Sei sulla pagina 1di 30

Design Intent

SHoP The Porter House. .

Herzog&deMeuron. ElbPhilarmonie.

SHoP The Green Street Lofts .

Columbia building intelligenCe ProjeCt integrated design studio - sPring 2011

an2400sTUCTUREmEmBERUDF

anh minh ngo

Phase two: element design 11 marCh 2011

Design Intent

AvailFAR

[incl BonusFAR]

Existing Building Structure

Sell Development Rights [TDR]

Scenario 1

Scenario 2

Scenario 3

Scenario 4

UnAvailFAR

Unused FAR

Structure Type A added with AvailFAR left

Structure Type B added with AvailFAR left

Structure Type A added with no AvailFAR left

Existing structure reinforced

Columbia building intelligenCe ProjeCt integrated design studio - sPring 2011

an2400sTUCTUREmEmBERUDF

anh minh ngo

Phase two: element design 11 marCh 2011

330 Hudson Street Case Study

Masonry Load-bearing wall

Concrete Columns

Concrete Core

Concrete Slabs

Columbia building intelligenCe ProjeCt integrated design studio - sPring 2011

an2400sTUCTUREmEmBERUDF

anh minh ngo

Phase two: element design 11 marCh 2011

330 Hudson Street Case Study


Existing structure reinfocement

Live Load based on Occupancy Types

Columbia building intelligenCe ProjeCt integrated design studio - sPring 2011

an2400sTUCTUREmEmBERUDF

anh minh ngo

Phase two: element design 11 marCh 2011

330 Hudson Street Case Study

Columbia building intelligenCe ProjeCt integrated design studio - sPring 2011

an2400sTUCTUREmEmBERUDF

anh minh ngo

Phase two: element design 11 marCh 2011

Design Intent
EXISTING BUILDING
Available FAR
Bonus FAR?

STRUCTURAL CONDITIONS (based on programmatic requirements)


Square Footage left

ENVIRONMENTAL INTEGRATION
Shading

Residential Commercial

Intended Program Use


Sport Facilities Theater / Auditorium

}
DL + LL LL / sqf / person

Deviation from the existing structural grid

Connections to existing structure

Cantilever Long spans Voids / Atriums

Climatic Envelope MEP Integration Water treatment s-m Wind Channelling

Existing Structural Capacity


Original Construction Technology

Intended Occupancy

Leftover Capacity (psf)


not enough?

Scenario 1_Top Addition

Scenario 2_Structure Reinforcement

Scenario 3_Combination

Structural Reinforcement

Scenario 4_Tensile / Cable

Scenario 5_Tube

Columbia building intelligenCe ProjeCt integrated design studio - sPring 2011

an2400sTUCTUREmEmBERUDF

anh minh ngo

Phase two: element design 11 marCh 2011

Structure & Design Load

Lecture halls Theaters

40psf Stack Areas

50psf

40psf

Columbia building intelligenCe ProjeCt integrated design studio - sPring 2011

an2400sTUCTUREmEmBERUDF

anh minh ngo

Phase two: element design 11 marCh 2011

DESIGN MAP_PART1
EXISTING BUILDING

STRUCTURE ANALYSIS + SURPLUS LOAD-BEARING CAPACITY CALCULATION


heavy timber frame 85 pcf load-bearing masonry 130 pcf steel skeletal frame 490 psf reinforced concrete 200 pcf

OriginalDL

NAMING CONVENTION ACTION GEOMETRY INPUT GEOMETRY OUTPUT MEASUREMENT INPUT MEASUREMENT OUTPUT RULE - BASED OUPUT

CONSTRUCTION TYPE

ORIGINAL DEAD LOAD DESIGN OriginalDL

ORIGINAL TOTAL DESIGN LOAD


Check NYC Building Information System for Certificate of Occupancy

OriginalTotalDesignLoad = OriginalDL + OriginalLL ORIGINAL LIVE LOAD DESIGN OriginalLL

+ 25%
ReinforcementFactor = 1.25

REINFORCED TOTAL DESIGN LOAD ReinforcedTotalDesignLoad = OriginalTotalDesignLoad x ReinforcementFactor

ORIGINAL OCCUPANCY

SURPLUS DESIGN LOAD SurplusDesignLoad


Check NYC Building Code for Occupancy Live Loads
http://www.nyc.gov/html/dob/downloads/bldgs_code/bcrs9.pdf

RULE # 1

FALSE

END

Check formula for Reduced Live Load from the Excel table

= OriginalTotalDesignLoad x ReinforcementFactor

If the current / proposed occupancy within the existing building has a lower design live load [CurrentdLL] than the original occupancy design live load [OriginalLL] than vertical structural / programmatic addition is allowed.

