Sei sulla pagina 1di 16

BAR BENDING SCHEDULE OF FOOTING P1 and P8 to P14

Structure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier.
Structure Name.: MAYAR RIVER BRIDGE
Drawing No.: REL-SUMPP-TES-311-C-1016
Dia
Sl.
of No Cutting No. of Total Cut No Unit Total
Length per Total
Bar mark bar Shape of bar Of Length Lap Length of Weight weight Remarks
Lap (m) Length (m)
Bent Reqrd (m)
(mm (m) bars (kg/m) (MT)
no.
)
32 2
@ Footing-
1 1 14.955 1 2.765 17.720 68 1204.960 6.321 7.62
1868

1868
Raft Main Bottom 2nd
200 Layer
C/C 11328
32 2
Footing-
@
2 2 17.019 1 2.765 19.784 96 1899.264 6.321 12.01
1900

1900
Raft Main Bottom 1st
120 Layer
C/C 13328
20 2
Footing-
@
3 3 12.272 1 1.728 14.000 68 952.000 2.469 2.35 Raft Main Top
500

500
200 11340 Inner Layer
C/C
20 2
Footing-
@
4 4 14.272 1 1.728 16.000 58 928.000 2.469 2.29 Raft Main Top
500

500

200 Surface Layer


13340
C/C
20 11380 4
Footing-
13380

13380

5 5 49.584 4 1.728 51.312 14 718.368 2.469 1.77 Raft Binder/Outer


100 Ring
11380 ###
25 2
@ Footing-
1836

1836

8 8 120 16.794 1 2.160 18.954 96 1819.584 3.858 7.02 Raft Main Bottom 3rd
Layer
C/C 13207
32 1000 4

Footing-
1739

1739

9 Chair 5.260 0.000 5.260 90 473.436 6.321 2.99 Chairs

500 500

Total:::: 36.05 MT

____________________ ____________________
For Contractor Page -1 of 16 For Client
(ITD Cementation India Ltd) (Reliance Infrastructure Limited)
BAR BENDING SCHEDULE OF FOOTING P2 to P7
Structure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier.
Structure Name.: MAYAR RIVER BRIDGE
Drawing No.: REL-SUMPP-TES-311-C-1016
Dia
Sl.
of No Cutting No. of Total Cut No Unit Total
Length per Total
Bar mark bar Shape of bar Of Length Lap Length of Weight weight Remarks
Lap (m) Length (m)
Bent Reqrd (m)
(mm (m) bars (kg/m) (MT)
no.
)
32 2
@ Footing-
1 16 16.255 1 2.765 19.020 73 1388.460 6.321 8.78
2018

2018
Raft Main Bottom 2nd
200 Layer
C/C 12328
32 2
Footing-
@
2 17 18.319 1 2.765 21.084 96 2024.064 6.321 12.79
2050

2050

Raft Main Bottom 1st


130 Layer
C/C 14328
20
2

Footing-
@
3 18 13.272 1 1.728 15.000 58 870.000 2.469 2.15 Raft Main Top
500

500

250 Inner Layer


C/C 12340
20
2

Footing-
@
4 19 15.272 1 1.728 17.000 50 850.000 2.469 2.10 Raft Main Top
500

500

250 Surface Layer


C/C 14340
4

20 14380
Footing-
12380

12380

5 20 100
53.584 4 1.728 55.312 14 774.368 2.469 1.91 Raft Binder/Outer
Ring
14380 ###
25
2

@ Footing-
1986

1986

7 22 130 18.094 1 2.160 20.254 96 1944.384 3.858 7.50 Raft Main Bottom 3rd
Layer
C/C 14207
32 1000 4

Footing-
1889

1889

9 Chair 5.560 0.000 5.560 100 556.040 6.321 3.52 Chairs

500 500

Total:::: 38.746 MT

For Contractor For Client


Page -2 of 16
(ITD Cementation India Limited) (Reliance Infrastructure Limited)
Client RELIANCE INFRASTRUCTURE LIMITED
Project Name 6 x 660 MW SASAN ULTRA MEGA POWER PROJECT _ CONSTRUCTION of CONVEYOR cum ROAD BRIDGE.
(CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)

