Sei sulla pagina 1di 13

FIBER MANAGEMENT - BUILDING CONNECTIVITY -- RIYADH

Fiber Cable Management S.NO. Building Code 1 2 3 4 5 6 7 8 9 RY024A (Al-Owassai) Saudi Fransi Bank Bank AL-Jazira Falcom Bank AL-Jazira SAMBA SAMBA (Speed Cash) Olya Ouroba St. Olya St. King Fahad Road King Fahad Road King Fahad Road King Fahad Road Connected Connected Connected Connected Connected Connected Disconnected Connected Connected Customer Name Location ( street ) Status Ring Identification Connection with MH Cable Joint Closure Identification Identification C0101 C0101 C0101 C0101 C0101 C0101 C0101 C0101 C0101 S010106 S010103 S010104 S010111 S010108 S010109 S010109 S010105 Remarks Fiber # connected to customer/sites Tube#4 Tube#5 Tube#5 Tube#5 Tube#5 Tube#5 Tube#5 Tube#6 Tube#6 37, 38 49,50 51,52 53, 54 55, 56 57, 58 59, 60 61, 62 63, 64 79,80,81,82 GPON ODF Port # ODF Port # ODF Port # 91,92,93,94 Tube#6 65, 66, 67, 68 ODB ODF Port # 1,2,3,4,5,6,7,8 ODF Port #11,12,13,14,21,22,23,24, ODF Port #19, 20 ODF Port # 15,16,17,18 ODF Port# 9,10 69,70 POP-all in all out On hold REMOVED CABINET AND RETURNED TO BAYANAT STROE/Building Demolished MH-031

WARD-00-119 WARD-00-041 WARD-00-044 OLAY-00-352 RAHM-00-007 OLAY-00-290 OLAY-00-351 WARD-00-054 OLAY-00-222

1 1 1 1 1 1 1 1 1 1

MH-011 MH-005 MH-006 MH-031 MH-020 MH-028 MH-028 MH-008 MH-081 MH#081

NCB (AL-Rahmaniah BR-230) Olya St. NCCI NCCI Golden Square Golden Square NCCI Building NCCI Building NCCI Building Olaya St. Olaya St. Akariyah Akariyah Akariyah Akariyah Olaya St. AL-Ourobh King Fahad Road

9.1 9.2 9.3 OLAY-00-235 10 10.1 10.2 10.3 10.4 11 12 13 OLAY-00-175 WARD-00-002 RAHM-00-003

NCCI - Tadawal GIB Bayanat roof top (Office 18th Floor) Akaria Center No 3 (GPON) Akaria Center No 3 AwalNet Al-Rajhi Bank Global Investment Wathiqa Capital SWCC-Riyadh RY001A (Bayanat-HQ) Royal Shopping Center

Connected from main Bayanat cabinet to customer area. Connected from main Bayanat cabinet to customer area. Connected from main Bayanat cabinet to customer area. 1 Connected 1 MH091 C0101 C0101

Connected from main Bayanat cabinet to customer area. Customer side connectivity is pending Connected from main Bayanat cabinet to customer area. Connected from main Bayanat cabinet to customer area. Connected Connected on hold 1 1 1 MH#088 MH-000 MH-018 C0101 C0101 C0101 S010107 Tube#6 All

