NAMA BANGUNAN 1 PEKERJAAN : PONDASI POMPA FOC I & FOC II 2 PEKERJAAN : SITE PREPARATION 1 BONGKAR BETON BERTULANG , TEBAL 25 CM 2 STRIPPING AREA 3 BUANG TANAH EX GALIAN < 10 KM
JENIS BANGUNAN PONDASI LAND CLEARING BONGKAR LAND CLEARING LAND CLEARING
OWNER ESTIMATE
KETERANGAN
NOVA INDAH
DRAFT BQ PEKERJAAN PEMBANGUNAN INSTALASI PENGOLAH AIR LIMBAH (IPAL) PT. PERTAMINA (PERSERO) REFINERY UNIT IV CILACAP NO 3 3.1 3.1.1 3.1.2 3.1.3 3.1.4 3.1.5 3.1.6 3.1.7 3.1.8 3.1.9 URAIAN SIPIL PEKERJAAN : PONDASI POMPA FOC I & FOC II POTONG LANTAI BETON BERTULANG TEBAL : 15 CM GALIAN TANAH PEMADATAN TANAH DASAR PEMADATAN TANAH ATAS / LANTAI URUGAN TANAH KEMBALI & PEMADATAN BUANG TANAH EX GALIAN < 10 KM BATU BELAH ANSTAMPENG LANTAI KERJA BETON BERTULANG K-350 KG/CM2 Beton Besi Bekisting BETON BERTULANG K-250 KG/CM2 (LANTAI / PAVING ) Beton Besi Bekisting ANCHOR BOLT M-25, ASTM A-139 GRADE B, 700 MM GROUTING NON SHRINK GROUT SIKADUR 42 GROUTING NON SHRINK GROUT SIKADUR 214 PIPE SLEEVE GALV. DIA. 3" - PANJANG 30 CM SUB TOTAL PEKERJAAN : SITE PREPARATION BONGKAR BETON BERTULANG , TEBAL 25 CM STRIPPING AREA BUANG TANAH EX GALIAN < 10 KM SUB TOTAL VOLUME 1.00 1.00 42.00 56.70 42.00 19.44 22.31 34.39 7.34 1.12 21.06 SATUAN LS LS M2 M3 M2 M2 M3 M3 M3 M3 M3
3.1.10
2.43
M3
BH KG KG BH
LS M3 M3 M3
PEKERJAAN : UNDER GROUND SEWER, CATCH BASSIN & PIPE SLEEVE 1.00 GALIAN TANAH 898.00 PEMADATAN TANAH DASAR 30.00 URUGAN TANAH KEMBALI & PEMADATAN 826.00 BUANG TANAH EX GALIAN < 10 KM 71.00 LANTAI KERJA 2.00 BETON BERTULANG K350 18.00 Beton Besi Bekisting 3.3.7 STEEL STRUCTURE 3,030.00 3.3.8 PIPA A-53 GRADE B , SCH.40. DSAW @ 6 MTR 3.3.8.1 - DIA. 16" = 36 M 6.00 3.3.8.2 - DIA. 12" = 72 M 12.00 3.3.8.3 - DIA. 10" = 96 M 16.00
LS M3 M2 M3 M3 M3 M3
KG JT JT JT
- DIA. 8" = 72 M 12.00 - DIA. 6" = 192 M 32.00 SANDBLASTING , CAT PRIMAIR IN ORGANIC ZINK, FININSH POLYAMIDE EPOXY 400.00 WRAPPING PIPA 2 LAYER, OVERLAPPING 50% 400.00 SUB TOTAL PEKERJAAN : OIL CATHHER 2 UNIT GALIAN TANAH URUGAN TANAH KEMBALI & PEMADATAN BUANG TANAH EX GALIAN < 10 KM BATU BELAH ANSTAMPENG LANTAI KERJA BETON BERTULANG K-350 KG/CM2 Beton Besi Bekisting SUB TOTAL PEKERJAAN : RABAT FIRE HYDRANT - 6 UNIT GALIAN TANAH PEMADATAN TANAH DASAR BUANG TANAH EX GALIAN PLASTIK SHEET BETON BERTULANG K-350 KG/CM2 Beton Besi Bekisting SUB TOTAL 1.00 62.04 51.54 10.50 9.22 3.07 9.28
JT JT M2 M2
LS M3 M3 M3 M3 M3 M3
LS M3 M3 M3 M2 M3
3.6 3.6.1 3.6.2 3.6.3 3.6.4 3.6.5 3.6.6 3.6.7 3.6.8 3.6.9 3.6.10
PEKERJAAN : JALAN, OPEN DICH & GRAVEL - NEW AREA IPAL 1.00 LS GALIAN JALAN & OVEN DICH 2,972.10 M3 BUANG TANAH EX GALIAN < 10 KM 2,972.10 M3 PEMADATAN TANAH DASAR & PONDASI BANDAN JALAN (MENGGUNAKAN VIBRATOR ) 13,978.00 M2 BATU BELAH ANSTAMPENG 1,258.02 M3 URUGAN SIRTU ( PASIR + BATU ) 1,551.56 M3 URUGAN GRAVEL 754.65 M3 PENGASPALAN, TEBAL 7,5 CM ( HOT MIX ) 2,303.40 M2 HAMPARAN GRAVEL - NEW AREA IPAL 343.14 M3 BETON BERTULANG K-250 KG/CM2 116.77 M3 PLASTIK SHEET 973.06 M2 SUB TOTAL PEKERJAAN : SUB STATION 40 SS 12 PEMANCANGAN DIAMETER 40CM POTONG TIANG PANCANG GALIAN TANAH URUGAN TANAH KEMBALI & PEMADATAN PEMADATAN TANAH DASAR BUANG TANAH EX GALIAN < 10 KM BATU BELAH ANSTAMPENG 1.00 480.00 16.00 168.00 142.71 154.46 25.29 6.91 LS M BH M3 M3 M3 M3 M3
3.7.8 3.7.9
LANTAI KERJA 4.62 BETON BERTULANG K-350 KG/CM2 131.50 Beton Besi Bekisting 3.7.10 PASANGAN BATU BATA CAMP.1:4 (SETENGAN BATA) - 105KG/CM2 339.47 3.7.11 PLESTER CAMP. 1: 4 , TEBAL 2CM & ACIAN 766.78 3.7.12 FLOOR HARDENER LANTAI 1,071.97 3.7.13 ACID RESISTANT COATING 61.50 3.7.14 WATER PROOFING ATAP 203.78 3.7.15 STEEL STRUCTURE 3.7.15.1- HAND RAIL PIPA 388.49 3.7.15.2- PLATE BAR 75 X 6 MM 118.09 3.7.15.3- CHANNAL 150 X 75 X 6,5 MM 1,829.66 3.7.16 TALANG AIR SENG GALV. BJLS 80 17.14 3.7.17 PAGAR BRC HOT DIP GALV. TINGGI 175CM & INCLUDE PINTU 17.00 3.7.18 PINTU RANGKA PIPA DIA. 2" ( HOT DIP GALV.) 3.7.18.1- 185 M X 1,2 M 2.00 3.7.18.2- 185 M X 1,2 M 2.00 3.7.19 SUPPORT RANGKA PIPA DIA. 2" ( HOT DIP GALV ) 25.00 3.7.20 GEMBOK PINTU ( YALE / SETARA ) 3.00 3.7.21 PINTU , KUSEN ENGSEL, HANDLE PANIC DOOR, DOOR CLOSED & ACCESSORIES 3.7.21.1- 2,3 M X 1 M 4.00 3.7.21.2- 1,2 M X 0,9 M 2.00 3.7.22 BUAT TALI AIR PADA DINDING UKURAN 1CM X 2 CM 340.00 3.7.23 SEALER UNTUK TALI AIR 85.00 3.7.24 PLAMEUR , ACT FINISH ( DULUX) U/ DINDING 825.09 3.7.25 SANDBLASTING , CAT PRIMAIR IN ORGANIC ZINK, FININSH POLYAMIDE EPOXY 3.7.25.1- HAND RAIL PIPA 105.00 3.7.25.2- PLATE BAR 75 X 6 MM 4.19 3.7.25.3- CHANNAL 150 X 75 X 6,5 MM 58.80 3.7.26 HAMPARAN GRAVEL UKURAN 2/3 & 3/5 19.44 3.7.27 ANCHOR BOLT M-25, ASTM A-139 GRADE B, 700 MM 8.00 3.7.28 GROUTING NON SHRINK GROUT SIKADUR 214 434.01 3.7.29 PIPE SLEEVE GALV. DIA. 3" - PANJANG 30 CM 8.00 3.7.30 EXHAUST FAN ( PANASONIC / SETARA ) 2.00 3.7.31 LEM BETON ( SIKA BOND NV ) 10 KG/CAN 10.00 3.7.32 CURING COMPOUNDS ( SIKA ANTI SOL - E125) 20KG/CAN 7.00 3.7.33 TAG NUMBER - GEDUNG 1.00 SUB TOTAL 3.8 3.8.1 3.8.2 3.8.3 3.8.4 3.8.5 3.8.6 3.8.7 3.8.8 PEKERJAAN : CONTROL ROOM 40 BD 12 PEMANCANGAN DIAMETER 40CM POTONG TIANG PANCANG GALIAN TANAH URUGAN TANAH KEMBALI & PEMADATAN PEMADATAN TANAH DASAR BUANG TANAH EX GALIAN URUGAN PASIR PASANG / COR BATU BELAH ANSTAMPENG ( BATU KALI ) 1.00 180.00 6.00 147.75 117.75 211.09 30.00 13.85 5.54
M3 M3
LS M BH M3 M3 M3 M3 M2 M3
3.8.9 LANTAI KERJA 4.46 M3 3.8.10 BETON BERTULANG K-350 KG/CM2 33.80 M3 Beton Besi Bekisting 3.8.11 PASANGAN BATU BATA CAMP.1:4 (SETENGAN BATA) - 105KG/CM2 199.57 M2 3.8.12 BETON BERTULANG K-250 KG/CM2 5.14 M3 Beton Besi Bekisting 3.8.13 PLESTER CAMP. 1: 4 , TEBAL 2CM & ACIAN 399.14 M2 3.8.14 ACID RESISTANT COATING 20.00 M2 3.8.15 WATER PROOFING ATAP 105.34 M2 3.8.16 PASANG KERAMIK - KW 1 69.20 M2 3.8.17 PASANG PINTU BESI, KUSEN, ENGSEL, HANDLE PANIC DOOR, DOOR CLOSER & ACCESSORIES 3.8.17.1- PINTU BESI FIRE DOOR 5.00 BH 3.8.17.2- PINTU ALUMINIUM 1.00 BH 3.8.17.3- JENDELA ALUMINIUM + DAUN JENDELA + KACA 2.00 BH 3.8.17.4- JENDELA ALUMINIUM + KACA MATI 3.00 BH 3.8.18 PLAFOND AKUSTIK + RANGKA ALUMINIUM 76.96 M2 3.8.19 PLAMEUR , ACT FINISH ( DULUX) U/ DINDING 3.8.19.1- BAGIAN LUAR ( DULUX - WHEATER SHIELD ) 130.00 M2 3.8.19.2- BAGIAN DALAM ( DULUX - PENTALITE ) 251.00 M2 3.8.20 BIS BETON 1/2 DIA. 20 CM 41.60 M 3.8.21 PIPA PVC DIA 4" & 1" 3.8.21.1- TALANG AIR DIA 4" 72.00 M 3.8.21.2- JALUR AIR KOTOR & SEPTIK TANK DIA 4" 24.00 M 3.8.21.3- ELBOW DIA 4" + T + ACCESSORIES 34.00 BH 3.8.21.4- JALUR AIR BERSIH PIPA PVC DIA 1" 24.00 M 3.8.21.5- ELBOW DIA 1" + T + ACCESSORIES 30.00 BH 3.8.21.6- LEM 6.00 CAN 3.8.21.7- AMPLAS 10.00 LBR 3.8.22 BAK CUCI PIRING STAINLESS STEEL 1.00 UNIT 3.8.23 INSTALASI KRAN AIR 1.00 LS 3.8.24 CLOSET DUDUK 1.00 SET 3.8.25 BAK FIBBRE / PENAMPUNG AIR 1.00 SET 3.8.26 GANTUNGAN HANDUK 1.00 SET 3.8.27 FLOOR DRAIN 1.00 SET 3.8.28 ROOF DRAIN 6.00 SET 3.8.29 LEMARI DAPUR 2 M X 0.6 X 0.9 M 1.00 SET 3.8.30 RESAPAN 2M X 2 M X 2 M 1.00 SET 3.8.31 EXHAUST FAN (PANASINIC / SETARA ) 2.00 UNIT 3.8.32 LEM BETON ( SIKA BOND NV ) 10KG/CAN 10.00 KG 3.8.33 CURING COMPOUNDS ( SIKA ANTI SOL - E125) 20KG/CAN 5.00 CAN 3.8.34 TAG NUMBER - GEDUNG 1.00 LS 3.8.35 PLASTIK SHEET 60.00 M2 SUB TOTAL 3.9 3.9.1 PEKERJAAN : CPI SEPARATOR GALIAN TANAH 1.00 71.00 LS M3
