PROPERTY AND
CONSTRUCTION
HANDBOOK
2010
DAVIS LANGDON
AFRICA REGION
PROPERTY AND CONSTRUCTION
HANDBOOK 2010
ISBN 978-0-620-45751-4
Published by Davis Langdon as a service to the property and
construction industry.
SECTION 2
Inclusive rate estimates
Inherent difficulties and pitfalls 25
Specification 26
Wall to floor ratio - plan shape 27
Floor to ceiling heights 28
Plumbing, mechanical and electrical
installations 28
Construction areas 29
Internal subdivisions 29
Parking 29
SECTION 3
Approximate inclusive building cost rates
Regional variations 33
Building rates 33
Building services 38
SECTION 4
International costs
Cost comparisons 42
Africa building cost comparison 43
International building cost comparison 44
International office rental comparison 45
SECTION 5
Building cost
Building cost 48
Escalation rate 48
Calculation of estimated escalation 49
Tender price escalation 50
Cost indices 51
Tender climate 52
Unique large scale projects 53
Value added tax 53
SECTION 6
Graphs: BER and JBCC CPAP
January to January % change 55
January indices 56
Tender market indicator 57
SECTION 7
Method for measuring rentable areas
SAPOA methods 59
The basis 60
Area definitions 60
General definitions 62
Retail, industrial, residential and other 62
SECTION 8
Return on investment
Criteria to be employed 65
Initial return 65
Cash flow analysis 66
SECTION 9
Residual land value
The formula 71
Example 72
SECTION 10
Africa in figures
Area and population 74
Graph: population 2008 75
Gross domestic product 2008 76
Graph: gross domestic product 2008 77
SECTION 11
Directory of offices 79
SECTION 12
Magnificent Mapungubwe 88
1
GLOBAL
CONSTRUCTION
CONSULTANTS
VISION
AND VALUES
WE SEEK TO BUILD THE BEST AND MOST
VALUED RELATIONSHIPS IN THE
INDUSTRY
PURPOSE
OUR CORE PURPOSE IS TO MAKE A
MEASURABLE DIFFERENCE TO THE
VALUE, COST AND TIME OF OUR CLIENTS'
PROJECTS
VALUES
OUR CORE VALUES ARE INTEGRITY,
BACK TO INDEX
INNOVATION AND COLLABORATION. WE
CREATE AN ENVIRONMENT THAT
ENABLES OUR PEOPLE TO TAKE PRIDE IN
ACTING WITH THESE VALUES IN THE
THINGS WE DO
PASSION
WE ARE PASSIONATE ABOUT RECRUITING
AND DEVELOPING THE BEST PEOPLE,
WORKING WITH THE BEST TEAMS AND
DELIVERING SUCCESSFUL SOLUTIONS
THAT RESPECT THE ENVIRONMENT
GOAL
TO PROVIDE SERVICES THAT COMBINE TO
PRODUCE THE BEST PROJECT AND COST
MANAGEMENT IN OUR INDUSTRY
MESSAGE FROM THE
MANAGING DIRECTOR
LOOKING BACK ON MY MESSAGE IN LAST
YEAR'S PUBLICATION, IT INCORPORATED
A FORTUITOUS PHRASE HIGHLIGHTING
'OPPORTUNITIES AND CHALLENGES THAT
LIE AHEAD'. THIS RESONATED WITH OUR
BUSINESS AND ON THE BALANCE OF
THINGS WE COUNTED MORE
CHALLENGES THAN OPPORTUNITIES
DURING 2009.
The resilience shown by our firm during the global
recession has in large measure been due to the
BACK TO INDEX
business planning and strategy which we implemented
in previous years. This involved strengthening of our
service lines and sectors and investing geographically
with new businesses and offices in Southern Africa
and the rest of the African continent.
BACK TO INDEX
employee takes responsibility for the resources they
use and the activities they undertake on behalf of the
firm.
