Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
Key:
Local authority boundary
London Bridge
S h a d T h a m e s
St r ee t
ag ui r e
Ga is n f o r d S t r e e t
Main tunnel
Main tunnel
Chambers Wharf
100m
100m
FOR INFORMATION
J a m a i c a R o a d
Location
N Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
g s c p e uy e h Si Q a Hi t
T H A M
E S
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
Key:
e t af Wh a Wh r
a l a i n S s m C ut V nl a d e a e o r
g ei M su D s n ue m
Thames Path + 105.40m Existing levels (shown in metres above tunnel datum) Thames Water land
Thames Water buildings/structures Listed buildings/structures Existing trees within surveyed area Thames Water access
T H A M
Facilities building
S H A D
Car park for Vanilla and Seasame residential block Gated pedestrian entrance to Shad Thames Pumping Station Fire escape route from Wheat Wharf
Notes :
E S
1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and the topographic survey base, both of which have been used in the preparation of this drawing.
Boundary wall
+ 104.11
o ry r C ut ad
Grille to underground car park (as existing)
g ei M su D s n ue m
Transformer building
AG
I R
ST R
EE T
10m
10m
T e l e ud g h Co B ii v ln
n a ai C ut T m rd or
FOR INFORMATION
Location
S T R E E T
a oi d r o r C r n e C ut
4 1 t o 1 5 7
57
301 to 315
Jasmin
The Cardamom Building
N Coventrys Wharf
TCP
Ap ar t m
K n o t H o u s e 2
C o p p e r R o w
en t s
45
201 to 215
Lapsang
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
t o
101 to 126
101 to 716
Keyplan:
EE T
Pekoe
3
c p e uy Si Q a
Heights
Heights
This drawing
Fe nn el
ST R
LA FO
1 to 24 Cooperage Court
6 t o 9
Ps
G A n pa i g er rm t en t s
S es am
PH
1 0
1 to 12
ou r t
Area Cayenne Court to be temporarily stopped up. of Maguire Street - Existing pedestrian accesses to buildings will be maintained throughout all phases of construction. - Emergency vehicle access will be maintained at all times. C yn e o r a system ut - A two way traffic e n Cwill be operated in Shad Thames (between Maguire Street and Gainsford Caraway Street) when Maguire Street is stopped up. - Gainsford Street and Maguire Street will not be Apartments stopped up simultaneously.
2
1
3 0
t o
Thames Path
3 4
S H A D
River Thames
T H A M E S
Upper Pool
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
M W L
Posts
Key:
Limits of land to be acquired or used (LLAU) Existing public right of way
W a t e r
LE W
V an i l l a
Rayne Court
1 to 11 13 to 24
R a m p
S T
an d
Whitsters House
Wheldon Court
25 to 36
EE T
Court
45
Station
Bo at ho us e
ST R
EE T
30 t 37 o t 36 o 40
ST R
22 t 29 o t 28 o 35
Ap
ST R M EEA TG U
or s el y do an w s n i on s
27
32
I R
GA I N S F OR D
B u t lr e B u sW s ie n h s sC af r e n t r e
I R
LA FO
Th e
AG
2 1
3 1
T h e F l a g S t o r e
Multi Car PK
Ra v en
t o
St a
3 7
El Su bS t a
2 5
9 4
0 5
L AN E
Saffron Wharf
Chy
OA K
ES
e w
S T R E E T
3 9
El Su b
5 1 t o 1 2 2
FB
o n c o r d i a
E L I Z A B E T H
21
Jetty
o t
Q U E E N
23
2 3 t o 2 9
Area of Gainsford Street to be temporarily stopped up. - Existing pedestrian access to buildings will be maintained throughout all phases of construction. - Emergency vehicle access will be maintained at all times. - Gainsford Street and Maguire Street will not be stopped up simultaneously.