PASANG BATU KALI 1:4 LANTAI KERJA BETON K350 KEDAP AIR Beton Besi Bekisting 3.9.5 TIANG PANCANG D30 3.9.6 POTONG TIANG PANCANG 3.9.7 STUCTURE STEEL 3.9.8 SANDBLASTING & PAINTING 3.9.9 CAT DINDING LUAR 3.9.10 WATER STOP 400 MM 3.9.11 ADJUSTABLE WEIR SS316L SUB TOTAL 3.10 3.10.1 3.10.2 3.10.3 3.10.4 PEKERJAAN : DAF GALIAN TANAH PASANG BATU KALI 1:4 LANTAI KERJA BETON K350 Beton Besi Bekisting 3.10.5 TIANG PANCANG 40 CM 3.10.6 POTONG TIANG PANCANG 3.10.7 STEEL STUCTURE 3.10.8 ATAP ASBES GELOMBANG ( BESAR) 3.10.9 BETON K250 Beton Besi Bekisting 3.10.10 ANCHOR BOLT M-25, ASTM A-139 GRADE B, GALV. - 700 MM 3.10.11 SANDBLASTING & PAINTING 3.10.12 PERAWATAN BETON 3.10.13 GROUTING NON SHRING 3.10.14 BUMBUNGAN ATAP 3.10.15 HS BOLT ASTM 325 M16 SUB TOTAL 3.11 3.11.1 3.11.2 3.11.3 3.11.4 3.11.5 PEKERJAAN : BAK AERASI GALIAN TANAH PASANG BATU KALI 1:4 LANTAI KERJA STUCTURE STEEL ( BESI L & PLATE ) BETON K350 KEDAP AIR Beton Besi Bekisting 3.11.6 WATER STOP 400 3.11.7 SLING DIA 3/4"
M3 M3 M3
M' BH KG M2 M2 M' KG
LS M3 M3 M3 M3
M' BH KG M2 M3
BH M2 M2 KG M' PCS
LS M3 M3 M3 KG M3
163.00 120.00
M' M'
3.11.8 TIANG PANCANG DIA. 40CM 3.11.9 POTONG TIANG PANCANG 3.11.10 GROUTING NON SHRING 3.11.11 SANDBLASTING & PAINTING 3.11.12 CAT DINDING LUAR 3.11.13 WATER PROOFING DINDING & LANTAI 3.11.14 PERAWATAN BETON 3.11.15 TES KEBOCORAN SUB TOTAL 3.12 3.12.1 3.12.2 3.12.3 3.12.4 PEKERJAAN : BELT FILTER PRESS PRIMARY GALIAN TANAH PASANG BATU KALI 1 : 4 LANTAI KERJA BETON K350 Beton Besi Bekisting 3.12.5 TIANG PANCANG 30 CM 3.12.6 POTONG TIANG PANCANG 3.12.7 STEEL STUCTURE 3.12.8 ATAP ASBES GELOMBANG ( BESAR) 3.12.9 BETON K250 Beton Besi Bekisting 3.12.10 ANCHOR BOLT M-25, ASTM A-139 GRADE B, GALV. - 700 MM 3.12.11 SANDBLASTING & PAINTING 3.12.12 PERAWATAN BETON 3.12.13 GROUTING NON SHRING 3.12.14 HS BOLT ASTM 325 M16 3.12.15 TALANG AIR SUB TOTAL 3.13 3.13.1 3.13.2 3.13.3 3.13.4 PEKERJAAN : BELT FILTER PRESS SECONDARY GALIAN TANAH PASANG BATU KALI 1:4 LANTAI KERJA BETON K350 Beton Besi Bekisting TIANG PANCANG 30 CM POTONG TIANG PANCANG STEEL STUCTURE ATAP ASBES GELOMBANG ( BESAR) BETON K250 Beton Besi Bekisting
M' BH KG M2 M2 M2 M2 LS
LS M3 M3 M3 M3
M' BH KG M2 M3
BH M2 M2 KG PCS LS
LS M3 M3 M3 M3
M' BH KG M2 M3
3.13.10 ANCHOR BOLT M-25, ASTM A-139 GRADE B, GALV. - 700 MM 3.13.11 SANDBLASTING & PAINTING 3.13.12 PERAWATAN BETON 3.13.13 GROUTING NON SHRING 3.13.14 HS BOLT ASTM 325 M16 3.13.15 TALANG AIR SUB TOTAL 3.14 3.14.1 3.14.2 3.14.3 3.14.4 PEKERJAAN : OIL STORAGE TANK GALIAN TANAH PASANG BATU KALI 1:4 LANTAI KERJA BETON K350 Beton Besi Bekisting 3.14.5 BETON K250 Beton Besi Bekisting 3.14.6 TIANG PANCANG DIA. 30 CM 3.14.7 POTONG TIANG PANCANG 3.14.8 SANDBLASTING & PAINTING 3.14.9 PERAWATAN BETON 3.14.10 STUCTURE STEEL 3.14.11 PIPA 8" A53B 3.14.12 GATE VALVE 8" 3.14.13 WRAPING 3.14.14 FLANGE 8" 3.14.15 GASKET 8" 3.14.16 PIPA 14" SLEEVE A53B SUB TOTAL 3.15 3.15.1 3.15.2 3.15.3 3.15.4 3.15.5 PEKERJAAN : CLEAN WATER TANK GALIAN TANAH PASANG BATU KALI 1:4 LANTAI KERJA STUCTURE STEEL ( BESI L & PLATE ) BETON K350 KEDAP AIR Beton Besi Bekisting 3.15.6 WATER STOP 400 3.15.7 TIANG PANCANG DIA. 30CM 3.15.8 POTONG TIANG PANCANG 3.15.9 SANDBLASTING & PAINTING 3.15.10 CAT DINDING LUAR 3.15.11 WATER PROOFING DINDING & LANTAI 3.15.12 PERAWATAN BETON 3.15.13 TES KEBOCORAN
BH M2 M2 KG PCS LS
LS M3 M3 M3 M3
17.00
M3
30.00 1.00 30.00 120.00 83.00 4.00 1.00 22.00 2.00 2.00 3.00
LS M3 M3 M3 KG M3
M' M' BH M2 M2 M2 M2 LS
SUB TOTAL 3.16 3.16.1 3.16.2 3.16.3 3.16.4 3.16.5 PEKERJAAN : BAK EKUALISASI GALIAN TANAH PASANG BATU KALI 1:4 LANTAI KERJA STUCTURE STEEL ( BESI L & PLATE ) BETON K350 KEDAP AIR Beton Besi Bekisting 3.16.6 WATER STOP 400 3.16.7 SLING DIA 3/4" 3.16.8 TIANG PANCANG DIA. 40CM 3.16.9 POTONG TIANG PANCANG 3.16.10 GROUTING NON SHRING EPOXY 3.16.11 GROUTING NON SHRING 3.16.12 SANDBLASTING & PAINTING 3.16.13 CAT DINDING LUAR 3.16.14 WATER PROOFING DINDING & LANTAI 3.16.15 PERAWATAN BETON 3.16.16 TES KEBOCORAN SUB TOTAL 3.17 3.17.1 3.17.2 3.17.3 3.17.4 3.17.5 PEKERJAAN : API SEPARATOR GALIAN TANAH PASANG BATU KALI 1:4 LANTAI KERJA STUCTURE STEEL ( BESI L & PLATE ) BETON K350 KEDAP AIR Beton Besi Bekisting 3.17.6 WATER STOP 400 3.17.7 TIANG PANCANG DIA. 30 CM 3.17.8 POTONG TIANG PANCANG 3.17.9 GRATING 3.17.10 ADJUSTABLE WEIR SS316L 3.17.11 GROUTING NON SHRING EPOXY 3.17.12 SANDBLASTING & PAINTING 3.17.13 CAT DINDING LUAR SUB TOTAL 3.18 3.18.1 3.18.2 3.18.3 3.18.4 3.18.5 PEKERJAAN : TANKI SEDIMENTASI A&B GALIAN TANAH PASANG BATU KALI 1:4 LANTAI KERJA STUCTURE STEEL ( BESI L & PLATE ) BETON K350 KEDAP AIR Beton 1.00 4,445.00 426.00 139.00 8,133.00 1,170.00 LS M3 M3 M3 KG M3
163.00 120.00 1,950.00 65.00 120.00 451.00 165.00 611.00 2,446.00 2,100.00 1.00
LS M3 M3 M3 KG M3
M' M' BH M2 KG KG M2 M2
LS M3 M3 M3 KG M3
Besi Bekisting 3.18.6 WATER STOP 400 3.18.7 TIANG PANCANG DIA. 30CM 3.18.8 POTONG TIANG PANCANG 3.18.9 SANDBLASTING & PAINTING 3.18.10 CAT DINDING LUAR 3.18.11 WATER PROOFING DINDING & LANTAI 3.18.12 PERAWATAN BETON 3.18.13 TES KEBOCORAN 3.18.14 PLATE SS316L 3.18.15 GRATING 3.18.16 GALVANIZING SUB TOTAL 3.19 3.19.1 3.19.2 3.19.3 3.19.4 3.19.5 PEKERJAAN : PENGENTAL PASIR GALIAN TANAH PASANG BATU KALI 1:4 LANTAI KERJA STUCTURE STEEL ( BESI L & PLATE ) BETON K350 KEDAP AIR Beton Besi Bekisting 3.19.6 WATER STOP 400 3.19.7 TIANG PANCANG DIA. 30CM 3.19.8 POTONG TIANG PANCANG 3.19.9 SANDBLASTING & PAINTING 3.19.10 CAT DINDING LUAR 3.19.11 WATER PROOFING DINDING & LANTAI 3.19.12 PERAWATAN BETON 3.19.13 TES KEBOCORAN 3.19.14 PLATE SS316L 3.19.15 GRATING 3.19.16 GALVANIZING SUB TOTAL 3.20 3.20.1 3.20.2 3.20.3 3.20.4 3.20.5 PEKERJAAN : THICKENER GALIAN TANAH PASANG BATU KALI 1:4 LANTAI KERJA STUCTURE STEEL ( BESI L & PLATE ) BETON K350 KEDAP AIR Beton Besi Bekisting WATER STOP 400 TIANG PANCANG DIA. 30CM POTONG TIANG PANCANG SANDBLASTING & PAINTING
75.00 780.00 26.00 415.00 190.00 887.00 650.00 1.00 1,640.00 20.00 10,990.00
M' M' BH M2 M2 M2 M2 LS KG M2 KG
LS M3 M3 M3 KG M3
35.00 270.00 9.00 97.00 19.00 185.00 113.00 1.00 1,290.00 27.00 560.00
M' M' BH M2 M2 M2 M2 LS KG M2 KG
LS M3 M3 M3 KG M3
M' M' BH M2
3.20.10 CAT DINDING LUAR 3.20.11 WATER PROOFING DINDING & LANTAI 3.20.12 PERAWATAN BETON 3.20.13 TES KEBOCORAN 3.20.14 PLATE SS316L 3.20.15 GRATING 3.20.16 GALVANIZING SUB TOTAL 3.21 3.21.1 3.21.2 3.21.3 3.21.4 3.21.5 3.21.6 3.21.7 PEKERJAAN : PONDASI POMPA INSIDE BATTERY LIMIT GALIAN TANAH BATU BELAH ANSTAMPENG TIANG PANCANG DIAMETER 30 CM POTONG TIANG PANCANG LANTAI KERJA BETON K350 KEDAP AIR BETON K350 Beton Besi Bekisting 3.21.8 GROUTING NON SHRING EPOXY 3.21.9 GROUTING NON SHRING 3.21.10 ANCHOR BOLT M-25, ASTM A-139 GRADE B, GALV. - 700 MM SUB TOTAL 3.22 3.22.1 3.22.2 3.22.3 3.22.4 3.22.5 3.22.6 3.22.7
