TIME AND ACTION CALENDAR (KNIT)

Buyer Order # Style # Item Body Fabric Content Body Fab Knitting Pattern Body Fab GSM Gmts Ord Qty in pcs Ord Confirmation Date Del Date/ TOD Body Fab Consumption per Dz Color/Qty Pink Olive Brown Aqua Blue Total Sl No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 ED-APR-06 TNA Calendar Cargo must be at Ctg Port by Cargo must leave factory not later than Final Insp to be offered not later than Finshing must be completed not later than All Washing (if any) must be completed not later than All Sewing must be completed not later than Bulk Production as per target must be achieved not later than Input should be given in required lines to achieve day's Target prod not later than Emb for day's prod qty must be in house not later than (if any emb) Printing for day's tgt qty must be rcvd from printing not later than Cutting should be done for required day's production as per ratio not later than Size-set and PP must be approved not later than All Lab-Test which may affect shipment to be completed not later than
Dyed fabric as per size/col ratio for day's production must be delivere to cutting not later than Knitted Fabric for day's prod as per size color ratio must be delivered to cutting not later than

Li & Fung JA-2376 Boys-S6 Crew Neck Tee 100% Ctn S/J 170 GSM 240000 6/8/10 6-Oct 3.00 Kg M 20000 20000 20000 20000 80000 L 20000 20000 20000 20000 80000 Events

Rib Fab Content Rib Fab GSM Rib Consumption per Dz Total Rib Req Yarn Count Spandex Machine Dia to be used Yarn Count Finished fab requirement XL 10000 10000 10000 10000 40000 Total 60000 60000 60000 60000 240000

95%Ctn/5% Spandex 190 GSM 200 gm 4500 Kg 24/S 40D 24 ,28, 30, 34 28/S 60000 Kg

S 10000 10000 10000 10000 40000

Action Date 6-Oct

Remarks

5-Oct Truck, Cover Van 3-Oct 2-Oct 1-Oct 30-Sep 31-Aug All Fab & Accy 30-Aug 29-Aug 28-Aug 27-Aug 24-Aug 30-Sep 26-Aug 22-Aug 19-Aug 17-Aug 15-Aug 11-Aug 7-Aug 10-Aug 7-Aug 8-Aug 16-Aug 27-Aug 2-Sep 28-Aug

Knitting for day's garments production (as per ratio) must start not later than Yarn must be at Factory for day's targetted qty not later than BB L/C for yarn must be opened not later than Master L/C must be received from Buyer not later than Color Standard Must be received not later than First Labdip to be submitted not later than Product package must be received not later than Proto Sample must be submitted not later than (with available Fabric) All Accessories Development must be completed and approved not later than All Accessories must be at Factory not later than All washing approval (if any) must be obtained by Sewing and Thread Must be at Factory by

TIME AND ACTION CALENDAR (KNIT)


32

ED-APR-06

TNA Calendar