APPENDIX A Percentage carbonated area of formed concrete cube( in mm)

11mm

100mm For Bfc1 of 70days curring carbonation depth of 2mm,we have: (4 x 100 x 2 ) mm x 100%= 8% (100 x 100) For FC,after 7 days curring with carbonation depth of 1mm,we have : (4 x 100m x 1mm x 100% = 4% (100mm x 100mm) For B + FC,after 7 days curring with carbonation depth of 1mm,we have : (4 x 100m x 1mm x 100% = 4% (100mm x 100mm) APPENDIX B

Using the formular; 0.75 x C x C0 x MCo2/MCaO(kg/m2) Where C=amount of cement in the mix For laboratory Model C=800kg/m3 Ca0=64 (from table ) MCO2 = 44g/mol

Mcao=56g/molhence we have:0.75 x 800 x 64 x 44/56=30.182.4Kg/m3 1m3 of cabon=5m2 Area exposed=5m2 Depth of carbonation=1.0 x 10m-3m Vol= 5m2 x 1.0 x 10-3m3 Therefore 5.0 x 10-3 x 30 x 182.4 kg/m3 =150.912kg 150Kg CO2/m3 of cubes produced and cured in a sheltered environment in the laboratory. For every 1ton of cement produced 850Kg of CO2 is emmited.So if 40% 0f CO2 2. Factory CS model Block size = 100 x 200 x 450mm 1m3 of concrete = 111pieces If carbonation rate is taken in all the 6 surfaces of the block,we have 0.45 x 0.1 x 2 = 0.09m2 0.45x 0.2 x 2 =0.18m2 0.1 x 0.2 x 2 = 0.04m2 0.31m2 Therefore 111pieces of block (which is 1m3),we have; 111 x 0.31m2 = 34.4m2 Hence, volume of block with regards carbonation depth is; 34.4 x1.0 x 10-3 = 0.0344m3 Amount of CO2 sequester = 0.75 x C x CaO x Mco2/Mcao kg/m3 C=350kg/m3

CaO= 64 MCO2 = 44g/mol McaO =56/mol Therefore Amount of CO2 so quester = 0.75 x 350 x 64 x 0.785=13204.8kg/m3 CO2 = 13204.8 x 0.0344m3=454kg of CO2amonut content ratio Lab.CS module Commercial CS mole =350 = 1: 2 :3 800

Hence: Ratio of Sequester = 350 x 150kg of CO2 _ 66Kg of CO2 800