M2 M2 M2 LS KG M2 KG
LS M3 M3 M' PCS M3 M3 M3
KG KG PCS
PEKERJAAN : OUTSIDE BATTREY LIMIT IPAL (DBC; PBC; EC) 1.00 GALIAN TANAH 5,484.90 PEMADATAN TANAH DASAR 2,004.78 URUGAN TANAH KEMBALI & PEMADATAN 3,017.06 BUANG TANAH EX GALIAN < 10 KM 2,561.92 BATU BELAH ANSTAMPENG 569.38 LANTAI KERJA 138.09 BETON BERTULANG K-350 KG/CM2 1,074.36 Beton Besi Bekisting 3.22.8 STEEL STRUCTURE 34,164.05 3.22.9 SANDBLASTING , CAT PRIMAIR IN ORGANIC ZINK, FININSH POLYAMIDE EPOXY 1,053.88 3.22.10 ANCHOR BOLT M-25, ASTM A-139 GRADE B, GALV. - 700 MM 372.00 3.22.11 HS BOLT ASTM 325 M16 684.00 3.22.12 GROUTING NON SHRING EPOXY 850.00 3.22.13 GROUTING NON SHRING 1,745.00 3.22.14 PENGASPALAN TEBAL 7.5 CM ( HOT MIX) 51.00 3.22.15 PEMASANGAN BATU KALI CAMPURAN 1:4 92.80 3.22.16 PLESTERAN CAMPURAN 1:4, TEBAL 2.5CM & DIACI 293.15 3.22.17 POTONG LANTAI 37.50 3.22.18 BETON BERTULANG K250 37.50 Beton Besi Bekisting
LS M3 M2 M3 M3 M3 M3 M3
KG M2 PCS pcs KG KG M2 M3 M2 M3 M3
3.22.19 PLASTIK SHEET 3.22.20 CAT LANTAI WARNA MERAH SUB TOTAL 3.23 3.23.1 3.23.2 3.23.3 PODASI LAIN-LAIN GALIAN TANAH LANTAI KERJA BETON BERTULANG K-350 KG/CM2 Beton Besi Bekisting 3.23.4 ANCHOR BOLT M-25, ASTM A-139 GRADE B, GALV. - 700 MM SUB TOTAL TOTAL KESELURUHAN
250.00 275.00
M2 M2
M3 M3 M3
200.00
PCS
PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA
SUB 2
SUBKON 1 NI
PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA
SUBKON 3
PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA
PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA
PROVIDED BY ELNUSA
PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA
SUBKON 7
PROVIDED BY ELNUSA
PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA
SUBKON 8
KON 9
PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA
SUBKON 9
SUBKON GALIAN TANAH PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA
SUBKON 10
SUBKON GALIAN TANAH PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA
SUBKON 11
SUBKON 11
PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA
SUBKON GALIAN TANAH PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA
SUBKON 12
SUBKON GALIAN TANAH PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA
SUBKON 13
PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA
SUBKON GALIAN TANAH PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA
SUBKON 14
SUBKON GALIAN TANAH PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA
SUBKON 15
SUBKON GALIAN TANAH PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA
SUBKON 16
SUBKON GALIAN TANAH PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA
SUBKON 17
SUBKON GALIAN TANAH PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA SUBKON 18
SUBKON 18
PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA
SUBKON GALIAN TANAH PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA
SUBKON 19
SUBKON GALIAN TANAH PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA
SUBKON 20
SUBKO
PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA
SUBKON GALIAN TANAH PROVIDED BY ELNUSA PROVIDED BY ELNUSA SUBKON 21 PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA
PROVIDED BY ELNUSA
PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA
SUBKON 22
SUBKON23
SUBKON GALIAN TANAH PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA PROVIDED BY ELNUSA
SCHEDULE PEMANCANGAN MEN CRANE 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 SUB JUMLAH CRANE 2 1 2 3 4 5 6 7 8 9 SUB JUMLAH TOTAL TITIK 40 30 30 30 30 30 30 30 30 40 40 40 30 40 30 40 30 30 30 30 30 30 30 30 30 TTK PCG 6 16 9 3 26 2 65 6 1 1 9 2 12 6 1 1 166 TTK PCG 91 3 26 18 1 6 1 18 2 166 332 213 119 URAIAN PEKERJAAN : CONTROL ROOM 40 BD 12 PEKERJAAN : SUB STATION 40 SS 12 PEKERJAAN : DAF PONDASI POMPA 47 P 507 A&B, 47 P 516&515, 47 P 507 C&D PEKERJAAN : BAK AERASI PONDASI POMPA 47 P 506 A & B PEKERJAAN : BAK EKUALISASI PEKERJAAN : BELT FILTER PRESS PRIMARY PONDASI POMPA 47 P 503 PONDASI POMPA 47 P 502A&B PEKERJAAN : PENGENTAL PASIR PONDASI POMPA 47 P 501 A&B PEKERJAAN : API SEPARATOR PEKERJAAN : CPI SEPARATOR PEKERJAAN : OIL STORAGE TANK PONDASI POMPA 47 P 504 A&B PRODUKTIVITAS/ HARI CRANE 1 URAIAN PEKERJAAN : BAK AERASI PONDASI POMPA 47 P 509 A&B&C PEKERJAAN : TANKI SEDIMENTASI A&B PEKERJAAN : THICKENER PONDASI POMPA 47 P 510 A&B PEKERJAAN : BELT FILTER PRESS SECONDARY PONDASI POMPA 47 P 512 PEKERJAAN : CLEAN WATER TANK PONDASI POMPA 47 P 511 A&B PRODUKTIVITAS/ HARI CRANE 2 (TITIK) TOTAL PRODUKTIVITAS CRANE 1 DAN 2 (TITIK) TOTAL DIA 40/HARI TOTAL DIA 30/HARI
SCHEDULE DELIVERY TIANG PANCANG DENGA Truk Top Botom Truk 1 40 40 KONFIGURASI
Midle Top Botom Midle Top Botom Midle Top Botom Midle
Truk 2
Truk 1
SCHEDULE G BACK HOE 1 1 2 3 4 5 6 VOLUME 148 168 232 4,445 4,445 83 DIMENSI 5x8 29 x 7,5 13 x 8 40 x 60 x 2,85 20 x 60 x 2,85 9 x 4,4 URAIAN PEKERJAAN : CONTROL ROOM 40 BD 12 PEKERJAAN : SUB STATION 40 SS 12 PEKERJAAN : DAF PONDASI POMPA 47 P 507 A&B, 47 P 516&515, 47 P 507 C&D PEKERJAAN : BAK AERASI PONDASI POMPA 47 P 506 A & B PEKERJAAN : BAK EKUALISASI PEKERJAAN : BELT FILTER PRESS PRIMARY PONDASI POMPA 47 P 503 PONDASI POMPA 47 P 502A&B PEKERJAAN : PENGENTAL PASIR PONDASI POMPA 47 P 501 A&B PEKERJAAN : API SEPARATOR PEKERJAAN : CPI SEPARATOR PEKERJAAN : OIL STORAGE TANK PONDASI POMPA 47 P 504 A&B URAIAN
7 8 9 10 BACK HOE 2 1 2 3 4 5
21 30 120 71 73 VOLUME
741 42 83 1,185
PEKERJAAN : BAK AERASI PONDASI POMPA 47 P 509 A&B&C 12,3 x 2,75 PEKERJAAN : TANKI SEDIMENTASI A&B 5 PEKERJAAN : THICKENER PONDASI POMPA 47 P 510 A&B 9 x 4,4 PEKERJAAN : BELT FILTER PRESS SECONDARY PONDASI POMPA 47 P 512 25,4 x 10,4 x 2,75 PEKERJAAN : CLEAN WATER TANK PONDASI POMPA 47 P 511 A&B
CHEDULE PEMANCANGAN MENGGUNAKAN 2 CRANE DGN ASUMSI PRODUKTIVITAS 7 TITIK PANCANG/CRANE/HARI, 1 TITIK 30 M APRIL 24 25
6 16 9 3 26 2 65 6 1 1 9 2 12 6 1 1
18 5 -
19 1 4
20 5
21 5 -
22 2 3 -
23
26
27
28
29
30
5 -
1 3 1
5 2 3 5 5 5 5
5 18 5
5 19 5
5 20 5
5 21 5
5 22 5
5 23 5
91 3 26 18 1 6 1 18 2
5 5 APRIL 24 25 5 5
5 26 5
5 27 5
5 28 5
5 29 5
5 30 5
5 1 5
5 2 5
5 1 5
5 2 5
5 10 10 -
5 10 10 -
5 10 10 -
5 10 10 -
5 10 10 -
5 10 10 -
5 10 7 3
5 10 10 -
5 10 10 -
5 10 10 -
5 10 10 -
5 10 10 -
5 10 8 2
5 10 10 -
5 10 10 -
5 10 10 -
5 10 10 -
VERY TIANG PANCANG DENGAN ASUMSI 1 TRUK MEMBAWA 15 TIANG PANCANG PANJANG 10 M APRIL 23 24 5 5 5 5
MEI 25 5 5 26 5 5 27 5 5 28 5 5 29 5 5 30 5 5 1 5 5 2 5 5 3 5 5
17 5 5
18 5 5
19 5 5
20 5 5
21 5 5
22 5 5
15 5 5 5
15 5 5 5
15 5 5 5
15 5 5 5
15 5 5 5
15 5 5 5
15 10
15 10
15 10
15 10
15 10
15 10
15 2 2 2 3 3 3 15 10
15 5 5 5
15 5 5 5
15 5 5 5
15 5 5 5
15 5 5 5
15 10
15 10
15 10
15 10
15 10
15 3 3 3 2 2 2 15 10
15 5 5 5
5 15 5 5 5
5 15 5 5 5
5 15 5 5 5
15 10
15 10
15 10
15 10
SCHEDULE GALIAN MENGGUNAKAN 2 BACK HOE DGN ASUMSI PRODUKTIVITAS 40M3/HARI APRIL M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 4 1 4 1 1 1 1 6 1 1 1 1 1 14 111 2 1 MEI M3 M4