Contractor ITD Cementation India Limited Cem

BAR BENDING SCHEDULE OF P1 FOOTING


Structure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier.
Structure Name.: MAYAR RIVER BRIDGE
Drawing No.: REL-SUMPP-TES-311-C-1016
Dia
Sl.
of No Cutting No. of Total Cut No Unit Total
Length per Total
Bar mark bar Shape of bar Of Length Lap
Lap (m)
Length of Weight weight Remarks
Bent Reqrd (m) Length (m)
(mm (m) bars (kg/m) (MT)
no.
)
32 500 2
12151

Footing-
6 6 13.042 1 2.765 15.807 70 1106.490 6.321 6.99 Vertical (Outer Face)
11597.1428571429

500
10
@ Footing & shaft-
7 7 11.797 0.000 11.797 41 483.683 0.617 0.30
100

300 Stirrups

C/C ###
Total:::: 7.293 MT

____________________ ____________________
For Contractor Page -3 of 16 For Client
(ITD Cementation India Ltd) (Reliance Infrastructure Limited)
Client RELIANCE INFRASTRUCTURE LIMITED
Project Name 6 x 660 MW SASAN ULTRA MEGA POWER PROJECT _ CONSTRUCTION of CONVEYOR cum ROAD BRIDGE.
(CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)

Contractor ITD Cementation India Limited Cem

BAR BENDING SCHEDULE OF P2 FOOTING


Structure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier.
Structure Name.: MAYAR RIVER BRIDGE
Drawing No.: REL-SUMPP-TES-311-C-1016
Dia
Sl.
of No Cutting No. of Total Cut No Unit Total
Length per Total
Bar mark bar Shape of bar Of Length Lap Length of Weight weight Remarks
Lap (m) Length (m)
Bent Reqrd (m)
(mm (m) bars (kg/m) (MT)
no.
)
2

32 500
14723

Footing-
6 21 15.614 1 2.765 18.379 105 1929.795 6.321 12.20 Vertical (Outer Face)
11597.1428571429

500
10
@ Footing & shaft-
8 23 11.797 0.000 11.797 50 589.857 0.617 0.36 Stirrups
300

C/C ###
Total:::: 12.562 MT

For Contractor For Client


Page -4 of 16
(ITD Cementation India Limited) (Reliance Infrastructure Limited)
Client RELIANCE INFRASTRUCTURE LIMITED
Project Name 6 x 660 MW SASAN ULTRA MEGA POWER PROJECT _ CONSTRUCTION of CONVEYOR cum ROAD BRIDGE.
(CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)

Contractor ITD Cementation India Limited Cem

BAR BENDING SCHEDULE OF P3 FOOTING


Structure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier.
Structure Name.: MAYAR RIVER BRIDGE
Drawing No.: REL-SUMPP-TES-311-C-1016
Dia
Sl.
of No Cutting No. of Total Cut No Unit Total
Length per Total
Bar mark bar Shape of bar Of Length Lap Length of Weight weight Remarks
Bent Reqrd
Lap (m)
(m) Length (m)
(mm (m) bars (kg/m) (MT)
no.
)
2

32 500
16001

Footing-
6 21 16.892 1 2.765 19.657 105 2063.985 6.321 13.05 Vertical (Outer Face)
11597.1428571429

500
10
@ Footing & shaft
8 23 100 11.797 0.000 11.797 54 637.046 0.617 0.39 Stirrups
300
C/C ###
Total:::: 13.44 MT

For Contractor For Client


Page -5 of 16
(ITD Cementation India Limited) (Reliance Infrastructure Limited)
Client RELIANCE INFRASTRUCTURE LIMITED
Project Name 6 x 660 MW SASAN ULTRA MEGA POWER PROJECT _ CONSTRUCTION of CONVEYOR cum ROAD BRIDGE.
(CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)

Contractor ITD Cementation India Limited Cem

BAR BENDING SCHEDULE OF P4 FOOTING


Structure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier.
Structure Name.: MAYAR RIVER BRIDGE
Drawing No.: REL-SUMPP-TES-311-C-1016
Dia
Sl.
of No Cutting No. of Total Cut No Unit Total
Length per Total
Bar mark bar Shape of bar Of Length Lap Length of Weight weight Remarks
Lap (m) Length (m)
Bent Reqrd (m)
(mm (m) bars (kg/m) (MT)
no.
) 500
2

32
Footing-
15028

Shaft Vertical (Outer


6 21 15.919 1 2.765 18.684 105 1961.820 6.321 12.40 Face)
11597.1428571429

500
10
@ 100 Footing & shaft-
8 23 11.797 0.000 11.797 51 601.654 0.617 0.37 Stirrups
300

