Sei sulla pagina 1di 5

N

Status:

DO NOT SCALE - IF IN DOUBT ASK

FOR INFORMATION
Keyplan:
N

CHELSEA EMBANKMENT

K L E A N W H Y C E

THIS DRAWING

MAPPING REPRODUCED BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND DATABASE RIGHT 2011. ALL RIGHTS RESERVED ORDNANCE SURVEY LICENCE NUMBER 100019345

9 0 .0 CH. 7 0 0

CH. 8 0 0 9 0 .0

THIS IS A WORKING DRAFT PLAN WHICH HAS BEEN PRODUCED

CH. 9 0 0 9 0 .0

CH. 0 0 . 0 1 0 00

FOR THE PURPOSE OF PHASE TWO CONSULTATION ON THE

CH. 0 0 . 0 1 1 00

CH. 0 0 . 0 1 2 00

M ATCHL NE: I DRG . No . 1 0 DA- N- 0 0 - 0 4 6 1 GE 0 0 0 0 0 9

.0 6 00 9 0 CH.

THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWINGS IS ILLUSTRATIVE OF WHAT WILL BE REQUIRED FOR THE PURPOSE OF CONSTRUCTING AND OPERATING THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWING MAY CHANGE AS A RESULT OF THAMES WATERS CONSIDERATION OF THE RESPONSES RECEIVED TO PHASE TWO CONSULTATION AND ANY FURTHER DESIGN DEVELOPMENT THAT IS CARRIED OUT.

COORDINATES ARE TO ORDNANCE SURVEY DATUM OSGB36. ALL LEVELS ARE IN METRES AND RELATE TO THE TUNNEL DATUM WHICH IS 100 METRES BELOW ORDNANCE DATUM NEWLYN.

KEY:
DRAFT HORIZONTAL TUNNEL LIMIT OF DEVIATION (LOD) - (NOTE 1) DRAFT LIMIT OF LAND TO BE ACQUIRED OR USED (LLAU) - (NOTE 2)

120.0m NOTES: BATTERSEA BRIDGE 110.0m MEAN HIGH WATER SPRINGS


2. DRAFT LLAU SHOWS LAND TO BE ACQUIRED AND USED AT CONSTRUCTION SITES, BUT NOT THE SUBSOIL ALONG

100.0m

90.0m

. No G. 4 4 DR 0 9 : -0 N IE 00 HL 0 0 0 0 TC NMA G - E DA 1 1 0

ALBERT BRIDGE

BATTERSEA BRIDGE

PROPOSED SHAFT

PROPOSED TUNNEL

HORIZONTAL GEOMETRY KEY:


L= R = LENGTH RADIUS OF CURVATURE

PLAN
SCALE 1:1000

ALBERT BRIDGE

1. VERTICAL LIMIT OF DEVIATION HAS NOT YET BEEN DEFINED AND IS NOT SHOWN.

THE TUNNEL.

3. EXISTING BUILDINGS ARE NOT SHOWN ON THE PROFILE FOR CLARITY.

EL EVATI ON

BED OF RIVER 80.0m


2 0 m 0 m 10 m 0 100 m

70.0m

60.0m
1 0 5 0 5 0
Scale:

50.0m

40.0m M ATCHL NE I M ATCHL NE I

Thames Water Utilities

The Point, 7th Floor, 37 North Wharf Road, Paddington, London W2 1AF

20.0m

Project Name:

THAMES TUNNEL HORIZONTAL GEOMETRY


Purpose:

FOR PHASE 2 CONSULTATION


Location / Site Name:

VERTICAL GEOMETRY
5 .9 98 1 5 .4 98 1 5 .0 97 1 5 .5 96 1 5 .4 99 2 5 .5 97 2 5 .0 99 4 5 .1 97 4 5 .6 99 7 5 .1 99 7 5 .9 97 0 5 .7 97 7 5 .2 97 7 5 .0 96 0 5 .8 95 7 5 .2 99 9 5 .7 98 9 5 .5 98 3 5 .2 98 8 5 .0 98 3 5 .3 97 9 5 .8 96 9 5 .6 96 3 5 .3 96 8 5 .1 96 3 5 .6 98 6 5 .7 96 6 5 .5 99 5 5 .1 98 5 5 .6 97 5 5 .2 96 5