M3
M4
M1
M2
M1
5, 47 P 507 C&D 1 1 1 1 1 1
1 3 2 2 APRIL 24 25
18 97 19 1 2 30
19
20
21
22
23
26
27
28
29
30
11
12
13
14
15
16
17
18
19
2 3
3 1 1 5 4 1 1 4
3 2
4 1 5 18 1 1 19
5 3 5
5 4 1 3 1
5 5
5 6
5 7
5 8
5 5 MEI 9 10
5 11
5 12
5 13
5 14
5 15
5 16
5 17
5 5 5 5 3 1 1
5 1 4 5 5 10 10 5 5 10 10 4 1 5 10 10
5 10 10 -
5 10 6 4
5 10 5 5
5 10 5 5
5 10 5 5
5 10 5 5
5 10 5 5
5 10 5 5
5 10 2 8
5 10 10
5 10 10
5 10 10
5 10 10
1 1 2 2
4 5 5
MEI 5 6 5 5 5 5
7 5 5
8 5 5
9 5 5
10 5 5
11 5 5
12 2 2
13
14
15
16
17
18
19
20
5 15 5 5 5
15 10
5 15 1 1 1 4 4 4 15 10
15
15
15
15
15
15
2 3 3 3 15
5 5 5 15
5 5 5 15
5 5 5 15
5 5 5 15
5 5 5 15
5 5 5 15
5 5 5 15
5 5 5 15 10
5 5 5 15 10
5 5 5 15 10
5 5 5 15 10
5 5 5 15 10
5 5 5 15 10
5 5 5 15 10
5 5 5 15 10
5 5 5 15 10
5 5 5 15 10
5 5 5 15 10
5 5 5 15 10
5 5 5 15 10
5 5 5 15 10
2 2 2 6 2
332
M2
M3
M4
M1
M2
M3
M4
M1
M2
M3
M4
M1
M2
M3
M4
M1
M2
M3
MEI 9 10
11
12
13
14
15
16
17
18
19
20
M4
M1
M2
M3
M4
M1
M2
M3
M4
M1
M2
M3
M4
21
22
23
24
25
26
27
28
29
30
31
32
33
SPESIFIKASI DAN JUMLAH UKURAN TIANG PANCANG Diameter 40 Kelas A2 JMLH TTK PANCANG 213 KEDALAMAN PANCANG 30 KONFIGURASI PJG TP Upper 10 Middle 10 Botom 10 Upper Middle Botom 10 10 10 JMLH TIANG PCG SPEC 213 Presstressed Spun Concrete Piles, mutu beton K-600 kg/cm2, ukuran diameter 213 40 cm (PC wire 10 7), menggunakan joit plate dengan material material SS213 400 639 119 Presstressed Spun Concrete Piles, mutu beton K-600 kg/cm2, ukuran diameter 119 30 cm (PC wire 6 7) dan, menggunakan joit plate dengan material material SS119 400 357 996
Diameter 30 Kelas A2
119
30
TOTAL
DRAFT BQ PEKERJAAN PEMBANGUNAN INSTALASI PENGOLAH AIR LIMBAH (IPAL) PT. PERTAMINA (PERSERO) REFINERY UNIT IV CILACAP NO 3 3.1 3.1.1 3.1.2 3.1.3 3.1.4 3.1.5 3.1.6 3.1.7 3.1.8 3.1.9 3.1.10 3.1.11 3.1.12 3.1.13 3.1.14 URAIAN SIPIL PEKERJAAN : PONDASI POMPA FOC I & FOC II POTONG LANTAI BETON BERTULANG TEBAL : 15 CM GALIAN TANAH PEMADATAN TANAH DASAR PEMADATAN TANAH ATAS / LANTAI URUGAN TANAH KEMBALI & PEMADATAN BUANG TANAH EX GALIAN < 10 KM BATU BELAH ANSTAMPENG LANTAI KERJA BETON BERTULANG K-350 KG/CM2 BETON BERTULANG K-250 KG/CM2 (LANTAI / PAVING ) ANCHOR BOLT M-25, ASTM A-139 GRADE B, 700 MM GROUTING NON SHRINK GROUT SIKADUR 42 GROUTING NON SHRINK GROUT SIKADUR 214 PIPE SLEEVE GALV. DIA. 3" - PANJANG 30 CM SUB TOTAL PEKERJAAN : SITE PREPARATION BONGKAR BETON BERTULANG , TEBAL 25 CM STRIPPING AREA BUANG TANAH EX GALIAN < 10 KM SUB TOTAL VOLUME 1.00 1.00 42.00 56.70 42.00 19.44 22.31 34.39 7.34 1.12 21.06 2.43 36.00 850.50 1,743.59 36.00
3.3 3.3.1 3.3.2 3.3.3 3.3.4 3.3.5 3.3.6 3.3.7 3.3.8 3.3.8.1 3.3.8.2 3.3.8.3 3.3.8.4 3.3.8.5 3.3.9 3.3.10
PEKERJAAN : UNDER GROUND SEWER, CATCH BASSIN & PIPE SLEEVE 1.00 GALIAN TANAH 898.00 PEMADATAN TANAH DASAR 30.00 URUGAN TANAH KEMBALI & PEMADATAN 826.00 BUANG TANAH EX GALIAN < 10 KM 71.00 LANTAI KERJA 2.00 BETON BERTULANG K350 18.00 STEEL STRUCTURE 3,030.00 PIPA A-53 GRADE B , SCH.40. DSAW @ 6 MTR - DIA. 16" = 36 M 6.00 - DIA. 12" = 72 M 12.00 - DIA. 10" = 96 M 16.00 - DIA. 8" = 72 M 12.00 - DIA. 6" = 192 M 32.00 SANDBLASTING , CAT PRIMAIR IN ORGANIC ZINK, FININSH POLYAMIDE EPOXY 400.00 WRAPPING PIPA 2 LAYER, OVERLAPPING 50% 400.00 SUB TOTAL PEKERJAAN : OIL CATHHER 2 UNIT GALIAN TANAH URUGAN TANAH KEMBALI & PEMADATAN BUANG TANAH EX GALIAN < 10 KM 1.00 62.04 51.54 10.50
BATU BELAH ANSTAMPENG LANTAI KERJA BETON BERTULANG K-350 KG/CM2 SUB TOTAL PEKERJAAN : RABAT FIRE HYDRANT - 6 UNIT GALIAN TANAH PEMADATAN TANAH DASAR BUANG TANAH EX GALIAN PLASTIK SHEET BETON BERTULANG K-350 KG/CM2 SUB TOTAL
3.6 3.6.1 3.6.2 3.6.3 3.6.4 3.6.5 3.6.6 3.6.7 3.6.8 3.6.9 3.6.10
PEKERJAAN : JALAN, OPEN DICH & GRAVEL - NEW AREA IPAL 1.00 GALIAN JALAN & OVEN DICH 2,972.10 BUANG TANAH EX GALIAN < 10 KM 2,972.10 PEMADATAN TANAH DASAR & PONDASI BANDAN JALAN (MENGGUNAKAN VIBRATOR ) 13,978.00 BATU BELAH ANSTAMPENG 1,258.02 URUGAN SIRTU ( PASIR + BATU ) 1,551.56 URUGAN GRAVEL 754.65 PENGASPALAN, TEBAL 7,5 CM ( HOT MIX ) 2,303.40 HAMPARAN GRAVEL - NEW AREA IPAL 343.14 BETON BERTULANG K-250 KG/CM2 116.77 PLASTIK SHEET 973.06 SUB TOTAL PEKERJAAN : SUB STATION 40 SS 12 PEMANCANGAN DIAMETER 40CM POTONG TIANG PANCANG GALIAN TANAH URUGAN TANAH KEMBALI & PEMADATAN PEMADATAN TANAH DASAR BUANG TANAH EX GALIAN < 10 KM BATU BELAH ANSTAMPENG LANTAI KERJA BETON BERTULANG K-350 KG/CM2 PASANGAN BATU BATA CAMP.1:4 (SETENGAN BATA) - 105KG/CM2 PLESTER CAMP. 1: 4 , TEBAL 2CM & ACIAN FLOOR HARDENER LANTAI ACID RESISTANT COATING WATER PROOFING ATAP STEEL STRUCTURE - HAND RAIL PIPA - PLATE BAR 75 X 6 MM - CHANNAL 150 X 75 X 6,5 MM TALANG AIR SENG GALV. BJLS 80 PAGAR BRC HOT DIP GALV. TINGGI 175CM & INCLUDE PINTU PINTU RANGKA PIPA DIA. 2" ( HOT DIP GALV.) - 185 M X 1,2 M - 185 M X 1,2 M 1.00 480.00 16.00 168.00 142.71 154.46 25.29 6.91 4.62 131.50 339.47 766.78 1,071.97 61.50 203.78 388.49 118.09 1,829.66 17.14 17.00 2.00 2.00
3.7 3.7.1 3.7.2 3.7.3 3.7.4 3.7.5 3.7.6 3.7.7 3.7.8 3.7.9 3.7.10 3.7.11 3.7.12 3.7.13 3.7.14 3.7.15 3.7.15.1 3.7.15.2 3.7.15.3 3.7.16 3.7.17 3.7.18 3.7.18.1 3.7.18.2
3.7.19 3.7.20 3.7.21 3.7.21.1 3.7.21.2 3.7.22 3.7.23 3.7.24 3.7.25 3.7.25.1 3.7.25.2 3.7.25.3 3.7.26 3.7.27 3.7.28 3.7.29 3.7.30 3.7.31 3.7.32 3.7.33
SUPPORT RANGKA PIPA DIA. 2" ( HOT DIP GALV ) 25.00 GEMBOK PINTU ( YALE / SETARA ) 3.00 PINTU , KUSEN ENGSEL, HANDLE PANIC DOOR, DOOR CLOSED & ACCESSORIES - 2,3 M X 1 M 4.00 - 1,2 M X 0,9 M 2.00 BUAT TALI AIR PADA DINDING UKURAN 1CM X 2 CM 340.00 SEALER UNTUK TALI AIR 85.00 PLAMEUR , ACT FINISH ( DULUX) U/ DINDING 825.09 SANDBLASTING , CAT PRIMAIR IN ORGANIC ZINK, FININSH POLYAMIDE EPOXY - HAND RAIL PIPA 105.00 - PLATE BAR 75 X 6 MM 4.19 - CHANNAL 150 X 75 X 6,5 MM 58.80 HAMPARAN GRAVEL UKURAN 2/3 & 3/5 19.44 ANCHOR BOLT M-25, ASTM A-139 GRADE B, 700 MM 8.00 GROUTING NON SHRINK GROUT SIKADUR 214 434.01 PIPE SLEEVE GALV. DIA. 3" - PANJANG 30 CM 8.00 EXHAUST FAN ( PANASONIC / SETARA ) 2.00 LEM BETON ( SIKA BOND NV ) 10 KG/CAN 10.00 CURING COMPOUNDS ( SIKA ANTI SOL - E125) 20KG/CAN 7.00 TAG NUMBER - GEDUNG 1.00 SUB TOTAL PEKERJAAN : CONTROL ROOM 40 BD 12 1.00 PEMANCANGAN DIAMETER 40CM 180.00 POTONG TIANG PANCANG 6.00 GALIAN TANAH 147.75 URUGAN TANAH KEMBALI & PEMADATAN 117.75 PEMADATAN TANAH DASAR 211.09 BUANG TANAH EX GALIAN 30.00 URUGAN PASIR PASANG / COR 13.85 BATU BELAH ANSTAMPENG ( BATU KALI ) 5.54 LANTAI KERJA 4.46 BETON BERTULANG K-350 KG/CM2 33.80 PASANGAN BATU BATA CAMP.1:4 (SETENGAN BATA) - 105KG/CM2 199.57 BETON BERTULANG K-250 KG/CM2 5.14 PLESTER CAMP. 1: 4 , TEBAL 2CM & ACIAN 399.14 ACID RESISTANT COATING 20.00 WATER PROOFING ATAP 105.34 PASANG KERAMIK - KW 1 69.20 PASANG PINTU BESI, KUSEN, ENGSEL, HANDLE PANIC DOOR, DOOR CLOSER & ACCESSORIES - PINTU BESI FIRE DOOR 5.00 - PINTU ALUMINIUM 1.00 - JENDELA ALUMINIUM + DAUN JENDELA + KACA 2.00 - JENDELA ALUMINIUM + KACA MATI 3.00 PLAFOND AKUSTIK + RANGKA ALUMINIUM 76.96 PLAMEUR , ACT FINISH ( DULUX) U/ DINDING - BAGIAN LUAR ( DULUX - WHEATER SHIELD ) 130.00 - BAGIAN DALAM ( DULUX - PENTALITE ) 251.00 BIS BETON 1/2 DIA. 20 CM 41.60 PIPA PVC DIA 4" & 1"
