Sei sulla pagina 1di 3

STANDARD FORM: DAILY REPORT

Project: FIRST SOLAR DONG NAM _Project No:_______________________________

Package No: WP 5700___________________Contractor: TES Co.,Ltd_____________________ Weather: __________________________________________________________________ Engineer-in-charge: Huynh Trung Thong Date (day): 04 / Nov/ 2011.

A.

MANAGEMENT AND SUPERVISORY STAFF DESIGNATION MEN DESIGNATION

MEN

DESIGNATION
SITE CLERK

MEN

PROJECT MANAGER CONSTRUCTION MANAGER SITE MANAGER CONTRACT MANAGER QUANTITY SURVEYOR HOUSE ARCHITECT QC MANAGER PROJECT COORDINATOR M&E COORDINATOR

1 x x x x x 1 x x

ENGINEER M&E ENGINEER SUPERVISOR / FOREMAN LEADER CAD OPERATOR LAND SURVEYOR DRAUGHTMAN ADMIN / QS ASSISTANT SAFETY SUPERVISOR

1 x 5 x x x x x 1
MEN

B.

BUILDING WORKFORCE DESIGNATION MEN DESIGNATION

DESIGNATION
RAISED FLOOR WORKER ROLLER SHUTTER WORKER METAL WORKS WORKER CLADDING WORKER CLEANER DRAIN WORKERS TURFING WORKERS

MEN

REBAR WORKER CARPENTER CONCRETOR CHAINMEN WELDER PILING GANG GENERAL WORKER BRICK LAYER PLASTERER/SKIM COATER SCREEDER TILER

x x x x x x x x x x x

PAINTER STEEL WORKER ROOFER PC INSTALLER DOOR INSTALLER WINDOW / GLAZIER MASONARY WORKER CEILING WORKER DRYWALL WORKER WATERPROOFER FLOOR COATER

x x x x x x x x x x x
MEN

x x x x x x x

C.

M & E WORK FORCE DESIGNATION MEN

DESIGNATION
FIRE PROTECTION TECH. LIFT TECHNICIAN BUILDING AUTOMATION TECH. COMPUTER TECH.

DESIGNATION
CCTV TECHNICIAN

MEN

ELECTRICIAN MECHANIC PLUMBER ACMV TECHNICIAN

x 24 x x

x x x

D.

MACHINERY & EQUIPMENT (OPERATOR) DESCRIPTION QTY. OPERATOR DESCRIPTION

QTY.

OPERATOR

PILING RIG BORING RIG CRANE LORRY CRANE CONCRETE PUMP EXCAVATOR ROLLER LORRY DUMPER

x x x x x x x x x
Page 1 of 3

AIR COMPRESSOR GENERATOR WELDING SET WATER PUMP BAR BENDING/CUTTING MACHINE BOOM/SCISSOR LIFT CONCRETE VIBRATOR

x x x x x x x x x

E. WORK DONE

S IT ED A IL Y R E P O R T

ACTIVITIES

LOCATION

WORK FORCE

REMARKS

Panels installation for wall of raw water tank.


-

Axis 8 13 Axis D-F

30

TOTAL
F.

30

ISSUES OF CONCERN (MEETINGS, VERBAL INSTRUCTIONS, REMARKS, INCIDENTS, ETC)

CONTRACTOR :

MWZ SUPERVISOR / ENGINEER :

Review and accepted by: Contractor

TES Co., Ltd

M+W Engineer/ Supervisor ----------------------------------------Signature / Date Name :-----------------------------Page 2 of 3

Signature / Date: 05 / Nov / 2011. Name : Huynh Trung Thong

DAILY WORKING PLAN


05 / Nov / 2011. Project : FIRST SOLAR DONG NAM Contractor: TES Co.,Ltd Package No: WP 5700 Description work
Panels installation for wall of raw water tank.
-

Location Axis 8 10 Axis F - N

Work Force 29

Remarks

Supervisor M+W Reviews: Contractor TES CO.,Ltd Signature/date: Huynh Trung Thong
Page 3 of 3

Potrebbero piacerti anche