Indresen Pillay
BACK TO INDEX
BACK TO INDEX
• ownership
• management control
• employment equity
• skills development
• preferential procurement
• enterprise development
• socio and economic development
BACK TO INDEX
• the resources and information needed to support
those processes are monitored, measured,
analysed and continually improved
• the system is fully documented by means of a
quality manual containing policies, objectives and
system procedures supported by additional
documentation incorporating operational work
instructions, practice notes and standards
• all records necessary for demonstrating
conformance to requirements and for analysis are
held in safekeeping
QUALITY MANAGEMENT 9
and continually improving the ‘best practice’
procedures within the various Davis Langdon offices
throughout Southern Africa. Regular surveillance and
recertification audits are conducted by DEKRA
Certification, an international market leader in
certification and testing services. The latest audit was
successfully conducted in mid 2009.
BACK TO INDEX
BACK TO INDEX
Research activities nationally, regionally and
internationally include amongst others, the following:
• cost research
• life cycle and whole life costing
• collaboration with universities, professional
bodies, government and research institutions
• continuing educational workshops
• industry reports and brochures
• collaboration with our international offices with
specific reference to the following:
o education
o retail
o hotels, sports and culture
o infrastructure
o public sector
o commercial
o industrial
o mining
o engineering
o sustainability
o tall, large and complex buildings
RESEARCH SUPPORT 11
SUSTAINABILITY
In the wake of global warming we are facing a
planetary emergency. The contribution of
construction and operation of buildings to the
destruction of the earth compel us to change the
methods of the past and to adopt environmentally
sustainable development principles.
BACK TO INDEX
in the USA the LEEDS system have been developed.
Through their relevant Green Building Councils
(GBC) they advocate sustainable principles and
methods for property owners and contractors to
adhere and aspire to in order to achieve their desired
green ratings.
BACK TO INDEX
SUSTAINABILITY 13
QUANTITY SURVEYING/
COST MANAGEMENT
Davis Langdon provides comprehensive cost
estimating and cost planning services, including
viability analysis, to enable budgets to be established
and approved. Cost control and monitoring
procedures during detail design stage are dynamically
implemented and maintained in order to keep
budgets relevant.
BACK TO INDEX
subcontractor selection. Being a large practice, we
have a comprehensive construction data bank which
facilitates contract negotiation. Effective cost
planning, cost control and monitoring throughout the
duration of a project, including regular issue of cost
reports and cash flow projections.
BACK TO INDEX
With offices located in Johannesburg and Klerksdorp,
Engineering operates throughout Africa using
infrastructure support from other local Davis
Langdon offices located in all major centres in South
Africa and Botswana. Engineering employs
professional qualified quantity surveyors, cost
managers, cost engineers, contract administrators,
construction programmers and building surveyors.
ENGINEERING 15
Engineering strives to significantly influence project
outcomes to benefit all stakeholders.
BACK TO INDEX
BACK TO INDEX
• building management systems
• security systems
• data systems
BACK TO INDEX
management of risk throughout the project cycle.
BACK TO INDEX
built upon strong alliances with long standing clients
and our ability to deliver wherever and whenever
required, to a prescribed quality, on time and within
budget on a consistent basis.
PROJECT MANAGEMENT 19
VALUATION SERVICES
Davis Langdon’s valuation subsidiary, Abalaing
Valuers, specialises in all types of property valuations,
including replacement cost analyses for insurance
purposes, insurance assessments, estate appraisals,
building inspections and pre-blasting surveys.
BACK TO INDEX
African Council for the Property Valuers Profession
and South African Institute of Valuers.
BACK TO INDEX
the project participants.
SPECIFICATION CONSULTANCY 21
We underwrite our specifications by the guarantees of
knowledge, research, experience and professionalism.
Through them we aim to add value, ensure quality
and reduce the risk on projects.
BACK TO INDEX
• prepare appropriate documentation
• assist in the procurement process
BACK TO INDEX
As another development of our service line, we have
recently introduced the concept of ‘design team
management’ to South Africa. Close collaboration
with design teams has led to the evolution of our
design team management service, the purpose of
which is to facilitate the design process by managing
issues that impinge on it. This service is based on our
contractual, technical and organisational knowledge,
deployed to support the working methods of design
firms and to protect their interests.
