aumcemmein] srr sseaenrrrane | A acs
GANDHINAGAR, CUJARATINDUA, (RAJKOT - JAMNAGAR SECTION) INFRA
Taceha INDOOR LIGHTING CALULATION VALDELK
Del eee |r eae Spoken
[contract TLE [BHARUCH JAMNAGAR PIPELINE PROJECT
lcontRACT No oasave
JOWNER/ COMPANY [GUJARAT STATE PETRONET LIMITED
PMc [TRACTEBEL ENGINEERS & CONSTRUCTORS PVT. LTD.
lcontRacTor IMAYTAS NAFTOGAS BUD JV
@ | ecumenrnuneer — [osnia0sz7sa58
INDOOR LIGHTING CALCULATION - SV3 STATION @ BERAJA PASAYA,
a> a \
i 7280807 | Re- Issued for Approval TSK" $8 58K,
o 260707 Issued for Approval PTR SRS SRS)
‘Approved
by PMC/
Rev Date Description Prepared | Reviewed | Approved | _GSPL
Date Document. No. Page
28.09.07 ‘GSPL203-75-3526 1 1 of 20PAGE No.2 of 20,
VALDEL ENGINEERS &
‘CONSTRUCTORS REVISION STATUS SHEET CONTRACT No: 9468
REV: 1 ‘DATE: 28.08.2007
DOCUMENT No. GSPL203-75-3526 IsIGN:
DOCUMENT TITLEINDOOR LIGHTING CALCULATION Isr. 7 oF
'8V3 station @ Beraje Pasaya
"ADDL ‘REV. | PAGENo, | REV] ADOL. | REV. [PAGENa] REV,
PAGE No. PAGE No,
To
702,
7103,
104,
7108,
7106,
407
109)
at
7
73
74
75
7
7
7
73
0
m
2
3
ea
m
28
42,
143,
a,
5,
"48.
"a8,
8,
00) 750.
TF REVISION REQUIRES ADDITIONAL PAGES TO BE INSERTED IN BETWEEN THE DOCUMENT, THE NUMBER OF THE
PAGE AT INSERTION SHALL BE NUMBERED WITH DECIMAL (e.g. INSERTION BETWEEN PAGE 10 AND 11 SHALL
BE NUMBERED A$ 10.1, 102...)
is|s|s|s\2/2|2/8|2/2MAYTAS NAFTOGAS BUD JV GSPL203-75-3526
Rev
PURPOSE
‘The objective ofthis calculation is to determine the No. of fixtures and illumination level attained for the
following rooms in SV3 Station @ Beraja Pasaya by using the BAJAJ software package:
1. Control room
2, Electrical room
3. Store room
REFERENCE DOCUMENTS:
1. Electrical Design Basis - 61109/16/11/E/61/0006
2. PTS-Electrical Package - 61109/16/21/E/21/0451
3. Control Building & Guard Room -Indoor Lighting layout-SV3 Station @ Beraja Pasaya - GSPL203-75-1-3051
4. Control Building -Architectural Plan, Elevation & Section - SV3 Station @ Beraja Pasaya - GSPL203-73-1-1047
5. GTS - Lighting Fixtures and Accessories E/02/2504
INPUTS JASSUMPTIONS:
Lux levels considered are as per Design basis
The following Reflectance factors are considered for calculation for the building rooms:
|) for ceiling - 0.7
i for walls - 0.5,
i) for floors - 0.2
‘The maintenance factor is considered as 0.7 as per design basis.
4.0 INDOOR FIXTURES
4.1 Control room lighting fotures shall be 3 X 36W CFL recessed mounting type fire.
4.2 Electrical room lighting fixtures shall be 2 X 36W FL industrial fixture with reflector
4.3 Store room lighting fixtures shall be 2 X 11W CFL ceiling mounting type fhture,
ONTRACT NO ? 8460VE
VALDEL ENGINEERS —_| PROJECT: BHARUCH JAMNAGAR PIPELINE PROJECT
& CONSTRUCTORS TLE : INDOOR LIGHTING CALCULATION
'SV3_ STATION @ BERAJA PASAYA
The Happiness Project: Or, Why I Spent a Year Trying to Sing in the Morning, Clean My Closets, Fight Right, Read Aristotle, and Generally Have More Fun