14 16 17

OLAY-00-232 WARD-00-046 MOHD-00-009

Bank Mascut Rukun Al-Darayah Al-Oula Building

King Fahad Road Olaya St. King Fahad

Connected

1 1 1

MH-034 MH-006 MH-017

C0101 C0101

Tube#6 Tube#7 Tube#8

71,72 77,78 85,86,87,88,89,90

FIBER MANAGEMENT - BUILDING CONNECTIVITY -- RIYADH


Fiber Cable Management S.NO. Building Code 17 18 19 20 21 22 23 23.1 24 25 26 27 27.1 27.2 28 28.1 28.2 29 30 31 32 33 34 35 36 37 RY088A (SAMATCO) RY027B (Beside Centria) AL-Rajhi Bank Branch 126 RY089C Riyadh Bank H.Q SAMBA STG-2 Jamiah Building Saudi Fransi Bank H.Q Saudi Fransi Bank H.Q (2nd pair) AL-Rajhi Bank Dabab Olya Sallah AL-Deen St. AL-Jamiah street Batha Jamia street Mather St. Mather St. Olya St. Cable extended Room required Connected Connected Connected Connected Connected Connected Connected Connected Disconnected Connected Customer Name Location ( street ) Status Ring Identification Connection with MH Cable Joint Closure Identification Identification C0201 C0201 C0201 C0201 C0201 C0201 C0201 C0201 C0201 C0201 C0201 C0201 S020111 S020111 S020112 S020109 S020113 S020114 S020110 S020115 S020106 S020107 S020108 All All Tube#4 Tube#4 Tube#4 Tube#4 Tube#4 Tube#6 Tube#4 Tube#5 Tube#5 Tube#5 51, 52 ODF Port # ODF Port # 55, 56 Bayanat Main Cabinet- ODF port# 1,2,3,4 ODF Port # 5,6,7,8 ODF Port # 9,10,11,12,13,14,15,16 57, 58 59, 60 63, 64, 83, 84 65, 66 67, 68 69, 70 71,72 73,74,75,76 77,78,79,80 49, 50 13-20 21,22 37, 38 Bayanat Main Cabinet ODF Port # Remarks Fiber # connected to customer/sites POP-all in all out POP-all in all out 37, 38 39, 40 41, 42 43, 44 45, 46 61, 62 47, 48 53, 54 Cabinet removed installed in Rukn AlDarayah, Bank vacate the building 2nd pair connectivity

2 2 2 2 2 2 2 2 2 2 2 2

MH-057 MH-087 MH-033 MH-037 MH-046 MH-037 MH-061 MH-061 MH-080 MH-051 MH-080 MH-080

RY033A (Shokry), (Near ITC) Dabab Bank AL-Jazira South (Near Musa Center) Musa Center Interactive Saudi Arabia Ltd. Innovative Solution AL-Ummam Building Bayanat roof top NourNet Olya St. Olya St. Musa Center Musa Center Alsteen St. Al-Ummam Building Al-Ummam Building

Connected from main Bayanat cabinet to customer area. to be Connected from main Bayanat cabinet to customer area. (to be done by customer) Connected 2 MH025 C0201 Tube#5

Connected from main Bayanat cabinet to customer area. Connected from main Bayanat cabinet to customer area. Connected connected Connected Connected Connected Connected Connected Connected Connected In progress In progress Connected 2 2 2 2 2 2 2 2 2 2 2 2 3 mh056 MH# 052 C0201 C0201 C0201 C0201 C0201 C0201 C0201 C0201 C0201 C0201 C0201 C0201 C0301 Tube#5 Tube#5 Tube#6 Tube#6 Tube#6 Tube#6 Tube#6 Tube#7 Tube#7 Tube#5 Tube#2 Tube#2 Tube#2

Chamber of commerce-Al Zajil Dabab BSF- Dabab road SAAB-HQ SAMBA-DRC Saudi Post Jail Directorate Osool Capital NIC Global Investment Musa Center (GPON) Atheeb Atheeb Dabab road Dabab Street Sitten Street Batha Street Mather St. King Fahad Mather St. Mather St. Olaya St. King Abdul Aziz road Dabab road King Abdul Aziz road Bin Tami Building

MH#062

15.7.2008

MH#080 MH#10

GPON

38 38.1

Bin Tami Building Emmar

Connected from main Bayanat cabinet to customer area.

FIBER MANAGEMENT - BUILDING CONNECTIVITY -- RIYADH


Fiber Cable Management S.NO. Building Code BMG GITEX RY0105 (Al-Hazzazi) 39 BSF-DRC King Abdullah road connected Customer Name Location ( street ) Status Ring Identification 3 3 Connection with MH Cable Joint Closure Identification Identification Remarks Fiber # connected to customer/sites Tube#2 Tube#2 39 49-60 GPON GPON

King Abdullah road In progress AL-Ourobh Not ready King Abdul Aziz road King Abdul Aziz road Connected

