Project: Site oftice Hambantota Intemational Airport, Mattala, Hambantota.

China Harbour Engineering Company Ltd.

Hambantota International Airport Development Project

Tel: 0094 47 5679593


Fax: 0094 47 3623806

Our Ref: CHEc/ HIA/02.03 / CP C/FH / o0OO27 Date: 14th December 2011

Mr. Dhammika Mallikarachchi


Deputy Operation Manager

Aviation Refueling Terminal


Banda ranayake lntern ationa I

Airport

Colombo, Katu naya ke


Dear Sir,

Project title: Hambantota lnternational Airoort, Mattala - Desisn of Aviation Fuel farm &
Fuel Hvdrant svstem and Construction of Fuel Hvdrant svstem

within the Apron area

Subject

: Submission

of Method Statement for Water Proofins of Construction Joints

The method statement for the water proofing

ofthe construction joints ofthe valve pits for the

captioned project for your review and approval please.

Thanking you.
Yours fa ithfully,

Houliang (Jay) Jiang Project Manager, China Harbour Engineering Company Limited Hambantota lnternational Airport Development Project

Cc:

1. 2: 3. 4.

Mr. Ranjith wickramasinghe, (DGM

P&D), CPC

Mr. Erajh Alahakoon, Project Consultant Mr. Ariya Manjula, Project Engineer, CPC Mr. Nihal Jayathilake, PM, Access Engineering Ltd

WATERPROOFING OF CONSTRUCTION JOINT

METHOD STATEMENT

Material; . Master flow 810 grout Non shrink natural aggregate cementaneous grout

XYPex concentrate

Xypex has an affinity with water, the crystalline formation migrates tl" roughout the pores and capillary tracts of concrete even against strong hydrostatic pressur.

METHOD OF CONSTRUCTION

1. 2. 3. 4.

Form a groove of 20x20mm against the wall along the slab construction joint's outer edge (this can be carried out while the wall concreting is being done, by fixing a 20x20mm hardwood strip to the wall formwork). Once the curing period is 6ver, the groove must be cleaned thoroughly. Apply Xypex concentrate to the groove and fill with Master Flow 810 cement paste. (technical details of these chemicals are attached Finally, the Xypex concentrate can be applied to the wall and the slab top as per the sketch (app.
Up to 300mm height)

Zypex Concentrate

application J300mml

20x20 Groove filled with

Master Flow 810 Grout

Construction Joint