CURRENT / PROPOSED OCCUPANCY WITHIN THE EXISTING BUILDING

CURRENT LIVE LOAD DESIGN CurrentLL

CURRENT REDUCED LIVE LOAD CurrentReducedLL

CURRENT TOTAL DESIGN LOAD CurrentTotalDesignLoad

NEW ROOF-TOP ADDITION

STRUCTURE ANALYSIS

TRUE

STEEL MEMBER CONSTRUCTION

Check NYC Building Code for Occupancy Live Loads


http://www.nyc.gov/html/dob/downloads/bldgs_code/bcrs9.pdf

Check formula for Reduced Live Load from the Excel table

PROPOSED OCCUPANCY WITHIN THE ROOF-TOP ADDITION

PROPOSED LIVE LOAD DESIGN ProposedLL

PROPOSED REDUCED LIVE LOAD ProposedReducedLL

Columbia building intelligenCe ProjeCt integrated design studio - sPring 2011

an2400sTUCTUREmEmBERUDF

anh minh ngo

Phase two: element design 11 marCh 2011

DESIGN MAP_PART1
ColumnGridLength GEOMETRY INPUTS

x
ColumnGridWidth

ExistingColumnCenterPt2

ExistingColumnCenterPt3

ExistingColumnCenterPt4

PARAMETER INPUTS

1 branch 2 branch 3 branch 4 branch

BranchCount

MemberNLength MemberNParameterChoice MemberNHeight

Length MemberLength = MemberHeight / Cos (MemberVerticalInclineAngle) Height

MemberNVerticalInclineAngle

MemberNRotationAngle

OriginalDL

NAMING CONVENTION ACTION GEOMETRY INPUT GEOMETRY OUTPUT PARAMETER INPUT PARAMETER OUTPUT RULE - BASED OUPUT

ExistingColumnCenterPt1

Columbia building intelligenCe ProjeCt integrated design studio - sPring 2011

an2400sTUCTUREmEmBERUDF

anh minh ngo

Phase two: element design 11 marCh 2011

CATIA

Columbia building intelligenCe ProjeCt integrated design studio - sPring 2011

an2400sTUCTUREmEmBERUDF

anh minh ngo

Phase two: element design 11 marCh 2011

CATIA

Columbia building intelligenCe ProjeCt integrated design studio - sPring 2011

an2400sTUCTUREmEmBERUDF

anh minh ngo

Phase two: element design 11 marCh 2011

CATIA

Columbia building intelligenCe ProjeCt integrated design studio - sPring 2011

an2400sTUCTUREmEmBERUDF

anh minh ngo

Phase two: element design 11 marCh 2011

CATIA

Columbia building intelligenCe ProjeCt integrated design studio - sPring 2011

an2400sTUCTUREmEmBERUDF

anh minh ngo

Phase two: element design 11 marCh 2011

CATIA

Columbia building intelligenCe ProjeCt integrated design studio - sPring 2011

an2400sTUCTUREmEmBERUDF

anh minh ngo

Phase two: element design 11 marCh 2011

CATIA

Columbia building intelligenCe ProjeCt integrated design studio - sPring 2011

an2400sTUCTUREmEmBERUDF

anh minh ngo

Phase two: element design 11 marCh 2011

CATIA

Columbia building intelligenCe ProjeCt integrated design studio - sPring 2011

an2400sTUCTUREmEmBERUDF

anh minh ngo

Phase two: element design 11 marCh 2011

CATIA

Columbia building intelligenCe ProjeCt integrated design studio - sPring 2011

an2400sTUCTUREmEmBERUDF

anh minh ngo

Phase two: element design 11 marCh 2011

CATIA

Columbia building intelligenCe ProjeCt integrated design studio - sPring 2011

an2400sTUCTUREmEmBERUDF

anh minh ngo

Phase two: element design 11 marCh 2011

CATIA

Columbia building intelligenCe ProjeCt integrated design studio - sPring 2011

an2400sTUCTUREmEmBERUDF

anh minh ngo

Phase two: element design 11 marCh 2011

CATIA

Columbia building intelligenCe ProjeCt integrated design studio - sPring 2011

an2400sTUCTUREmEmBERUDF

anh minh ngo

Phase two: element design 11 marCh 2011

CATIA

Columbia building intelligenCe ProjeCt integrated design studio - sPring 2011

an2400sTUCTUREmEmBERUDF

anh minh ngo

Phase two: element design 11 marCh 2011

CATIA

Columbia building intelligenCe ProjeCt integrated design studio - sPring 2011

an2400sTUCTUREmEmBERUDF

anh minh ngo

Phase two: element design 11 marCh 2011

CATIA

Columbia building intelligenCe ProjeCt integrated design studio - sPring 2011

an2400sTUCTUREmEmBERUDF

anh minh ngo

Phase two: element design 11 marCh 2011

CATIA

Columbia building intelligenCe ProjeCt integrated design studio - sPring 2011

an2400sTUCTUREmEmBERUDF

anh minh ngo

Phase two: element design 11 marCh 2011

CATIA

Columbia building intelligenCe ProjeCt integrated design studio - sPring 2011

an2400sTUCTUREmEmBERUDF

anh minh ngo

Phase two: element design 11 marCh 2011

CATIA

Columbia building intelligenCe ProjeCt integrated design studio - sPring 2011

an2400sTUCTUREmEmBERUDF

anh minh ngo

Phase two: element design 11 marCh 2011

CATIA

Columbia building intelligenCe ProjeCt integrated design studio - sPring 2011

an2400sTUCTUREmEmBERUDF

anh minh ngo

Phase two: element design 11 marCh 2011

CATIA

Columbia building intelligenCe ProjeCt integrated design studio - sPring 2011

an2400sTUCTUREmEmBERUDF

anh minh ngo

Phase two: element design 11 marCh 2011

STRUCTURE EXAMPLES

Columbia building intelligenCe ProjeCt integrated design studio - sPring 2011

an2400sTUCTUREmEmBERUDF

anh minh ngo

Phase two: element design 11 marCh 2011

STRUCTURE EXAMPLES

Columbia building intelligenCe ProjeCt integrated design studio - sPring 2011

an2400sTUCTUREmEmBERUDF

anh minh ngo

Phase two: element design 11 marCh 2011

Potrebbero piacerti anche