Sei sulla pagina 1di 1

1. Optical encoder installed along the hydraulic dynamometer 2. Calibration of the hydraulic dynamometer. 3.

Installtion of air tank for air intake of the engine. 4. RPM counter installed on the measuremnet panel. 5 Machining work in progress on pilot pump assembly

Potrebbero piacerti anche