hard works and soft works are shown on the Proposed landscape plan and/or Proposed site features plan.

Zone within which Work No. 14a would be located

Sliding gate to shut off riverside walk when operational access to foreshore structure is required

105.85

Exs i g it n Tr n f r e a so m r b i ig ul n d

Passive filter breather unit 0.5m internal dia 1m high

b n u o S i t a t S

0.225m internal dia ventilation column, 6m high

Existing South Western Storm Relief riser shaft and tidal flap valve chamber (cover to be raised)

Passive filter chamber

South Western Storm Relief interception chamber Local control pillar 0.3m x 0.7m x 1.2m high

1.2m internal dia column of 4m minimum to 8m maximum height Electrical and control equipment housed within existing Pumping Station building

l o n ay a B udrw l n n r ce s o a t n e A cs f m ie a c vehicles
10m 0 10m

Scale 1:200 at A1 1:400 if reproduced at A3 Zone within which the ventilation columns and local control pillar serving the shaft and South Western Storm Relief interception chamber may be located

ILLUSTRATIVE

Existing screen house

Location

Heathwall Pumping Station London Borough of Wandsworth


Document Information

Section 48 publicity Permanent works layout Book of plans - section 14


S48-PP-14X-HEAPS-000164 July 2012

c Thames Water Utilities Ltd 2008

N Outfall apron to prevent local scour of riverbed Ventilation column 6m high Existing river wall retained. Concrete wall to be cleaned and made good Existing pedestrian access to jetty to be removed

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

Vertical timber fenders

wa tr e

Me a nl o w

Secure gates give access to foreshore structure

Two tone (dark and silver grey) granite paving with 10mm steel strip between types Heathwall PS CSO New pedestrian maintenance access to jetty Proposed weathered steel fence to boundary with Thames path Boundary marker strip in footpath at edge of safeguarded wharf Local control pillar 1.2m high

Timber bench

This drawing

Sliding gate to shut off Thames path when operational access to foreshore structure required Minor modifications to Riverlight landscaping to join up Thames path

105.41

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Limits of land to be acquired or used (LLAU) Zone within which permanent above ground structures would be located Sliding gate to shut off Thames Path when operational access to foreshore structure required Cut back existing wall and greenery to form new opening Zone within which required landscape would be located Thames Path + 105.40m Existing levels (shown in metres above tunnel datum) Proposed levels (shown in metres above tunnel datum) Approximate position of CSO outlet 105.87
mp a R

Existing ventilation column 2m high

Passive filter breather unit 1.0m high Access to pumping station motor room 105.41 South West Storm Relief CSO 105.41

Existing jetty

New fence to existing wall

104.50

mp a R

104.22

105.41 AA

mp a R

Secure gates give access to jetty

105.40

Existing trees within surveyed area 105.41 105.41 104.50 New brickwall to boundary Ventilation column of 4m minimum to 8m maximum height Raised inteception and tidal flap valve chamber at 105.85m ATD Middle Wharf Railings around raised chamber

Battersea Barge returned to approximately existing position

105.00

Proposed trees

Notes :
1. All dimensions and levels are approximate.

105.85
Ra p m

2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and the topographic survey base, both of which have been used

+ 104.57m Local control pillar 1.2m high Thames Water compound Existing Heathwall Pumping Station 104.50 Substation Ventilation column of 4m minimum to 8m maximum height 103.25 Main electrical and control equipment located in existing pumping station building

in the preparation of this drawing.

103.39

Regrade surface down to road level Riverlight landscaping scheme (by others) shown grey Perimeter brick walling to be cleaned New paving to pavement on Nine Elms Lane
e n a L s m l E e n i N

+ 104.57m

+ 103.33m

10m

10m

+ 103.26m

Scale 1:200 at A1 1:400 if reproduced at A3

+ 103.28m

INDICATIVE
+ 103.32m Save for the layout of above ground structures which is illustrative

+ 103.55m

Provision of 3 No. semi-mature London planes

Location

Heathwall Pumping Station London Borough of Wandsworth

+ 103.46m Document Information + 103.42m

Section 48 publicity Proposed landscape plan Book of plans - section 14


S48-PP-14X-HEAPS-000165 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Proposed weathered steel fence and gates

2 No. ventilation columns of 4m minimum to 8m maximum height

South Western storm relief CSO culvert

Concrete foreshore with horizontal grooves to mark river levels and vertical timber fenders

Ventilation column 6m high

Repaint existing louvres

Consented Riverlight development shown dotted

Keyplan:

Existing Middle Wharf jetty to be retained

Heathwall Pumping Station (Thames Water)

Local control pillar 1.2m high This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Notes :
1. All dimensions and levels are approximate. 2. The purpose of this section is to illustrate the scale of the below ground infrastructure to be provided.

