Introduction to Pre Engineered Buildings Technological improvement over the year has contributed immensely to the enhancement of quality of life through various new products and services. One such revolution was the pre engineered buildings. Through its origin can be traced back to 1960s its potential has been felt only during the recent years. This was mainly due to the development in technology, which helped in computerizing the design and design. Though initially only off the shelf products were available in these configurations aided by the technological development tailor made solutions are also made using this technology in very short durations. A recent survey by the Metal Building Associations (MBMA) shows that about 60% of the non residential low rises building in USA are pre engineered buildings. Although PEB systems are extensively used in industrial and many other non residential constructions world wide, it is relatively a new concept in India. These concepts were introduced to the Indian markets lately in the late 1990s with the opening up of the economy and a number of multi nationals setting up their projects.The market potential of PEBs is 1.2 million tones per annum. The current pre engineered steel building manufacturing capacity is 0.35 million tones per annum. The industry is growing at the compound rate of 25 to 30 %. With respect to design of the structure and aesthetic appearance India is way behind. Indian manufacturers are trying to catch up; comparatively PEBs is a new concept in India. Beside, in fabrication and other areas of PEB India is very good. As compared to other countries Indian codes for building design are stringent but safer. IS standards are upgraded continuously. In India, American codes are also followed.
Pre engineered steel buildings can be fitted with different structural accessories including mezzanine floors, canopies, fascias, interior partitions etc. and the building is made water proof by use of special mastic beads, filler strips and trims. This is very versatile buildings systems and can be finished internally to serve any functions and accessorized externally to achieve attractive and unique designing styles. It is very advantageous over the conventional buildings and is really helpful in the low rise building design. Pre engineered buildings are generally low rise buildings however the maximum eave height can go upto 25 to 30 metres. Low rise buildings are ideal for offices, houses, showrooms, shop fronts etc. The application of pre engineered buildings concept to low rise buildings is very economical and speedy. Buildings can be constructed in less than half the normal time especially when complemented with the other engineered sub systems. The most common and economical type of low rise buildings is a building with ground floor and two intermediate floor plus roof. The roof of low rise buildings may be flat or sloped. Intermediate floors of low rise buildings are made of mezzanine systems. Single storied houses for living take minimum time for construction and can be built in any type of geographical location like extreme cold hilly areas, high rain prone areas, plain land obviously and extreme hot climatic zones as well. Applications of Pre Engineered Buildings (PEB) 1. WAREHOUSES 2. FACTORIES
3. WORKSHOPS 4. OFFICES 5. GAS STATIONS 6. VEHICLE PARKING SHEDS 7. SHOWROOMS 8. AIRCRAFT HANGARS 9. METRO STATIONS 10. SCHOOLS 11. RECREATIONAL 12. INDOOR STADIUM ROOFS 13. OUTDOOR STADIUM CANOPIES 14. BRIDGES 15. RAILWAY PLATFORM SHELTERS Advantages of Pre Engineered Buildings REDUCED CONSTRUCTION TIME: Buildings are typically delivered in just a few weeks after approval of drawings. Foundation and anchor bolts are cast parallel with finished, ready for the site bolting. Our study shows that in India the use of PEB will reduce total construction time of the project by at least 50%. This also allows faster occupancy and earlier realization of revenue. LOWER COST: Due to the systems approach, there is a significant saving in design, manufacturing and on site erection cost. The secondary members and cladding nest together reducing transportation cost. FLEXIBILTY OF EXPANSION: Buildings can be easily expanded in length by adding additional bays. Also expansion in width and height is possible by pre designing for future expansion. LARGE CLEAR SPANS: Buildings can be supplied to around 80M clear spans. QUALITY CONTROL: As buildings are manufactured completely in the factory under controlled conditions the quality is assured. LOW MAINTENANCE : Buildings are supplied with high quality paint systems for cladding and steel to suit ambient conditions at the site, which results in long durability and low maintenance coats.
