Our Ref: CHEc/ HIA/02.03 / CP C/FH / o0OO27 Date: 14th December 2011
Airport
Project title: Hambantota lnternational Airoort, Mattala - Desisn of Aviation Fuel farm &
Fuel Hvdrant svstem and Construction of Fuel Hvdrant svstem
Subject
: Submission
Thanking you.
Yours fa ithfully,
Houliang (Jay) Jiang Project Manager, China Harbour Engineering Company Limited Hambantota lnternational Airport Development Project
Cc:
1. 2: 3. 4.
P&D), CPC
Mr. Erajh Alahakoon, Project Consultant Mr. Ariya Manjula, Project Engineer, CPC Mr. Nihal Jayathilake, PM, Access Engineering Ltd
METHOD STATEMENT
Material; . Master flow 810 grout Non shrink natural aggregate cementaneous grout
XYPex concentrate
Xypex has an affinity with water, the crystalline formation migrates tl" roughout the pores and capillary tracts of concrete even against strong hydrostatic pressur.
METHOD OF CONSTRUCTION
1. 2. 3. 4.
Form a groove of 20x20mm against the wall along the slab construction joint's outer edge (this can be carried out while the wall concreting is being done, by fixing a 20x20mm hardwood strip to the wall formwork). Once the curing period is 6ver, the groove must be cleaned thoroughly. Apply Xypex concentrate to the groove and fill with Master Flow 810 cement paste. (technical details of these chemicals are attached Finally, the Xypex concentrate can be applied to the wall and the slab top as per the sketch (app.
Up to 300mm height)
Zypex Concentrate
application J300mml
Construction Joint