ENGLISH TRANSLATION
JOHN A. BITZER ---- TED A. WOERNER
ARMY BALLISTIC MISSILE AGENCY
Redstone Arsenal, Alabama
1987.
ISBN 0-9696169-5-xTABLE OF CONTENTS
Page Page
Everbody Listen. 2 Preparations Prior to Launching. 62
You're a Member of the Long Range Rocket Crew. 4 Frequency doubler and Combustion Cutoft...... 65
Faster than Sound 5 The J-Device n
50 Word Technique from A-4 6 Guide Beam instalation, 18
Inthe Eiring Position 8 Guide Beam Controling Appatatus. 80
‘The Measuring Tio99, 14 The ein vis 83
Preparing a Position, 15 The Venictes. 84
rom the Garr a Installation of the Cable, 85
Driving Butwith Sense. 2 ‘Tho Power Supply Trailer a7
Erection 24 Inside the Launch Control Car. a8
Returning Faulty Equipment 3 The Nose Piece of the Fuse. s02
‘The Power Unit Man. 38 The Fue! Duma, 103
‘The Connection. 7 The Fuel 108
Power Unit Test. “a ‘The Fueling Operation. 107
Fueling, 48 Inthe Remote Control Position 121
Ignition System 53 Combustion cutoff Ground Instalation 422
“The Blecisician Crave 55 The Transmitter Truck 125
The Current 58 The Cut-off Evaluation Truck. 138
The Controls. 50 ‘Tho Guide Beam Ground Installation, 146
The Pilots of the A-4 60 ‘The Change in Frequency. 48