ENERGY EFFICIENT ROOFING AND WALL SYSTEMS: Buildings can be supplied with polyurethane insulated panels or fiberglass blankets insulation to achieve required U values. ARCHITECTURAL VERSTALITY: Building can be supplied with various types of fascias, canopies, and curved eaves and are designed to receive pre cast concrete wall panels, curtain walls, block walls and other wall systems. SINGLE SOURCE RESPONSIBILTY: As the complete building package is supplied by a single vendor, compatibility of all the building components and accessories is assured. This is one of the major benefits of the pre engineered building systems.
Pre Engineered Buildings Vs Conventional Steel Buildings PROPERTY PEB BUILDINGS CONVENTIONAL STEEL BUILDINGS
STRUCTURE WEIGHT
Pre engineered buildings are on the average 30% lighter because of the efficient use of steel. Primary framing members are tapered built up section. With the large depths in areas of higher stress.
Primary steel members are selected hot rolled T sections. Which are, in many segments of the members heavier than what is actually required by design? Members have constant cross section regardless of the varying magnitude of the local stresses along the member length.
Secondary members are selected from standard hot rolled sections which are much heavier.
DESIGN
Quick and efficient: since PEBs are mainly formed by standard sections and connections design, time is significantly reduced. Basic design based on international design codes are used over and over. Specialized computer analysis design programs optimize material required. Drafting is also computerized using standard detail that minimize the use of project custom details. Design shop detail sketches and erection drawings are supplied free of cost by the manufacturer. Approval drawing is usually prepared within in 2 weeks. PEB designers design and detail PEB buildings almost every day of the year resulting in improving the quality of designs every time they work Average 6 to 8 weeks Simple design, easy to construct and light weight. Since the connection of compounds is standard the learning curve of erection for each subsequent project is faster. Periodic free of charge erection is provided at the site by the manufacturer. Both costs and time of erection are accurately known based upon extensive experience with similar buildings. The erection process is faster and much easier with very less requirement for
Each conventional steel structure is designed form scratch with fewer design aids available to the engineer.
Substantial engineering and detailing work is required from the very basic is required by the consultant with fewer design aids.
Extensive amount of consultant time is devoted to the alterations that have to be done.
As each project is a new project engineers need more time to develop the designs and details of the unique structure. Average 20 to 26 weeks Extensive, heavy foundation required. The connections are normally complicated and differ from project to project resulting tin increasing the time for erection of the buildings. There has to be separate allocation of labour for the purpose of erection. Typically, conventional steel buildings are 20% more expensive than PEB in most of the cases, the erection costs and time are not estimated accurately. Erection process is slow and extensive field labour is required. Heavy equipment
SEISMIC RESISTANCE
ARCHITECTURE
equipment. The low weight flexible frames offer higher resistance to seismic forces. Price per square meter may be as low as by 30 % than the conventional building. Outstanding architectural design can be achieved at low cost using standard architectural details and interfaces. Building is supplied complete with all accessories including erection for a single ONE STOP SOURCE. PEB manufactures usually stock a large amount of that can be flexibly used in many types of PEB projects. Change orders are easily accommodated at all stages of the order fulfillment process. Little or no material is wasted even if a change order is made after fabrication starts. Designed to fit the system with standardized and inter changeable parts. Including pre designed flashing and trims. Building accessories are mass produced for economy and are available with the building. All project records are safely and orderly kept in electronic format which make sit easy for the owner to obtain a copy of his building record at any time. Future expansion is very easy and simple. Single source of responsibility is there because all the job is being done by one supplier.
is also needed. Rigid heavy frames do not perform well in seismic zones. Higher price per square meter. Special architectural design and features must be developed for each project which often require research and thus resulting in higher cost. Many sources of supply are there so it becomes difficult to co ordinate and handle the things. Substitution of hot rolled sections infrequently rolled by mills is expensive and time consuming. Change orders that are made after the dispatch of hot rolled sections result in increasing the time and cost involved in the project.
BUILDING ACCESSORIES
Every project requires different and special design fro accessories and special sourcing for each item. Flashing and trims must be uniquely designed and fabricated. It would be difficult to obtain project records after a long period of time. It is required to contact more than one number of parties. Future expansion is most tedious and more costly. Multiple responsibilities can result in question of who is responsible when the components do not fit in
FUTURE EXPANSIONS
PERFORMANCE
All components have been specified and designed specially to act together as a system for maximum efficiency, precise fir and peak performance in the field. Experience with similar buildings, in actual field conditions world wide, has resulted in design improvements over time, which allow dependable prediction of performance.
properly, insufficient material is supplied or parts fail to perform particularly at the supplier/contractor interface. Components are custom designed for a specific application on a specific job. Design and detailing errors are possible when assembling the diverse components into unique buildings. Each building design is unique, so predication, of how components will perform together is uncertain. Materials which have performed well in some climates may not do well in other conditions.
