Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
COM
B. E./B. Tech. DEGREE EXAMINATION, MAY/JUNE 2009.
Eighth Semester
Information Technology
IT 1008 - SOFTWARE TESTING
(Regulation 2004)
Time: Three hours
Maximum: 100 marks
PART B - (5 X 16 = 80 marks)
11. (a) (i) Why is it important to meticulously inspect test result? Give Example.(10)
(ii)Discuss the drawbacks incase if you fail to inspect(6)
OR
(b) (i)Why is it necessary to develop test cases for both valid and invaiid input condition?
(8)
(ii) How important is document for product? How will you test requirement and design
document? (8)
12. (a) Develop black-box test cases using equivalence class partitionirig and boundary
value analysis to test a module for ATM system. (16)
OR
(b) Imagine yowrself as a developer of flight control system. Describe any three test
adequacy criteria you would consider applying to develop test cases for flight Control
system. (16)
14. (a)Why is testing plan important for developing a repeatable and managed
testing process? Give example. (16)
Or
(b)What role do user/client play in the development of test-plan for a project? Should
they be Present at any of the test plan reviews. Justify your answer. (16)
15. (a)If you are developing a patient record system for health care center, why of the
stop test will be most appropriate for this system? (16)
OR
(b) What is the role of the tester in supporting, monitoring and controlling of testing? (16)
WWW.COLLEGEBUDIES.BLOGSPOT.COM