SPECIFICATION CONSULTANCY 23
2
INCLUSIVE RATE
ESTIMATES
THIS SECTION HIGHLIGHTS THE
INHERENT DIFFICULTIES AND PITFALLS
THAT MAY BE EXPERIENCED WHEN
INCLUSIVE OR SINGLE RATES ARE USED
TO ESTABLISH THE ESTIMATED COST OF A
PARTICULAR BUILDING.
Construction cost estimation is complex.
Comprehensive exercises based on detailed and
accurate information are required to achieve reliable
levels of comfort. For various reasons however,
decisions are often based on inclusive rate estimates,
i.e. rate per m² of construction area or rate per unit in
number.
BACK TO INDEX
cost of a building is by the rate/m²-on-plan method.
It is often also referred to as 'order of magnitude'-type
methods of cost estimation. It certainly is both quick
and convenient but it can be very misleading if used
indiscriminately without care being taken in the
calculation of the construction area and the selection
of the rate.
1. SPECIFICATION
BACK TO INDEX
Case A
40m
40m
Area 1 600m²
Wall length 160m
Wall height 3m
Wall area 480m²
Wall floor ratio 480/1 600
Cost of external facade
BACK TO INDEX
in terms of R/m² of
floor area to each R/m²
of facade area 30.0%
Case B
100m
16m
Area 1 600m²
Wall length 232m
Wall height 3m
Wall area 696m²
Wall floor ratio 696/1 600
Cost of external facade
in terms of R/m² of
floor area to each R/m²
of facade area 43.5%
BACK TO INDEX
circle to be the most economical plan shape.
5. CONSTRUCTION AREAS
6. INTERNAL SUBDIVISIONS
BACK TO INDEX
internal partitions without the relevant adjustments
being made. The inclusion of partitions can increase
the overall rate/m² by up to R230/m² of office area.
7. PARKING
OFFICES
Plan area 600m2/floor
Construction area 3 000m2
OFFICES
OFFICES
OFFICES
Cost of building
Offices 2 400m² @ R7 000 = R 16 800 000
Parking 600m² @ R3 000 = R 1 800 000
Total R 18 600 000
BACK TO INDEX
Average rate/m² R 6 200
Case B
OFFICES
Plan area 600m2/floor
Construction area 2 400m2
OFFICES
OFFICES
Cost of building
Offices 2 400m² @ R7 000 = R 16 800 000
Parking 600m² @ R 300 = R 180 000
Total R 16 980 000
Average rate/m² R 7 075
BACK TO INDEX
In conclusion, rates/m² must be used with
circumspection and the degree of accuracy of the
answers provided must be considered to be in direct
proportion to the amount of research and study
undertaken to establish the rate for the building in
question.
REGIONAL VARIATIONS
BACK TO INDEX
Construction costs normally vary between the
different provinces of South Africa. Costs in the
Western Cape and KwaZulu-Natal, specifically upper
class residential, for example, are generally
significantly higher than Gauteng due to the demand
for this accommodation. Rates have therefore been
based on data received from the Gauteng province,
where possible. Be mindful however that cost
differences between provinces at a given point in time
are not constant and may vary over time periods due
to differences in supply and demand or other factors.
Specific costs for any region can be given upon
request by any Davis Langdon office in that region.
