Per shift

543 49 38000

Walk Auto Inspection Man

Operation Description
Work Element Loading / Unloading M/C Inspection Walk 2 4 6 8 10 12 14 16

MAN MACHINE CHART


18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64

Takt Time in sec. Customer Demand / month

66 68

70 72

74 76

78 80

82

84

86 88

90 92

94

20

2
Scope for Improvement

Cycle time - 28 secs

18

Scope for Improvement

Operator 1 : Manual time - 20 Secs Cycle time - 28 Secs Operator Idle time - 8 Secs Operator utilization - 71.42 % Cycle time - 22 secs Operator 2 : Manual Time - 16 Secs Cycle time - 22 Secs Operator Idle Time - 6 Secs Operator Utilization - 72.72 %

16

2
Scope for Improvement

Total Time (InSec)

24

68

Prepared by

Accepted by