C/C ###
Total:::: 12.772 MT

For Contractor Page -6 of 16 For Client


Client RELIANCE INFRASTRUCTURE LIMITED
Project Name 6 x 660 MW SASAN ULTRA MEGA POWER PROJECT _ CONSTRUCTION of CONVEYOR cum ROAD BRIDGE.
(CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)

Contractor ITD Cementation India Limited Cem

BAR BENDING SCHEDULE OF P5 FOOTING


Structure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier.
Structure Name.: MAYAR RIVER BRIDGE
Drawing No.: REL-SUMPP-TES-311-C-1016
Dia
Sl.
of No Cutting No. of Total Cut No Unit Total
Length per Total
Bar mark bar Shape of bar Of Length Lap Length of Weight weight Remarks
Lap (m) Length (m)
Bent Reqrd (m)
(mm (m) bars (kg/m) (MT)
no.
) 500
2
32
Footing-
16165

6 21 17.056 1 2.765 19.821 105 2081.205 6.321 13.16 Vertical (Outer Face)
11597.1428571429

500
10
@ Footing & shaft-
100
8 23 11.797 0.000 11.797 54 636.928 0.617 0.39 Stirrups
300

C/C ###

Total:::: 13.548 MT

For Contractor For Client


Page -7 of 16
(ITD Cementation India Limited) (Reliance Infrastructure Limited)
Client RELIANCE INFRASTRUCTURE LIMITED
Project Name 6 x 660 MW SASAN ULTRA MEGA POWER PROJECT _ CONSTRUCTION of CONVEYOR cum ROAD BRIDGE.
(CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)

Contractor ITD Cementation India Limited Cem

BAR BENDING SCHEDULE OF P6 FOOTING


Structure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier.
Structure Name.: MAYAR RIVER BRIDGE
Drawing No.: REL-SUMPP-TES-311-C-1016
Dia
Sl.
of No Cutting No. of Total Cut No Unit Total
Length per Total
Bar mark bar Shape of bar Of Length Lap Length of Weight weight Remarks
Lap (m) Length (m)
Bent Reqrd (m)
(mm (m) bars (kg/m) (MT)
no.
) 500
2
32
Footing-
14961

6 21 15.852 1 2.765 18.617 105 1954.785 6.321 12.36 Vertical (Outer Face)
11597.1428571429

500
10
@ Footing & shaft-
8 23 100 11.797 0.000 11.797 50 589.582 0.617 0.36 Stirrups
300

C/C ###
Total:::: 12.72 MT

For Contractor For Client


Page -8 of 16
(ITD Cementation India Limited) (Reliance Infrastructure Limited)
Client RELIANCE INFRASTRUCTURE LIMITED
Project Name 6 x 660 MW SASAN ULTRA MEGA POWER PROJECT _ CONSTRUCTION of CONVEYOR cum ROAD BRIDGE.
(CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)

Contractor ITD Cementation India Limited Cem

BAR BENDING SCHEDULE OF P7 FOOTING


Structure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier.
Structure Name.: MAYAR RIVER BRIDGE
Drawing No.: REL-SUMPP-TES-311-C-1016
Dia
Sl.
of No Cutting No. of Total Cut No Unit Total
Length per Total
Bar mark bar Shape of bar Of Length Lap Length of Weight weight Remarks
Lap (m) Length (m)
Bent Reqrd (m)
(mm (m) bars (kg/m) (MT)
no.
) 500
2
32
Footing-
14028

6 21 14.919 1 2.765 17.684 105 1856.820 6.321 11.74 Vertical (Outer Face)
11597.1428571429

500
10
@
100 Footing & shaft-
8 23 11.797 0.000 11.797 47 554.466 0.617 0.34 Stirrups
300

C/C ###
Total:::: 12.079 MT

For Contractor For Client


Page -9 of 16
(ITD Cementation India Limited) (Reliance Infrastructure Limited)
Client RELIANCE INFRASTRUCTURE LIMITED
Project Name 6 x 660 MW SASAN ULTRA MEGA POWER PROJECT _ CONSTRUCTION of CONVEYOR cum ROAD BRIDGE.
(CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)