JM 15

Tube#8(96F), 93(141), 94(142), 95(143), Ring-2A is spliced with RingTube#6(144) 96(144) 2 cable (tube # 8) Tube#8(96F), Tube#6(144) 91(139), 92(140) Ring-2A is spliced with Ring2 cable (tube # 8) Ring-2A is spliced with Ring2 cable (tube # 8,85-96)

40

SAMBA-HQ

Connected

JM 5 JM 15 JM JM JM JM JM 2

41

MOT (GPON)

85(133)

Jeel ISP SIB HQ Nadi Hilal

15 19 54

31, 32 (131, 132) 11, 12 (129, 130) 3.4

Nadi Hilal in Swedi

Cable Joint

C0101 S010101

C=cable S=Splice

01=Ring-1 01=Ring-1

01=cable-1 01=cable-1 01=Joint-1

RING-1/RIYADH

FIBER MANAGEMENT FOR BUILDING CONNECTIVITY

Fiber Cable Identification

Tube # 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5 6 6 6 6 6

Tube Color Fiber # Blue Blue Blue Blue Blue Blue Blue Blue Blue Blue Blue Blue Orange Orange Orange Orange Orange Orange Orange Orange Orange Orange Orange Orange Green Green Green Green Green Green Green Green Green Green Green Green Brown Brown Brown Brown Brown Brown Brown Brown Brown Brown Brown Brown Grey Grey Grey Grey Grey Grey Grey Grey Grey Grey Grey Grey White White White White White 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65

Fiber Color Blue Orange Green Brown Gray White Red Black Yellow Violet Pink Aqua Blue Orange Green Brown Gray White Red Black Yellow Violet Pink Aqua Blue Orange Green Brown Gray White Red Black Yellow Violet Pink Aqua Blue Orange Green Brown Gray White Red Black Yellow Violet Pink Aqua Blue Orange Green Brown Gray White Red Black Yellow Violet Pink Aqua Blue Orange Green Brown Gray

Building Connected

Remarks

Reserved for POP and Backup

Atheeb Atheeb Atheeb Atheeb Atheeb Atheeb Atheeb Atheeb RY024A (Al-Owassai) RY024A (Al-Owassai) MTC MTC MTC MTC

C0101(Ring-01, 96 Fiber Cable)

BSF-Olaya/Aruba Street BSF-Olaya/Aruba Street Bank Al-Jazira, Olaya Street Bank Al-Jazira, Olaya Street Falcom, King Fahad road Falcom, King Fahad road Bank Al-Jazira, King Fahad road Bank Al-Jazira, King Fahad road SAMBA, King Fahad road SAMBA, King Fahad road SAMBA-Speed Cash, King Fahad road SAMBA-Speed Cash, King Fahad road NCB-Rahmania BR-230, Olaya Street NCB-Rahmania BR-230, Olaya Street NCCI, King Fahad road NCCI, King Fahad road Akariyah-3, Olaya road

Al Mousa Center

RING-1/RIYADH

FIBER MANAGEMENT FOR BUILDING CONNECTIVITY

Fiber Cable Identification

Tube # 6 6 6 6 6 6 6 7 7 7 7 7 7 7 7 7 7 7 7 8 8 8 8 8 8 8 8 8 8 8 8

Tube Color Fiber # White White White White White White White Red Red Red Red Red Red Red Red Red Red Red Red Black Black Black Black Black Black Black Black Black Black Black Black 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96

Fiber Color White Red Black Yellow Violet Pink Aqua Blue Orange Green Brown Gray White Red Black Yellow Violet Pink Aqua Blue Orange Green Brown Gray White Red Black Yellow Violet Pink Aqua

Building Connected Akariyah-3, Olaya road Akariyah-3, Olaya road Akariyah-3, Olaya road SWCC SWCC Bank Mascut Bank Mascut Al-Oula Building Al-Oula Building Al-Oula Building Al-Oula Building Rukn Al-Daraya Rukn Al-Daraya NCCI, King Fahad road NCCI, King Fahad road NCCI, King Fahad road NCCI, King Fahad road Aqaria Aqaria Al-Oula Building Al-Oula Building Al-Oula Building Al-Oula Building Al-Oula Building Al-Oula Building Akariayah Akariayah Akariayah Akariayah Akariayah Akariayah