Length = 18195.812m Slope = 1:-789.000 5 .1 95 1 5 .6 95 2 5 .2 94 2 5 .7 93 2 5 .2 93 1 5 .3 92 2 5 .2 95 4 5 .8 93 4 5 .3 93 4 5 .3 95 7 5 .6 94 0 5 .1 94 0 5 .9 93 7 5 .7 92 0 5 .2 92 0 5 .4 95 9 5 .9 94 8 5 .7 94 3 5 .4 94 8 5 .5 93 9 5 .0 93 8 5 .8 92 3 5 .5 92 8 5 .0 92 7 5 .9 91 4 5 .8 91 2 5 .8 94 6 5 .4 93 6 5 .9 92 6 5 .6 91 9 5 .7 95 5 5 .3 94 5 5 .4 92 5 5 .5 91 6

LONDON 00000 - ROUTEWIDE


Drawing Title:

PROPOSED INVERT CHAINAGE

1 0 0 0 0

1 0 0 0 1

1 0 0 0 2

1 0 0 0 3

1 0 0 0 4

1 0 0 0 5

1 0 0 0 6

1 0 0 0 7

1 0 0 0 8

1 0 0 0 9

1 1 0 0 0

1 1 0 0 1

1 1 0 0 2

1 1 0 0 3

1 1 0 0 4

1 1 0 0 5

1 1 0 0 6

1 1 0 0 7

9 3 5 0

9 4 5 0

9 5 5 0

9 6 5 0

9 7 5 0

9 8 5 0

9 9 5 0

9 0 6 0

9 1 6 0

9 2 6 0

9 3 6 0

9 4 6 0

9 5 6 0

9 6 6 0

9 7 6 0

9 8 6 0

9 9 6 0

9 0 7 0

9 1 7 0

9 2 7 0

9 3 7 0

9 4 7 0

9 5 7 0

9 6 7 0

9 7 7 0

9 8 7 0

9 9 7 0

9 0 8 0

9 1 8 0

9 2 8 0

9 3 8 0

9 4 8 0

9 5 8 0

9 6 8 0

9 7 8 0

9 8 8 0

9 9 8 0

9 0 9 0

9 1 9 0

9 2 9 0

9 3 9 0

9 4 9 0

9 5 9 0

9 6 9 0

9 7 9 0

9 8 9 0

9 9 9 0

TUNNEL PLAN AND PROFILE MAIN TUNNEL SHEET 16 OF 40 BOOK OF PLANS


Drawing No.:

PROFILE

SCALE 1:1000 HORIZ : 1:500 VERTICAL

110-DA-GEN-00000-000495
c Thames Water Utilities Ltd 2008

1:2000@ A3 1:1000@ A1

1 0 0

30.0m

D K SR E U E T E T

DO NOT SCALE - IF IN DOUBT ASK

S N E D R GA T N ME K N A B M E

Status:

FOR INFORMATION
Keyplan:
N

C E S AE B N M H LE M A K E T N

C E S AE B N M H LE M A K E T N
THIS DRAWING

MAPPING REPRODUCED BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND DATABASE RIGHT 2011. ALL RIGHTS RESERVED ORDNANCE SURVEY LICENCE NUMBER 100019345

THIS IS A WORKING DRAFT PLAN WHICH HAS BEEN PRODUCED FOR THE PURPOSE OF PHASE TWO CONSULTATION ON THE

1 0 DA1 GEN- 0 0 - 0 4 5 0 0 00 0 9

M ATCHL NE: RG . I D No . 1 0 DA- EN- 0 0 1 G 0 0 00 0 9 -0 4 7

CH. 0 0 . 0 1 2 00

THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE

CH. 0 0 . 0 1 3 00

CH. 0 0 . 0 1 4 00

DRAWINGS IS ILLUSTRATIVE OF WHAT WILL BE REQUIRED FOR

CH. 0 0 . 0 1 5 00

CH. 0 0 . 0 1 6 00

THE PURPOSE OF CONSTRUCTING AND OPERATING THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWING MAY CHANGE AS A RESULT OF THAMES WATERS CONSIDERATION OF THE RESPONSES RECEIVED TO PHASE TWO CONSULTATION AND ANY FURTHER DESIGN DEVELOPMENT THAT IS CARRIED OUT.

CH. 0 0 . 0 1 7 00

CH. 0 0 . 0 1 8 00

COORDINATES ARE TO ORDNANCE SURVEY DATUM OSGB36. ALL LEVELS ARE IN METRES AND RELATE TO THE TUNNEL DATUM WHICH IS 100 METRES BELOW ORDNANCE DATUM NEWLYN.

M ATCHL NE: I DRG. No .

KEY:
DRAFT HORIZONTAL TUNNEL LIMIT OF DEVIATION (LOD) - (NOTE 1) DRAFT LIMIT OF LAND TO BE ACQUIRED OR USED (LLAU) - (NOTE 2)

PROPOSED SHAFT

PROPOSED TUNNEL

CHELSEA TO HACKNEY LINE - LIMITS OF LAND SUBJECT TO CONSULTATION

HORIZONTAL GEOMETRY KEY:


L= R = LENGTH RADIUS OF CURVATURE

PLAN
SCALE 1:1000

120.0m NOTES:
1. VERTICAL LIMIT OF DEVIATION HAS NOT YET BEEN DEFINED AND IS NOT SHOWN.

