Sei sulla pagina 1di 11

TECHNICAL LOSSES OF 11-KV FEEDERS

Connected KVA
Sr
.No

Grid
Station

11-kv
Feeder

Max:
Length Nature
KVA
Load
(km) of Load
Demand
(Amp)

Unit Fed
from Grid

Qataba

Samanabad

5.82

Mix
Load

290

5525.08

23231856.38

Mix
Load

290

Mix
Load

270

Mix
Load

280

Mix
Load

380

Gulshan
Ravi

Union
Park

6.77

Qartaba

Rahat Park

6.19

Qartaba

Poonch
Road

6.95

Pir
Ghazi
Road

4.92

Shadman

5525.08

5144.04

5334.56

7239.76

15

25

50

100

150

200

14

11-kv Losses with Transformer

400 630

10

11

12

13

100

900

150 4600

100

50

200

1400

5600

50

50

200

50

500

15

75

400

100

50

1000

1200

Total

15

16

17

18

19

5750

1780

7000

300

5800

6350

400

990

900

5000

5900

250

100

200

400

1000

50

1400

4600

6050

15 125 100

200

800

1240

800 630

23231856.38

21629659.39

22430757.89

30441742.85

%
V
Drop

KW Loss

Energy Loss

P
%age
Losses

26

27

28

29

30

161.8

4%

612281.0

3%

22619575.4 42722 374244720 876000 374857001.0

1613.55

3.7%

203.0

5%

767973.2

3%

22463883.2 52752 462107520 876000 462875493.2

1992.42

3.7%

169.3

4%

640669.1

3%

20988990.3 51856 454258560 876000 454899229.1

2103.13

4.6%

156.0

4%

590667.6

3%

21840090.3 46050 403398000 876000 403988667.6

1801.05

4.1%

241.7

4%

914577.4

3%

29527165.4 44152 386771520 876000 387686097.4

1273.53

KVA Demand x P.F (0.8) x 8760 x Load Factor (60% for Urban & 40% for Rural)

Sum of No. of Capacity wise Transformer * KW Loss of each Transformer * Loss Factor (0.232 for Rural and 0.432 for Urban)
where LT KW Loss of each Transformer is 0.5 for 25-KVA, 1.4 for 50-KVA, 3.0 for 100-KVA & 8.67 for 200KVA
Units Loss in LT / Units fed for LT

%age

2.8%

Units fed for HT Minus (-) Units Loss in Transformers and HT Line (Shown on Analysis)

KWH

24

Units Loss in LT

%age

23

Units Fed for HT

KWH

22

1.732x11xMax Load of Feeder

25

KW

21

% age Loss in LT

%age

Unit Fed
for LT

Total Energy Loss

20

KWA Demand

Units Fed for LT

KWH

LT Loss

Total Energy Loss

LT Loss + HT & Transformer Loss / Units Fed for HT

Power
Losses
10-2010

31

TECHNICAL LOSSES OF

11-KV FEEDER

ANALYSIS SABZAZAR

IN RESPECT OF SAID PUR SUB DIVISION LESCO

INPUT DATA FORM FOR 11-KV SAMANABAD FEEDER


Circle:

Central

Division: Samanabad

Sub Division:

Grid Station: Qartaba


Feeder Type (R/U/M):
Data Collected by:

Power Transformer:
U

Feeder Name: Samanabad

From

To

Distance
(Km)

0
1
2
3
3
4
5
7
8
9
9
11
12
13
13
14
15
15
16
18
19
19
21
22
24
24
24
27
28
29
29
30
31
31

1
2
3
4
7
5
6
8
9
10
11
12
13
14
24
15
16
18
17
19
20
21
22
23
25
26
27
28
29
30
38
31
32
33

0.050
0.264
1.106
0.044
0.025
0.107
0.029
0.320
0.092
0.030
0.029
0.035
0.065
0.035
0.067
0.130
0.065
0.079
0.110
0.021
0.028
0.136
0.072
0.047
0.174
0.170
0.035
0.025
0.046
0.075
0.060
0.045
0.052
0.048

Feeder Code:

Data Checked by:

Date:

Month:

Year:

Peak Load:
Node

Samanabad

Siza of
Conductor

T/F
(KVA)

