Sei sulla pagina 1di 79

CONTENTS

Description Page No

Acknowledgement i

List of figures ii

List of tables iii

Executive Summary iv

1. Introduction 1

1.2 Company profile 6

1.3 Need of the study 10

1.4 Objective of the study 11

1.5 Scope of the study 11

2. Research Methodology 13

3. Literature Review 16

4. Analysis and Interpretation 44

5. Findings and Suggestions 61

6. Conclusion 72

Limitations of the study 73

Further scope of study 73

Bibliography 74
 

 
LIST OF FIGURES

FIGURE NO. FIGURE TITLE PAGE NO.

3.1.1 MYERS” THEORY ON MERCHANDISING. 17

3.3 MERCHANDISING WORK FLOW 21

3.4 MERCHANDISING PROCESS FLOW 22

3.5.13 WORK FLOW OF SAMPLING 26

3.8.1.2 NETWORK DIAGRAM 42

4.1.1.1 GRAHICAL REPRESENTATION OF T&A 48

4.3.2 GRAPHICAL REPRESENTATION OF MONTHLY 52


SAMPLING PRODUCTION

4.4.2 CURRENT SAMPLING DEPARTMENT STUCTURE 55

5.2.11 SUGGESTED SAMPLING DEPARTMENT STRUCTURE 65

5.3.1 MONTHNLY SAMPLING PRODUCTION, JULY’10 67

  ii
 

 
LIST OF TABLES

SL. NO. TABLE TITLE PAGE NO.

3.8.1.1 TIME AND ACTION CALENDER FORMAT 35

4.1.1 T&A CHART 45

4.3.1 MONTHLY SAMPLING PRODUCTION CHART-JULY’10 51

4.6.3 CAD IMPLEMENTATION COST TABLE 60

5.4.3 CAD IMPLEMENTATION COST TABLE 69

5.4.4.1 PAY BACK PERIOD TABLE 71

  iii
EXECUTIVE SUMMARY

The study was undertaken principally to analyze the merchandising process and to

understand the internal weakness and flaws of the company there by finding out the internal

problems of the organization. Further, focusing into the major reasons for the problems and

coming up with some practical suggestions to overcome the problem to an extent.

The study is carried out in GOGO International’s Bangalore unit. They are capable of

producing around 12000 pieces of garments per day. They have a central planning and control

cell which is responsible for planning and making ‘time and action calendars’ for all the orders

they receive. Further, it will be forwarded to merchandisers for the order execution as per the

planned dates. It was found out that there is a lot of variation happening in the planned and actual

T&A’s. Reasons for the delays are found out and analyzed during the study. This study is an

effort to reduce the delay in pre-production activity as it is crucial, because the pre-production

delays can affect the further production process a.

If the company can find out the major reasons for the delays and try to get some practical

solution for it, then it will be helpful for the smooth running of the whole merchandising process

and goods can be delivered as per the planned date. In order to find a way out from this problem

this study has been done.

As an initial step, the study gave more focus on the thorough study on merchandising

process and T&A of various orders. Then the study moves towards analyzing and finding out the

reasons and causes for the problem and comes up with acceptable practical solutions and

  iv
suggestions. The collected data have been classified and tabulated. Simple tables have been

prepared and liberally used to exhibit the classified data to provide easy and better understanding

of the study.

This study will provide significant inputs to the industry peoples as well as academicians

towards unleashing the lead time of the Indian garment industry and enable the industry to realize

its rightful place in the global economic space. The goal of the apparel industry is not delivering

within the original cost and expected time estimates but the impetus is now on shrinking the

existing lead times in order to compete with the international supply chain standards.

  v
CHAPTER-1

INTRODUCTION

The textile and garment industry is booming in India, especially after elimination

of the global quota system. Presently India is exporting garments to more than 100

countries including US, EU, Latin America, and Middle East. The main competitors of

India are countries like China, Korea, Pakistan, Bangladesh, Malaysia, and Sri-Lanka.

The Indian garment industry is gaining ground in the world market at breakneck

speed, but still not flourished at its fullest extent. Although the resources are available

plentiful with a powerful foundation of fabric and spinning sector to support. The key

factors behind this are low technological development, lower output, cut throat

competition, high raw material cost, inadequate infrastructure, traditional productivity,

unfavorable regulatory policies, and globalization impact. However, there is a fair list of

the producers, suppliers, and exporters that are fully acknowledged with regulatory

policies and formalities, international marketing policies and procedures. The only

concern is in executing their productivity initiatives, and meeting with order deadlines.

Now days, major companies are adopting merchandising concepts, which comply

with all procedures to execute and dispatch the shipment on time, considering quality,

cost and time. Merchandisers are serious in the success of any garment retail business.

1
They provide the right products at the right time, enabling a company to match

with latest market trends and meet the market demand. In the merchandising concept,

time management is a gig to manage one's time properly, so he can focus on value adding

actions.

Today's garment merchandisers have to move with frequent changes in demand and

the developing technologies utilized in manufacturing and production. To find out

customer requirements, they regularly visit retail outlets, and come up with latest updates

from frontline staff. In order to keep an eye on developments in sourcing, site visits are

made every week to mainland factories to meet suppliers and study production.

In garment merchandising, there is no specific rule, so it's important to be able to

think on one's feet. The main procedures of merchandisers are as followed:

• Understanding Sample Order

Merchandiser has to understand the buyer's requirements after receiving specification

in the sample order. In many cases, there are modifications pertaining to the

specifications in the order to dispatch on time and the right quality. He has to talk with

the in-house veterans on the execution problems of sample orders, as the right

information is required in decision making.

2
• Managing order route card and production timetable

Merchandiser has to manage every single production schedule and order route card

that helps to follow-up the execution in the planned way. It is expected to be

acknowledged of the various descriptions like: design, no. of modules, no. of operators,

how many processes, date of dispatch, quantity, output capacity, and deadlines in the

schedules.

The sub-ordinates are normally assigned to follow-up with execution of the plan.

Merchandiser plans the activities depending on the essentials or non-essentials, and top

priority are given to the most essential tasks. This is customary that the essential activities

are handled personally or with the support of junior merchandisers/sub-ordinates.

In a "daily schedule", merchandiser has to carry-out and categorize which is the most

significant and urgent task. The activity that has to be focused with full attention to

sweep-off non-essential activities and have to be to be corrected by prioritizing to meet

the deadlines.

• Using route card to reschedule activities

To get updated on the current status on the order, the route cards should be utilized.

The latest status can be fed into the computers. In case, the buyer ask for the goods prior

3
to the deadline, then merchandiser has to reorganize the schedules to accomplish tasks,

output capacity, no. of pieces to be produced daily, substitute arrangements, time

availability, supply time, scheduling critical ratio, etc.

• Submitting pre-production samples

The pre-production samples should be provided on time to the concerned buyers.

Quality of the sample must be verified. If required, revised samples should be made

available to the buyers. Merchandiser should adjust to the required changes demanded by

the buyer. The execution of bulk orders should be made only after samples are approved

by the buyer.

In-process inspection denote between any tasks in order-execution. In case of non-

conformation, it is better to focus on the concerns of quality. Merchandisers that work on

complete orders have to check deviation to the production teams so that any amendments

can be done to avoid the non-conformities.

• Solving shortage problem

The merchandiser should know about the dearth of any commodity such as fabric,

yarn, etc. from the beginning. Actions should be taken immediately to arrange required

materials, after discovering the shortage. It is expected that the merchandisers should

verify quality of the goods prior to execution of the order. If the material is found

unavailable, the superior should be informed about the concern.

4
• Communicating with associated people and buyer

It is essential to communicate with the buyers regarding the order. It is expected to

give some time to the buyer to read the sent messages. Merchandiser should to go

through the messages received from the buyer and reply on time. In many cases,

merchandisers have to provide order status to the buyers. Also, merchandiser has to

communicate with the people that are in-house, venders, contractors and job-workers.