ha r f
24
2 0
Coriander Court
a n n i
4 8
h a r f
13
THA M
1 to 30
Triangle
House
21
6 to 54
TH R
oc k
EE
FB
S tS av i ou r s
ha r f
PH
i l l W
R a m p
20 6
9A
1 to 63
23
9B
t o
9C
28 to 187
FB
19 8
LB
2 5 3
The Circle
C 1 o o t o p 3 e 7 r s L o d g e
55 to 87
S TR
3 5 2
t o
3 7 2
1 T t o o w 1 8 e r W h 2 a 8 1 r f
28 to 60
Millenium Square
St Georges
Shuters Wharf
Wharf
I LL
1 t o 3
6 0
1 t o 3 0
17
St Saviours
E E T
2 5 5
Wharf
9
Unity
t o3 H 5 o b b C s o ut r
l 2
5
c Thames Water Utilities Ltd 2008
BERMONDSEY
1 t o 2 1
T C h i e r c l e S t a t u e
1 0
SH AD
197 to 361
T e il h Cr e c
2 2 t o 4 3
4 4
4 8
4 6 t o 5 0
J u b i l e e Y a r d
n P v a y s r a H m o u i s d e B u i l d i n g
C a
29
1t o 1 5t 3 o 2 8 5 1 5t o8 2 8 8 1 a
21 t o
8 a T 9 h t a o1 m 1 3 e 9t sH o2 eg 3 ih t s
5 2
5 4
5 7
6 0
1 0
A l b i o n
2 0
H o u s e
6 2
M e a n L o w
TCB
Alumni
Court
37 to 48
Mud
Ap Ac Notes:
Wolfson
I n d i a H o u s e
Pumping Ap
6 2
Ac
T a rd Wh r e Ta e af
1. This plan does not show stopping up and diversions of limited duration (eg hoarding erection, minor utility diversions and minor
The Clove Building
4
highway works). 2. Only rights of way in or close to worksites are shown. The full extents of rights of way are not shown where they cease to be relevant to the project.
Bollard
S T R E E T
1 6 a 1 6 b
1 to 68
n a ai C ut T m rd or
1 8
2 4
d r a l l o B
6
1 to 25
1 0 1
o t
2 0 8
f r a h W
d r n a l l o o B m
14
1 t o
22
25
Java Wharf
1 6
2 0
1 to 49
10m
10m
St Saviours Wharf
FB
FOR APPROVAL
St Andrews Wharf
r e t a
1 2
Location
1 to 70
Vogans Mill
J A C O BS T R E E T
n a e
h g i H
10 5. 83
30 PIG
1 0 3 . 7 8
1 0 3 . 8 1
1 0 4 . 7 8 1 0 4 . 8 0
1 0 4 . 8 0
S h a d
100
30
S te r et
T h a m
PIG 1 0 3 . 8 6
1 0 4 . 0 0
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
Wheat Wharf
1 0 3 . 7 5
e s
10 4. 15
1 0 4 . 7 9
10 3. 93
1 0 4 . 0 4
ur l ew
ou r t
1 0 3 . 9 2
S es am
1 0 3 . 8 9
Design Museum
10 3. 86
an d
Boundary wall
10 4. 00
1 0 3 . 9 6
1 0 3 . 9 5
ac
1 0 4 . 0 3
1 0 4 . 0 1
S t o n e
10 4. 09
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
V an i l l a
Ta r m
E d g i T n g a r m a c
10 3. 81
C P S
1 0 4 . 0 2
10 3. 91
Key:
1 0 4 . 1 5
Limits of land to be acquired or used (LLAU) Trees to be removed Above ground structures to be removed Below ground structures to be removed or infilled
1 0 4 . 0 2
en t
Ex t en to fB as em
10 4. 13
10 4. 11
10 3. 98
Below
Ap pr ox i m
10 4. 16
Pumping Station
S te r et
Basement
10 5. 50
10 4. 80
Notes:
10 5. 48
at e
ag ui r e
Approximate Extent
breaking out of suspended base slab. 2. Minor items to be removed (e.g. barriers, bollards etc.) are not shown.
10 4. 18
10 4. 09
1 0 4 . 1 9
of Basement
10 4. 10
10 4. 24
3. General activities of site clearance such as removal of hardstanding and foundations, stripping of topsoil and clearance of minor vegetation not shown.