UG5
OSP
OSP
OSP
OSP
OSP
OSP
OSP
OSP
UG2
OSP
OSP
OSP
RAB
RAB
RAB
RAB
RAB
UG2
RAB
UG2
RAB
RAB
RAB
RAB
DOG
OSP
OSP
OSP
DOG
OSP
DOG
DOG
DOG

0
0
0
400
0
400
0
200
0
630
0
100
0
200
200
200
0
100
25
200
200
200
200
200
200
0
0
200
0
200
0
0
200
0

Node
Capacitor/
Switchs
From To

450

34
35
35
38
39
39
40
40
43
44
45
45
46
47
47
50
51
51
52
54
55
56
57
58
59
59
60
62
62
64
65
66
66
68

35
36
37
39
40
43
41
42
44
45
46
50
47
48
49
51
52
54
53
55
56
57
58
59
60
62
61
63
64
65
66
67
68
69

Distance
(Km)

Siza of
Conductor

T/F
(KVA)

0.052
0.110
0.070
0.044
0.060
0.106
0.065
0.027
0.145
0.083
0.045
0.015
0.035
0.065
0.015
0.103
0.023
0.087
0.054
0.072
0.055
0.041
0.050
0.054
0.065
0.070
0.030
0.046
0.054
0.036
0.084
0.046
0.117
0.009

DOG
RAB
DOG
OSP
DOG
OSP
DOG
RAB
OSP
OSP
DOG
DOG
DOG
DOG
DOG
DOG
DOG
DOG
DOG
DOG
DOG
DOG
DOG
DOG
UG2
DOG
UG2
RAB
DOG
DOG
DOG
DOG
DOG
UG2

0
200
200
0
200
200
0
100
100
0
200
0
0
0
200
100
200
100
0
200
100
250
0
0
25
200
100
150
50
100
0
0
25
25

Capacitor/
Switchs

450

33

34

0.026

DOG

50

69

70

0.042

DOG

200

INPUT DATA FORM FOR 11-KV PIR GHAZI ROAD FEEDER


Circle:

Central

Division: Samanabad

Sub Division:

Grid Station: Qartaba


Feeder Type (R/U/M):
Data Collected by:

Power Transformer:
U

Feeder Name: Pir Ghazi Road

Feeder Code:

Data Checked by:

Date:

Month:

Year:

Peak Load:
Node

Samanabad

Distance
(Km)

Siza of
Conductor

T/F
(KVA)

Node

Distance
(Km)

Siza of
Conductor

T/F
(KVA)

27

0.021

RAB

200

27

28

0.124

RAB

225

50

29

30

0.094

RAB

200

OSP

200

29

32

0.050

DOG

250

0.034

OSP

200

30

31

0.216

RAB

300

0.015

RAB

32

33

0.110

UG2

100

0.025

OSP

32

34

0.068

DOG

0.035

\R

100

34

35

0.098

DOG

200

0.080

RAB

300

35

36

0.030

RAB

100

10

0.070

OSP

100

35

38

0.085

DOG

200

15

0.140

DOG

200

36

37

0.103

RAB

200

10

11

0.065

OSP

200

38

39

0.118

DOG

11

12

0.142

OSP

100

39

40

0.038

DOG

200

12

13

0.038

OSP

39

42

0.020

UG2

200

13

14

0.285

OSP

200

39

43

0.020

DOG

15

15

16

0.068

DOG

100

40

41

0.080

DOG

200

16

17

0.042

DOG

200

43

44

0.165

DOG

17

18

0.080

DOG

44

45

0.114

DOG

200

18

19

0.110

UG2

100

44

48

0.081

RAB

200

18

20

0.040

DOG

100

45

46

0.079

RAB

200

20

21

0.082

DOG

25

45

47

0.089

DOG

50

21

22

0.106

RAB

200

48

49

0.090

RAB

400

21

23

0.096

DOG

250

49

50

0.090

RAB

200

23

24

0.129

DOG

50

51

0.032

RAB

100

24

25

0.080

RAB

25

51

52

0.095

RAB

100

From

To

0.050

UG5

0.632

Capacitor/
Switchs

From

To

26

OSP

100

0.062

OSP

0.092

Capacitor/
Switchs

450

24

29

0.146

DOG

200

25

26

0.065

RAB

100

52

53

0.003

RAB

200

DATA FORM 100KVA TRANSFORMER OVER LOAD