3.8 3.8.1 3.8.2 3.8.3 3.8.4 3.8.5 3.8.6 3.8.7 3.8.8 3.8.9 3.8.10 3.8.11 3.8.12 3.8.13 3.8.14 3.8.15 3.8.16 3.8.17 3.8.17.1 3.8.17.2 3.8.17.3 3.8.17.4 3.8.18 3.8.19 3.8.19.1 3.8.19.2 3.8.20 3.8.21
3.8.21.1 3.8.21.2 3.8.21.3 3.8.21.4 3.8.21.5 3.8.21.6 3.8.21.7 3.8.22 3.8.23 3.8.24 3.8.25 3.8.26 3.8.27 3.8.28 3.8.29 3.8.30 3.8.31 3.8.32 3.8.33 3.8.34 3.8.35
- TALANG AIR DIA 4" - JALUR AIR KOTOR & SEPTIK TANK DIA 4" - ELBOW DIA 4" + T + ACCESSORIES - JALUR AIR BERSIH PIPA PVC DIA 1" - ELBOW DIA 1" + T + ACCESSORIES - LEM - AMPLAS BAK CUCI PIRING STAINLESS STEEL INSTALASI KRAN AIR CLOSET DUDUK BAK FIBBRE / PENAMPUNG AIR GANTUNGAN HANDUK FLOOR DRAIN ROOF DRAIN LEMARI DAPUR 2 M X 0.6 X 0.9 M RESAPAN 2M X 2 M X 2 M EXHAUST FAN (PANASINIC / SETARA ) LEM BETON ( SIKA BOND NV ) 10KG/CAN CURING COMPOUNDS ( SIKA ANTI SOL - E125) 20KG/CAN TAG NUMBER - GEDUNG PLASTIK SHEET SUB TOTAL PEKERJAAN : CPI SEPARATOR GALIAN TANAH PASANG BATU KALI 1:4 LANTAI KERJA BETON K350 KEDAP AIR TIANG PANCANG D30 POTONG TIANG PANCANG STUCTURE STEEL SANDBLASTING & PAINTING CAT DINDING LUAR WATER STOP 400 MM ADJUSTABLE WEIR SS316L SUB TOTAL PEKERJAAN : DAF GALIAN TANAH PASANG BATU KALI 1:4 LANTAI KERJA BETON K350 TIANG PANCANG 40 CM POTONG TIANG PANCANG STEEL STUCTURE ATAP ASBES GELOMBANG ( BESAR) BETON K250 ANCHOR BOLT M-25, ASTM A-139 GRADE B, GALV. - 700 MM SANDBLASTING & PAINTING PERAWATAN BETON
72.00 24.00 34.00 24.00 30.00 6.00 10.00 1.00 1.00 1.00 1.00 1.00 1.00 6.00 1.00 1.00 2.00 10.00 5.00 1.00 60.00
3.9 3.9.1 3.9.2 3.9.3 3.9.4 3.9.5 3.9.6 3.9.7 3.9.8 3.9.9 3.9.10 3.9.11
1.00 71.00 181.00 5.00 66.00 180.00 6.00 1,100.00 70.00 100.00 49.70 380.00
3.10 3.10.1 3.10.2 3.10.3 3.10.4 3.10.5 3.10.6 3.10.7 3.10.8 3.10.9 3.10.10 3.10.11 3.10.12
1.00 232.00 72.00 21.00 154.00 270.00 9.00 6,601.00 215.00 14.00 48.00 325.00 300.00
GROUTING NON SHRING BUMBUNGAN ATAP HS BOLT ASTM 325 M16 SUB TOTAL
3.11 3.11.1 3.11.2 3.11.3 3.11.4 3.11.5 3.11.6 3.11.7 3.11.8 3.11.9 3.11.10 3.11.11 3.11.12 3.11.13 3.11.14 3.11.15
PEKERJAAN : BAK AERASI GALIAN TANAH PASANG BATU KALI 1:4 LANTAI KERJA STUCTURE STEEL ( BESI L & PLATE ) BETON K350 KEDAP AIR WATER STOP 400 SLING DIA 3/4" TIANG PANCANG DIA. 40CM POTONG TIANG PANCANG GROUTING NON SHRING SANDBLASTING & PAINTING CAT DINDING LUAR WATER PROOFING DINDING & LANTAI PERAWATAN BETON TES KEBOCORAN SUB TOTAL PEKERJAAN : BELT FILTER PRESS PRIMARY GALIAN TANAH PASANG BATU KALI 1 : 4 LANTAI KERJA BETON K350 TIANG PANCANG 30 CM POTONG TIANG PANCANG STEEL STUCTURE ATAP ASBES GELOMBANG ( BESAR) BETON K250 ANCHOR BOLT M-25, ASTM A-139 GRADE B, GALV. - 700 MM SANDBLASTING & PAINTING PERAWATAN BETON GROUTING NON SHRING HS BOLT ASTM 325 M16 TALANG AIR SUB TOTAL PEKERJAAN : BELT FILTER PRESS SECONDARY GALIAN TANAH PASANG BATU KALI 1:4 LANTAI KERJA BETON K350 TIANG PANCANG 30 CM POTONG TIANG PANCANG STEEL STUCTURE ATAP ASBES GELOMBANG ( BESAR)
1.00 4,445.00 832.00 277.00 8,133.00 2,049.00 163.00 120.00 3,510.00 117.00 60.00 360.00 773.00 4,440.00 5,450.00 1.00
3.12 3.12.1 3.12.2 3.12.3 3.12.4 3.12.5 3.12.6 3.12.7 3.12.8 3.12.9 3.12.10 3.12.11 3.12.12 3.12.13 3.12.14 3.12.15
1.00 83.00 16.00 6.00 9.00 180.00 6.00 4,182.00 115.00 6.00 50.00 185.00 70.00 466.00 330.00 1.00
BETON K250 ANCHOR BOLT M-25, ASTM A-139 GRADE B, GALV. - 700 MM SANDBLASTING & PAINTING PERAWATAN BETON GROUTING NON SHRING HS BOLT ASTM 325 M16 TALANG AIR SUB TOTAL PEKERJAAN : OIL STORAGE TANK GALIAN TANAH PASANG BATU KALI 1:4 LANTAI KERJA BETON K350 BETON K250 TIANG PANCANG DIA. 30 CM POTONG TIANG PANCANG SANDBLASTING & PAINTING PERAWATAN BETON STUCTURE STEEL PIPA 8" A53B GATE VALVE 8" WRAPING FLANGE 8" GASKET 8" PIPA 14" SLEEVE A53B SUB TOTAL PEKERJAAN : CLEAN WATER TANK GALIAN TANAH PASANG BATU KALI 1:4 LANTAI KERJA STUCTURE STEEL ( BESI L & PLATE ) BETON K350 KEDAP AIR WATER STOP 400 TIANG PANCANG DIA. 30CM POTONG TIANG PANCANG SANDBLASTING & PAINTING CAT DINDING LUAR WATER PROOFING DINDING & LANTAI PERAWATAN BETON TES KEBOCORAN SUB TOTAL PEKERJAAN : BAK EKUALISASI GALIAN TANAH PASANG BATU KALI 1:4 LANTAI KERJA STUCTURE STEEL ( BESI L & PLATE ) BETON K350 KEDAP AIR
3.14 3.14.1 3.14.2 3.14.3 3.14.4 3.14.5 3.14.6 3.14.7 3.14.8 3.14.9 3.14.10 3.14.11 3.14.12 3.14.13 3.14.14 3.14.15 3.14.16
1.00 73.00 16.00 5.00 9.00 17.00 30.00 1.00 30.00 120.00 83.00 4.00 1.00 22.00 2.00 2.00 3.00
3.15 3.15.1 3.15.2 3.15.3 3.15.4 3.15.5 3.15.6 3.15.7 3.15.8 3.15.9 3.15.10 3.15.11 3.15.12 3.15.13
1.00 1,185.00 97.00 32.00 3,718.00 303.00 150.00 540.00 18.00 165.00 180.00 696.00 996.00 1.00
3.16.6 3.16.7 3.16.8 3.16.9 3.16.10 3.16.11 3.16.12 3.16.13 3.16.14 3.16.15 3.16.16
WATER STOP 400 SLING DIA 3/4" TIANG PANCANG DIA. 40CM POTONG TIANG PANCANG GROUTING NON SHRING EPOXY GROUTING NON SHRING SANDBLASTING & PAINTING CAT DINDING LUAR WATER PROOFING DINDING & LANTAI PERAWATAN BETON TES KEBOCORAN SUB TOTAL PEKERJAAN : API SEPARATOR GALIAN TANAH PASANG BATU KALI 1:4 LANTAI KERJA STUCTURE STEEL ( BESI L & PLATE ) BETON K350 KEDAP AIR WATER STOP 400 TIANG PANCANG DIA. 30 CM POTONG TIANG PANCANG GRATING ADJUSTABLE WEIR SS316L GROUTING NON SHRING EPOXY SANDBLASTING & PAINTING CAT DINDING LUAR SUB TOTAL PEKERJAAN : TANKI SEDIMENTASI A&B GALIAN TANAH PASANG BATU KALI 1:4 LANTAI KERJA STUCTURE STEEL ( BESI L & PLATE ) BETON K350 KEDAP AIR WATER STOP 400 TIANG PANCANG DIA. 30CM POTONG TIANG PANCANG SANDBLASTING & PAINTING CAT DINDING LUAR WATER PROOFING DINDING & LANTAI PERAWATAN BETON TES KEBOCORAN PLATE SS316L GRATING GALVANIZING SUB TOTAL PEKERJAAN : PENGENTAL PASIR GALIAN TANAH
163.00 120.00 1,950.00 65.00 120.00 451.00 165.00 611.00 2,446.00 2,100.00 1.00
3.17 3.17.1 3.17.2 3.17.3 3.17.4 3.17.5 3.17.6 3.17.7 3.17.8 3.17.9 3.17.10 3.17.11 3.17.12 3.17.13
1.00 120.00 425.00 10.00 5,376.80 96.00 424.50 360.00 12.00 4.30 278.00 36.00 80.00 112.00
3.18 3.18.1 3.18.2 3.18.3 3.18.4 3.18.5 3.18.6 3.18.7 3.18.8 3.18.9 3.18.10 3.18.11 3.18.12 3.18.13 3.18.14 3.18.15 3.18.16
1.00 741.00 77.00 25.00 19,211.00 523.00 75.00 780.00 26.00 415.00 190.00 887.00 650.00 1.00 1,640.00 20.00 10,990.00
3.19 3.19.1
1.00 21.00
3.19.2 3.19.3 3.19.4 3.19.5 3.19.6 3.19.7 3.19.8 3.19.9 3.19.10 3.19.11 3.19.12 3.19.13 3.19.14 3.19.15 3.19.16