THAMES PATH

2020 Flood Defence Level 105.41m ATD

Mean High Water Springs 103.96m ATD

Interception chamber

Mean Low Water Springs 97.76m ATD

10m CSO drop shaft

10m

Scale 1:200 at A1 1:400 if reproduced at A3

ILLUSTRATIVE

Location

Heathwall Pumping Station London Borough of Wandsworth

Connection tunnel Document Information

Section 48 publicity Section AA Book of plans - section 14


S48-PP-14X-HEAPS-000166 July 2012

Section AA

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Middle Wharf jetty (shown notionally)

Royal Mail sorting office Keyplan:

This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Notes :
2020 flood defence level 105.41m ATD Mean high water springs 103.96m ATD

1. All dimensions and levels are approximate.

Mean low water springs 97.76m ATD

Middle Wharf

Heathwall PS

Tideway Industrial Estate

Nine Elms Pier

As existing North elevation

Existing jetty to be retained

2 No. ventilation columns of 4m minimum to 8m maximum height

Concrete foreshore with horizontal grooves to mark river levels and vertical timber fenders

Consented Riverlight development shown dotted

Nine Elms Pier subject to planning application

Weathered steel fence and gates

Heathwall PS CSO

Ventilation column 6m high

THAMES PATH

2020 flood defence level 105.41m ATD Mean high water springs 103.96m ATD

Mean low water springs 97.76m ATD

New foreshore structure

10m

40m

Proposed North elevation


N

Scale 1:500 at A1 1:1000 if reproduced at A3

ILLUSTRATIVE
n o t ai v e l he r ot N

Location

Heathwall Pumping Station London Borough of Wandsworth


Document Information

Section 48 publicity As existing and proposed North elevation Book of plans - section 14
S48-PP-14X-HEAPS-000167 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Heathwall Pumping Station (Thames Water)

Middle Wharf jetty (shown notionally)

Waste transfer station

Battersea Power Station (disused)

Cringle Dock (covered)

Kirtling Wharf concrete banching works (Cemex LTD)

Keyplan:

This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Notes :
1. All dimensions and levels are approximate.

2020 flood defence level 105.41m ATD Mean high water springs 103.96m ATD

Mean low water springs 97.76m ATD

Former TSO printing works

Nine Elms Lane

Middle Wharf

As existing East elevation

Consented Riverlight development shown dotted

2 No. ventilation column of 4m minimum to 8m maximum height

Combined ventilation column 6m high for foreshore structures at the side of building

Concrete foreshore with horizontal grooves to mark river levels and vertical timber fenders

Nine Elms Pier (subject to planning application)

New gate and fencing reinstated after construction

Proposed weathered steel fence

Existing jetty to be retained (shown notionally)

2020 flood defence level 105.41m ATD Mean high water springs 103.96m ATD

Mean low water springs 97.76m ATD

New foreshore structure 10m 0 40m

Proposed East elevation


N

Scale 1:500 at A1 1:1000 if reproduced at A3

ILLUSTRATIVE
n o t ai lv ee t s Ea

Location

Heathwall Pumping Station London Borough of Wandsworth


Document Information

Section 48 publicity As existing and proposed East elevation Book of plans - section 14
S48-PP-14X-HEAPS-000168 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This drawing Existing Heathwall pumping station outfall culvert to be abandoned

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Existing SWSR outfall culvert to be retained

Key:
Limits of land to be acquired or used (LLAU) Hoarding Thames Path Maximum extent of working area Existing public right of way

Potential use of existing mooring facilities

Jack up barge servicing piling operations Piling rig

Barge on campshed

Site access Access / haul route

Cofferdam piling alignment subject to survey of existing obstructions Existing raised flapvalve chamber

Existing sewers Sheet piles


6 7 o t 1 y a

Temporary working area

Concrete batching plant and aggregate storage area Storage on existing jetty
M S

m l E

Qu

Extent of temporary working area over the foreshore

0 5 o t 2 2

Jetty Crane

Temporarily relocated Battersea Barge

E N A L MS LThese construction phasing plans have been 1. EE N I N prepared to illustrate possible site layouts for
the principal construction phases. Contractors may choose to lay sites out differently during

Notes :

Mud

Prescot Wharf
Hopper

construction depending on their preferred Ventilation Crane construction methods subject to any controls on layout imposed through the planning submission and approval process. 2. Traffic management plans for construction phases of the work would be submitted to the appropriate authority for approval. Where appropriate, outline traffic management Shaft

M d l Wh r i e d af
MH & MLW

New mooring piles to be installed


MP Navigation Light (fixed red)

Mud
Tank MP

Vehicle turntable

s n o r g ot M oi P s

Capstan MPs

arrangements are shown. 3. Utility supplies for the construction of the works

s n o r g ot M oi P s Jetty

Site power structure


2 5

would be agreed with the relevant utility company. 4. Additional noise mitigation including noise barriers may be required but is not shown on this drawing.