Only through the right communication can one meet deadline for the concerned orders.

Apart from the above mention procedures, merchandiser has to assign subordinates to

help him in the order execution, and direct the procedures. He has to revise his

knowledge from time-to-time to know current market trends. To record preferences for

all the planned activities, use daily or time log systems.

The Merchandiser should find out exact reasons for time consumption. It is

necessary to keep record of time value and keeping it safe, as it is going to be shared with

concerned parties/buyers. It is certain that merchandising jobs need huge time planning.

5
1.2 COMPANY PROFILE

GOGO INTERNATIONAL, Bangalore is established in 1983 by Mr. S.S Goenka, later

joined by his sons Mr. Rajeev Goenka (an engineer by Profession) and Mr. Achal Goenka

(a doctor by profession)

o Starting from a modest turnover, now GOGO has a turnover of $ 40 million with

garment export of over 10 million units annually.

o Over the years GOGO has won many trophies and awards for outstanding

performance, best export performance etc. with award by the president of India

also.

RANGE OF GARMENTS:

o Knitted garments have been the forte of GOGO, however recently GOGO has

ventured into the production of woven garments.

o In knit they produce men, ladies and children garments.

o The range includes casual wear, sweater, sports wear, active wear, night wear and

high fashioned boutique garments.

6
MARKETS AND CLIENTS:

o GOGO enjoys a clientele that spans not only countries but also continents.

o It exports across the globe to countries in Europe, America, Australia and Asia.

o GOGO’s customer base gives immense pride and motivates to standards at sky

level always

o Some of their best customers are listed along:

• Kids wear: Gymboree, Disney, Barbie

• Women: Marks & Spencer, by design, Mervyns, united colors of

Benetton, exit, replay etc.

• Men: VF corp., lee, wrangler, jack and Jones, quicksilver, replay, Steve

and Barrys etc.

• Apart from above GOGO also work with leading sports wear and active

wear labels such as NFL, Harley Davidson, mountain warehouse etc.

EMBROIDERY:

o A large part of Gogo’s production is fashion oriented and therefore the

embroidery department is very prominent. It has facilities for both computerized

and hand embroidery.

o Computerized embroidery machines are capable of producing about 10,000

pieces per day.

7
INFRASTRUCTURE:

o A strong infrastructure is a backbone of a strong production base.

o GOGO has made Bangalore its head office which means which is the hub for

manufacturing facilities as well as it centralized departments like shipping,

quality control, designing, sampling, embroidery, computer systems and

accounts.

o It also has office in Delhi, Ludhiana, Mumbai and Tirupur.

o It employs over 3000 people all across its factories and office.

o Total area covered under production is to the tune of 4,00,000 sq.ft

o All factories are modern with state of the art machinery and have the relevant

social, technical and administrative compliance.

o An integrated modern ERP program links all the factories and office, and also

links the function of merchandising, production, designing, inventory and

shipment.

o The management of GOGO has recognized the need for expansion and has

explored the various industrial areas open for investment. From among these

GOGO has chosen to expand its plant at Hassan, where government has started

an SEZ (special economic zone) for the textile industry.

o On completion of this project, Gogo’s production capacity is expected to grow

from 10 million to 35 million garments per annum. The factory and processing

plant will be spread across 1 million sq. ft., the processing capacity will be

25,000 lbs per day.

8
o The same campus will have a fully equipped laundry, embroidery and printing. In

addition to the integrated production facilities, Hassan will also have a dedicated

training center and knitting plants.

PROCESS HOUSE:

o In 1995 the need to be vertical made Gogo start its own processing plant in

Bangalore.

o The modern plant has latest machinery from Italy, America, UK and turkey.

o The plant has facilities for knit dying, printing, compacting etc.

o The recent addition is a garment dying and washing plant.

o The plant includes a sophisticated lab for all their research, developing and

testing.

o A reverse osmosis plant, one of the first few in textile industry, ensures clean

environment.

DESIGNING:

o Many of Gogo’s clients are fashion houses that set trends.

o To cater the need of its buyers Gogo has a qualified design and development

department.

o Creativity is given freedom.

9
1.3 NEED OF THE STUDY

The export oriented Garment manufacturing company is facing a cut throat

competition in today’s global business cluster. As there are many key players the

business became very tough and competitive as only those who have some competitive

advantage can only survive. On the other side merchandising is the backbone of any

apparel manufacturing and exporting companies, so the efficiency and effectiveness of

merchandising process is inevitable for the timely delivery of goods so as to impress the

buyer and get more future orders, So the researcher tried to understand the merchandising

process of apparel manufacturing and exporting company and tried to find out the key

internal issues, its causes and suggestions which can help the company to deliver the

goods in time to the buyers end.

The following are the key need of the study.

 Execution and delivery of goods as per the merchandising plan always gives an

edge for the company in current cut throat competition.

 Delay in any of the process can adversely affect the further processes and it is

observed that there are delays happening in the merchandising work process in

GOGO INTERNATIONAL.

 Further, the study gives focus on various internal causes, affects and suggestions

to avoid delay in work process.

10
1.4 OBJECTIVE OF THE STUDY

 To analyze merchandising process in GOGO INTERNATIONAL.

 Identifying various internal issues, weakness, and flaws in the current practices.

 Analyzing and finding out the ways of improvement of efficiency and

effectiveness of merchandising process.

1.5 SCOPE OF THE STUDY

The Indian garment industry is facing a fierce competition in global market,

where price is order qualifier whereas transparency in system, excellent service, high

quality goods and timely delivery are real winners. The export oriented Garment

manufacturing company is facing many risks, which make delays in delivering the

fashion merchandise from the concept stage to the store. The pre-production process

networks are unique for every single enterprise, every single buyer, even sometimes for

every single order whereas the input of one process will be the output the other process.

So a proper analysis will make the delays and variations caused by internal processes at

both ends of the chain as well as the import/export procedures in between, a benefit to the

organization.

11
The following are the scope of the study.

 This study is an effort to reduce the delay in merchandising process in apparel

manufacturing and exporting company.

 Reasons for the problem are found out as per the analysis made on the T&A and

the suggestions are made related to the findings.

 The study will help the organization (Gogo international) to reduce the delay in

merchandising process by identifying and rectifying some of the causes of delay.

12
CHAPTER-2

RESEARCH METHODOLOGY

Research design: The relevant project brief on the practical understanding of “Apparel

manufacturing and export merchandising and its various processes”. Research defines

activities involved in each process and its responsible departmental functioning. This was

done by activity definition and time estimation. The observations and findings are done

by tracking down recent and past orders (four orders have been taken for analysis, out of

30 observed). The research focuses more on the ‘internal’ reasons for the issues which

acts as a hurdle for the smooth functioning of merchandising process.

Sources and method of data collection:

• Primary data:

Data is collected through observation and interview method. Visiting

various departments and direct interaction with the merchandisers, planning

manager, various department heads and stakeholders involve in the order

execution process helped to collect various datas.

13
• Secondary data:

Secondary data is collected by understanding the process and

information flows, time and action calendar, past records and departmental

reports of orders executed by the company and vendor profiles in detail of the

company.

• Sample size:

Time and action calendar (T&A) prepared for various styles has been taken as

samples for the study. Four samples (styles) were randomly taken from the total of 30

samples observed.

• Collection of literature phase:

Research is being initiated and frame worked after going through various library

books, journals, company news and knowledge bases across internet.

• Presentation and interpretation of data:

The collected data have been classified and tabulated. Simple tables have been

prepared. Graphical representations and investment ‘Payback period method’ have

14
been liberally used to exhibit the classified data to provide easy and better

understanding of the study.