Contractor ITD Cementation India Limited Cem

BAR BENDING SCHEDULE OF P8 FOOTING


Structure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier.
Structure Name.: MAYAR RIVER BRIDGE
Drawing No.: REL-SUMPP-TES-311-C-1016
Dia
Sl.
of No Cutting No. of Total Cut No Unit Total
Length per Total
Bar mark bar Shape of bar Of Length Lap Length of Weight weight Remarks
Lap (m) Length (m)
Bent Reqrd (m)
(mm (m) bars (kg/m) (MT)
no.
) 500
32 2
11241

Footing-
6 6a 12.132 1 2.765 14.897 60 893.820 6.321 5.65 Vertical (Outer Face)
11597.1428571429

500
10
@ Footing & shaft-
7 7 100 11.797 0.000 11.797 38 448.291 0.617 0.28 Stirrups
300

C/C ###
Total:::: 5.927 MT

For Contractor For Client


Page -10 of 16
(ITD Cementation India Limited) (Reliance Infrastructure Limited)
Client RELIANCE INFRASTRUCTURE LIMITED
Project Name 6 x 660 MW SASAN ULTRA MEGA POWER PROJECT _ CONSTRUCTION of CONVEYOR cum ROAD BRIDGE.
(CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)

Contractor ITD Cementation India Limited Cem

BAR BENDING SCHEDULE OF P9 FOOTING


Structure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier.
Structure Name.: MAYAR RIVER BRIDGE
Drawing No.: REL-SUMPP-TES-311-C-1016
Dia
Sl.
of No Cutting No. of Total Cut No Unit Total
Length per Total
Bar mark bar Shape of bar Of Length Lap Length of Weight weight Remarks
Lap (m) Length (m)
Bent Reqrd (m)
(mm (m) bars (kg/m) (MT)
no.
)
32 500 2
Footing-
10389

6 6a 11.280 1 2.765 14.045 60 842.700 6.321 5.33 Vertical (Outer Face)


11597.1428571429

500
10
@ Footing & shaft-
7 7 100 11.797 0.000 11.797 35 412.900 0.617 0.26 Stirrups
300

C/C ###
Total:::: 5.582 MT

For Contractor For Client


Page -11 of 16
(ITD Cementation India Limited) (Reliance Infrastructure Limited)
Client RELIANCE INFRASTRUCTURE LIMITED
Project Name 6 x 660 MW SASAN ULTRA MEGA POWER PROJECT _ CONSTRUCTION of CONVEYOR cum ROAD BRIDGE.
(CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)

Contractor ITD Cementation India Limited Cem

BAR BENDING SCHEDULE OF P10 FOOTING


Structure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier.
Structure Name.: MAYAR RIVER BRIDGE
Drawing No.: REL-SUMPP-TES-311-C-1016
Dia
Sl.
of No Cutting No. of Total Cut No Unit Total
Length per Total
Bar mark bar Shape of bar Of Length Lap Length of Weight weight Remarks
Lap (m) Length (m)
Bent Reqrd (m)
(mm (m) bars (kg/m) (MT)
no.
) 500
32 2
Footing-
9682

6 6a 10.573 1 2.765 13.338 60 800.280 6.321 5.06 Vertical (Outer Face)


11597.1428571429

500
10
@ Footing & shaft-
7 7 100 11.797 0.000 11.797 33 389.306 0.617 0.24 Stirrups
300

C/C ###
Total:::: 5.299 MT

For Contractor For Client


Page -12 of 16
(ITD Cementation India Limited) (Reliance Infrastructure Limited)
Client RELIANCE INFRASTRUCTURE LIMITED
Project Name 6 x 660 MW SASAN ULTRA MEGA POWER PROJECT _ CONSTRUCTION of CONVEYOR cum ROAD BRIDGE.
(CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)

Contractor ITD Cementation India Limited Cem

BAR BENDING SCHEDULE OF P11 FOOTING


Structure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier.
Structure Name.: MAYAR RIVER BRIDGE
Drawing No.: REL-SUMPP-TES-311-C-1016
Dia
Sl.
of No Cutting No. of Total Cut No Unit Total
Length per Total
Bar mark bar Shape of bar Of Length Lap Length of Weight weight Remarks
Lap (m) Length (m)
Bent Reqrd (m)
(mm (m) bars (kg/m) (MT)
no.
) 500
32 2
Footing-
9050

6 6a 9.941 1 2.765 12.706 60 762.360 6.321 4.82 Vertical (Outer Face)