110.0m MEAN HIGH WATER SPRINGS 100.0m

2. DRAFT LLAU SHOWS LAND TO BE ACQUIRED AND USED AT CONSTRUCTION SITES, BUT NOT THE SUBSOIL ALONG THE TUNNEL.

3. EXISTING BUILDINGS ARE NOT SHOWN ON THE PROFILE FOR CLARITY.

90.0m BED OF RIVER 80.0m


2 0 m 0 m 10 m 0 100 m

EL EVATI ON

70.0m

60.0m
1 0 5 0 5 0
Scale:

50.0m

40.0m M ATCHL NE I M ATCHL NE I

Thames Water Utilities

The Point, 7th Floor, 37 North Wharf Road, Paddington, London W2 1AF

20.0m
L 1101.0m

Project Name:

THAMES TUNNEL HORIZONTAL GEOMETRY


Purpose:

FOR PHASE 2 CONSULTATION


Location / Site Name:

VERTICAL GEOMETRY
5 .3 91 1 5 .4 89 1 5 .0 88 1 5 .4 90 2 5 .9 89 2 5 .5 88 2 5 .4 91 4 5 .0 90 4 5 .1 88 4 5 .8 90 0 5 .3 90 0 5 .1 90 7 5 .9 88 0 5 .7 88 7 5 .2 88 7 5 .6 91 9 5 .1 91 8 5 .9 90 3 5 .6 90 8 5 .7 89 9 5 .5 89 3 5 .2 89 8 5 .0 89 3 5 .3 88 9 5 .8 87 9 5 .5 91 6 5 .0 91 6 5 .6 89 6 5 .5 90 5 5 .1 89 5 5 .6 88 5

Length = 18195.812m Slope = 1:-789.000 5 .5 87 1 5 .1 86 1 5 .6 85 1 5 .6 86 2 5 .2 86 4 5 .7 84 2 5 .0 87 0 5 .8 86 7 5 .3 86 7 5 .1 85 0 5 .9 84 7 5 .4 84 7 5 .3 84 4 5 .2 84 1 5 .6 87 3 5 .3 87 8 5 .1 87 3 5 .4 86 9 5 .9 85 9 5 .7 85 3 5 .4 85 8 5 .2 85 3 5 .5 84 9 5 .0 84 8 5 .8 83 3 5 .7 83 0 5 .7 87 6 5 .8 85 6 5 .2 87 5 5 .7 86 5 5 .3 85 5 5 .8 84 5 5 .9 83 6 5 .5 83 8

LONDON 00000 - ROUTEWIDE


Drawing Title:

PROPOSED INVERT CHAINAGE

1 1 0 0 6

1 1 0 0 7

1 1 0 0 8

1 1 0 0 9

1 2 0 0 0

1 2 0 0 1

1 2 0 0 2

1 2 0 0 3

1 2 0 0 4

1 2 0 0 5

1 2 0 0 6

1 2 0 0 7

1 2 0 0 8

1 2 0 0 9

1 3 0 0 0

1 3 0 0 1

1 3 0 0 2

1 3 0 0 3

1 3 0 0 4

1 3 0 0 5

1 3 0 0 6

1 3 0 0 7

1 3 0 0 8

1 3 0 0 9

1 4 0 0 0

1 4 0 0 1

1 4 0 0 2

1 4 0 0 3

1 4 0 0 4

1 4 0 0 5

1 4 0 0 6

1 4 0 0 7

1 4 0 0 8

1 4 0 0 9

1 5 0 0 0

1 5 0 0 1

1 5 0 0 2

1 5 0 0 3

1 5 0 0 4

1 5 0 0 5

1 5 0 0 6

1 5 0 0 7

1 5 0 0 8

1 5 0 0 9

1 6 0 0 0

1 6 0 0 1

1 6 0 0 2

1 6 0 0 3

1 6 0 0 4

1 6 0 0 5

1 6 0 0 6

1 6 0 0 7

1 6 0 0 8

1 6 0 0 9

1 7 0 0 0

1 7 0 0 1

1 7 0 0 2

1 7 0 0 3

1 7 0 0 4

1 7 0 0 5

1 7 0 0 6

1 7 0 0 7

1 7 0 0 8

1 7 0 0 9

1 8 0 0 0

TUNNEL PLAN AND PROFILE MAIN TUNNEL SHEET 17 OF 40 BOOK OF PLANS


Drawing No.:

PROFILE

SCALE 1:1000 HORIZ : 1:500 VERTICAL

110-DA-GEN-00000-000496
c Thames Water Utilities Ltd 2008

1:2000@ A3 1:1000@ A1

1 0 0

30.0m

N
Status:

DO NOT SCALE - IF IN DOUBT ASK

FOR INFORMATION
Keyplan:
N

T M N K E B N M A E E S A H L C E

THIS DRAWING

CHELSEA EMBANKMENT FORESHORE DROP SHAFT GROSVENOR BRIDGE RANELAGH CONNECTION TUNNEL CHELSEA BRIDGE

M ATCHL N I E: RG . D No . 1 0 DA- E 1 G N- 0 0 0 0 00 0 -0 4 8 9

MAPPING REPRODUCED BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND DATABASE RIGHT 2011. ALL RIGHTS RESERVED ORDNANCE SURVEY LICENCE NUMBER 100019345

THIS IS A WORKING DRAFT PLAN WHICH HAS BEEN PRODUCED FOR THE PURPOSE OF PHASE TWO CONSULTATION ON THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWINGS IS ILLUSTRATIVE OF WHAT WILL BE REQUIRED FOR THE PURPOSE OF CONSTRUCTING AND OPERATING THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWING MAY CHANGE AS A RESULT OF THAMES WATERS CONSIDERATION OF THE RESPONSES RECEIVED TO PHASE TWO CONSULTATION AND ANY FURTHER DESIGN DEVELOPMENT THAT IS CARRIED OUT.

1 0 00 CH. 1 0 . 0

CH. 1 0 . 0 1 1 00

0 .0 1 9 00 CH. 0

CH. 1 0 1 2 00 .0

CH. 1 0 1 3 00 .0

.0 00 0 0 1 8 CH.

CH. 1 0 1 4 00 .0

COORDINATES ARE TO ORDNANCE SURVEY DATUM OSGB36. ALL LEVELS ARE IN METRES AND RELATE TO THE TUNNEL DATUM WHICH IS 100 METRES BELOW ORDNANCE DATUM NEWLYN.

KEY:
DRAFT HORIZONTAL TUNNEL LIMIT OF DEVIATION (LOD) - (NOTE 1) DRAFT LIMIT OF LAND TO BE ACQUIRED OR USED (LLAU) - (NOTE 2)

N . . o DRG 6 N 0 9 I E: 0 4 00 CHL 0 0 0 M AT -0 G EN DA1 1 0


120.0m 110.0m 100.0m 90.0m

CHELSEA TO HACKNEY LINE - LIMITS OF LAND SUBJECT TO CONSULTATION

PROPOSED SHAFT

PROPOSED TUNNEL

HORIZONTAL GEOMETRY KEY:


L= R = LENGTH RADIUS OF CURVATURE

PLAN
SCALE 1:1000

NOTES: CHELSEA BRIDGE GROSVENOR BRIDGE


1. VERTICAL LIMIT OF DEVIATION HAS NOT YET BEEN DEFINED AND IS NOT SHOWN.

2. DRAFT LLAU SHOWS LAND TO BE ACQUIRED AND USED AT CONSTRUCTION SITES, BUT NOT THE SUBSOIL ALONG THE TUNNEL.

3. EXISTING BUILDINGS ARE NOT SHOWN ON THE PROFILE FOR CLARITY.

EL EVATI ON

80.0m

70.0m

60.0m
10 m 0 100 m 1 0 5 0 5 0
Scale:

50.0m

RANEL AGH CONNECTI ON TUNNEL

40.0m M ATCHL NE I

Thames Water Utilities


M ATCHL NE I

The Point, 7th Floor, 37 North Wharf Road, Paddington, London W2 1AF

20.0m
R 1000.0m L 109.3m L 38.7m R 1000.0m L 146.0m L 345.5m

Project Name:

THAMES TUNNEL
Purpose:

HORIZONTAL GEOMETRY

FOR PHASE 2 CONSULTATION


Location / Site Name:

VERTICAL GEOMETRY
5 .3 82 1 5 .4 80 1 5 .3 83 2 5 .8 82 2 5 .4 81 2 5 .9 80 2 5 .9 82 4 5 .4 82 4 5 .0 81 4 5 .5 80 4 5 .2 83 0 5 .0 83 7 5 .8 81 0 5 .3 81 0 5 .1 81 7 5 .9 79 0 5 .5 83 8 5 .6 82 9 5 .1 82 8 5 .9 81 3 5 .6 81 8 5 .7 80 9 5 .2 80 8 5 .0 80 3 5 .7 79 8 5 .5 82 6 5 .0 82 6 5 .6 80 6 5 .1 80 6 5 .4 83 5 5 .5 81 5