15
CHAPTER-3

LITERATURE REVIEW

3.1 MERCHANDISING

In the textile business, merchandisers have a particularly strong role because of

the intensive nature of product range. The process of buying and selling goods and

services are termed as merchandising. In other wards, the area of a company that

develops strategies to have the right merchandise, at the right places, at the right time and

at the right locations to meet the needs and wants of the target customers. Effective

merchandising saves time and money. It coordinates various departments in the

organization. Merchandising forms an effective liaison with the buyers. It identifies and

develops potential new buyers. It builds good relationship with the buying houses and

merchandiser attends to queries, order processing and evaluation of apparel products. So

merchandising is of greater importance in apparel industry.

The term merchandising means simply to buy and sell commodities for a profit.

The role of merchandising varies depending upon whether it is performed in retail or

manufacturing context, Merchandising involves the conceptualization, development,

procurement of raw materials, sourcing of production and delivery of product to buyers.

The merchandiser must combine logical and analytical thinking with initiative and

expressive creativity.

16
As per the below figure the merchandiser must have the capability of utilizing the

integrated activity of right brain and left — brain functions to attain both analytical and

creative thought process. The merchandiser must be able to rigorously plan and control

the functions involved in developing. Products, sourcing it and getting it to the customer

on time.

3.1.1 “Myers” Theory on Merchandising.

In other words, merchandiser must be able to involve in all company functions

that result in creation, development, execution, and deliver of product line such as

materials management, planning and control, market knowledge, product development,

production authorization, interface with sales, sourcing and interface with manufacturing

global textile industry, a merchandiser must possess a rare blend of traits, skills and

experience. A merchandiser must be a part designer, part engineer, part computer expert,

part marketer, and part business management guru and part entrepreneurs. According to

,
Theory on Merchandising Myer defines merchandising as ‘Careful planning,

capable styling and production or selecting and buying, and effective selling”. By

17
this definition, the primary mission of today’s merchandisers seems unchanged.

They continue to play an important role in the exchange process by providing

products for consumption.

3.2 WORK ACTIVITIES OF A MERCHANDISER WILL TYPICALLY

INCLUDE:

o Analyze the needs of the Buyer, Interpret and communicate them to the

respective departments and try to present the buyers with the materialist’s

product which they need as well as deserve.

o To ensure the quality in production and timely delivery. The work of the

merchandiser starts even before getting the order and extends even after the

shipment happens so as to maintain post purchase service and relationship with

the buyer.

o Creating a TNA (Time and Action) calendar for fixing schedules for various

activities like cutting, sewing, dispatch etc.

o The merchandisers constantly have to keep track of the position of the order that

is being processed in the factory. He/She is the one who is responsible and in turn

answerable to the Buyer for delivering the goods as specified and with in the

committed period of time. Therefore, he is a link in order to achieve maximum

customer satisfaction.

18
o Basing upon the existing infrastructure, quality norms and capabilities of the

plant the merchandiser sources orders across the markets and submits a probable

costing sheet to the buyer. If the buyer finds the plant compatible with its

compliance with the costing being appropriate to the merchandise, the order is

confirmed.

o Sometimes orders are confirmed after a few sample pieces are seen by the buyer.

The sample pieces are sent and the comments, feed back is collected by the

merchandiser and the necessary changes are conveyed to the concerned

personnel.

o Coordinates and tracks the sourcing activities and makes sure that all the raw

materials are delivered on time.

o Once the order is executed and the merchandise is dispatched, the merchandiser

takes care of the post shipment comments and tries to maintain a long term

relationship with the buyer.

o accompanying buyers on visits to manufacturers to appreciate production

processes;

o meeting with suppliers and managing the distribution of stock, possibly

negotiating cost prices with suppliers;

o Identifying production and supply difficulties and dealing with them as and when

they occur.

o Requisition of trims and fabrics from CPC, who approves of the quantity

requested for.

19
o A pre production meeting is held in units one day after the package is sent to the

unit. The internal PPM is held only among factory members to discuss the style,

trims, construction etc. if there are further clarifications, an external PPM is held

with the Q.C, merchandiser, and buyer.

20
3.3 MERCHANDISING WORKFLOW

Make contact with buyer

Obtain order

Do costing for that particular style

Negotiation with buyer

Order fabric and trims

Receiving bulk fabrics and trims

Send samples to production

Supervising the order till shipment

21
3.4 MERCHANDISING PROCESS FLOW

Development sample
(If no)
Send for approval to buyer

Fit sample
(If no, send for
Send for approval to buyer rectification)

Pre production sample

Send to buyer (order conformation)

Marker development

Fabric sourcing

Preparation of Job file

File forwarded to production merchandiser

Order tracking (WIP till shipment)

3.5 GENERAL MERCHANDISING PROCESS:

Merchandiser is a person who interacts with the buyer and the main job is to get the

work done as per the requirement of the buyer and deliver the finished goods to the

buyer’s destination on time. He interacts and coordinates various activities which are

discussed in detail.

22
3.5.1 Order enquiry:

This is the first stage in which the buyer will enquire with the merchant about

the new order.

3.5.2 forwarding tech pack:

When the order enquiry has been done then the buyer will sent a “tech pack”

or specification sheet to the merchant. Tech pack includes all the details of a style

and which includes the items as follows:

o product style design

o measurements

o fabric

o style code

o surface ornamentation details etc

3.5.3 Product development:

Once the tech pack is received by the merchant. He will arrange the tech

pack details in a format by dividing various styles and its details. Then, he will

advice the junior merchandiser about the style and its details so that the junior

can assist the sample coordinators and gets the development samples ready from

the sampling department.

3.5.4 Approval of development samples:

Once the development samples are ready, 2-3 samples are sent to the buyer

for approval. In the development sample the main objective is to understand how

the garment style looks with the specific details. So here samples are made with

the available fabric in store with closely resembles the exact requirement. In

23
development sample surface ornamentations and fit is followed as per the tech

pack. if some correction is to be done then the buyer will sent the correction

details and again the samples are made till it get approved.

3.5.5 Costing:

Once the development is made and approval is received from the buyer, then

the costing is done. It is done by calculating various costs incurred to make a

garment style. it consist of various factors like:

o fabric cost

o trims and accessories cost

o CMT

o Washing or finishing cost

o Bank charges

o Buffer value

o Miscellaneous costs like rejection cost, wastage etc.

3.5.6 order placement:

Once costing is done and the same is accepted by the buyer then the buyer

will place the order with the required order quantity and other main details to the

merchant

3.5.7 Fabric and trims ordering:

Once the order placement is made by the buyer with the required quantity

then the merchandiser will place the order for required fabric as per the color,

GSM, weave etc which is required in the style. The merchant will forward the

24
requirement sheet to the purchase department they place orders with the

suppliers.

3.5.8 Lab dip:

By this time merchant will sent the lab dips to buyer. This includes many

shades of the color which the buyer is asked to make the garment. So the same

has to be approved by the buyer to finalize the color.

3.5.9 Fit sample:

After approval of development sample from buyer, fit sample is made. The

sample is usually made of the medium size to check the fit. All measurements are

checked correctly as per the specs. The buyer returns Fit approvals sheet which

contains all the actual measurements and required measurements and how much

deviation has occurred for the purpose of correction. This sample is made from

original or if that’s not available, then in proxy fabric. 3 pieces are made, all of

which are sent to the buyer and sent back to merchandiser after approval. Once

this is approved the order is confirmed.

3.5.10 pre-production samples:

Once the fit samples are approved then the pre production samples or the red

seal samples are made. PP sample will have all the specific details of the style

with the exact fabric, color, trims, surface, ornamentations etc. so this is a main

step where the sample has to look exactly as per the buyer’s requirement. Around

2-3 samples (in 4 sizes each) are sent to buyer for the approval and buyer can

advice the corrections if required

25
3.5.11 size set samples:

From this stage onwards, samples are made in respective units. Size set

samples are made for the purpose of checking the different sizes of the same style

in terms of fit, measurements, styling etc. It is also made to check whether the

assigned unit is able to produce that style as per the specs. 3 sets are made for all

sizes. It is done in original fabric.