10 4. 15
10 4. 21
10 4. 29
10 4. 25
Suspended ground floor slab inside building and section of base slab
10 4. 64
10 4. 26
10 4. 66
10 4. 61
10 4. 24
10 4. 29
P e n s t o c k
10 4. 29
10 4. 58
Tamarind Court
10 4. 57
10 4. 30
10 4. 27
10 4. 31
10 4. 34
10 4. 63
S h a d
T h a m
10 4. 40
e s
10 4. 41
10m
10m
1 0 4 . 4 3
10 4. 41
1 0 4 . 3 7
FOR APPROVAL
10 4. 37
Location
1 0 4 . 4 2
10 4. 40
IC(U) CL 104.22
1 0 4 . 3 2
1 0 4 . 3 4
1 0 4 . 3 7
1 0 4 . 4 0
1 0 4 . 3 6
July 2012
1 0 4 . 4 3
G a i n s f o r d S t r e e t
T H M
ou r t
E S
N Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
A n pa i g er rm t en t s
S es am
Table 1
Maximum height above finished ground level (Minimum heights are in brackets where applicable) 9.5m
Posts
Design Museum
an d
S T
LE W
V an i l l a
2 8
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
TCB
Key:
Limits of land to be acquired or used (LLAU) Zone within which electrical switchgear and facilities building would be located Zone within which all permanent site structures would be located Zone within which permanent above ground structures would be located (those listed in Table 1)
Pumping
I n d i a H o u s e
Notes:
Zone within which Work No. 18 would be located 1. The zone within which the shaft would be located would include all permanent works including shaft walls (including appropriate allowances for construction tolerances) and if applicable under-reaming. Shaft construction temporary works may be located within or outside this zone provided they are located within the Limits of land to be acquired or used.
Station
B u t lr e B u sW s ie n h s sC af r e n t r e
AG
I R
ST R
4
EE T
F O D S T R E E T
1 6 a 1 6 b
1 to 68
n a ai C ut T m rd or
2 0
13
St a
Su b
4 6 t o 5 0
10m
10m
1 8
2 4
FOR APPROVAL
6
Location
1 to 25 Coriander Court
o t 1 0 1 Section 48 publicity
Document Information
2 0 8
22
5 1 t o 1 2 2
P e d e s t r i a n i s e d
S h a d
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
Wheat Wharf
ou r t
an d
S es am
Zone within which electrical switchgear and facilities building may be located Electrical switchgear and facilities building + 103.92
ac
V an i l l a
Design Museum
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
Ta r m
S t o n e
E d g i T n g a r m a c
Key:
Limits of land to be acquired or used (LLAU) Existing sewers
Ventilation duct
C P S
S te r et
ag ui r e
Proposed access cover + 104.10m Existing Level (shown in metres above tunnel datum) Zone within which all permanent site structures would be located
Existing switchgear and transformers Existing Shad Thames Pumping Station 3.6m internal dia, pumping station within existing pumping station building.
Notes:
Connection pipe (to be constructed below existing pumping station base slab) 1. All dimensions and levels are approximate. 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and topographical survey base, both of which have been used in the preparation of this drawing. 3. This drawing shows permanent site structures only. Landscaping hard works and soft works are shown on the Proposed landscape plan and/or Proposed site features plan.
Access for maintenance vehicles (as existing) Modifications to existing internal storm sewage pump pipework required including new connection to suction culvert (works not shown on this drawing).
Suction culvert
Existing pumping station window to be removed. Window arch to be utilised to form new door to proposed pumping station (access for maintenance vehicles). Dropped kerb
Tamarind Court
Ventilation duct
S h a d
T h a m
e s
10m
10m
ILLUSTRATIVE
f r a h
Control cabling
Location
m a n n i C
n o
Coriander Court
S t . S a v i o u r s
G a i n s f o r d S t r e e t
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
g s c p e uy e h Si Q a Hi t
Keyplan:
S H A D
This drawing
T H A M
E S
e t af Wh a Wh r
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
Key:
g ei M su D s n ue m
a l a i n S s m C ut V nl a d e a e o r
Limits of land to be acquired or used (LLAU) Zone within which permanent above ground structures would be located Thames Path
North elev.
New trees + 105.40m Existing levels (shown in metres above tunnel datum) Listed buildings/structures
Proposed trees
AA
Notes :
1. All dimensions and levels are approximate. Gated pedestrian entrance to Shad Thames Pumping Station to be retained Electrical switchgear and facilities building 2. Any discrepancy between the location of structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and the topographic survey base, both of which have been used in the preparation of this drawing.