Length = 18195.812m Slope = 1:-789.000 5 .5 78 1 5 .1 77 1 5 .5 79 2 5 .0 79 2 5 .6 77 2 5 .6 76 1 5 .1 79 4 5 .6 78 4 5 .4 79 0 5 .2 79 7 5 .0 78 0 5 .8 77 7 5 .3 77 7 5 .2 77 4 5 .1 76 0 5 .9 75 7 5 .7 75 2 5 .8 78 9 5 .3 78 8 5 .1 78 3 5 .4 77 9 5 .9 76 9 5 .7 76 3 5 .4 76 8 5 .2 76 3 5 .7 78 6 5 .6 79 5 5 .2 78 5 5 .7 77 5 5 .8 76 6 5 .3 76 5 5 .8 75 5 5 .5 75 9 5 .4 75 7

LONDON 00000 - ROUTEWIDE


Drawing Title:

PROPOSED INVERT CHAINAGE

1 8 0 0 0

1 8 0 0 1

1 8 0 0 2

1 8 0 0 3

1 8 0 0 4

1 8 0 0 5

1 8 0 0 6

1 8 0 0 7

1 8 0 0 8

1 8 0 0 9

1 9 0 0 0

1 9 0 0 1

1 9 0 0 2

1 9 0 0 3

1 9 0 0 4

1 9 0 0 5

1 9 0 0 6

1 9 0 0 7

1 9 0 0 8

1 9 0 0 9

1 0 0 1 0

1 0 0 1 1

1 0 0 1 2

1 0 0 1 3

1 0 0 1 4

1 0 0 1 5

1 0 0 1 6

1 0 0 1 7

1 0 0 1 8

1 0 0 1 9

1 1 0 1 0

1 1 0 1 1

1 1 0 1 2

1 1 0 1 3

1 1 0 1 4

1 1 0 1 5

1 1 0 1 6

1 1 0 1 7

1 1 0 1 8

1 1 0 1 9

1 2 0 1 0

1 2 0 1 1

1 2 0 1 2

1 2 0 1 3

1 2 0 1 4

1 2 0 1 5

1 2 0 1 6

1 2 0 1 7

1 2 0 1 8

1 2 0 1 9

1 3 0 1 0

1 3 0 1 1

1 3 0 1 2

1 3 0 1 3

1 3 0 1 4

1 3 0 1 5

1 3 0 1 6

1 3 0 1 7

1 3 0 1 8

1 3 0 1 9

1 4 0 1 0

1 4 0 1 1

1 4 0 1 2

1 4 0 1 3

1 4 0 1 4

TUNNEL PLAN AND PROFILE MAIN TUNNEL SHEET 18 OF 40 BOOK OF PLANS


Drawing No.:

PROFILE

SCALE 1:1000 HORIZ : 1:500 VERTICAL

110-DA-GEN-00000-000497
c Thames Water Utilities Ltd 2008

1:2000@ A3 1:1000@ A1

1 0 0

30.0m

2 0 m 0 m

CHELSEA TO HACKNEY LINE - LIMITS OF LAND SUBJECT TO CONSULTATION

DO NOT SCALE - IF IN DOUBT ASK

THAMES WATER BATTERSEA TO PIMLICO TUNNEL

1 6 00 CH. 1 0 . 0

Status:

FOR INFORMATION
Keyplan:
N

CH. 1 7 0 1 0 . 0 0

H 00 . 00 21 .1

.0 00 1 0 1 5 CH.

C H . 1 1 8 0 . 00 0

BATTERSEA POWER STATION DISCHARGE TUNNEL BATTERSEA POWER STATION CABLE TUNNELS

120.0m NOTES: EXISTING GROUND LEVEL 110.0m MEAN HIGH WATER SPRINGS 100.0m
1. VERTICAL LIMIT OF DEVIATION HAS NOT YET BEEN DEFINED AND IS NOT SHOWN.

90.0m

80.0m

EL EVATI ON

70.0m

60.0m

10 m

100 m

BATTERSEA POW ER STATI ON CABL TUNNEL E

BATTERSEA POW ER STATI ON CABL TUNNEL E

50.0m

40.0m M ATCHL NE I

THAM ES W ATER BATTERSEA TO PI L CO M I TUNNEL

THAM ES W ATER RI NG M AI BATTERSEA TO N, BARROW HI L L

BATTERSEA POW ER STATI ON DI SCHARGE TUNNEL

Thames Water Utilities


M ATCHL NE I

The Point, 7th Floor, 37 North Wharf Road, Paddington, London W2 1AF

20.0m
R 600.0m L 398.8m

Project Name:

THAMES TUNNEL
L 94.6m
Purpose:

HORIZONTAL GEOMETRY

FOR PHASE 2 CONSULTATION


Location / Site Name:

VERTICAL GEOMETRY
5 .2 75 1 5 .8 73 1 5 .3 73 1 5 .9 71 1 5 .3 74 2 5 .4 72 2 5 .3 75 4 5 .9 73 4 5 .0 72 4 5 .7 74 0 5 .0 74 7 5 .8 72 0 5 .6 72 7 5 .1 72 7 5 .0 75 8 5 .8 74 3 5 .5 74 8 5 .1 74 9 5 .6 73 9 5 .4 73 3 5 .1 73 8 5 .9 72 3 5 .2 72 9 5 .7 71 9 5 .4 75 6 5 .9 74 6 5 .5 73 6 5 .6 71 6 5 .4 74 5 5 .0 73 5 5 .5 72 5

Length = 18195.812m Slope = 1:-789.000 5 .4 71 1 5 .0 70 1 5 .5 69 1 5 .5 70 2 5 .1 70 4 5 .7 68 4 5 .6 68 2 5 .9 70 0 5 .7 70 7 5 .2 70 7 5 .0 69 0 5 .8 68 7 5 .2 68 4 5 .1 68 1 5 .5 71 3 5 .2 71 8 5 .0 71 3 5 .3 70 9 5 .8 69 9 5 .6 69 3 5 .3 69 8 5 .1 69 3 5 .4 68 9 5 .9 67 8 5 .7 67 3 5 .6 67 0 5 .7 69 6 5 .3 68 6 5 .1 71 5 5 .6 70 5 5 .2 69 5 5 .8 67 6 5 .4 67 8 5 .3 67 5

LONDON 00000 - ROUTEWIDE


Drawing Title:

PROPOSED INVERT CHAINAGE

1 4 0 1 4

1 4 0 1 5

1 4 0 1 6

1 4 0 1 7

1 4 0 1 8

1 4 0 1 9

1 5 0 1 0

1 5 0 1 1

1 5 0 1 2

1 5 0 1 3

1 5 0 1 4

1 5 0 1 5

1 5 0 1 6

1 5 0 1 7

1 5 0 1 8

1 5 0 1 9

1 6 0 1 0

1 6 0 1 1

1 6 0 1 2

1 6 0 1 3

1 6 0 1 4

1 6 0 1 5

1 6 0 1 6

1 6 0 1 7

1 6 0 1 8

1 6 0 1 9

1 7 0 1 0

1 7 0 1 1

1 7 0 1 2

1 7 0 1 3

1 7 0 1 4

1 7 0 1 5

1 7 0 1 6

1 7 0 1 7

1 7 0 1 8

1 7 0 1 9

1 8 0 1 0

1 8 0 1 1

1 8 0 1 2

1 8 0 1 3

1 8 0 1 4

1 8 0 1 5

1 8 0 1 6

1 8 0 1 7

1 8 0 1 8

1 8 0 1 9

1 9 0 1 0

1 9 0 1 1

1 9 0 1 2

1 9 0 1 3

1 9 0 1 4

1 9 0 1 5

1 9 0 1 6

1 9 0 1 7

1 9 0 1 8

1 9 0 1 9

1 0 0 2 0

1 0 0 2 1

1 0 0 2 2

1 0 0 2 3

1 0 0 2 4

1 0 0 2 5

1 0 0 2 6

1 0 0 2 7

1 0 0 2 8

TUNNEL PLAN AND PROFILE MAIN TUNNEL SHEET 19 OF 40 BOOK OF PLANS


Drawing No.: Scale:

c Thames Water Utilities Ltd 2008

PROFILE

SCALE 1:1000 HORIZ : 1:500 VERTICAL

110-DA-GEN-00000-000498

1:2000@ A3 1:1000@ A1

5 0

1 0 0

30.0m

1 0 5

2 0 m 0 m

. No G. D 4 7 : R 0 0 9 N -0 IE 0 HL 0 0 TC 0 0 NMA G - E DA 1 1 0

THIS DRAWING

o. 9 9 .N 04 G R -0 0 :D 0 E 00 N 00 LI H N E C T G A M DA 011

C H 00 . 00 20 .1

MAPPING REPRODUCED BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND DATABASE RIGHT 2011. ALL RIGHTS RESERVED ORDNANCE SURVEY LICENCE NUMBER 100019345

C H. 1 1 9 0 00 .0

THIS IS A WORKING DRAFT PLAN WHICH HAS BEEN PRODUCED FOR THE PURPOSE OF PHASE TWO CONSULTATION ON THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWINGS IS ILLUSTRATIVE OF WHAT WILL BE REQUIRED FOR THE PURPOSE OF CONSTRUCTING AND OPERATING THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWING MAY CHANGE AS A RESULT OF THAMES WATERS CONSIDERATION OF THE RESPONSES RECEIVED TO PHASE TWO CONSULTATION AND ANY FURTHER DESIGN DEVELOPMENT THAT IS CARRIED OUT.