3.5.13 WORKFLOW OF SAMPLING

BUYER’S SAMPLE / INFORMATION

REQUISITION PREPARED BY MERCHANDISER

SAMPLING DEPARTMENT

DEVELOPMENT SAMPLE

BUYER
FIT SAMPLE
COMMENTS

SIZE SET SAMPLES

PRE PRODUCTION SAMPLES

26
3.5.1 Pre-production meeting (PPM):

Once all the samples are approved and all raw materials are ready in the store the

bulk production has to be started. Before that merchants will conduct a pre production

meeting with the production manager and other department heads to plan the process, so

that delay can be avoided. Here the merchants will discuss with the production heads on

how the production can be scheduled and done within the required time. So this meeting

is important and inevitable.

3.5.14 Forwarding of production file to production planning and control:

Production file is a document which includes all the details of a particular style. This

document is prepared by the merchants. Production file is forwarded to CPC once the PP

sample is approved, along with the file merchants will forward the approved PP sample

also. Finally the same is forwarded to PPC after checking the file by the CPC. Some of

the details in the production file include the following items:

• measurements

• export order sheet

• color details

• style description

• packing type

• print/embroidery instructions

27
• material requirement sheet (category,item,position,color,size,consumption,unit in

kgs,qty,total qty)

• job details for lectra and fabric order

• marker plan

• TNA order sheet

• 2D style diagram and trims

• Packing information

3.5.15 Checking the availability of fabrics and trims:

Once the file is received by the PPC, they will check and study each and everything

of the file and parallel they will check the availability status of the fabric and trims in the

store and they will follow up the same if it’s not yet reached in house.

3.5.16 Checking the surface ornamentation of the particular style:

Surface ornamentation may include embroidery, printing or appliqué and these are

done as per the buyer’s requirement so PPC will check the ornamentation details and

plans according to that and parallel arrange all the required things for the same.

28
3.5.17 Checking the status of stitching materials in-house:

Stitching materials are those which is used for sewing like threads and accessories

which assist production so parallel they will do the arrangement for the stitching

materials in-house.

3.5.18 Checking the patterns with master:

Production file includes all the details about the patterns and merchants will forward

the original patterns along with the production file to the PPC. Once they receive the

patterns they will forward the patterns to the pattern master and master will cross check

the pattern with the actual and confirms.

3.5.19 Grading and final cross check:

Once everything is checked and confirmed by the master then, the pattern is

forwarded to the CAD department for GRADING. Grading is a process of making

different sizes from a basic size. When the file is forwarded to PPC only one centre

pattern will be provided and grading is done for other sizes. Finally the graded pattern

will be cross checked and confirmed with the master.

3.5.20 Laying and cutting:

Laying is a process in which huge lot of fabric lots are laid flat in several plies as per

the marker plan’s length. Laying is done carefully without any wrinkles happening. Once

laying is done the patterns are laid on it as per the marker plan and the main concern is to

minimize wastage. The patterns are marked and the plies are cut. Band knife and Straight

29
knife cutting machines are used to cut the plies. Once the plies are cut, it is separated and

tied as bundles.

3.5.21 Garment wash:

The next process is to wash the cut pieces. The bundled pieces goes for specific

washes as per the buyers requirement.

3.5.22 Bit printing/appliqué/embroidery:

When the garment wash is finished then the bundles will be sent for

printing/appliqué/embroidery if the style demands. Surface ornamentation is done on cut

pieces rather than in full garment this is because it reduces the risk of spoiling the whole

garment if some defects occurred during printing or so, if defect happens in cut pieces

that can be replaced and less fabric wastage happens.

3.5.23 Loading in line:

When surface ornamentation is done on cut pieces then, the whole bundles moves to

the sewing lines as per the plan. Here bundles are loaded to each worker as per his work

and the sewing process moves from one end to other end where the whole garment is

stitched. One worker does the same job always say, if a worker‘s job is to stitch a collar

with collar bone then he does the same always when he receives the materials moves

from his co-worker after he completes his part. Like this sewing happens in a chain

format.

30
3.5.24 Finishing:

Once the whole garment is stitched and collected in the end of the line then the

same will be forwarded to the finishing section where, workers will do the finishing

of the garment like

• Checking: here the whole garment is checked.

• Trimming: trimming is the process in which all the protruding threads are cut and

gives a good appearance to the garment

• Ironing: in this process steam iron is given on the garment to avoid wrinkles.

• Packing: it is the process in which the garment is folded and packed in the

polythene covers.

3.5.25 Dispatch:

Dispatch is the end process in which the garments are packed in the cartons and

shipped. There are so many procedures and documents which have to be checked and

processed when the goods are moved out of the factory.

31
3.6 QUALITY CHECKING IN VARIOUS STAGES OF PRODUCTION:

3.7 SOME IMPORTANT DOCUMENTS WHICH THE MERCHANDISER IS


REQUIRED TO DRAFT ARE:

• Production Order:

There is a P.O for ever single style of every buyer. The Production Order is

a form that communicates all the details required by the Production Planning department

in order to generate a loading plan. The merchandising department issues a PO for every

fabric that is to be processed.

- It contains style number, style description, order quantity, sizes, quantity for each size,

fabric consumption, interlining details, trims description, packing instructions, label specs

etc.

32
• Bill of Materials (BOM)

From the production order, the quantity of fabric and trims is calculated for a single

unit, and this is multiplied into the number of shirts being produced in the style. These

quantities are issued as a Bill of Materials for various trims such as buttons, threads,

collarbones and cuff links. BOMs are also produced for packing materials and wash care

labels. These are issued to the trims store.

Accordingly the store issues the required amount of trims. Each BOM is identified by its

issue number and date. A copy of these above details is maintained by the accounts

department for the purpose of costing.

• Tech Pack:

This is the file which is considered the most important during the execution of an

order. It contains all the relevant technical information regarding the style fabric process,

tolerances, interlining details, the setting of various machines for the style processing.

- There are information regarding all departments i.e. for cutting, documents like marker

planning, consumption etc; for sewing, construction details, measurements, etc.

-Even comments from buyers during sourcing and sampling stage are recorded to clarify

any doubts and mistakes.

-This tech pack along with the PO file is transferred to all the sections while the style is

passed on from section to section.

33
• Order status report:

This is a report in which all the styles and its various activities are updated

in an excel sheet. This is maintained by the senior merchants so that he can easily track

the current status of a particular style. The status information is given by the merchants

and it is updated once in a week.

3.8 CENTRAL MERCHANDISING PLANNING AND CONTROL (CPC):

Central planning and control is a planning cell where the pre production

and production activities related to each and every order is analyzed and planned to make

sure that the activities are executed as per the planned date so as to finish the whole work

within the lead time and shipments done on the buyer specified date. Planning is done by

looking into the practicality of executing the process by being aware of the current issues

and challenges faced by the company.

3.8.1 TIME AND ACTION PLAN

Time and action (T&A) plan is an inevitable part of CPC. Time and action

calendar is a planned calendar which includes:

• Major key activities

• Planned dates for executing each activities

34
• Actual date of each activity being executed

• Remarks

There is a usual format maintained for T&A using spreadsheet. Once when an

order is placed then the merchandiser will forward the tech pack to the CPC and on that

basis the T&A is prepared by the CPC and the same will be sent back to the

merchandiser, which includes on which date the particular activity should be started and

ended so as to make the goods ready for shipment on ex-factory date.

Most of the time there happens many reworking and negotiations done on T&A

between the CPC and merchandisers due to many delays and uncertain things happening

on the way of execution of orders.

