Pintura blanca

Pintura muros Fondo (m2)


Pintura muros Frente (m2)
Total m2
galones
30 m2 por galon
Pintura Naranja
0.738 Frente (m2) 1.5822
0.48 Posterior (m2) 2.4684
Laterales (m2) 1.9466
1.218
0.0406 Total m2 5.9972
Galones 0.2
30 1
1.218 0.0406
,/748
Pared fondo Pared frente pared lateral
Alto (m) Ancho (m) Profundo (m) Alto (m) Ancho (m) Profundo (m) Area (m2) Profundo (m) numero de muros
1.21 2.04 0.07 0.8 2.04 0.07 0.9733 0.07 3
Volumen pared Fondo (m3) 0.172788 Separador LADRLLO (mts)
Volumen Pared Frente (m3) 0.11424 Alto (m) Ancho (m) Profundo (m) ALTO LARGO PROFUNDO
Volumen paredes Laterales (m3) 0.204393 0.9825 0.8 0.07 0.07 0.1 0.22
Volumen Pared Separador (m3) 0.05502
Volumen Total (m3) 0.546441
Volumen Por Ladrillo (m3) 0.00154
Numero de Ladrillos 354.8318182
Concreto Suelo
Dimensiones suelo
Alto (m) Ancho (m) Profundo (m)
1.14 2.21 0.08
Volumen Suelo (m3) 0.201552
Concreto Columna
Columna Fondo Columna Frente
Area Lateral (m3) Profundidad (m) Cantidad Area Lateral (m3) Profundidad (m) Cantidad
0.1208 0.1 2 0.0798 0.1 2
Volumen Columnas Fondo (m3) 0.02416
Volumen Columnas Frente (m3) 0.01596
Volumen Total Concreto 0.000385594
Mortero Entre Ladrillos
Pared Fondo Pared Frente Pared Lateral
Area Lateral (m3) Profundidad (m) Cantidad Area Lateral (m3) Profundidad (m) Cantidad Area Lateral (m3) Profundidad (m) Cantidad
0.1428 0.01 12.1 0.1428 0.01 8 0.0679 0.01 12.1
Volumen Pared Fondo (m3) 0.0172788 Separador
Volumen Pared Frente (m3) 0.011424 Area Lateral (m3) Profundidad (m) Cantidad
Volumen Pared Lateral (m3) 0.0246477 0.056 0.01 9.825
Volumen Separador (m3) 0.005502
Volumen Total Mortero entre ladrillos 0.0588525
Friso Paredes (mortero)
Profundida Friso 0.01 * ncluye parte anterior y posterior del muro
APU ALAMACENAMENTO DE MATERAL APROVECHABLE
Volumen Friso Pared Fondo (m3)* 0.049368
Volumen Friso Pared Frente (m3) 0.161137152
Volumen Friso Pared Lateral (m3) 0.029199
Volumen Friso Separador (m3) 0.01572
Total Friso Paredes (m3) 0.255424152
lTEM DESCRlPClN UNlDAD CANTlDAD VALOR PARClAL SUBTOTAL
1 Laorillos H10 Unioaoes 370 700 25v,000
2 Concreto 2500 PSl [m3 m3 0.2 2v0,000 58,562
3 Mortero [m3 m3 0.3 182,264 57,281
4 Lstructura Metalica Unioaoes 1 500,000 500,000
5 Pintura Blanca gal 0.1 44,857 4,486
6 Pintura Naranja gal 0.2 44,857 8,v71
7 Mano oe obra unioaoes 3 30,000 v0,000
8 Herramientas menores Clobal 1 300,000 300,000
v Bisagra Unioaoes 2 5,100 10,200
Sub total S 1,288,500
aomon [6% S 77,310
lmprevistos [4% S 51,540
Utilioao [4% S 51,540
1otal AlU S 180,3v0
lva S 8,246
Valor Acta [lva lncluioo S 1,477,137