West elev. Existing car park for Vanilla and Seasame residential block
y o r ad C ut r
Boundary wall Grille to underground car park (as existing) Existing transformer building Asphalt courtyard South elev. + 104.11 + 104.03
Landscape key:
Asphalt
g ei M su D s n ue m
Rebuild existing wall - Extent to be agreed, subject to boundary wall agreement and condition survey
AG
I R
ST R
EE T
10m
10m
T e l e ud g h Co B ii v ln
n a ai C ut T m rd or
FOR APPROVAL
M A H T D A H S
S E
Location
Section 48 publicity Proposed landscape plan at roof level Book of plans - section 18
S48-PP-18X-SHTPS-000240 July 2012
a oi d r o r C r n e C ut
Vanilla and Sesame Courtyard Ventilation column 9.5m high Existing grille to underground car park
Boundary wall to be surveyed and reconstructed. The building is built independently of the wall
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
Key:
Courtyard +104.11 105.40 Louvres within roller shutter / garage doors HV Electrical room Detailed layout of plant and equipment not shown on this drawing. 104.11 Transformer + 105.40m Existing levels (shown in metres above tunnel datum) Proposed levels (shown in metres above tunnel datum)
Stairs Up
Notes :
1. All dimensions and levels are approximate. 2. Any discrepancy between the location of
104.66
W h a W h r fee e t a fi r s a er ue c p o t
104.11
Transformer
Lobby 104.66
structures and the parameters marked on the drawings are due to differences between the Ordnance Survey base and the topographic survey base, both of which have been used in the preparation of this drawing.
+ 103.98
Existing door
Infill window
+104.16
Fixed window
Integrated louvres within window opening Stairs LV Electrical room Tables and chairs Courtyard Up Stairs Detailed layout of plant and equipment not shown on this drawing. 1m 109.16 Scale 1:50 at A1 1:100 if reproduced at A3 0 4m Integrated louvres within window openings WC
W h a W h r fee e t a fi r s a er ue c p o t
INDICATIVE
Revised underground drainage route to accommodate WC and roof drainage Location
Section 48 publicity Electrical switchgear and facilities building layout plan Book of plans - section 18
S48-PP-18X-SHTPS-000241 July 2012
Infill window
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
Notes:
1. All dimensions and levels are approximate.
Shad Thames
Wheat Wharf
Tamarind Court
Gainsford Street
10m
10m
INDICATIVE
es te l ev at i on
R a m p
4.3m
3.9m
4.6m
4.6m
4.1m
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
Notes:
LONDON COUNTY COUNCIL
LONDON
COUNTY
COUNCIL
Tamarind Court
Wheat Wharf
Shad Thames
Thames path
River Thames
LONDON
COUNTY
COUNCIL
LONDON
COUNTY
COUNCIL
10m
INDICATIVE
Location
Ea s te l ev at i on
Section 48 publicity As existing and proposed East elevation Book of plans - section 18
S48-PP-18X-SHTPS-000243 July 2012
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
Roof line
Glazed window behind horizontal louvres LV Electrical room Fixed glazed window behind horizontal louvres Obscured glass windows Removable glazing panel for installation of LV equipment Raised access floor 800mm zone Boundary wall Boundary wall infill Car park basement grille for Vanilla and Sesame Court Top of grille level +104.58 SSL +107.66 Shad Thames Pumping Station
FFL +109.16
FFL +104.66
FFL +104.66
1m
4m
Section AA
INDICATIVE
Location
A A
S e o l uh e v t a t i o n
3 t o 3 4
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
G A n pa i g er rm t en t s
S es am
ou r t
Existing drop kerb to be extended and bollards to be relocated in order to allow construction vehicle access
S h a d T h a m e s
P e d e s t r i a n i s e d
an d
V an i l l a
Ta r m
ac
B u t lr e B u sW s ie n h s sC af r e n t r e
ag ui r e
Multi Car PK
2 0
13
St a
El Su b
9 4
0 5
4 6 t o 5 0
St r ee t
Existing facilities building to be demolished and replaced with proposed two storey switch gear building
Design Museum
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
2 8
Key:
Limits of land to be acquired or used (LLAU) Hoarding
S t o n e
E d g i T n g a r m a c
Maximum extent of working area Route of temporary diversion of footway Site access
C P S
Notes :
1. These construction phasing plans have been prepared to illustrate possible site layouts for the principle construction phases. Contractors may choose to lay sites out differently during construction depending on their preferred construction methods subject to any controls
6 2
I n d i a H o u s e
45
Offices