3.8.1.1 TIME AND ACTION CALENDER FORMAT

KEY ACTIVITIES

Job #

Merchandiser

Buyer

35
Quantity

Allocation

Lectra and ERP entry

Lab Dip Approval (sent to buyer)

Lab Dip Approval (receive from buyer)

Yarn in-house

Griege fabric in house date

Finish Fabric in-house

Bulk fabric approval (sent to buyer)

Bulk fabric approval (receive from buyer)

Further process fabric

Dying

Print/Embroidery. strike off (sent to buyer)

Print/Embroidery. strike off (received from buyer)

Fit sample approval (sent to buyer)

Fit sample approval (receive from buyer)

PP sample submission

PP sample approval to receive

Size set sample approval (sent to buyer)

Size set sample approval (receive from buyer)

36
Stitching accessories in-house

Packing accessories in-house

Cutting start date

Washing start date

Bit print start date

Bit Embroidery start date

Stitching start date

Garment wash start date

Washing end date

Bit print end date

Bit Embroidery end date

Stitching end date

Garment wash end date

Final inspection

Ex-factory

Delivery date

The insistence on shorter lead times and pressure on the margins of export and

other units has grown over time, along with the need to stick to delivery schedules strictly

and to improve quality to grow in an exceedingly competitive market.

37
Despite all the possible roadblocks, the fact remains that timely deliveries and

short leads times are on the top of the buyers’ agendas. The competitive scenario is

changing extremely rapidly. Companies must be prepared to make the radical change of

planning and managing their processes on software-aided tools, or be prepared to be left

behind in the race.

The current method used in the company is T&A (time and action) which

captures the two main concerns of buyers, merchandisers in buying offices and

manufacturers:

 “Are we on time? (The frequent answer is, "Mostly not!")

 “Are all the action steps happening the way they should? (Again, "Mostly not!")

It is also a common practice to prepare two TNAs; one with a few main

important activities that were suggested by the buyer, while the other one with more

number of in-between activities (to keep tab on in-house activities in micro details) and

pre-poned target dates (buffer time)

For example, TNA suggested by buyer may have only 4 target dates, i.e. fit sample

approval date, size set approval date, lab dip approval date and planned cut date (PCD).

While a TNA created by a manufacturing organization (for same order) may have target

dates for total 15-20 activities: like pattern approval, grading approval, dispatch dates for

all approvals, loading for bulk dyeing, receipt of fabric and accessories, etc.

38
The fashion industry's processes, indeed any multi-step process, can be broken

down like this and re-built into a time-and-action calendar, that tells you how long your

process is expected to take, and when you should be completing each step so that you

complete the entire process in time.

In simple terms a "time and action calendar" is something that captures several

work-steps, the deadlines for completing those work-steps and also capture, as much as

feasible, the time when the work-steps have actually been completed. Typically, for easy

reference, the steps would have been mentioned in the sequence that they are supposed to

start, or in the sequence in which they are expected to be completed.

In brief, there are three main problems with this simplistic notion of T&A calendars

Problem # 1 – Delays

Unexpected delays in the existing activities, or addition of new work steps due to

some problem occurring in the chain. Discovering it too late that stocks of the lace that

was supposed to go into the peasant blouse are not enough and we need to wait a week

before the balance quantity becomes available. Or the rib fabric needed urgently for the

Navy Blue T-shirt is available, but only in light shades which will need to be re-dyed and

we lose two weeks. Delay happens but the customers now have become more impatient

and less tolerant. By putting in place a clear time and action calendar, we should be able

39
to know when each activity is supposed to be begun and ended, and delays should be

handled easily.

FACT: most factories miss the first agreed target shipment date on 50-80% of their

orders, and many end up with 30-40% late shipments despite extension of delivery dates.

Problem #2-- Delays and Solutions are not Straightforward

The second problem that adds a layer of complexity is that very often the

"cause-and-effect" relationship between a delay in one activity and the total delay.As

explained in the previous section about critical path, this is the sequence which

determines the total lead time of the process. The same delay in different activities does

not have the same impact on the end-result. There is an impact on the end-result only

when the delays happen in an activity that is on the critical path.This fact is not accounted

for in T&A calanders, this is why, when having lost a week in one of the early activities

in an order and the order is running late after trying and speeding up a later activity

doesn't seem to work! That is because, while the delayed activity is on the critical path,

the work-step that one is trying to speed up is not on the critical path. Hence your

corrective action produces no result.

Problem # 3 - Many Hands

Dependency between the activities already exists - some activities cannot be

started unless an earlier activity is completed. Take for example the instance of a print

40
strike-off approval. A factory will not place the confirmed order for the bulk fabric,

unless the strike-off has been approved. Or, looking earlier, the buyer cannot approve the

strike-off, unless it has been sent to him by the factory or the mill. Delegation or working

in a team / organization also creates dependency on other people. This interdependence

and mutual responsibility is something that is almost entirely missed out when one is

dealing with a table of task names and dates in an Excel spreadsheet. Ignoring the

interdependence, in turn, creates more problems.

Problem # 4 paradox of plenty

A typical apparel order broken down properly has many more work-steps. These

could be 35-40 at the very least, up to 150 in some cases. Most people using Excel

spreadsheets for T&A calendars list 15-25 critical points, including the various major

approvals, fabric receipt, cutting, finishing, packing, etc. However, this obviously

provides only a limited amount of visibility into what is actually going on in the order.

Following is a network diagram, consisting of only 26 tasks. The tasks have been laid out

in the logical connected sequence, based on the dependency between them. Looks

complex, doesn't it? And yet, each merchandiser in a manufacturing organization is

expected to handle 8-15 orders simultaneously. We might have an average of 50 work

steps if all orders are properly analyzed and the process defined. That means 400-750

work-steps need to be monitored by the merchandiser at any point in time.

41
3.8.1.2 NETWORK DIAGRAM FOR A 26 STEP ORDER PLAN

Not just that, apart from some of the activities that are the merchandiser's direct
responsibility, most other activities are performed by other people within the same
company, or people in other companies. For example, in this 26-step example shown
above what has not been highlighted is the fact that these 26 steps require coordination
between 5 companies and 9-12 individual people across those companies.
This, then, is the paradox of plenty:

o The better you are able to define the process and break-down the order plan, the

more the number of work-steps that you end up monitoring.

o The greater the number of orders, the more the work-steps that need to be

followed-through.

42
o The more you actually work as a team, rather than in an individual capacity, the

more the number of interactions that need to be managed and followed-through,

and the higher the dependency on others to complete their activities on or before

time.

3.8.1.3 METHODS FOLLOWED FOR MANAGING T&A

 Some people manually calculate the likely timelines and note down the key dates

in their notebooks or diaries. Sometimes, unwittingly resources tend to migrate

between several projects and hence to a “multi-tasking” in response to the

customer demand in an attempt to keep as many customers satisfied as possible.

 Keeping track on the phone, through faxes and emails, and tick off things as they

happen or make notes of the new likely dates if there are delays. All the time,

they are mentally figuring out what the impact of the delay is going to be.

 Others use a hand-made chart that they might stick up on the wall. This may have

arrow diagrams similar to what we used above, or other forms of notation to

pinpoint planned starting and ending dates of activities. Naturally, these charts

get scribbled over, or redone, when things do not go to plan.

 Most of the "computer-savvy" people use Excel spreadsheets in which they note

down the planned dates and actual completion dates of a limited number of work-

steps in the order.

43
CHAPTER-4

ANALYSIS AND INTERPRETATIONS

In this study the analysis is based on:

• Time and action calendar (central planning and control)

• Major delays happening in time and action plan (Delay analysis)

• SWOT analysis on sampling department, which focuses more on:

1. Line balancing

2. Structure on sampling department

3. Productivity in the area of pattern making

4. Reference with TUKA CAD

4.1 TIME AND ACTION CALENDER AND DELAY ANALYSIS:

Time and action calendar is prepared by the central planning and controlling

department. The T&A calendar acts or guides the merchandiser to plan his schedules and

work as per the date given for each and every activity in the T&A. T&A is prepared for

each and every order. When an order is received by merchandiser from the buyer then he

44
will forward a copy of tech pack to the planning cell. In turn the planning cell will

prepare the T&A by practically thinking on all the internal and external problems and

delays which may occur during the execution of that particular order.