Remarks

Oula Building Protection yp to Tawareen Oula Building Protection yp to Tawareen Oula Building Protection yp to Tawareen Oula Building Protection yp to Tawareen

GPON GPON GPON GPON NEW CON AL HARBI telecom and Top Net NEW CON AL HARBI telecom and Top Net

GPON GPON GPON GPON NEW CON AL HARBI telecom and Top Net NEW CON AL HARBI telecom and Top Net

RING-2/RIYADH Fiber Cable Identification Tube # 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5

FIBER MANAGEMENT FOR BUILDING CONNECTIVITY


Tube Color Blue Blue Blue Blue Blue Blue Blue Blue Blue Blue Blue Blue Orange Orange Orange Orange Orange Orange Orange Orange Orange Orange Orange Orange Green Green Green Green Green Green Green Green Green Green Green Green Brown Brown Brown Brown Brown Brown Brown Brown Brown Brown Brown Brown Grey Grey Grey Grey Grey Grey Grey Grey Grey Grey Fiber # Fiber Color 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 Blue Orange Green Brown Gray White Red Black Yellow Violet Pink Aqua Blue Orange Green Brown Gray White Red Black Yellow Violet Pink Aqua Blue Orange Green Brown Gray White Red Black Yellow Violet Pink Aqua Blue Orange Green Brown Gray White Red Black Yellow Violet Pink Aqua Blue Orange Green Brown Gray White Red Black Yellow Violet Building Connected Connected From Sitten Side Connected From Sitten Side Nadi Hilal Nadi Hilal Remarks MODA from Olaya Side MODA from Olaya Side

Used From Olaya Side Used From Olaya Side SIB HQ Mather SIB HQ Mather Atheeb-R1, King Abdul Aziz road Atheeb-R1, King Abdul Aziz road Atheeb-R1, King Abdul Aziz road Atheeb-R1, King Abdul Aziz road Atheeb-R1, King Abdul Aziz road Atheeb-R1, King Abdul Aziz road Atheeb-R1, King Abdul Aziz road Atheeb-R1, King Abdul Aziz road Atheeb, Dabab road-R4 Atheeb, Dabab road-R4 DWDM DWDM

MODA From Sitten Side MODA From Sitten Side

Atheeb
Atheeb Atheeb Atheeb Atheeb Atheeb

MOE JM MOE JM MOC JM MOC JM

Jeel ISP
Project Dana-sulay-Sumatco-Dana SOR # 10388\TXM\08\09 SOR # 10559\TXM\08\09 AL-Rajhi Bank Branch 126 AL-Rajhi Bank Branch 126 RY089C, Jamia Street RY089C, Jamia Street Riyadh Bank H.Q, Batha Riyadh Bank H.Q, Batha SAMBA STG-2 Jamiah Building SAMBA, Jamia Street SAMBA STG-2 Jamiah Building SAMBA, Jamia Street Saudi Fransi Bank H.Q Saudi Fransi Bank H.Q AL-Rajhi Bank, Olaya Street AL-Rajhi Bank, Olaya Street Bank AL-Jazira, Olaya south (Near Musa Center) Bank AL-Jazira, Olaya south (Near Musa Center) Musa Center, Olaya Street Musa Center, Olaya Street SIDF / JM Al-Ummam Building, Sitten Street Al-Ummam Building, Sitten Street Chamber of Commerce (Zajil), Dabab Street Chamber of Commerce (Zajil), Dabab Street

C0201(Ring-01, 96 Fiber)

disconnect disconnect

Fib #126 @ JM Cable

RING-2/RIYADH Fiber Cable Identification Tube # 5 5 6 6 6 6 6 6 6 6 6 6 6 6 7 7 7 7 7 7 7 7 7 7 7 7 8 8 8 8 8 8 8 8 8 8 8 8