Design of Pre Engineered Buildings (PEB) The main framing of PEB systems is analyzed by the stiffness matrix method. The design is based on allowable stress design (ASD) as per the American institute of Steel Construction specification or the IS 800. the design program provides an economic and efficient design of the main frames and allows the user to utilize the program in different modes to produce the frame design geometry and loading and the desired load combinations as specified by the building code opted by the user. The program operates through the maximum number of cycles specified to arrive at an acceptable design. The program uses the stiffness matrix method to arrive at an acceptable design. The program uses the stiffness matrix method to arrive at the solution of displacements and forces. The strain energy method is adopted to calculate the fixed end moments, stiffness and carry over factors. Numerical integration is used. Design Cycle The design cycle consists of the following steps: 1. Set up section sizes and brace locations based on the geometry and loading specified for the frame design. 2. Calculate moment, shear, and axial force at each analysis point for each load combination. 3. Compute allowable shear, allowable axial and allowable bending stress in compression and tension at each analysis point. 4. Compute the corresponding stress ratios for shear, axial and bending based on the actual and allowable stresses and calculate the combined stress ratios.
5. Design the optimum splice location and check to see whether the predicted sizes confirm to manufacturing constraints. 6. Using the web optimization mode, arrive at the optimum web depths for the next cycle and update the member data file. 7. At the end of all design cycles, an analysis is run to achieve flange brace optimization. Frame Geometry The program has the capability to handle different types of frame geometry as follows
Frames of different types viz. rigid frames, frames with multiple internal columns, single slope frames, lean to frames etc. Frames with varying spans, varying heights and varying slopes etc. Frames with different types of supports viz. pinned supports, fixed supports, sinking supports, supports with some degrees of freedom released. Unsymmetrical frames with off centric, unequal modules, varying slopes etc. User specified purlin and girt spacing and flange brace location. Frame Loading Frame design can handle different types of loadings as described below: All the building dead loads due to sheeting, purlins, etc. and the self weight of the frame. Imposed live load on the frame with tributary reductions as well. Collateral load such as false ceiling, light fixtures, AC ducting loads, sprinkler systems and many other suspended loads of similar nature.
Wind loads input such as basic wind speed or basic wind pressure that will be converted to deign wind pressure as per the building code specified by the user and shall be applied to the different members of the building according to the coefficients mentioned in the codes prescribed by the user. The standard building codes like MBMA, UBC, ANSI, IS:875 part 3 etc are used fro this purpose. Crane and non crane loading can be specified by the user and the program has the capability to handle these special loads and combine them with the other loads as required.