Here analysis is done with the help of 4 orders and the focus is given on that

activity where more deviation has happened.

4.1.1 T&A CHART

P*: planned date, A*: actual date

TIME AND
ACTION ORDER 1 ORDER 2 ORDER 3 OREDR 4
CALENDER
KEY
ACTIVITIES P* A* P* A* P* A* P* A*

Lab Dip
Approval (sent
to buyer) 2-12 5-12 2-12 3-12 2-12 2-12 2-12 2-12
Lab Dip
Approval
(receive from
buyer) 12-12 16-12 12-12 10-12 12-12 13-12 12-12 14-12
Yarn in-house 2-12 2-12 2-12 2-12
Griege fabric in
house date 12-12 12-12 12-12 12-12
Finish Fabric in-
house 22-12 22-12 22-12 22-12
Bulk fabric

45
approval (sent to
buyer)
Bulk fabric
approval
(receive from
buyer)
Further process
fabric
Print/Embroider
y. strike off (sent
to buyer) NA NA 3-12 3-12 3-12 3-12 NA NA
Print/Embroider
y. strike off
(received from
buyer) NA NA 6-12 7-12 6-12 5-12 NA NA
Fit sample
approval (sent to
buyer) 10-12 18-12 10-12 14-12 10-12 13-12 10-12 14-12
Fit sample
approval
(receive from
buyer) 17-12 25-12 17-12 20-12 17-12 22-12 17-12 24-12
PP sample
submission 28-12 7-1 28-12 31-12 28-12 30-12 28-12 5-1
PP sample
approval to
receive 4-1 15-1 4-1 7-1 4-1 8-1 4-1 13-1
Size set sample
approval (sent to
buyer) 7-1 25-1 7-1 11-1 7-1 11-1 7-1 16-1
Size set sample
approval
(receive from
buyer) 10-1 30-1 10-1 15-1 10-1 15-1 10-1 20-1
Stitching
accessories in-
house 12-1 15-1 12-1 12-1 12-1 12-1 12-1 12-1
Packing
accessories in- 8-1 16-1 8-1 8-1 8-1 10-1 8-1 9-1

46
house
Cutting start
date 11-1 1-2 11-1 16-1 11-1 16-1 11-1 21-1
Washing start
date 15-1 5-2 15-1 21-1 15-1 22-1 15-1 25-1
Bit print start
date NA NA NA NA 12-1 16-1 NA NA
Bit Embroidery
start date NA NA NA NA 12-1 16-1 NA NA
Stitching start
date 17-1 8-2 17-1 24-1 17-1 22-1 17-1 27-1
Garment wash
start date
Washing end
date 3-2 22-2 3-2 9-2 3-2 7-2 3-2 8-2
Bit print end
date 15-1 20-1 NA NA
Bit Embroidery
end date 15-1 20-1 NA NA
Stitching end
date 7-2 28-2 7-2 14-2 7-2 14-2 7-2 18-2
Garment wash
end date
Final inspection 11-2 1-3 11-2 15-2 11-2 15-2 11-2 20-2
Ex-factory 14-2 3-3 14-2 17-2 14-2 17-2 14-2 22-2
Delivery date 28-2 10-3 28-2 1-3 28-2 1-3 28-2 3-3

47
4.1.1.1 GRAPHICAL REPRESENTATION OF T&A

INTERPRETAION:

As per the above graph we can understand that there is a lot of deviation

happened in planned and actual dates in time and action plan. If we divide the key

activities in the graph into two sections i.e. pre-production activities and production

activities then we can categorize them into two sections, they are:

Pre- production activities and delays Production activities and delays

fit sample (23 days) cutting start date (40 days)


PP sample (27 days) stitching start date (43 days)

48
size set sample (40 days) stitching end date (36 days)
final inspection (38 days)
ex-factory date (31 days)

If we notice, more delay has happened in production activities but the number of

days it has taken is just normal. So the production activities are delayed due to the delay

in pre- production activities i.e., sampling delay. So the delays can be controlled only

when the company focuses more on the reasons of samples getting delayed with suitable

preventive measures.

4.2 ANALYSIS ON SAMPLING DEPARTMENT

4.2.1 Basic details of sampling department:

• Number of lines: 20 lines

• Number of machines: 120 machines (6 machines per line)

• Number of pattern masters : 10

4.2.2 Various sections in sampling department:

• Store

• Pattern making

• CAD

• Cutting and sewing

49
• Ironing

4.2.3 Sampling department structure:

• sampling manager

• pattern masters

• sample coordinators

• line supervisors’

• workers

• Represent all in line diagram with flow of authority.

4.2.4 Various documents maintained:

• Monthly sample production report

• Daily sample production register

• Sample fabric stock register

• Daily measurement report

• Daily pattern checking report

• Daily manpower report

50
4.3 ANALYSIS ON SAMPLING LINE BALANCING:

There are 20 lines having 6 machines each. The productions of samples are done

in such a way that each line is allocated with few buyers and that particular line will

produce samples only for its concerned buyers. The line supervisors make sure that the

samples are loaded as per the plan and the workers are performing it well. The following

are the details of line allocation and its production for the month of July 2010:

4.3.1 MONTHLY SAMPLING PRODUCTION CHART – JULY’10

BUYERS LINE A,B,C LINE D,E,F LINE G,H,I LINE J,K,L LINE M,N,O LINE P,Q,R

1 NAME IT C&A M.CARE M&S MEXX OTHER


2 ONLY VETIR LEVIS GAP ERICA PRODN
3 MAMALICIOUS COOP PEOTTIC GEM GUESS
4 MGB CARRIFOUR G.JONNY
5 LTB DESIGOUL DESIGNER
6 TKO EVANS MR NOAH
GRUPPU
7 COIN DEBHAMS R.CLUB
TOTAL 2154 801 1826 835 448

51
4.3.2 GRAPHICAL REPRESENTATION OF MONTHLY SAMPLING
PRODUCTION

INTERPRETATION:

4.3.3 The Main Reasons for the Variation in the Graph

The sampling department includes 20 lines and 120 machines i.e., 6 machines per

line. The Graph shows how much pieces a line produced for a month. When we observe

52
there is a huge variation happening from one line to another. It shows that some lines are

loaded with more work and some are not. This deep variation in graph shows ineffective

planning of allocating work to various lines. Here 3 line are combined and made into one

group (like line A,B,C combined into one and D,E,F made into another) and it is

distributed to few buyers ( find the table 4.3.1 ). So each line gives more priority to do the

work of their buyers first. Even though they load some other line’s work when they have

less work but this is not happening in an effective way. If so, the graph will show a

balanced line. This may be due to various reasons like:

• The pressure from the merchants as they are concerned more on their work so

they resist allocating other buyers work load to their line.

• There is a usual question comes into every line supervisors’ mind when they take

some other line’s work “ we will get loaded fully when we receive new orders

from our buyers shortly, then everything will become a mess”

So there are two main reasons for the ineffective allocation of work to various lines, they

are:

4.3.3.1 Improper planning:

One of the other major reason is the lack of continuous and practical planning

regarding the allocation of work to various lines as per the orders. Effectiveness of

planning is the by product of a graph showing linearity, i.e.; less variation in the graph.

But graph 4.3.2 shows a huge variation happening so it supports the statement.