FIBER MANAGEMENT FOR BUILDING CONNECTIVITY


Tube Color Grey Grey White White White White White White White White White White White White Red Red Red Red Red Red Red Red Red Red Red Red Black Black Black Black Black Black Black Black Black Black Black Black Fiber # Fiber Color 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85(133) 86(134) 87(135) 88(136) 89(137) 90(138) 91(139) 92(140) 93(141) 94(142) 95(143) 96(144) Pink Aqua Blue Orange Green Brown Gray White Red Black Yellow Violet Pink Aqua Blue Orange Green Brown Gray White Red Black Yellow Violet Pink Aqua Blue Orange Green Brown Gray White Red Black Yellow Violet Pink Aqua Building Connected BSF-Dabab road BSF-Dabab road BSF-HQ, Mather road BSF-HQ, Mather road SABB-HQ, Dabab road SABB-HQ, Dabab road SAMBA-DRC Sitten Street SAMBA-DRC Sitten Street Saudi Post Saudi Post Jail Directorate Jail Directorate Osool Capital Osool Capital NIC NIC NIC NIC Global Investment Global Investment Global Investment Global Investment New GOSI MH014 New GOSI MH014 SABB-HQ, Dabab road SABB-HQ, Dabab road MOT King Abdullah Public Education+ Kanoo+Holiday Inn Ministry of Education GPON Customers GPON Customers SAMBA-HQ, King Abdul Aziz road SAMBA-HQ, King Abdul Aziz road BSF-DRC, King Abdul Aziz road BSF-DRC, King Abdul Aziz road BSF-DRC, King Abdul Aziz road BSF-DRC, King Abdul Aziz road Remarks

2nd pair connected 2nd pair connected

MOC JM MOC JM Fib# 11 in JM Cable Fib# 12 in JM Cable 2nd pair connected 2nd pair connected

Reserved for Ring-2A (Mather to Jamia)-- Connected with 144 Fiber cable

RING-3/RIYADH

FIBER MANAGEMENT FOR BUILDING CONNECTIVITY

Fiber Cable Identification

Tube # 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6

Tube Color

Fiber # Fiber Color 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133(85) 134(86) 135(87) 136(88) 137(89) 138(90) 139(91) 140(92) 141(93) 142(94) 143(95) 144(96)

Building Connected

Remarks

MOC MOE

TCIL TCIL

GOSI - 01

C02A01(JM - 144Fiber Cable)

MOE - HRDF SDH Ring GPON 2:4 SIDF MODA SIB HQ Jeel ISP

GPON Connectivity SAMBA-HQ King Abdul Aziz road SAMBA-HQ King Abdul Aziz road BSF-DRC King Abdul Aziz road BSF-DRC King Abdul Aziz road BSF-DRC King Abdul Aziz road BSF-DRC King Abdul Aziz road

Connected with Ring-02 cable (96F) with fiber# 85-96

RING-1/RIYADH

FIBER MANAGEMENT FOR BUILDING CONNECTIVITY

Fiber Cable Identification

Tube # 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6

Tube Color

Fiber # Fiber Color 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144

Building Connected

Remarks

Emmar, King Abdul Aziz road Emmar, King Abdul Aziz road BMG, King Abdul Aziz road

JDSU RY046, RY086

GITEX GITEX GITEX GITEX

Using ring-05

C0301 (Ring-03, 144 fiber)

RING-1/RIYADH

FIBER MANAGEMENT FOR BUILDING CONNECTIVITY

Fiber Cable Identification

Tube # 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6

Tube Color

Fiber # Fiber Color 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144

Building Connected

Remarks

C0102 (Ring-01, 144 fiber)

RING-1/RIYADH

FIBER MANAGEMENT FOR BUILDING CONNECTIVITY

Fiber Cable Identification

Tube # 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6

Tube Color

Fiber # Fiber Color 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144

Building Connected

Remarks

C0202 (Ring-02 144 Fiber)

Tadawal

Diverted to Al-Ahsa Street

RING-1/RIYADH

FIBER MANAGEMENT FOR BUILDING CONNECTIVITY

Fiber Cable Identification

Tube # 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6

Tube Color

Fiber # Fiber Color 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144

Building Connected

Remarks

CGS0 (Ring-Golden Square-1 144 Fiber)

RING-1/RIYADH

FIBER MANAGEMENT FOR BUILDING CONNECTIVITY

Fiber Cable Identification

Tube # 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6

Tube Color

Fiber # Fiber Color 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144

Building Connected

Remarks

CGS02(Ring-Golden Square-1 144 Fiber-Spare in same duct)

Potrebbero piacerti anche