Stage in the authorization and execution of civil engineering: 1.

Obtaining the Certificate of Urbanism Planning certificate is obtained from the municipality, upon request form and cadastralplans endorsed by the county the land; 2. Development project in accordance with customer requirements and conditions imposed by the Urbanism Certificate; 3. Obtaining building permits required by the Urbanism Certificate on the project in UniqueAgreement Committee 4. Approval for Construction (AC) from City Hall, on the Certificate of Urbanism, the designand building permits; 5. Announcing the start of work at City Hall and the State Construction Inspection; 6. Start the works, subject to authorization and the project to the issuance thereof. Anychanges to the plans approved by the mayor can make the provisions drawn up by the designer of the site and issue a new construction permit for modification of the design project; 7. Preparation of construction technical book is during the execution of works and includesthe construction documents and documentation, including any provisions of contract; 8. Construction works and receive their closing declaration of the City Hall and the State Construction Inspection.

Steps to building a Skyscraper:


1. 2. A clear piece of land with stable ground and a good location is found. A hole is dug to bedrock level to support the building; this could be up to 200-plus feet deep. The footings (which are like big pads that spread out the weight) are placed at the bottom of the hole. The footings must be placed on stable ground, which is often bedrock. 4. 5. 6. 7. Concrete is poured over the footings. The vertical support beams are constructed and placed using large cranes. These are used to support the vertical load. The horizontal steel girders are then placed between the vertical beams. These are used to bind the building together. The outside walls, which act like curtains, are then placed and the building is finished off.

3.

Potrebbero piacerti anche