PASANG BATU KALI 1:4 LANTAI KERJA STUCTURE STEEL ( BESI L & PLATE ) BETON K350 KEDAP AIR WATER STOP 400 TIANG PANCANG DIA. 30CM POTONG TIANG PANCANG SANDBLASTING & PAINTING CAT DINDING LUAR WATER PROOFING DINDING & LANTAI PERAWATAN BETON TES KEBOCORAN PLATE SS316L GRATING GALVANIZING SUB TOTAL PEKERJAAN : THICKENER GALIAN TANAH PASANG BATU KALI 1:4 LANTAI KERJA STUCTURE STEEL ( BESI L & PLATE ) BETON K350 KEDAP AIR WATER STOP 400 TIANG PANCANG DIA. 30CM POTONG TIANG PANCANG SANDBLASTING & PAINTING CAT DINDING LUAR WATER PROOFING DINDING & LANTAI PERAWATAN BETON TES KEBOCORAN PLATE SS316L GRATING GALVANIZING SUB TOTAL PEKERJAAN : PONDASI POMPA INSIDE BATTERY LIMIT GALIAN TANAH BATU BELAH ANSTAMPENG TIANG PANCANG DIAMETER 30 CM POTONG TIANG PANCANG LANTAI KERJA BETON K350 KEDAP AIR BETON K350 GROUTING NON SHRING EPOXY GROUTING NON SHRING ANCHOR BOLT M-25, ASTM A-139 GRADE B, GALV. - 700 MM SUB TOTAL PEKERJAAN : OUTSIDE BATTREY LIMIT IPAL (DBC; PBC; EC)
45.00 10.00 3,884.00 96.00 35.00 270.00 9.00 97.00 19.00 185.00 113.00 1.00 1,290.00 27.00 560.00
3.20 3.20.1 3.20.2 3.20.3 3.20.4 3.20.5 3.20.6 3.20.7 3.20.8 3.20.9 3.20.10 3.20.11 3.20.12 3.20.13 3.20.14 3.20.15 3.20.16
1.00 42.00 89.00 20.00 7,770.00 190.00 35.00 540.00 18.00 196.00 38.00 368.00 450.00 1.00 2,580.00 54.00 1,120.00
3.21 3.21.1 3.21.2 3.21.3 3.21.4 3.21.5 3.21.6 3.21.7 3.21.8 3.21.9 3.21.10
1.00 286.00 28.00 510.00 17.00 5.02 30.00 122.00 3,572.00 7,270.00 150.00
3.22
1.00
3.22.1 3.22.2 3.22.3 3.22.4 3.22.5 3.22.6 3.22.7 3.22.8 3.22.9 3.22.10 3.22.11 3.22.12 3.22.13 3.22.14 3.22.15 3.22.16 3.22.17 3.22.18 3.22.19 3.22.20
GALIAN TANAH 5,484.90 PEMADATAN TANAH DASAR 2,004.78 URUGAN TANAH KEMBALI & PEMADATAN 3,017.06 BUANG TANAH EX GALIAN < 10 KM 2,561.92 BATU BELAH ANSTAMPENG 569.38 LANTAI KERJA 138.09 BETON BERTULANG K-350 KG/CM2 1,074.36 STEEL STRUCTURE 34,164.05 SANDBLASTING , CAT PRIMAIR IN ORGANIC ZINK, FININSH POLYAMIDE1,053.88 EPOXY ANCHOR BOLT M-25, ASTM A-139 GRADE B, GALV. - 700 MM 372.00 HS BOLT ASTM 325 M16 684.00 GROUTING NON SHRING EPOXY 850.00 GROUTING NON SHRING 1,745.00 PENGASPALAN TEBAL 7.5 CM ( HOT MIX) 51.00 PEMASANGAN BATU KALI CAMPURAN 1:4 92.80 PLESTERAN CAMPURAN 1:4, TEBAL 2.5CM & DIACI 293.15 POTONG LANTAI 37.50 BETON BERTULANG K250 37.50 PLASTIK SHEET 250.00 CAT LANTAI WARNA MERAH 275.00 SUB TOTAL PODASI LAIN-LAIN GALIAN TANAH LANTAI KERJA BETON BERTULANG K-350 KG/CM2 ANCHOR BOLT M-25, ASTM A-139 GRADE B, GALV. - 700 MM SUB TOTAL TOTAL KESELURUHAN
UNAN INSTALASI PENGOLAH AIR LIMBAH (IPAL) RSERO) REFINERY UNIT IV CILACAP SATUAN LS LS M2 M3 M2 M2 M3 M3 M3 M3 M3 M3 BH KG KG BH BIAYA Normal M3 Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. K-350 Kedap Air M3
2.00 6.00 3.00 2.00 1.00 1.00 3.00 3.00 4.00 4.00 4.00 4.00
21.06
LS M3 M3 M3
30.00 2.00 28.00 3.00 4.00 1.00 7.00 3.00 6.00 8.00 6.00 16.00 2.00 4.00
LS M3 M2 M3 M3 M3 M3 KG JT JT JT JT JT M2 M2
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
18.00
LS M3 M3 M3
M3 M3 M3
9.28
LS M3 M3 M3 M2 M3
4.05
60.00 60.00 56.00 84.00 52.00 47.00 47.00 47.00 3.00 56.00
LS M3 M3 M2 M3 M3 M3 M2 M3 M3 M2
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
3.20 5.60 4.76 10.30 0.84 2.30 9.24 4.38 13.58 25.56 35.73 35.73 6.79 7.77 3.94 12.20
15.00 15.00 6.00 5.00 11.00 3.00 10.00 5.00 14.00 26.00 36.00 36.00 7.00 8.00 4.00 13.00 3.00 3.00 1.00 1.00
LS M BH M3 M3 M3 M3 M3 M3 M3 M2 M2 KG M2 M2 KG KG KG M2 M2 BH BH
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
131.50
3.00 2.00 1.00 1.00 34.00 34.00 28.00 3.00 2.00 20.00
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
LS M BH M3 M3 M3 M3 M2 M3 M3 M3 M2 M3 M2 M2 M2 M2 BH BH BH BH M2 M2 M2 M
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
33.80
M M BH M BH CAN LBR UNIT LS SET SET SET SET SET SET SET UNIT KG CAN LS M2
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
LS M3 M3 M3 M3 M' BH KG M2 M2 M' KG
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
66.00
LS M3 M3 M3 M3 M' BH KG M2 M3 BH M2 M2
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
154.00
KG M' PCS
16.71
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
2,049.00
LS M3 M3 M3 M3 M' BH KG M2 M3 BH M2 M2 KG PCS LS
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
9.00
LS M3 M3 M3 M3 M' BH KG M2
4.00
M3 BH M2 M2 KG PCS LS
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
9.00
LS M3 M3 M3 KG M3 M' M' BH M2 M2 M2 M2 LS
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
303.00
LS M3 M3 M3 KG M3
1,170.00
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
LS M3 M3 M3 KG M3 M' M' BH M2 KG KG M2 M2
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
96.00
LS M3 M3 M3 KG M3 M' M' BH M2 M2 M2 M2 LS KG M2 KG
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
523.00
LS M3
Rp.
M3 M3 KG M3 M' M' BH M2 M2 M2 M2 LS KG M2 KG
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
96.00
LS M3 M3 M3 KG M3 M' M' BH M2 M2 M2 M2 LS KG M2 KG
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
190.00
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
30.00 122.00
LS
M3 M2 M3 M3 M3 M3 M3 KG M2 PCS pcs KG KG M2 M3 M2 M3 M3 M2 M2
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
1,074.36
M3 M3 M3 PCS
30.00
1,620.05
4,523.00
K-250 M3
Jumlah Ttk
TP 40 Panjang
Batang/10M
Jumlah Ttk
TP 30 Panjang
2.43
116.77
16.00
30.00
48.00
6.00
30.00
18.00
5.14
6.00
30.00
9.00
30.00
27.00
14.00
117.00
30.00
351.00
6.00
30.00
6.00
6.00
30.00
6.00
18.00
30.00
65.00
30.00
195.00
12.00
30.00
26.00
30.00
9.00
30.00
18.00
30.00
17.00
30.00
37.50
204.84
TP 30 Batang/10M
18.00
18.00
18.00
3.00
54.00
36.00
78.00
27.00
54.00
51.00
DRAFT BQ PEKERJAAN PEMBANGUNAN INSTALASI PENGOLAH AIR LIMBAH (IPAL) PT. PERTAMINA (PERSERO) REFINERY UNIT IV CILACAP NO 3 3.1 3.1.1 3.1.2 3.1.3 3.1.4 3.1.5 3.1.6 3.1.7 3.1.8 3.1.9 3.1.10 3.1.11 3.1.12 3.1.13 3.1.14
3.3 3.3.1 3.3.2 3.3.3 3.3.4 3.3.5 3.3.6 3.3.7 3.3.8 3.3.8.1 3.3.8.2 3.3.8.3 3.3.8.4 3.3.8.5 3.3.9 3.3.10
3.6 3.6.1 3.6.2 3.6.3 3.6.4 3.6.5 3.6.6 3.6.7 3.6.8 3.6.9 3.6.10
3.7 3.7.1 3.7.2 3.7.3 3.7.4 3.7.5 3.7.6 3.7.7 3.7.8 3.7.9 3.7.10 3.7.11 3.7.12 3.7.13 3.7.14 3.7.15 3.7.15.1 3.7.15.2 3.7.15.3 3.7.16 3.7.17 3.7.18 3.7.18.1 3.7.18.2
3.7.19 3.7.20 3.7.21 3.7.21.1 3.7.21.2 3.7.22 3.7.23 3.7.24 3.7.25 3.7.25.1 3.7.25.2 3.7.25.3 3.7.26 3.7.27 3.7.28 3.7.29 3.7.30 3.7.31 3.7.32 3.7.33
3.8 3.8.1 3.8.2 3.8.3 3.8.4 3.8.5 3.8.6 3.8.7 3.8.8 3.8.9 3.8.10 3.8.11 3.8.12 3.8.13 3.8.14 3.8.15 3.8.16 3.8.17 3.8.17.1 3.8.17.2 3.8.17.3 3.8.17.4 3.8.18 3.8.19 3.8.19.1 3.8.19.2 3.8.20 3.8.21
3.8.21.1 3.8.21.2 3.8.21.3 3.8.21.4 3.8.21.5 3.8.21.6 3.8.21.7 3.8.22 3.8.23 3.8.24 3.8.25 3.8.26 3.8.27 3.8.28 3.8.29 3.8.30 3.8.31 3.8.32 3.8.33 3.8.34 3.8.35
3.9 3.9.1 3.9.2 3.9.3 3.9.4 3.9.5 3.9.6 3.9.7 3.9.8 3.9.9 3.9.10 3.9.11
3.10 3.10.1 3.10.2 3.10.3 3.10.4 3.10.5 3.10.6 3.10.7 3.10.8 3.10.9 3.10.10 3.10.11 3.10.12
3.11 3.11.1 3.11.2 3.11.3 3.11.4 3.11.5 3.11.6 3.11.7 3.11.8 3.11.9 3.11.10 3.11.11 3.11.12 3.11.13 3.11.14 3.11.15
3.12 3.12.1 3.12.2 3.12.3 3.12.4 3.12.5 3.12.6 3.12.7 3.12.8 3.12.9 3.12.10 3.12.11 3.12.12 3.12.13 3.12.14 3.12.15
3.14 3.14.1 3.14.2 3.14.3 3.14.4 3.14.5 3.14.6 3.14.7 3.14.8 3.14.9 3.14.10 3.14.11 3.14.12 3.14.13 3.14.14 3.14.15 3.14.16
3.15 3.15.1 3.15.2 3.15.3 3.15.4 3.15.5 3.15.6 3.15.7 3.15.8 3.15.9 3.15.10 3.15.11 3.15.12 3.15.13