Seismic loads corresponding to the different zone categories of various international codes can also be defined and combined with other load cases as required.Temperature loads can also be specified in the form of different differential temperature value on centigrade and specifying the appropriate coefficient for the thermal expansion.Load combinations with appropriate load factors can be specified by the user as desired. Design Codes Following are the main design codes generally used: AISC : American institute of steel construction manual AISI : American iron and steel institute specifications MBMA : Metal building manufacturers code ANSI : American national standards institute specifications ASCE : American society of civil engineers UBC : Uniform building code IS : Indian standards Design Criteria DESIGN METHOD: Allowable stress design method is used as per the AISC specifications. DEFLECTIONS: Unless otherwise specified, the deflections will go to MBMA, AISC criteria and standard industry practices. PRIMARY FRAMING: Moment resisting frames with pinned or fixed bases. SECONDARY FRAMING: Cold formed Z sections or C sections for purlins or girts designed as continuous beams spanning over rafters and columns with laps. LONGITUDANAL STABILITY: Wind load on building end walls is transferred through roof purlins to braced bays and carried to the foundations through diagonal bracing. DESIGN SOFTWARE The latest software that is used for design is STAAD 2007. DESIGN PROCESS The frame data is assembled based on number of frame members, number of joints, number of degrees of freedom, the conditions of restraint and the elastic properties of the members. Based on this, the data is stored and member section properties are computed. The overall joint stiffness matrix is obtained based on the above frame data by summation of individual stiffness matrices considering all possible displacements. The load vector is then generated
based on the loading data and the unknown displacements are obtained by inverting the overall joint stiffness matrix and multiplying with the load vector. Knowing the free joint displacements REPORT ON PLANT VISIT DEPARTMENTS IN THE PLANT PRODUCTION, PLANNING & CONTROL (PPC) SHEARING BUILT UP FINISHING COLD FORM SHIPPING QUALITY CONTROL MAINTENANCE (ELECTRICAL) MAINTENANCE (MECHANICAL) PRODUCTION, PLANNING & CONTROL The PPC department in our plant is headed over by Mr. C.M.PANDE. The PPC department can be called to be the controller of all the other departments of our plant because it keeps a check on at what point of time what kind of work and how much work according to the manpower available is to be given to a particular department. They also plan the releases as to how much tonnage is to be released on any given data. They also keep a proper record on daily, weekly, monthly basis that how much work is being done by which department and is it fulfilling the criteria or not so as to ensure proper meeting up of the targets assigned. We also got to know about the manufacturing processes that how they take place in a sequent manner in our plant. They also made us aware of the system that how a BOQ and drawings travels from the head office to the plant and then the work is actually distributed among the departments in the plant. The PPC department is using nesting software to prepare proper part marks for eg. We get HR plates in a standard width of 1500 mm so nesting software tells us that what sized plates should be cut from that so as to minimize the scrap, this job is also done by the PPC and is known as part marking. The entire job in the plant is done according to these part marks only. Also the job of maintaining the inventory of raw materials is done by the PPC department i.e. it has to keep a check on the quantity of raw materials available and has to ensure that sufficient quantity of material is always available. Also it has to take care of the transport availability for dispatching the materials. PPC department works in co ordination with the every department like with accounts department.
This informational post has been submitted to us by Er Gursharan Singh and then modified by Er Kanwarjot Singh. To see the presentation of the same click here.
Presentation On Pre Engineered Steel Buildings Steel Build Expo 2012 Load And Resistance Factor Design For Shear In Buildings What are the IS Codes used for Structural Engineering And Structural Sections? What are the IS Codes used Functional Requirements In Buildings? A Comparative Study of Retrofitting Of R.C. Building Using Steel Bracing And Infill Walls Analysis and Design Of 2-D Tubular Frame Using USFOS Modeling What are the IS codes used for Construction Management?
Comments
datta nanasaheb dighe November 21, 2008 at 3:32 pm is it possible ao design pre engineered buildings by using indian standered codes Reply Link Quote
o
Yesha Soni December 17, 2010 at 2:14 am YEAH OFCOURSE.. Reply Link Quote
Kishan Shinde December 3, 2008 at 8:16 am Can I get PEB alignment inspection procedure & IS standards for inspection PEB erection & Alingnment Reply Link Quote
MANISH PRATAP SINGH December 9, 2008 at 10:08 am Can I get PEB alignment inspection procedure & IS standards for inspection PEB erection & Alingnment Reply Link Quote
We want to get Amercian Codes for Designing of PEB Reply Link Quote
o
Er. Rakesh Sharma July 17, 2010 at 6:22 am READ MBMA-96, 2007 Reply Link Quote
GETACHEW OKBAY January 24, 2009 at 6:47 am our company would like to purchase a soft ware that could do design for preengineered building structural analysis, shop drawing, erection drawing, BOQ, Anchor bolt plan etc automatic generation by computer, so would you please give us a contact detail so that we will detail our communication. with retgards# Getachew Okbay Reply Link Quote
Badrul Islam February 4, 2009 at 9:03 am Can I get quality improvement procedure and Process improvement in PEB Section With Regards Badrul Islam Reply Link Quote
Prem Shenoy February 9, 2009 at 12:18 am While the Analysis of any Structure would be universal, designs need to be done as per the local/ regional codes.Other wise why different countries have different codes of Practice? For example, If a PEB is built in India, The load calculations need to be as per the latest IS 875, the designs need to be as per IS800 for main frame members, as per IS 801 for thin rolled secondary members (Z and C purlins and Girts). If a country does not have a code, the building may follow the UBC, or the code of a country near by IF suitable. To make the superstructure most economical and very competitive, most of the PEB vendors select the codes as per THEIR requirement. For example, for a structure built in India, they might calculate the loads as per IS 875, but do the design as per AISC or MBMA and use welds as per AWS. If they feel that the Steel Section is lighter as per one code, they will adopt THAT clause of the code and select an equivalent clause of another code of another country. Some PEB vendors select some clauses of Previous versions of the Code and other clauses of the Latest Versions ! This style is not the same every time. PEB Design teams are on constant research in the Selection of Codal provisions of Variuos countries and are on trials with different clauses.