BUILDING RATES
BACK TO INDEX
Parking
Retail
Neighbourhood centres
(5 000 - 12 000m²) R 4 500 - R 6 500
Community centres
(12 000 - 25 000m²) R 5 000 - R 7 000
Regional centres
(50 000 - 100 000m²) R 6 000 - R 8 000
BACK TO INDEX
Industrial
Industrial warehouse
including office and
change facilities within
structure area (architect/
engineer-designed):
- steel frame, steel cladding
and roof sheeting R 2 400 - R 3 700
- steel frame, brickwork to
ceiling, steel cladding
above and roof sheeting R R2 700
2 800 - R 43 100
900
- administration offices,
ablution and change
room block R R4 600
4 800 - R 5 700
400
- cold storage facilities R R8 000
8 400 - R 12
1 0000
000
Duplex townhouse
- economic R 4R2004 400
- R
- R 6 6000
300
BACK TO INDEX
Outbuildings R 1R8001 900
- R
- R 3 3000
200
Swimming pool
- not exceeding 50 kl R 55 000 R 58 000
- exceeding 50 kl and not
exceeding 100 kl R 55 000000
R 58 - R
- R90
95000
000
Tennis court
- standard R120 000 R126 000
- floodlit R140 000 R147 000
Clinics
Clinic - 150-bed,
5-theatre (excluding
consulting rooms) R530
R560000
000-- R800
R840 000/bed
36 DAVIS LANGDON APPROXIMATE INCLUSIVE BUILDING COST RATES
Hotels Rate per no (excl VAT)
Conference Centres
Conference centre to
international standards R15 R
000 - R19
15 000 000
- R 20 000
BACK TO INDEX
Retirement Centres
Dwelling houses
- middle class R4 300 R 5 000
- luxury R6 100 R 7 000
Apartment block
- middle class R4 500 R 5 200
- luxury R6 400 R 8 000
Community centre
- middle class R5 900 R 6 800
- luxury R 9 900
Schools
Prisons
R 160
New generation prison R 170 000000
- R -200
R 190
000/inmate
BUILDING SERVICES
BACK TO INDEX
In particular the design, and therefore the cost of air-
conditioning can vary appreciably depending on the
orientation, shading, extent and type of glazing,
external wall and roof construction, etc.
Offices
- standard installation R 310 -R
R280 510
-
- sophisticated installation R
R400 440 - R R500
730
- UPS, substations, standby
generators R 220 - R300 R 220 - R 500
Offices
- standard installation R 340 - R 425
- sophisticated installation R 440 - R 560
R440 - R560
Residential R 180 - R 230
R180 - R230
Shopping centres R 400 - R 550
R400 - R550
Hotels R 360 - R 450
R360 - R450
Hospitals R370 - R460 R 370 - R 460
BACK TO INDEX
Sprinkler system including
hydrants and hosereels
(excluding void sprinklers) R140 R- R220
140 - R 220
Air-conditioning installation
Ventilation to parking/
service areas R 150 - R 300
R150 - R300
Offices
- console units R 440 - R 600
- console/split units R 500 - R 650
- package units R 700 - R 900
- central plant R950 - R1 350 R 950 - R 1 350
- Variable Refrigerant Flow
(VRF) R950 - R1 500 R 950 - R 1 500
Hotels
- console units R12 000 - RR1812000/key
000 - R 18 000/key
- split units R25 000 - R35R000/key
25 000 - R 35 000/key
R 000/key
- central plant R40 000 - R65 40 000 - R 65 000/key
BACK TO INDEX
Emerging Green Design Attributes'.
BACK TO INDEX
qualifications dealt with elsewhere in this publication
would apply.
INTERNATIONAL COSTS
Prices exclude land, site works, professional fees, tenant fitout, equipment and VAT
43
Hotel rates include an allowance for FF&E
BACK TO INDEX
INTERNATIONAL BUILDING COST COMPARISON (USD/m²) : 2nd QUARTER 2009
44
DAVIS LANGDON INTERNATIONAL COSTS
Note: Large fluctuations in exchange rates can create short-term anomalies
Prices exclude land, site works, professional fees, tenant fitout, equipment and VAT
BACK TO INDEX
INTERNATIONAL PRESTIGIOUS OFFICE
RENTAL COMPARISON: USD/m2 p.a.
BACK TO INDEX
England Leeds 370
England Liverpool 340
England London (City) 750
England London (West End) 1420
England Manchester 500
England Oxford 320
France Paris 1035
India Bangalore 185
India Mumbai 800
Indonesia Jakarta 240
Ireland Dublin 635
Kenya Nairobi 290
Korea Seoul 370
Lebanon Beirut 375
Malaysia Kuala Lumpur 280
Mozambique Maputo 300
New Zealand Auckland 200
New Zealand Christchurch 185
New Zealand Wellington 235
INTERNATIONAL COSTS 45
Country City USD/m² p.a.