Barge grid to be extended

Pumping Station

Existing substation Existing trees (to remain)


4 5

5. Offices and welfare at Kirtling Street site. 6. Existing flood defence levels to be maintained at all times.

Storage (open area or containerised)

y r n o s a m g n i p o l S

Thames Path

Construction access, left turn in, left turn out

Warehouse

Consented Riverlight development

E N I N

M L E

E N A L
d n o P l l i

e g d i r B

Sorting Office

g n i t r o S

e c i f f

1 5

g a M e n Hi h W
tr ae

Vehicle turntable

6 5

Construction access, left turn in, left turn out

10m

40m

Scale 1:500 at A1 1:1000 if reproduced at A3

Security office

ILLUSTRATIVE

Excavated material storage and handling area

Location

Heathwall Pumping Station London Borough of Wandsworth


Document Information

Section 48 publicity Construction phases - phase 1 Site setup shaft construction & tunnelling Book of plans - section 14
S48-PP-14X-HEAPS-000169 July 2012

M S
c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn. Existing SWSR outfall culvert to be retained

Key:
Limits of land to be acquired or used (LLAU)

Options for contractor to transport materials using barges

Hoarding Thames Path Maximum extent of working area Existing public right of way

Campshed

Potential use of existing mooring facilities Cofferdam piling alignment subject to survey of existing obstructions

Site access Access / haul route Existing sewers Extent of temporary working area over the foreshore

Permanent foreshore works

Existing raised flapvalve chamber

6 7 o t 1 y a

Crane Storage on existing jetty


Jetty Crane

m l E

Qu

0 5 o t 2 2

Notes :
A 1. These N L construction phasing plans have been E

Temporarily relocated Battersea Barge

MS Lprepared to illustrate possible site layouts for EE N I the principal construction phases. Contractors N
may choose to lay sites out differently during construction depending on their preferred

Mud

M S

Prescot Wharf
Hopper

Ventilation

construction methods subject to any controls on layout imposed through the planning submission and approval process.

M d l Wh r i e d af
MH & MLW Navigation Light (fixed red) MP

Station

Mud
Tank

Crane

2. Traffic management plans for construction phases of the work would be submitted to the appropriate authority for approval. Where

s n o r g ot M oi P s

MP

Shaft

appropriate, outline traffic management arrangements are shown.

Capstan MPs

3. Utility supplies for the construction of the works would be agreed with the relevant utility company. Site power structure 4. Additional noise mitigation including noise barriers may be required but is not shown Existing substation on this drawing. 5. Offices and welfare at Kirtling Street site. 6. Existing flood defence levels to be maintained at all times.
4 5

s n o r g ot M oi P s Jetty

2 5
Pumping Station

Vehicle turntable

Storage (open area or containerised)

y r n o s a m g n i p o l S

Thames Path Construction access, left turn in, left turn out
Warehouse

E N I N

M L E

E N A L
d n o P l l i

e g d i r B

Consented Riverlight development

Sorting Office

g n i t r o S

e c i f f

1 5

g a M e n Hi h W
tr ae

6 5

Construction access, left turn in, left turn out

10m

40m

Scale 1:500 at A1 1:1000 if reproduced at A3 Security office Crane

ILLUSTRATIVE

Location

Heathwall Pumping Station London Borough of Wandsworth


Document Information

Section 48 publicity Construction phases - phase 2 Construction of other structures Book of plans - section 14
S48-PP-14X-HEAPS-000170 July 2012

M S
c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This drawing

Outfall apron constructed prior to foreshore reinstatement

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Limits of land to be acquired or used (LLAU) Cofferdam piling and fill removed and foreshore reinstated Hoarding Thames Path Maximum extent of working area Existing public right of way Site access Existing sewers Extent of temporary working area over the foreshore Permanent foreshore structure
6 7 o t 1 y a

Campshed removed and foreshore reinstated

Battersea Barge to be repositioned after cofferdam removal (refer to permanent works layout for permanent position)
Mud

m l E

Qu

0 5 o t 2 2

Jetty Crane

E N A L MS L EE N I N

M S

Prescot Wharf
Hopper

M d l Wh r i e d af
MH & MLW Navigation Light (fixed red) MP

Station

Mud
Tank

Hoarding removed

s n o r g ot M oi P s

MP

Shaft

Capstan MPs

Temporary construction facilities removed

s n o r g ot M oi P s Jetty

2 5
Pumping Station

Existing substation

Hoarding removed

y r n o s a m g n i p o l S

Thames Path

Warehouse

E N I N

M L E

E N A L
d n o P l l i

e g d i r B

Consented Riverlight development

Sorting Office

g n i t r o S

e c i f f

1 5

g a M e n Hi h W
tr ae

4 5

6 5

10m

40m

Scale 1:500 at A1 1:1000 if reproduced at A3

ILLUSTRATIVE

Location

Heathwall Pumping Station London Borough of Wandsworth


Document Information

Section 48 publicity Construction phases - phase 3 Site demobilisation Book of plans - section 14
S48-PP-14X-HEAPS-000171 July 2012

M S
c Thames Water Utilities Ltd 2008

Potrebbero piacerti anche