This way of varied design is not legally valid. If the loads and Codes are not specified by the buyer, It is binding on the PEB supplier to use the Local/ Regional Codes of practice. The evolution of a Code of Practice is based on the Weather & other climatic conditions, Material, Local Practices, Skill levels at manufacturing,Transporting, Assembling,erecting, finishing and maintaining. Hence it is rediculus to use Indian Steel plate of any yield stress, Cut and manufactured in India, Loaded & transported in Indian Style, Unloaded and stacked in Indian Style, Assembled & erected by Indian (skilled) Labour, Finished by Indian Painters using Indian paints, Maintained by Indian Client in an Indian Town or village BUT DESIGNED USING AMERICAN CODE ! Most of the clients, Arcitects and Engineers in India feel that American Codes are Better than Indian! Clients,Architects and Engineers in India, Beware! The Pre Engineered Buildings are not a New Concept. But the Jumping-Code-Practice is the NEW Concept and STYLE. If you are not Sure of the Codes, DO NOT SIGN a Purchase order just copying the Specifications given by the PEB Vendor. Just mention somewhere that the Latest Revisions of Indian Standard Codes should be followed. Luckily, India has all the codes available for the design of all the Parts of a PEB structure. Premanand Shenoy. M.Tech,MIE,FIAStructE Structural Consultant and Managing Partner Roy and Shenoy, India. Reply Link Quote
ravee March 6, 2009 at 8:22 am hi all! i have received the PEBs reaction & moments there are 1. what are the load combinations to be considered 2. the vendor has given the Dead, collateral, Live, Wind_L1 seismic. like this 16 loads which are the ones should i consider 3. can i get any example of the design of foundation system thanks in advance raveeleo Reply Link Quote
varal pandu June 21, 2009 at 2:36 pm could you please guide in my job hunting in pre-engineering metal building jobs in overseas as i am a detailing engineer with around 4 years of exp. presently associated with zamil steel,pune looking for future growth in same field Reply Link Quote
Good impressive web site . We are a Turnkey service provider for Pre engineered and Pre fabricated steel building . We would be interested to undertake projects of this kind . Reply Link Quote
SHABEENA BEGUM August 9, 2009 at 12:00 pm kindly give me the detailed design of a pre engineered building for a shed of 32m span and80m length Reply Link Quote
Roger - PEMB Dealer August 20, 2009 at 4:25 am We would be pleased to provide PEMB sales support for any project in any country. We can ship worldwide our building systems. If you can list required local codes we can meet or exceed any code. We have all US codes on file currently. Reply Link Quote
K.Rajaganapathi October 6, 2009 at 6:25 am Dear Sir, I will learn pre engineered building design Where is avilable this coruse Please mail adreess Reply Link Quote
SURESHA.K October 25, 2009 at 3:53 am DEAR SIR, I WANT KNOW ABOUT MEASUREMENT OF AREA IN PEB IS FROM CENTRE TO CENTRE LINE OF BUILDING OR IT IS FROM STEEL LINE TO STEEL LINE? ALSO I WANT TO KNOW THAT WHILE FIXING RATE TO THE ERECTOR WHICH AREA WILL CONSIDER FOR PAYMENT. KINDLY DO THE NEED FULL. THANKS Reply Link Quote
hi me anshuman .if possible pls guide me the required frame size in 30 mt span frame,x30 mt width.wht size of purlin req n how much distance-thanks n regards.anshuman Reply Link Quote
bapat & sons November 28, 2009 at 1:24 am we have an enquiry for a industrial shed measuring 90mts x 30 mts with height of 10 mts in Aurangabad ( maharashtra ). It will be our pleasure if we can work together& give offer for complete job. waiting for reply. thanking you with regards Reply Link Quote