KIRTLING STREET SHAFT

COORDINATES ARE TO ORDNANCE SURVEY DATUM OSGB36. ALL LEVELS ARE IN METRES AND RELATE TO THE TUNNEL DATUM WHICH IS 100 METRES BELOW ORDNANCE DATUM NEWLYN.

T E T E S R N IG R L IT K

KEY:
DRAFT HORIZONTAL TUNNEL LIMIT OF DEVIATION (LOD) - (NOTE 1) DRAFT LIMIT OF LAND TO BE ACQUIRED OR USED (LLAU) - (NOTE 2)

PROPOSED SHAFT

GROSVENOR BRIDGE
PROPOSED TUNNEL

THAMES WATER RING MAIN BATTERSEA TO BARROW HILL HORIZONTAL GEOMETRY KEY:

R E T E T RN L C IG ES

L= R =

LENGTH RADIUS OF CURVATURE

PLAN
SCALE 1:1000

KIRTLING STREET SHAFT

2. DRAFT LLAU SHOWS LAND TO BE ACQUIRED AND USED AT CONSTRUCTION SITES, BUT NOT THE SUBSOIL ALONG THE TUNNEL.

3. EXISTING BUILDINGS ARE NOT SHOWN ON THE PROFILE FOR CLARITY.

BED OF RIVER

DO NOT SCALE - IF IN DOUBT ASK

N
Status:

FOR INFORMATION

. No G. D 5 0 : R 0 0 N -0 IE 00 0 HL 00 0 . 0 0 TC 0 0 1 7 . 2 NCH MA G - E DA 1 1 0

Keyplan:

THAMES WATER CROSS THAMES LINK WESTERN P.S TO HEATHWALL P.S.

UKPN CABLE TUNNEL WIMBLEDON TO PIMLICO

THIS DRAWING

MAPPING REPRODUCED BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND DATABASE RIGHT 2011. ALL RIGHTS RESERVED ORDNANCE SURVEY LICENCE NUMBER 100019345

THIS IS A WORKING DRAFT PLAN WHICH HAS BEEN PRODUCED FOR THE PURPOSE OF PHASE TWO CONSULTATION ON THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWINGS IS ILLUSTRATIVE OF WHAT WILL BE REQUIRED FOR THE PURPOSE OF CONSTRUCTING AND OPERATING THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWING MAY CHANGE AS A RESULT OF THAMES WATERS CONSIDERATION OF THE RESPONSES RECEIVED TO PHASE TWO CONSULTATION AND ANY FURTHER DESIGN DEVELOPMENT THAT IS CARRIED OUT.

CH. 1 1 0 2 0 . 0 0

CH

CH. 1 2 0 2 0 . 0 0

0 00 0 . 1 6 . 2

CH. 1 3 0 2 0 . 0 0

COORDINATES ARE TO ORDNANCE SURVEY DATUM OSGB36. ALL LEVELS ARE IN METRES AND RELATE TO THE TUNNEL DATUM WHICH IS 100 METRES BELOW ORDNANCE DATUM NEWLYN.

M ATCHL NE: RG I D . o N . 1 0 DA- EN- 0 0 1 G 0 0 00 0 9 -0 4 8

0 0 .0 1 5 0 CH. 2

CH. 2 0 . 0 1 4 00

KEY:
DRAFT HORIZONTAL TUNNEL LIMIT OF DEVIATION (LOD) - (NOTE 1) DRAFT LIMIT OF LAND TO BE ACQUIRED OR USED (LLAU) - (NOTE 2)

HEATHWALL / SWSR CONNECTION TUNNEL

PROPOSED SHAFT

PROPOSED TUNNEL

HORIZONTAL GEOMETRY KEY:


L= LENGTH RADIUS OF CURVATURE

HEATHWALL / SWSR PUMPING STATION DROP SHAFT

R =

NINE ELMS LANE

PLAN
SCALE 1:1000

120.0m NOTES: 110.0m MEAN HIGH WATER SPRINGS 100.0m


1. VERTICAL LIMIT OF DEVIATION HAS NOT YET BEEN DEFINED AND IS NOT SHOWN.

2. DRAFT LLAU SHOWS LAND TO BE ACQUIRED AND USED AT CONSTRUCTION SITES, BUT NOT THE SUBSOIL ALONG THE TUNNEL.

3. EXISTING BUILDINGS ARE NOT SHOWN ON THE PROFILE FOR CLARITY.

90.0m

BED OF RIVER 80.0m

EL EVATI ON

70.0m

60.0m

10 m

100 m

50.0m

40.0m M ATCHL NE I

HEATHW AL / L SW SR CONNECTI ON TUNNEL

UKPN CABL TUNNEL E W I BL M EDON TO PI L CO M I

THAM ES W ATER CROSS THAM ES L NK W ESTERN I P. TO HEATHW AL P. S L

Thames Water Utilities


M ATCHL NE I

The Point, 7th Floor, 37 North Wharf Road, Paddington, London W2 1AF

20.0m

Project Name:

THAMES TUNNEL
L 395.4m

HORIZONTAL GEOMETRY

R -600.0m L 250.8m

Purpose:

FOR PHASE 2 CONSULTATION


Location / Site Name:

VERTICAL GEOMETRY
5 .2 66 1 5 .3 64 1 5 .2 67 2 5 .7 66 2 5 .3 65 2 5 .8 64 2 5 .8 66 4 5 .3 66 4 5 .9 64 4 5 .4 64 4 5 .1 67 0 5 .9 66 7 5 .7 65 0 5 .2 65 0 5 .0 65 7 5 .8 63 0 5 .5 66 9 5 .0 66 8 5 .8 65 3 5 .5 65 8 5 .6 64 9 5 .1 64 8 5 .9 63 3 5 .6 63 8 5 .4 66 6 5 .9 65 6 5 .5 64 6 5 .0 64 6 5 .3 67 5 5 .4 65 5

Length = 18195.812m Slope = 1:-789.000 5 .9 62 1 5 .4 62 1 5 .0 61 1 5 .4 63 2 5 .5 61 2 5 .5 60 1 5 .0 63 4 5 .1 61 4 5 .6 59 2 5 .1 63 7 5 .9 61 0 5 .7 61 7 5 .2 61 7 5 .0 60 0 5 .8 59 7 5 .2 63 9 5 .7 62 9 5 .5 62 3 5 .2 62 8 5 .0 62 3 5 .3 61 9 5 .8 60 9 5 .6 60 3 5 .3 60 8 5 .1 60 3 5 .6 62 6 5 .5 63 5 5 .1 62 5 5 .6 61 5 5 .7 60 6 5 .2 60 5 5 .7 59 5 5 .4 59 9 5 .3 59 7 5 .2 59 4

LONDON 00000 - ROUTEWIDE


Drawing Title:

PROPOSED INVERT CHAINAGE

1 0 0 2 8

1 0 0 2 9

1 1 0 2 0

1 1 0 2 1

1 1 0 2 2

1 1 0 2 3

1 1 0 2 4

1 1 0 2 5

1 1 0 2 6

1 1 0 2 7

1 1 0 2 8

1 1 0 2 9

1 2 0 2 0

1 2 0 2 1

1 2 0 2 2

1 2 0 2 3

1 2 0 2 4

1 2 0 2 5

1 2 0 2 6

1 2 0 2 7

1 2 0 2 8

1 2 0 2 9

1 3 0 2 0

1 3 0 2 1

1 3 0 2 2

1 3 0 2 3

1 3 0 2 4

1 3 0 2 5

1 3 0 2 6

1 3 0 2 7

1 3 0 2 8

1 3 0 2 9

1 4 0 2 0

1 4 0 2 1

1 4 0 2 2

1 4 0 2 3

1 4 0 2 4

1 4 0 2 5

1 4 0 2 6

1 4 0 2 7

1 4 0 2 8

1 4 0 2 9

1 5 0 2 0

1 5 0 2 1

1 5 0 2 2

1 5 0 2 3

1 5 0 2 4

1 5 0 2 5

1 5 0 2 6

1 5 0 2 7

1 5 0 2 8

1 5 0 2 9

1 6 0 2 0

1 6 0 2 1

1 6 0 2 2

1 6 0 2 3

1 6 0 2 4

1 6 0 2 5

1 6 0 2 6

1 6 0 2 7

1 6 0 2 8

1 6 0 2 9

1 7 0 2 0

1 7 0 2 1

1 7 0 2 2

TUNNEL PLAN AND PROFILE MAIN TUNNEL SHEET 20 OF 40 BOOK OF PLANS


Drawing No.: Scale:

c Thames Water Utilities Ltd 2008

PROFILE

SCALE 1:1000 HORIZ : 1:500 VERTICAL

110-DA-GEN-00000-000499

1:2000@ A3 1:1000@ A1

5 0

1 0 0

30.0m

1 0 5

2 0 m 0 m

Potrebbero piacerti anche