3.16.6 3.16.7 3.16.8 3.16.9 3.16.10 3.16.11 3.16.12 3.16.13 3.16.14 3.16.15 3.16.16
3.17 3.17.1 3.17.2 3.17.3 3.17.4 3.17.5 3.17.6 3.17.7 3.17.8 3.17.9 3.17.10 3.17.11 3.17.12 3.17.13
3.18 3.18.1 3.18.2 3.18.3 3.18.4 3.18.5 3.18.6 3.18.7 3.18.8 3.18.9 3.18.10 3.18.11 3.18.12 3.18.13 3.18.14 3.18.15 3.18.16
3.19 3.19.1
3.19.2 3.19.3 3.19.4 3.19.5 3.19.6 3.19.7 3.19.8 3.19.9 3.19.10 3.19.11 3.19.12 3.19.13 3.19.14 3.19.15 3.19.16
3.20 3.20.1 3.20.2 3.20.3 3.20.4 3.20.5 3.20.6 3.20.7 3.20.8 3.20.9 3.20.10 3.20.11 3.20.12 3.20.13 3.20.14 3.20.15 3.20.16
3.21 3.21.1 3.21.2 3.21.3 3.21.4 3.21.5 3.21.6 3.21.7 3.21.8 3.21.9 3.21.10
3.22
3.22.1 3.22.2 3.22.3 3.22.4 3.22.5 3.22.6 3.22.7 3.22.8 3.22.9 3.22.10 3.22.11 3.22.12 3.22.13 3.22.14 3.22.15 3.22.16 3.22.17 3.22.18 3.22.19 3.22.20
DRAFT BQ PEKERJAAN PEMBANGUNAN INSTALASI PENGOLAH AIR LIMBAH (IPAL) PT. PERTAMINA (PERSERO) REFINERY UNIT IV CILACAP URAIAN SIPIL PEKERJAAN : PONDASI POMPA FOC I & FOC II POTONG LANTAI BETON BERTULANG TEBAL : 15 CM GALIAN TANAH PEMADATAN TANAH DASAR PEMADATAN TANAH ATAS / LANTAI URUGAN TANAH KEMBALI & PEMADATAN BUANG TANAH EX GALIAN < 10 KM BATU BELAH ANSTAMPENG LANTAI KERJA BETON BERTULANG K-350 KG/CM2 BETON BERTULANG K-250 KG/CM2 (LANTAI / PAVING ) ANCHOR BOLT M-25, ASTM A-139 GRADE B, 700 MM GROUTING NON SHRINK GROUT SIKADUR 42 GROUTING NON SHRINK GROUT SIKADUR 214 PIPE SLEEVE GALV. DIA. 3" - PANJANG 30 CM SUB TOTAL PEKERJAAN : SITE PREPARATION BONGKAR BETON BERTULANG , TEBAL 25 CM STRIPPING AREA BUANG TANAH EX GALIAN < 10 KM SUB TOTAL PEKERJAAN : UNDER GROUND SEWER, CATCH BASSIN & PIPE SLEEVE GALIAN TANAH PEMADATAN TANAH DASAR URUGAN TANAH KEMBALI & PEMADATAN BUANG TANAH EX GALIAN < 10 KM LANTAI KERJA BETON BERTULANG K350 STEEL STRUCTURE PIPA A-53 GRADE B , SCH.40. DSAW @ 6 MTR - DIA. 16" = 36 M - DIA. 12" = 72 M - DIA. 10" = 96 M - DIA. 8" = 72 M - DIA. 6" = 192 M SANDBLASTING , CAT PRIMAIR IN ORGANIC ZINK, FININSH POLYAMIDE EPOXY WRAPPING PIPA 2 LAYER, OVERLAPPING 50% SUB TOTAL PEKERJAAN : OIL CATHHER 2 UNIT GALIAN TANAH URUGAN TANAH KEMBALI & PEMADATAN BUANG TANAH EX GALIAN < 10 KM
BATU BELAH ANSTAMPENG LANTAI KERJA BETON BERTULANG K-350 KG/CM2 SUB TOTAL PEKERJAAN : RABAT FIRE HYDRANT - 6 UNIT GALIAN TANAH PEMADATAN TANAH DASAR BUANG TANAH EX GALIAN PLASTIK SHEET BETON BERTULANG K-350 KG/CM2 SUB TOTAL PEKERJAAN : JALAN, OPEN DICH & GRAVEL - NEW AREA IPAL GALIAN JALAN & OVEN DICH BUANG TANAH EX GALIAN < 10 KM PEMADATAN TANAH DASAR & PONDASI BANDAN JALAN (MENGGUNAKAN VIBRATOR ) BATU BELAH ANSTAMPENG URUGAN SIRTU ( PASIR + BATU ) URUGAN GRAVEL PENGASPALAN, TEBAL 7,5 CM ( HOT MIX ) HAMPARAN GRAVEL - NEW AREA IPAL BETON BERTULANG K-250 KG/CM2 PLASTIK SHEET SUB TOTAL PEKERJAAN : SUB STATION 40 SS 12 PEMANCANGAN DIAMETER 40CM POTONG TIANG PANCANG GALIAN TANAH URUGAN TANAH KEMBALI & PEMADATAN PEMADATAN TANAH DASAR BUANG TANAH EX GALIAN < 10 KM BATU BELAH ANSTAMPENG LANTAI KERJA BETON BERTULANG K-350 KG/CM2 PASANGAN BATU BATA CAMP.1:4 (SETENGAN BATA) - 105KG/CM2 PLESTER CAMP. 1: 4 , TEBAL 2CM & ACIAN FLOOR HARDENER LANTAI ACID RESISTANT COATING WATER PROOFING ATAP STEEL STRUCTURE - HAND RAIL PIPA - PLATE BAR 75 X 6 MM - CHANNAL 150 X 75 X 6,5 MM TALANG AIR SENG GALV. BJLS 80 PAGAR BRC HOT DIP GALV. TINGGI 175CM & INCLUDE PINTU PINTU RANGKA PIPA DIA. 2" ( HOT DIP GALV.) - 185 M X 1,2 M - 185 M X 1,2 M
SUPPORT RANGKA PIPA DIA. 2" ( HOT DIP GALV ) GEMBOK PINTU ( YALE / SETARA ) PINTU , KUSEN ENGSEL, HANDLE PANIC DOOR, DOOR CLOSED & ACCESSORIES - 2,3 M X 1 M - 1,2 M X 0,9 M BUAT TALI AIR PADA DINDING UKURAN 1CM X 2 CM SEALER UNTUK TALI AIR PLAMEUR , ACT FINISH ( DULUX) U/ DINDING SANDBLASTING , CAT PRIMAIR IN ORGANIC ZINK, FININSH POLYAMIDE EPOXY - HAND RAIL PIPA - PLATE BAR 75 X 6 MM - CHANNAL 150 X 75 X 6,5 MM HAMPARAN GRAVEL UKURAN 2/3 & 3/5 ANCHOR BOLT M-25, ASTM A-139 GRADE B, 700 MM GROUTING NON SHRINK GROUT SIKADUR 214 PIPE SLEEVE GALV. DIA. 3" - PANJANG 30 CM EXHAUST FAN ( PANASONIC / SETARA ) LEM BETON ( SIKA BOND NV ) 10 KG/CAN CURING COMPOUNDS ( SIKA ANTI SOL - E125) 20KG/CAN TAG NUMBER - GEDUNG SUB TOTAL PEKERJAAN : CONTROL ROOM 40 BD 12 PEMANCANGAN DIAMETER 40CM POTONG TIANG PANCANG GALIAN TANAH URUGAN TANAH KEMBALI & PEMADATAN PEMADATAN TANAH DASAR BUANG TANAH EX GALIAN URUGAN PASIR PASANG / COR BATU BELAH ANSTAMPENG ( BATU KALI ) LANTAI KERJA BETON BERTULANG K-350 KG/CM2 PASANGAN BATU BATA CAMP.1:4 (SETENGAN BATA) - 105KG/CM2 BETON BERTULANG K-250 KG/CM2 PLESTER CAMP. 1: 4 , TEBAL 2CM & ACIAN ACID RESISTANT COATING WATER PROOFING ATAP PASANG KERAMIK - KW 1 PASANG PINTU BESI, KUSEN, ENGSEL, HANDLE PANIC DOOR, DOOR CLOSER & ACCESSORIES - PINTU BESI FIRE DOOR - PINTU ALUMINIUM - JENDELA ALUMINIUM + DAUN JENDELA + KACA - JENDELA ALUMINIUM + KACA MATI PLAFOND AKUSTIK + RANGKA ALUMINIUM PLAMEUR , ACT FINISH ( DULUX) U/ DINDING - BAGIAN LUAR ( DULUX - WHEATER SHIELD ) - BAGIAN DALAM ( DULUX - PENTALITE ) BIS BETON 1/2 DIA. 20 CM PIPA PVC DIA 4" & 1"
- TALANG AIR DIA 4" - JALUR AIR KOTOR & SEPTIK TANK DIA 4" - ELBOW DIA 4" + T + ACCESSORIES - JALUR AIR BERSIH PIPA PVC DIA 1" - ELBOW DIA 1" + T + ACCESSORIES - LEM - AMPLAS BAK CUCI PIRING STAINLESS STEEL INSTALASI KRAN AIR CLOSET DUDUK BAK FIBBRE / PENAMPUNG AIR GANTUNGAN HANDUK FLOOR DRAIN ROOF DRAIN LEMARI DAPUR 2 M X 0.6 X 0.9 M RESAPAN 2M X 2 M X 2 M EXHAUST FAN (PANASINIC / SETARA ) LEM BETON ( SIKA BOND NV ) 10KG/CAN CURING COMPOUNDS ( SIKA ANTI SOL - E125) 20KG/CAN TAG NUMBER - GEDUNG PLASTIK SHEET SUB TOTAL PEKERJAAN : CPI SEPARATOR GALIAN TANAH PASANG BATU KALI 1:4 LANTAI KERJA BETON K350 KEDAP AIR TIANG PANCANG D30 POTONG TIANG PANCANG STUCTURE STEEL SANDBLASTING & PAINTING CAT DINDING LUAR WATER STOP 400 MM ADJUSTABLE WEIR SS316L SUB TOTAL PEKERJAAN : DAF GALIAN TANAH PASANG BATU KALI 1:4 LANTAI KERJA BETON K350 TIANG PANCANG 40 CM POTONG TIANG PANCANG STEEL STUCTURE ATAP ASBES GELOMBANG ( BESAR) BETON K250 ANCHOR BOLT M-25, ASTM A-139 GRADE B, GALV. - 700 MM SANDBLASTING & PAINTING PERAWATAN BETON
GROUTING NON SHRING BUMBUNGAN ATAP HS BOLT ASTM 325 M16 SUB TOTAL PEKERJAAN : BAK AERASI GALIAN TANAH PASANG BATU KALI 1:4 LANTAI KERJA STUCTURE STEEL ( BESI L & PLATE ) BETON K350 KEDAP AIR WATER STOP 400 SLING DIA 3/4" TIANG PANCANG DIA. 40CM POTONG TIANG PANCANG GROUTING NON SHRING SANDBLASTING & PAINTING CAT DINDING LUAR WATER PROOFING DINDING & LANTAI PERAWATAN BETON TES KEBOCORAN SUB TOTAL PEKERJAAN : BELT FILTER PRESS PRIMARY GALIAN TANAH PASANG BATU KALI 1 : 4 LANTAI KERJA BETON K350 TIANG PANCANG 30 CM POTONG TIANG PANCANG STEEL STUCTURE ATAP ASBES GELOMBANG ( BESAR) BETON K250 ANCHOR BOLT M-25, ASTM A-139 GRADE B, GALV. - 700 MM SANDBLASTING & PAINTING PERAWATAN BETON GROUTING NON SHRING HS BOLT ASTM 325 M16 TALANG AIR SUB TOTAL PEKERJAAN : BELT FILTER PRESS SECONDARY GALIAN TANAH PASANG BATU KALI 1:4 LANTAI KERJA BETON K350 TIANG PANCANG 30 CM POTONG TIANG PANCANG STEEL STUCTURE ATAP ASBES GELOMBANG ( BESAR)