Nigeria Abuja 650
Nigeria Lagos 750
Philippines Manila 210
Qatar Doha 905
Russia Moscow 710
Russia St Petersburg 605
Rwanda Kigali 300
Scotland Edinburgh 520
Scotland Glasgow 480
Singapore Singapore 900
South Africa Cape Town 255
South Africa Durban 245
South Africa Johannesburg 315
South Africa Port Elizabeth 200
South Africa Pretoria 225
Spain Barcelona 380
BACK TO INDEX
Tanzania Dar Es Salaam 300
Thailand Bangkok 300
Uganda Kampala 275
United Arab Emirates Dubai 1000
USA Los Angeles 300
USA New York (Manhattan) 500
USA Philadelphia 250
USA Sacramento 300
USA San Francisco 400
USA Seattle 250
Zambia Lusaka 290
2. ESCALATION RATE
BACK TO INDEX
and expressing percentage annual increases, namely
the average rate and the year-on-year rate. The
average rate is of no real use in calculating escalation
and is of general interest only. The year-on-year rate
should be used in escalation calculations, taking
cognisance of actual project programmes.
3. CALCULATION OF ESTIMATED
ESCALATION OF CONSTRUCTION
CONTRACTS
Pre-contract
BACK TO INDEX
building cost by the average estimated monthly
percentage increase and by the number of months
from the date of the estimate to the tender date.
BACK TO INDEX
BACK TO INDEX
Note: The average annual increases indicated by the
BER in their publications are the average of
the quarterly increases for that particular year
and will not correspond to the above year-on-
year increases.
BUILDING COST 51
5. TENDER CLIMATE
BACK TO INDEX
(tender index) is less than the increase in the JBCC
CPAP index; therefore a favourable tender market
from the viewpoint of the employer exists.
BACK TO INDEX
As the majority of developers are registered vendors in
the property industry, any value added tax (VAT) paid
by them on commercial property development is fully
recoverable. Therefore to reflect the net development
cost, VAT has not been allowed for in the above rates.
Should the gross cost (i.e. after VAT inclusion) be
required, then VAT at the ruling rate (currently 14%)
should be added to all the above rates.
BUILDING COST 53
6
GRAPHS
BER AND JBCC CPAP
JANUARY TO JANUARY
% Change
20
19
18
17
16
15
14
13
12
BACK TO INDEX
11
10
3
PERCENTAGE
0
04 05 06 07 08 09 10 11 12
YEAR
BER
JBCC CPAP
360
340
320
300
280
260
240
220
BACK TO INDEX
200
180
160
140
120
100
04 05 06 07 08 09 10 11 12 13
YEAR
BER
JBCC CPAP
1.45
1.40
1.35
1.30
1.25
BACK TO INDEX
1.20
1.15
1.10
1.05
1.00
0.95
04 05 06 07 08 09 10 11 12
YEAR
BACK TO INDEX
have abbreviated and simplified for easier
understanding the definitions contained in that
document, together with our comments on the use of
rentable areas as follows:
2. AREA DEFINITIONS
BACK TO INDEX
2.2 Rentable area
The total area of the building enclosed by the
dominant face, adjusted by deducting major
vertical penetrations. No deduction shall be made
for columns.
BACK TO INDEX
Common area has two components:
• Primary common area comprises all rentable
area on a given floor, that is not useable area,
together with remote common area, which
comprises areas such as entrance foyers, plant
and service rooms, or any other portion of
rentable area not located on the given floor.
• Secondary common area comprises areas
beyond primary common area giving access to
multiple tenancies. Accordingly, this area may
vary over the life of a multiple tenancy building.
3.1 Atrium
A weatherproof interior space, accessible and
capable of use by the tenant at the lowest level.
Voids in floors above atrium space shall not be
included in rentable area.
BACK TO INDEX
walls; exceeding 0.5m² in area shall be deducted
from rentable area.
GENERALLY
BACK TO INDEX
for measuring floor areas in buildings, First Edition’
and implement the various facets of the definitions to
achieve higher efficiencies between the various areas.
