KERJA-KERJA MEMBUKA, MEMASANG DAN MENGUJITERIMA SISTEM PENYAMAN UDARA JENIS ‘AIR

COOLED SPLIT UNIT’ DI KOLEJ CEMARA BLOK 2 DAN 3 SEKSYEN 18, SHAH ALAM, SELANGOR DARUL
EHSAN.

BIL PERKARA UNIT QTY KADAR JUMLAH (RM)


(RM)

1.0 Mechanical Work

A CEMARA BLOCK 2 104/106, BLOCK 2 112/114


AND BLOCK 3 111/113

1.1 To dismantle the existing ‘Split Airconditioning Unit’ Nos. 11 100.00 1,100.00
and cart away to the Maintenance Dept. Store,INTEC.

1.2 To do chemical cleaning for evaporator cooling coil Nos. 11 200.00 2,200.00
and condensing cooling coil.

1.3 To install existing ‘Split Airconditioning Unit’ at same Nos. 11 100.00 1,100.00
palace.

1.4 To supply and install of aircond refrigeration piping lot 11 300.00 3,300.00
and pvc drainage piping by using 3/4" diameter c/w
insulations and fittings.

1.5 To supply and install of aircond control wiring using lot 11 200.00 2,200.00
2.5 sqmm pvc cable in g.i conduit c/w earthing
between fan coil and condensing unit.

1.6 To make good all the defect area to match the existing L/S L/S 500.00 500.00
material, paint and chart all the debris from site.

1.7 To testing and commissioning for all the above L/S L/S 500.00 500.00
equipment installed.

Jumlah dibawa ke koleksi m.s F/2 10,900.00

F/1
KOLEKSI

KERJA-KERJA MEMBUKA, MEMASANG DAN MENGUJITERIMA SISTEM PENYAMAN UDARA JENIS ‘AIR
COOLED SPLIT UNIT’ DI KOLEJ CEMARA BLOK 2 DAN 3 SEKSYEN 18, SHAH ALAM, SELANGOR DARUL
EHSAN.

BIL HURAIAN JUMLAH ( RM )

1. Jumlah dibawa dari mukasurat F/1 10,900.00

JUMLAH DIBAWA KE BORANG TAWARAN DI M.S C/2 10,900.00

Ringgit Malaysia:………………………………………………………………………………………………………………..

Tempoh Siap :………………………………….. ( ) minggu.

…………………………… …………………………………….
Tandatangan Kontraktor Tandatangan Saksi.

Nama :……………………………… Nama:…………………………….

Alamat :…………………………..

…………………………………….

…………………………………….

………………………………………. …………………………………….
Cop / Meteri Syarikat

Tarikh :……………………………… Tarikh :……………………………

F/2