53
4.3.3.2 Improper control and monitoring leading to resistance to change:

One of the major reasons for the ineffectiveness in the line allocation is the

improper control and lack of monitoring. This leads to “resistance to change”, the

employees are not ready to accept change and they don’t want to make changes in their

day to day work process by taking unnecessary workloads from other lines. This is

because they are not properly controlled and monitored by the top authority and this can

be rectified only if subordinates are answerable to the top authority for the work done.

4.4 ANALYSIS ON THE STRUCTURE OF SAMPLING DEPARTMENT

4.4.1 Structure of sampling department includes:

• Sampling manager

• Pattern masters

• Sample coordinators

• Line supervisors’

• Workers

Sampling manager leads the sampling team and rest of the people executes the work. The

flow of information or communication is through the following ways:

• Register reports (Daily, weekly and monthly)

• Telephones and direct conversation

54
4.4.2 CURRENT SAMPLING DEPARTMENT STUCTURE

SAMPLE MANAGER MERCHANDISER

SAMPLE
COORDINATORS PATTERN MASTERS

LINE SUPERVICORS

WORKERS

INTERPRETATION:

• Sampling manager: He is person who leads the sampling team. All the reports

regarding production and quality and other reports and issues related to sampling

55
has to go to him. He is the person who has to address the top management

regarding his department’s efficiency, effectiveness etc and held responsible for

very many issues regarding sampling department.

• Merchandisers: Merchandisers involves in the sampling process as their work

schedules are affected and done in sampling department. They make sure their

samples are getting done on time and whether all the required materials are there

on time in the store for the work process.

• Pattern masters: Their main work is to get the specification sheets from the

merchandising department and get the pattern work done for various styles and

for the buyer he is allocated for.

• Sample coordinators: Sample coordinators acts as the intermediaries between

the merchandiser and the sampling department. They are the assistants to

merchandisers and they get the details of a particular order and guide pattern

masters and other workers in the sampling department and get the work done for

the merchandisers.

• Line supervisors: line supervisors are allocated with few lines and he guides the

workers to work. They get the work details and techniques from the sample

coordinators or merchants or even from pattern masters.

• Workers: They are the tailors who stitch the garment under the guidance of line

supervisors.

56
The last figure shows the current structure of sampling department. Here the

sampling manager leads the team but merchandisers can also use their authority on

various people in the sampling department to get their work done. They personally come

to sampling unit and interact with the workers, pattern masters and so on.

On the other side pattern masters also controls and guides the work by

communicating with line supervisors, sample coordinators and even with merchandisers.

4.4.3 DISADVANTAGES OF THE CURRENT STRUCTURE:

1. Very complex structure

2. Lack of unity of command

3. Purposefully moving away from responsibility

4. Wastage of time

5. Improper channels of communication

6. Confusion

57
4.5 ANALYSIS ON THE EFFICIENCY AND PRODUCTIVITY OF

PATTERN MASTERS

4.5.1 Basic details about pattern making:

• Number of pattern masters: 10

There are 10 pattern masters and the total buyers are divided and allocated among the

10 pattern masters. They get the style details from sample coordinators and through the

guidance of merchandisers and even sample coordinators the patterns are made.

Everything is manual and least application of CAD is done.

• Salary range: 35000-40000rs

The pattern masters are paid in between 35000-40000 and its comparatively good as

per the work load they are in to.

• Number of patterns made per day: 5-7 patterns

As per the observation done for 2 months it is analyzed that around 5-7 pattern styles

are made by a pattern master per day after excluding all the break time, errors, re-work,

communication delay etc.

58
4.6 ANALYSIS ON THE APPLICATION OF CAD SOFTWARE IN

PATTERN MAKING: TUKATECH CAD, USA

4.6.1 TUKATECH CAD

Tukatech provides affordable fashion design and apparel product development

solutions to the worldwide apparel and sewn goods industry. Tukatech quickly achieved

world recognition with an innovative approach to streamlining the fashion design,

development and manufacturing processes through award winning fashion software,

patternmaking and virtual sample services, consulting, and customer support.

Their product mix begins with an innovative apparel CAD/CAM software technology for

pattern making, pattern grading, and marker making, and extends to patented soft body

dress forms, 3D virtual apparel prototyping software, product lifecycle management,

product data management, and hardware solutions.

They are the first and leading company in the world to offer apparel product development

outsourcing (APDO) as a service to the industry. They leverage their expertise and

leading technology to streamline pattern making, sample making, and associated apparel

development processes for apparel companies worldwide.

4.6.2 Productivity:

• Number of patterns made per day by the manual pattern masters: 5-7 patterns

• Tuka claims : 15 patterns per day ( almost 3 times than manual)

59
4.6.3 Cad Implementation Cost table

SL.NO FEATURES PRICE


1 Basic requirements (pattern making, grading & marker making 150000 ONWARDS
2 Plotter 258500 ONWARDS
3 Digitizer 70500 ONWARDS

INTERPRETATION:

As per the productivity analysis of manual pattern making we can conclude that

only about 5-7 patterns can be made per day by a pattern master. On the other end CAD

can make around 15 patterns if the operator is efficient enough. As per the analysis it is

found out that each pattern master is earning a salary of 40000 rupees. So it’s always a

question whether the output is sufficient enough or not if we compare with the cost

aspect.

60
CHAPTER-5

FINDINGS AND SUGGESTIONS

The findings are made on the basis of analysis done on T&A, structure of sampling department,

productivity and cost factor of pattern making. Time and action is the main analysis which helps to find

out what is the main reason for total delay in the planned T&A. from the T&A it is found out that the

SAMPLING DELAY is the main reason for the further delay in production and late delivery of goods.

Due to the reason for sampling delay more analysis and observation has been done on SAMPLING

DEPARTMANT and found out many problems and reasons for the delay.

Why the sampling delay happens……………..???

From the analysis one can come to a point that there is a lot of reconstruction required in the

sampling department and sampling work method. There may be lot of reasons and hidden causes for the

samples getting delayed. But the root cause can be found out only by a detailed study of sampling

department work process. The following are the findings to support the analysis and the main problem.

Sampling is a crucial process in which more focus must be given. Buyer may get disappointed when the

samples are frequently coming up with lot of errors and re work.

61
5.1 FINDINGS ON SWOT ANALYSIS OF SAMPLING DEPARTMENT

5.1.1 NEGATIVE POINTS:

• Idle machines

• Idle workers

• Lack of monitoring

• Negative attitude of workers

• Lack of flexibility

• Domination of pattern masters

• More work is wasted due to errors on patterns and re-working on the same

• Misplacement of patterns made for past orders

• More depended on pattern masters and less application of CAD

• Wastage

• More confusion in the work end

5.1.2 POSSITIVE POINTS:

• Good capacity

• Sufficient workers and employees

• Experienced pattern masters

• Good plant layout

62
5.1.3 MAJOR KEY PROBLEMS

1. “Sampling delay”

2. “Less productivity compared to sufficient capacity”

5.1.4 CAUSES:

1. .Lack of good, well defined and flexible structure of sampling department

2. Lack of unity of command

3. Lack of control and monitoring

4. Improper line allocation planning

5. Resistance to change

5.1.5 SOLUTION FOR LONG TERM POINT OF VIEW

1. Re-structuring the sampling department and making it as a separate planning cell.

2. Line allocation must be done by dividing the whole quantity and by distributing

to various lines as per the plan.

3. Introducing cad by replacing manual work.

63
5.2 SUGGESTIONS

5.2.1 RE-STRUCTURING THE SAMPLING DEPARTMENT AND

MAKING IT AS A SEPARATE PLANNING CELL.

Every organizational or departmental structure should be designed in such a way that

it should posses the following qualities:

• It must be flexible

• There must unity of command i.e., there should be only one commanding head

(boss) for one or more subordinates.

• Proper channels of communication by avoiding intermediaries to the maximum.