11597.1428571429

500
10
@ Footing & shaft-
7 7 100 11.797 0.000 11.797 31 365.711 0.617 0.23 Stirrups
300

C/C ###
Total:::: 5.045 MT

For Contractor For Client


Page -13 of 16
(ITD Cementation India Limited) (Reliance Infrastructure Limited)
Client RELIANCE INFRASTRUCTURE LIMITED
Project Name 6 x 660 MW SASAN ULTRA MEGA POWER PROJECT _ CONSTRUCTION of CONVEYOR cum ROAD BRIDGE.
(CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)

Contractor ITD Cementation India Limited Cem

BAR BENDING SCHEDULE OF P12 FOOTING


Structure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier.
Structure Name.: MAYAR RIVER BRIDGE
Drawing No.: REL-SUMPP-TES-311-C-1016
Dia
Sl.
of No Cutting No. of Total Cut No Unit Total
Length per Total
Bar mark bar Shape of bar Of Length Lap Length of Weight weight Remarks
Lap (m) Length (m)
Bent Reqrd (m)
(mm (m) bars (kg/m) (MT)
no.
) 500
32 2
Footing-
10081

6 6a 10.972 1 2.765 13.737 60 824.220 6.321 5.21 Vertical (Outer Face)


11597.1428571429

500
10
@ Footing & shaft-
7 7 100 11.797 1 0.864 12.661 34 430.479 0.617 0.27 Stirrups
300

C/C ###
Total:::: 5.476 MT

For Contractor For Client


Page -14 of 16
(ITD Cementation India Limited) (Reliance Infrastructure Limited)
Client RELIANCE INFRASTRUCTURE LIMITED
Project Name 6 x 660 MW SASAN ULTRA MEGA POWER PROJECT _ CONSTRUCTION of CONVEYOR cum ROAD BRIDGE.
(CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)

Contractor ITD Cementation India Limited Cem

BAR BENDING SCHEDULE OF P13 FOOTING


Structure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier.
Structure Name.: MAYAR RIVER BRIDGE
Drawing No.: REL-SUMPP-TES-311-C-1016
Dia
Sl.
of No Cutting No. of Total Cut No Unit Total
Length per Total
Bar mark bar Shape of bar Of Length Lap Length of Weight weight Remarks
Lap (m) Length (m)
Bent Reqrd (m)
(mm (m) bars (kg/m) (MT)
no.
)
32 500 2
Footing-
11763

6 6 12.654 1 2.765 15.419 70 1079.330 6.321 6.82 Vertical (Outer Face)


11597.1428571429

500
10
@ Footing & shaft-
7 7 100 11.797 0.000 11.797 40 471.886 0.617 0.29 Stirrups
300
C/C ###
Total:::: 7.114 MT

For Contractor For Client


Page -15 of 16
(ITD Cementation India Limited) (Reliance Infrastructure Limited)
Client RELIANCE INFRASTRUCTURE LIMITED
Project Name 6 x 660 MW SASAN ULTRA MEGA POWER PROJECT _ CONSTRUCTION of CONVEYOR cum ROAD BRIDGE.
(CIVIL, STRUCTURAL & ARCHITECHTURAL WORKS FOR HIGH SPEED COAL CONVEYOR CORRIDOR SYSTEM FROM MINE TO PLANT AREA)

Contractor ITD Cementation India Limited Cem

BAR BENDING SCHEDULE OF P14 FOOTING


Structure Type : Conveyor Cum Road Bridges (2 Nos.) - Open foundation Footing of circular Pier.
Structure Name.: MAYAR RIVER BRIDGE
Drawing No.: REL-SUMPP-TES-311-C-1016

Dia
Sl.
of No Cutting No. of Total Cut No Unit Total
Length per Total
Bar mark bar Shape of bar Of Length Lap Length of Weight weight Remarks
Bent Reqrd
Lap (m)
(m) Length (m)
(mm (m) bars (kg/m) (MT)
no.
)
32 500 2
Footing-
12132

6 6 13.023 1 2.765 15.788 70 1105.160 6.321 6.99 Vertical (Outer Face)


11597.1428571429

500
10
@ Footing & shaft-
7 7 100 11.797 0.000 11.797 41 483.683 0.617 0.30 Stirrups
300
C/C ###

Total:::: 7.284 MT

For Contractor For Client


Page -16 of 16
(ITD Cementation India Limited) (Reliance Infrastructure Limited)