sathishkumar.g December 25, 2009 at 9:15 pm which std we have to follow for PEB fabrications. Reply Link Quote
o
Er. Rakesh Sharma July 17, 2010 at 6:37 am 1ST U CAN LEARN ABOUT THE DESIGN OF STEEL STRUCTURES, AS PER IS AND AISE (STEEL DESIGN) THEN STARTING LEARN OF CODES FOR LOAD DESIGN IS 875 PART -I TO V. OR MAIL UR PROBLEMS IN MY E MAIL Reply Link Quote
Er. Rakesh Sharma July 17, 2010 at 6:38 am IN THE FABRICATION U CAN USE FOR WELD AWS CODE AND FOR STEEL AISE Reply Link Quote
hani January 1, 2010 at 10:28 pm planting concrete column on top of concrete slab ?for archtecture cange Reply Link Quote
we would like to purchase a soft ware that could do design for preengineered building structural analysis, shop drawing, erection drawing, BOQ, Anchor bolt plan etc automatic generation by computer, so would you please give us a contact detail. and also let me konw 30mts span,300mts lenght,and 16mts clear heightand soil test report is 13.near seashore Reply Link Quote
basha February 2, 2010 at 1:45 am i want to learn the design of pre engg buildings, can you let me know any standard institute where i can learn design (if possible in bangalore) Reply Link Quote
1234
Share Information
Free Civil Engineering Magazines and White Papers Civil Engineering Books Civil Engineering Journals Civil Engineering Softwares
Building Bridge Engineering Concrete Engineering Highway Engineering Hydraulics Marine Engineering Piles Engineering Prestress Engineering Soil Engineering Steelworks Surveying Timber Engineering
Knowledge Center
Construction Equipments Civil Engineering Disasters Civil Engineering Events Civil Engineering Facts Civil Engineering Information Civil Engineering Notes From Universities Civil Engineering Presentations Civil Engineering Quotes Civil Engineering Videos Civil Engineering Wonders Construction Terms Famous Civil Engineers Interviews Material Testing Measurement Units Mix Design Project Reports Research Papers Student Corner Help Others
Civil Engineering Universities DECO 2012 China International Construction Machinery Exhibition (CME2012) TTUS2012
CTEE2012 WSPE2012 PMMHF 2012 Steel Build Expo 2012 Wooden House and Wooden Structure Fair
Bridges Civil Engineers And Workers Construction Equipments Construction Site Roads And Highways Skyscrapers
Search
Author
Top Contributors
You can list yourself here by submitting civil engineering related topics to us.
Er. Harpal Aujla Er. Raj M. Khan Er. Vikrant
Vincent
T. H. CHU
Yahoo Group - Civil Engineering Portal
Subscribe to EngineeringCivil.com
Enter email addre
Powered by groups.yahoo.com
Recently Added
Concrete Mix Design Excel Sheet How to identify sand and clay from the results of Cone Penetration Testing?
When would engineers use Cone Penetration Testing instead of Standard Penetration Test? What is the difference between Dynamic Probing and Standard Penetration test? What is the difference between cut-and-cover method and cover-and-cut method in tunnel construction? How could ground freezing stop ingress of groundwater in excavation? Foamed Cellular Light Weight Concrete What are the differences in design between normal precast concrete pipes and pipes used for pipe jacking? In the design of pipe jacking, what particular areas on pipe joints should engineers take care of? How can lubricants reduce the jacking forces? In pipe jacking, can engineers roughly estimate the order of stress concentration in pipe joints? Can pipe jacking be implemented in a fast manner? Mitigation of Soil Erosion with Jute Geotextile Aided by Vegetation Cover Structural Design of a Bus Terminal Understanding Nominal and Design Mixes
Gemini Geek The Bigger Civil Engr. Software Database Global Engineering Impressive Buildings Civil Engineering Links