PRE ENGINEERED STEEL BUILDINGS

T. Khaja Rasool V. Lila Srinivas Reddy Mohammed Moiz S. Venkatesh


Page 1

Introduction
Pre-Engineered Buildings can be adapted to suit a

wide variety of structural applications.


All the components are produced in a factory on basis of structural and aesthetic requirements. These components are made in modular (or) completely Knocked down condition.

Page 2

Introduction
Manufactured materials are transported and

assembled in the customer site. Manufacturing and Production processes like cutting

and welding is not done at the customer site.


An efficiently designed Pre-Engineered Building can be lighter that the conventional steel buildings by up to 30%.
Page 3

Technical Parameters of PEB


Breadth, width or span of the building. Length of the building. Roof slope. Design Loads. Bay spacing. Type of Frame. Sub Systems.

Page 4

Main Components of PEB


Anchor bolts: These are embedded
into the foundation.

Page 5

Main Components of PEB


Primary components: Primary components include Columns and Rafters Secondary Components: Secondary components include Purlins, Grits and Eaves

Page 6

Page 7

Main Components of PEB

Sheeting or Cladding: Corrugated or Galvanized sheets are used as sheeting

Page 8

Main Components of PEB


Accessories: Accessories include Sky lights, Wall lights and Turbo Ventilators.

Page 9

Advantages of PEB
Optimised design of steel reducing weight Architectural Versatility Light weight Quick Project completion Less cumbersome at site Good Seismic resistance Easy future expansion

Page 10

Advantages of PEB
Architectural Versatility Dismantellable and reusable Voluminous space (upto 30 m span) Weather proof Architectural versatility Water tight roof and wall coverings

Page 11

Applications
Industrial Buildings Ware houses Air Craft Hangers Commercial complexes Offices School Buildings Offices Indoor stadiums

Page 12

Applications
Outdoor stadiums Gas Stations Metro stations and Bus terminals Parking lots Stadiums Railway platforms Cold storages

Page 13

Industrial building

Indoor stadium

Parking lots

Railway Station

Page 14

Air Craft Hangers

Metro Station

Wear House

High Rise Buildings

Page 15

Self weight 30% lesser Primary member is Tapered section Secondary members are light weight rolled framed Z and C section

Self weight more heavy Primary member is Hot rolled section Secondary members are I or C section which are heavy in weight.

Page 16

Delivery average 6 to 8 weeks Foundation-simple design, easy to construct & light wt. Erection cost and timeaccurately known

Delivery- average 20 to 26 weeks Foundation- expensive, heavy foundation required. Erection cost and time20% more than PEB

Page 17

Market Potential
PEB is relatively a new concept in India and were
introduced to markets lately in 1990s. The market potential of PEB in India is 12 lakh metric tonne and growing at a compound rate of 25 to 30%.

Page 18

Conclusion
PEB concept has been very successful and well established in North America, Australia and is presently expanding in U.K and European countries. PEB buildings provide good insulation effect and would be highly suitable for a tropical country like India. The pre-engineered building calls for very fast construction of buildings and with good aesthetic looks and quality construction. Pre-engineered Buildings can be used extensively for construction of industrial and residential buildings.