• Clear defining of authority and responsibility

But, it is clear from the analysis of structure of sampling department that it lacks the

required qualities, so there is an urgent need for the re-structuring of the sampling

department.

64
5.2.1.1 SUGGESTED SAMPLING DEPARTMENT STRUCTURE

(SAPMLING PLANNING CELL)

MERCHANDISER

STORE
MANAGER
SAMPLING
PLANNING
MANAGER PATTERN
MASTER

COORDINATORS

LINE
SUPERVICORS

WORKERS

The process goes like this............

Once the merchandiser receives the order he has to book for the fabric, trims etc

which is required for that particular style. Parallel he can forward the spec sheet to the

sampling manager and can brief him the details. Once the fabric and all other required

65
things are ready in the store, merchandiser has to get the signature from the store manager

showing that all the required materials and accessories are ready in the store for the

particular style. The signed document is forwarded to the sampling manager and the

sampling manager advices his assistants (coordinator) and pattern master about the style.

Sampling manager parallely plans how the line allocation has to be made, here the lines

are not allocated for particular buyers and all the lines are combined and made flexible to

load any style at any time as per the plan. The merchandiser only communicate with the

sampling manager and he is not suppose to influence and use his power to change the

workings of any sections in the unit for getting his work done early. He can communicate

with the pattern masters if the situation demands or for any contingent situation. Here

there is more control than the current structure.

ADVANTAGES:

1. Less complexity

2. Unity of command

3. Full control in the hands of sampling manager

4. Better planning and controlling can be done

5. It reduces the idle machines and workers due to better planning

6. Effectiveness in communication

7. Less confusion

8. Merchandiser can give more focus on other crucial activities as the sampling

manager can control the whole unit

66
5.3 LINE ALLOCATION MUST BE DONE BY DIVIDING THE

WHOLE QUANTITY AND BY DISTRIBUTING TO VARIOUS

LINES AS PER THE PLAN.

Currently each line is allocated with few buyers and each line will be loaded as

per the requirement of its allocated buyers. The main problem in this line allocation plan

is that some time few buyers will have lot of orders and few will be having less, so this in

turn will load some line with more work and few with less work. This is the main reason

for some machines and manpower sitting idle without work. So sampling department

must be made as a separate planning cell and line balancing must be done flexible.

5.3.1 MONTHNLY SAMPLING PRODUCTION-JULY’10

This variation in graph or the problem of some lines getting more work and few

are idle can be sort out by distributing the total work quantity equally to various lines and

planning must be done centrally. If all the lines are allocated with somewhat equal

quantity of work then, the problem of idle machines and workers can be sorted out.

67
ADVANTAGES

1. Idle machines can be utilized by equal distribution of work.

2. Idle workers will be reduced due to the above reason

3. Better planning

4. More output with less errors

5. Less delay

6. Maximum utilization of available recourses

5.4 INTRODUCING CAD BY REPLACING MANUAL WORK.

5.4.1 Basic information about manual pattern making as per the analysis:

• Number of pattern masters:10

• Salary range: 35000-40000rs

5.4.2 Productivity:

• Number of patterns made per day manually: 5-7 patterns

As per the observation it is found out that a pattern master can make 5-7 pattern

styles per day.

68
• Tuka claims : 15 patterns per day

On the other hand TUKA claims that their productivity is around 15 patterns per

day, it’s almost 3 times more than manual pattern making.

5.4.3 CAD IMPLEMENTATION COST TABLE

SL.NO FEATURES PRICE


BASIC REQUIREMENTS (PATTERN 150000
1 MAKING,GRADING & MARKER MAKING ONWARDS
258500
2 PLOTTER ONWARDS
70500
3 DIGITIZER ONWARDS

5.4.4 PAY BACK PERIOD AS PER THE ABOVE DATAS:

Payback period is that period in which the initial investment is collected back by the

project. Here we take the initial investment as 1, 50,000 rupees as the amount because

only basic requirement like pattern making, grading and marker making is required. The

cash collected back in frequent intervals are based on replacing the man power (pattern

masters) by introducing CAD. The salary of the CAD operator is not taken into

consideration.

69
The following are the possibilities to collect back the invested amount.

 Replacing 1 pattern masters

MONTHS CASH SAVINGS CUMULATIVE CASH SAVINGS


1 40000 40000
2 40000 80000
3 40000 120000
4 40000 160000

 Replacing 2 pattern masters

MONTHS CASH SAVINGS CUMULATIVE CASH SAVINGS


1 80000 80000
2 80000 160000
3 80000 240000
4 80000 320000

 Replacing 3 pattern masters

MONTHS CASH SAVINGS CUMULATIVE CASH SAVINGS


1 120000 120000
2 120000 240000
3 120000 360000
4 120000 480000

70
5.4.4.1 PAYBACK PERIOD AS PER THE ABOVE POSSIBILITIES

POSSIBILITY PAYBACK PERIOD


1 3 MONTHS AND 22 DAYS
2 1 MONTH 26 DAYS
3 1 MONTH 7 DAYS

ADVANTAGES:

1. Reduces cost (reduce cardboard sheet, chalk, markers, cello tapes etc)

2. Easy to alter patterns and easy access if further reference required

3. Saves time and reduce errors

4. Number of pattern masters can be reduced

5. By reducing the pattern masters, monthly salary (35000-40000rs) can be saved

6. Due to the above ,the saved money can be compensated for the implementation

cost of cad, thereby reducing the payback period

7. It can increase the output per day

71
CHAPTER-6

CONCLUSION

The study helped to understand the merchandising process and some of the

crucial areas of merchandising which can affect the smooth functioning of the whole

process. It gave more focus on the internal causes for the problem. Internal issues and

flaws are controllable factors as the solutions are in the hands of the organization, but

some external issues are uncontrollable and to an extend the organization has to bear the

after affects. The study lights up the areas of technological advantage by replacing the

manual work.

Sampling is an inevitable process in merchandising and the importance of

sampling and the after affects of samples getting delayed are critical. Major delays are at

pre-production stage and remaining at the production stage. And reduction of such time

can help the company in meeting the delivery dates on time. Hence the companies, which

can foresee the kind of delivery schedules the buyers, are asking these days can get the

insights even on production delays. Controlling this delay would enable the company to

reduce the deviation from the scheduled lead time and honor the delivery date.

72
LIMITATIONS OF THE STUDY

• The time for the project was restricted to two months as the researcher has to deal with

the entire process of a garment manufacturing company especially this will take at least 5

months.

• The project was conducted for a company situated in Bangalore, operating in export and

domestic market. The study may not show the complete picture of apparel industry;

rather it will be confined to a single company only.

FURTHUR SCOPE OF STUDY

As per the study the researcher has given more focus to the internal weaknesses and issues of

the organization which is leading to the problem i.e., the controllable factors. Further, there can

be many external issue and problems which can also act as a hurdle for the smooth functioning of

the merchandising planning and process. Some of the external factors like,

 Delay in fabric in house (Delay in yarn procurement, dying, knitting etc)

 Delay from the suppliers end

 Logistic delay

 Plant location problem etc.

So, the above issues can also cause delay in work process. The study can be extended to find

out whether there are any external causes for the delay in work process or not, If yes how far it

affects the process efficiency.

73
BIBLIOGRAPHY

Books:

o Jermy A. Rosenau, Devid A. Wilson, “Apparel Merchandising: The line starts here”,

Fairchild, 2001.

o Grace I. Kuntz, “Merchandising: Theory, principle & practices” , Fairchild, 2000

Articles:

o Stitch world, 2010, Technology and management in sewn product industry

o Apparel online, 2010

o Apparel views, 2010/ VOL-IX/ ISSUE-09

o Knitting views, 2010/VOL-5/ ISSUE NO. 04

Websites:

o www.tukatech.com

o www.Gogoindia.com

o www.fibre2fashion.com

o www.ezinearticles.com

74

Potrebbero piacerti anche