Rev: 0
Z=
I =
D=
H=
Hs =
G=
tb =
3
0.3
1.0
125.3
45.43
46
0.9
0.5000
Fby =
Ws =
Wy =
Wt =
36,000
373.4
210.4
31,460
PSI
Kips
Kips
Kips
CALCULATIONS:
Seismic Coefficients:
Xs =
C1 =
D/H =
21 Ft
0.60
2.76
0.4
W1 =
12,584.1
W2 / Wt =
0.52
W2 =
16,359.3
X1 /H =
0.36
X1 =
16.4
X2 /H =
0.56
X2 =
25.4
E-3.3
6.72 Seconds
3.375 (s/T2) = 3.375*1.5/5.832 =
Page 1 of 5
0.112 Seconds
FileName: 69757972.xls.ms_office
WorkSheet: Foundation Design - 1
2920 kips
(G18)*(G16)*(G14)/(G13)2 )
1471932
7.9
Constant =
4,792
# / ft
4,792
# / ft
6404
# / ft
6404
# / ft
1213
54264 ft-kips
6.12 Kips
(G76)/(G13)2(6.12)
54264
96085
b = 1.815+1.273*54264/125.3^2
6.2
6.2
Page 2 of 5
1167
3.99 Kips
FileName: 69757972.xls.ms_office
WorkSheet: Foundation Design - 1
Page 3
FOUNDATION DESIGN:
Max. Overturning Moment Due To Seismic Loads.
Compression or Tension Due To Moment:
Seismic Base Shear:
54,264 Kips
7.74 kpf
0.27 kips
RINGWALL DESIGN:
Use Following Weight Values for Materials
490lb/ft3
110 lb/ft3
150 lb/ft3
50 lb/ft3
Wt. of Steel
Wt. Of Compacted Soil
Wt. Of Concrete Wall
Wt. Of Product in Tank
Horizontal Pressure on Ring Wall:
F=Kah(g*p*H+1/2 soh)+270
0.3*6.0[(50*44.5+0.5*110*6.0)]+270
4,953 kips
Hoop Tension:
1/2FD= 1/2(4869)(94.5)
310 kips
As= 310/24.0
9.63 in.
W = 1100
(2)(1100)/50(44.5)-2(6.0)(150-110)
1.23
Use 16" Thick Concrete Wall
12"
Top of Ground Elevation
16"
48"
12"
Page 3 of 5
FileName: 69757972.xls.ms_office
WorkSheet: Foundation Design - 2
Page 4
256 psi
450 psi
OK
Soil Bearing:
Try 3'- 6" Footing
Weight. of Wall = 1.33*5.0*.150
Weight of Footing = 3.5*1.0*.150
Weight of Fill = 2.17*4.0*.110
1.0
0.525
0.95
2.48
kips
kips
kips
kips
Case 1
Load from Shell + Roof + Live Load =
Weight of Wall +Footing + Fill =
Bearing Pressure =
3.58/3.50
1.1 kips
2.48 kips
1.0 kips
Case 2
Dead + Live Load + Earthquake Load =
P = 3.58 + 5.19 =
H=
Moment at Base of Footing =
.270(6.0)
8.77 kips
0.270 kips
1.62 kips
2.51 kips
3.30 kips
3.99
OK
Page 4 of 5
FileName: 69757972.xls.ms_office
WorkSheet: Foundation Design - 2
62' - 8"
4'-0"
12"
10"
12"
1'-4" Wall
NOTES:
1. Oiled sand to be mixture of sand and liquid asphalt (mc70):
2. Use 10 gallons of asphalt per cubic yard of sand:
3. Top of concrete to be smooth and level with 1/8" +/- in any 30 feet of circumferential length:
4. Maximum Deiation to be less than 1/4" overall:
Page 5 of 5
FileName: 69757972.xls.ms_office
WorkSheet: Foundation Design - 3