BETON K250 ANCHOR BOLT M-25, ASTM A-139 GRADE B, GALV. - 700 MM SANDBLASTING & PAINTING PERAWATAN BETON GROUTING NON SHRING HS BOLT ASTM 325 M16 TALANG AIR SUB TOTAL PEKERJAAN : OIL STORAGE TANK GALIAN TANAH PASANG BATU KALI 1:4 LANTAI KERJA BETON K350 BETON K250 TIANG PANCANG DIA. 30 CM POTONG TIANG PANCANG SANDBLASTING & PAINTING PERAWATAN BETON STUCTURE STEEL PIPA 8" A53B GATE VALVE 8" WRAPING FLANGE 8" GASKET 8" PIPA 14" SLEEVE A53B SUB TOTAL PEKERJAAN : CLEAN WATER TANK GALIAN TANAH PASANG BATU KALI 1:4 LANTAI KERJA STUCTURE STEEL ( BESI L & PLATE ) BETON K350 KEDAP AIR WATER STOP 400 TIANG PANCANG DIA. 30CM POTONG TIANG PANCANG SANDBLASTING & PAINTING CAT DINDING LUAR WATER PROOFING DINDING & LANTAI PERAWATAN BETON TES KEBOCORAN SUB TOTAL PEKERJAAN : BAK EKUALISASI GALIAN TANAH PASANG BATU KALI 1:4 LANTAI KERJA STUCTURE STEEL ( BESI L & PLATE ) BETON K350 KEDAP AIR
WATER STOP 400 SLING DIA 3/4" TIANG PANCANG DIA. 40CM POTONG TIANG PANCANG GROUTING NON SHRING EPOXY GROUTING NON SHRING SANDBLASTING & PAINTING CAT DINDING LUAR WATER PROOFING DINDING & LANTAI PERAWATAN BETON TES KEBOCORAN SUB TOTAL PEKERJAAN : API SEPARATOR GALIAN TANAH PASANG BATU KALI 1:4 LANTAI KERJA STUCTURE STEEL ( BESI L & PLATE ) BETON K350 KEDAP AIR WATER STOP 400 TIANG PANCANG DIA. 30 CM POTONG TIANG PANCANG GRATING ADJUSTABLE WEIR SS316L GROUTING NON SHRING EPOXY SANDBLASTING & PAINTING CAT DINDING LUAR SUB TOTAL PEKERJAAN : TANKI SEDIMENTASI A&B GALIAN TANAH PASANG BATU KALI 1:4 LANTAI KERJA STUCTURE STEEL ( BESI L & PLATE ) BETON K350 KEDAP AIR WATER STOP 400 TIANG PANCANG DIA. 30CM POTONG TIANG PANCANG SANDBLASTING & PAINTING CAT DINDING LUAR WATER PROOFING DINDING & LANTAI PERAWATAN BETON TES KEBOCORAN PLATE SS316L GRATING GALVANIZING SUB TOTAL PEKERJAAN : PENGENTAL PASIR GALIAN TANAH
PASANG BATU KALI 1:4 LANTAI KERJA STUCTURE STEEL ( BESI L & PLATE ) BETON K350 KEDAP AIR WATER STOP 400 TIANG PANCANG DIA. 30CM POTONG TIANG PANCANG SANDBLASTING & PAINTING CAT DINDING LUAR WATER PROOFING DINDING & LANTAI PERAWATAN BETON TES KEBOCORAN PLATE SS316L GRATING GALVANIZING SUB TOTAL PEKERJAAN : THICKENER GALIAN TANAH PASANG BATU KALI 1:4 LANTAI KERJA STUCTURE STEEL ( BESI L & PLATE ) BETON K350 KEDAP AIR WATER STOP 400 TIANG PANCANG DIA. 30CM POTONG TIANG PANCANG SANDBLASTING & PAINTING CAT DINDING LUAR WATER PROOFING DINDING & LANTAI PERAWATAN BETON TES KEBOCORAN PLATE SS316L GRATING GALVANIZING SUB TOTAL PEKERJAAN : PONDASI POMPA INSIDE BATTERY LIMIT GALIAN TANAH BATU BELAH ANSTAMPENG TIANG PANCANG DIAMETER 30 CM POTONG TIANG PANCANG LANTAI KERJA BETON K350 KEDAP AIR BETON K350 GROUTING NON SHRING EPOXY GROUTING NON SHRING ANCHOR BOLT M-25, ASTM A-139 GRADE B, GALV. - 700 MM SUB TOTAL PEKERJAAN : OUTSIDE BATTREY LIMIT IPAL (DBC; PBC; EC)
GALIAN TANAH PEMADATAN TANAH DASAR URUGAN TANAH KEMBALI & PEMADATAN BUANG TANAH EX GALIAN < 10 KM BATU BELAH ANSTAMPENG LANTAI KERJA BETON BERTULANG K-350 KG/CM2 STEEL STRUCTURE SANDBLASTING , CAT PRIMAIR IN ORGANIC ZINK, FININSH POLYAMIDE EPOXY ANCHOR BOLT M-25, ASTM A-139 GRADE B, GALV. - 700 MM HS BOLT ASTM 325 M16 GROUTING NON SHRING EPOXY GROUTING NON SHRING PENGASPALAN TEBAL 7.5 CM ( HOT MIX) PEMASANGAN BATU KALI CAMPURAN 1:4 PLESTERAN CAMPURAN 1:4, TEBAL 2.5CM & DIACI POTONG LANTAI BETON BERTULANG K250 PLASTIK SHEET CAT LANTAI WARNA MERAH SUB TOTAL PODASI LAIN-LAIN GALIAN TANAH LANTAI KERJA BETON BERTULANG K-350 KG/CM2 ANCHOR BOLT M-25, ASTM A-139 GRADE B, GALV. - 700 MM SUB TOTAL TOTAL KESELURUHAN
IR LIMBAH (IPAL) CAP VOLUME 1.00 1.00 42.00 56.70 42.00 19.44 22.31 34.39 7.34 1.12 21.06 2.43 36.00 850.50 1,743.59 36.00 SATUAN LS LS M2 M3 M2 M2 M3 M3 M3 M3 M3 M3 BH KG KG BH KETERANGAN
LS M3 M3 M3
1.00 898.00 30.00 826.00 71.00 2.00 18.00 3,030.00 6.00 12.00 16.00 12.00 32.00 400.00 400.00
LS M3 M2 M3 M3 M3 M3 KG JT JT JT JT JT M2 M2
LS M3 M3 M3
M3 M3 M3
LS M3 M3 M3 M2 M3
1.00 2,972.10 2,972.10 13,978.00 1,258.02 1,551.56 754.65 2,303.40 343.14 116.77 973.06
LS M3 M3 M2 M3 M3 M3 M2 M3 M3 M2
1.00 480.00 16.00 168.00 142.71 154.46 25.29 6.91 4.62 131.50 339.47 766.78 1,071.97 61.50 203.78 388.49 118.09 1,829.66 17.14 17.00 2.00 2.00
LS M BH M3 M3 M3 M3 M3 M3 M3 M2 M2 KG M2 M2 KG KG KG M2 M2 BH BH
PROVIDED BY ELNUSA
25.00 3.00 4.00 2.00 340.00 85.00 825.09 105.00 4.19 58.80 19.44 8.00 434.01 8.00 2.00 10.00 7.00 1.00
1.00 180.00 6.00 147.75 117.75 211.09 30.00 13.85 5.54 4.46 33.80 199.57 5.14 399.14 20.00 105.34 69.20 5.00 1.00 2.00 3.00 76.96 130.00 251.00 41.60
LS M BH M3 M3 M3 M3 M2 M3 M3 M3 M2 M3 M2 M2 M2 M2 BH BH BH BH M2 M2 M2 M
PROVIDED BY ELNUSA
72.00 24.00 34.00 24.00 30.00 6.00 10.00 1.00 1.00 1.00 1.00 1.00 1.00 6.00 1.00 1.00 2.00 10.00 5.00 1.00 60.00
M M BH M BH CAN LBR UNIT LS SET SET SET SET SET SET SET UNIT KG CAN LS M2
1.00 71.00 181.00 5.00 66.00 180.00 6.00 1,100.00 70.00 100.00 49.70 380.00
LS M3 M3 M3 M3 M' BH KG M2 M2 M' KG
PROVIDED BY ELNUSA
1.00 232.00 72.00 21.00 154.00 270.00 9.00 6,601.00 215.00 14.00 48.00 325.00 300.00
LS M3 M3 M3 M3 M' BH KG M2 M3 BH M2 M2
PROVIDED BY ELNUSA
KG M' PCS
1.00 4,445.00 832.00 277.00 8,133.00 2,049.00 163.00 120.00 3,510.00 117.00 60.00 360.00 773.00 4,440.00 5,450.00 1.00
PROVIDED BY ELNUSA
1.00 83.00 16.00 6.00 9.00 180.00 6.00 4,182.00 115.00 6.00 50.00 185.00 70.00 466.00 330.00 1.00
LS M3 M3 M3 M3 M' BH KG M2 M3 BH M2 M2 KG PCS LS
PROVIDED BY ELNUSA
LS M3 M3 M3 M3 M' BH KG M2
PROVIDED BY ELNUSA
M3 BH M2 M2 KG PCS LS
1.00 73.00 16.00 5.00 9.00 17.00 30.00 1.00 30.00 120.00 83.00 4.00 1.00 22.00 2.00 2.00 3.00
PROVIDED BY ELNUSA
1.00 1,185.00 97.00 32.00 3,718.00 303.00 150.00 540.00 18.00 165.00 180.00 696.00 996.00 1.00
LS M3 M3 M3 KG M3 M' M' BH M2 M2 M2 M2 LS
PROVIDED BY ELNUSA
LS M3 M3 M3 KG M3
163.00 120.00 1,950.00 65.00 120.00 451.00 165.00 611.00 2,446.00 2,100.00 1.00
PROVIDED BY ELNUSA
1.00 120.00 425.00 10.00 5,376.80 96.00 424.50 360.00 12.00 4.30 278.00 36.00 80.00 112.00
LS M3 M3 M3 KG M3 M' M' BH M2 KG KG M2 M2
PROVIDED BY ELNUSA
1.00 741.00 77.00 25.00 19,211.00 523.00 75.00 780.00 26.00 415.00 190.00 887.00 650.00 1.00 1,640.00 20.00 10,990.00
LS M3 M3 M3 KG M3 M' M' BH M2 M2 M2 M2 LS KG M2 KG
PROVIDED BY ELNUSA
1.00 21.00
LS M3
45.00 10.00 3,884.00 96.00 35.00 270.00 9.00 97.00 19.00 185.00 113.00 1.00 1,290.00 27.00 560.00
M3 M3 KG M3 M' M' BH M2 M2 M2 M2 LS KG M2 KG
PROVIDED BY ELNUSA
1.00 42.00 89.00 20.00 7,770.00 190.00 35.00 540.00 18.00 196.00 38.00 368.00 450.00 1.00 2,580.00 54.00 1,120.00
LS M3 M3 M3 KG M3 M' M' BH M2 M2 M2 M2 LS KG M2 KG
PROVIDED BY ELNUSA
1.00 286.00 28.00 510.00 17.00 5.02 30.00 122.00 3,572.00 7,270.00 150.00
PROVIDED BY ELNUSA
1.00
LS
5,484.90 2,004.78 3,017.06 2,561.92 569.38 138.09 1,074.36 34,164.05 1,053.88 372.00 684.00 850.00 1,745.00 51.00 92.80 293.15 37.50 37.50 250.00 275.00
M3 M2 M3 M3 M3 M3 M3 KG M2 PCS pcs KG KG M2 M3 M2 M3 M3 M2 M2