on layout imposed through the planning submission aapproval process. and f T a rd Wh r e Ta e 2. Traffic management plans for construction phases of the work would be submitted to the appropriate authority for approval. Where appropriate, outline traffic management arrangements are shown. 3. Utility supplies for the construction of the works would be agreed with the relevant utility company. 4. Additional noise mitigation including noise
Ga is n fr o dS t r e e t
1 6 a 1 6 b
s e
d a h S
m a h T
2 4
10m
10m
6
1 to 25 Coriander Court
1 0 1
22
o t
2 0 8
f r a h
ILLUSTRATIVE
C
5 1 t o 1 2 2
m a n n i
n o
W
Location
Section 48 publicity Construction phases - phase 1 Pumping station modification works Book of plans - section 18
S48-PP-18X-SHTPS-000245 July 2012
2 0
3 t o 3 4
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
S h a d T h a m e s
P e d e s t r i a n i s e d
G A n pa i g er rm t en t s
S es am
ou r t
an d
V an i l l a
Ta r m
ac
B u t lr e B u sW s ie n h s sC af r e n t r e
Ventilation duct
Crane
St r ee t
ag ui r e
Multi Car PK
2 0
13
St a
El Su b
9 4
0 5
4 6 t o 5 0
Design Museum
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
2 8
Key:
Limits of land to be acquired or used (LLAU) Hoarding
S t o n e
E d g i T n g a r m a c
Maximum extent of working area Route of temporary diversion of footway Site access
C P S
Welfare building
Existing sewers
Notes :
1. These construction phasing plans have been prepared to illustrate possible site layouts for the principle construction phases. Contractors may choose to lay sites out differently during construction depending on their preferred Parking in Maguire Street to be suspended as necessary to allow traffic movements Offices construction methods subject to any controls on layout imposed through the planning submission aapproval process. and f T a rd Wh r e Ta e 2. Traffic management plans for construction phases of the work would be submitted to the appropriate authority for approval. Where appropriate, outline traffic management arrangements are shown. Pumping main 3. Utility supplies for the construction of the works would be agreed with the relevant utility company. 4. Additional noise mitigation including noise
6 2
I n d i a H o u s e
45
barriers may be required but is not shown on this drawing. 5. 1 no. footway in Maguire Street to remain open at all stages and pedestrian access to existing building entrances to be managed by contractor.
Ga is n fr o dS t r e e t
1 6 a 1 6 b
Connection chamber
d a h S
m a h T
s e
Shad Thames to be changed to two way during Maguire Street road closure.
2 4
10m
10m
6
1 to 25 Coriander Court
1 0 1
22
o t
2 0 8
f r a h
ILLUSTRATIVE
C
5 1 t o 1 2 2
m a n n i
n o
W
Location
Section 48 publicity Construction phases - phase 2 Pumping station modification works Book of plans - section 18
S48-PP-18X-SHTPS-000246 July 2012
2 0
3 t o 3 4
Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
S h a d T h a m e s
P e d e s t r i a n i s e d
G A n pa i g er rm t en t s
S es am
ou r t
an d
V an i l l a
Ta r m
ac
B u t lr e B u sW s ie n h s sC af r e n t r e
ag ui r e
Multi Car PK
2 0
13
St a
El Su b
9 4
0 5
4 6 t o 5 0
St r ee t
Design Museum
Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.
2 8
Key:
Limits of land to be acquired or used (LLAU) Hoarding
S t o n e
E d g i T n g a r m a c
Maximum extent of working area Route of temporary diversion of footway Site access
C P S
Welfare building
Existing sewers
Notes :
1. These construction phasing plans have been prepared to illustrate possible site layouts for the principle construction phases. Contractors may choose to lay sites out differently during Construction access, right turn in, right turn out construction depending on their preferred construction methods subject to any controls on layout imposed through the planning Offices submission aapproval process. and f T a rd Wh r e Ta e 2. Traffic management plans for construction phases of the work would be submitted to the Parking in Maguire Street to be suspended as necessary to allow traffic movements appropriate authority for approval. Where appropriate, outline traffic management arrangements are shown. 3. Utility supplies for the construction of the works would be agreed with the relevant utility company. 4. Additional noise mitigation including noise
6 2
I n d i a H o u s e
45
Ga is n fr o dS t r e e t
1 6 a 1 6 b
s e
d a h S
m a h T
2 4
10m
10m
6
Crane
Junction to remain open to diverted traffic turning right onto Gainsford Street
1 to 25 Coriander Court
Chamber housing sensor
1 0 1
22
o t
2 0 8
f r a h
ILLUSTRATIVE
m a n n i
n o
W
Location
5 1 t o 1 2 2
Limited duration road closure of section of Gainsford Street during construction of chamber housing sensor. (Westbound traffic to be diverted on to Shad Thames / Maguire Street).
2 0