BACK TO INDEX
method is that expenses and income do not have to be
escalated too far into the future and these are
therefore relatively accurate and easily understood in
today’s money terms. The fact that the first year of
operation may have a higher vacancy factor than
subsequent years should be ignored when the initial
return is calculated in order to reflect long term
potential more accurately.
RETURN ON INVESTMENT 65
• The calculated returns are for the first complete
year of operation only and do not cater for the
following:
? o the project may not reach full maturity during
the first year of operation
? o vacancies
? o recoupment of capital during the income
bearing period of the investment or realisation
value of the investment at the end of the
investment period
? o income tax
BACK TO INDEX
employed to evaluate the financial viability.
BACK TO INDEX
there is a close relationship between the initial return
and the IRR - to be applied with care, however!
RETURN ON INVESTMENT 67
EXAMPLE
BACK TO INDEX
Year 9 20 921 908
Year 10 22 804 879
Year 11 24 857 319
Year 12 27 094 477
Year 13 29 532 980
Year 14 32 190 948
Year 15 35 088 134
Year 16 38 246 066
Year 17 41 688 212
Year 18 45 440 151
Year 19 49 529 764
Year 20 53 987 443
(+ terminal value) 560 441 075 614 428 518
BACK TO INDEX
time periods have become absolutely essential.
Capital expenses are normally higher due to
investment in 'green' technology and more
expensive methods employed. Therefore the
long-term effect on the operation and
maintenance of buildings due to better energy
efficiency and the like should be demonstrated
to building owners and tenants in order to
determine the viability in a scientific way.
RETURN ON INVESTMENT 69
9
RESIDUAL
LAND VALUE
THE CALCULATION OF THE RESIDUAL
LAND VALUE FOR A PREDETERMINED
RATE OF RETURN, I.E. WHAT A
DEVELOPER CAN AFFORD TO PAY FOR A
PARCEL OF LAND GIVEN A SPECIFIED
RETURN FOR A PARTICULAR
DEVELOPMENT.
The formula is determined as follows:
BACK TO INDEX
(where y = TCO excluding land value
and its corresponding loss of interest
and x = land value and its
corresponding loss of interest)
BACK TO INDEX
-y
return
BACK TO INDEX
ZIMBABWE
ANGOLA
12 MILLION
18 MILLION
ZAMBIA
13 MILLION BOTSWANA
1.9 MILLION
UGANDA
32 MILLION DRC
64 MILLION
TANZANIA
42 MILLION
GHANA
BACK TO INDEX
SWAZILAND 23 MILLION
1.2 MILLION
KENYA
39 MILLION
LESOTHO
2 MILLION
MALAWI
14 MILLION
SOUTH
AFRICA
49 MILLION MOZAMBIQUE
22 MILLION
NIGERIA
151 MILLION
NAMIBIA
2.1 MILLION
AFRICA IN FIGURES 75
GROSS DOMESTIC PRODUCT
(AT CONSTANT 2008 PRICES)
Average annual
USD 2008
USDm
USDm
1990
2008
Angola 10 260 83 383 13.7 3 450
BACK TO INDEX
Malawi 1 803 4 269 4.2 290
Swaziland * * * 2 520
280000 7000
260000 6500
240000 6000
220000 5500
200000 5000
180000 4500
BACK TO INDEX
160000 4000
140000 3500
120000 3000
100000 2500
80000 2000
60000 1500
40000 1000
20000 500
0 0
ANGOLA
BOTSWANA
DRC
GHANA
KENYA
LESOTHO
MALAWI
MOZAMBIQUE
NAMIBIA
NIGERIA
SOUTH AFRICA
SWAZILAND
TANZANIA
UGANDA
ZAMBIA
ZIMBABWE
AFRICA IN FIGURES 77
11
DIRECTORY
OF OFFICES
QUANTITY SURVEYING / COST
MANAGEMENT
Bloemfontein
Tel: +27 (0) 51 451 1548
E-mail: bfn@davislangdon.co.za
Director: Indresen Pillay
Cape Town
Tel: +27 (0) 21 423 7840
E-mail: ctn@davislangdon.co.za
Directors: Nigel Sessions
Martin Meinesz
Alan van Rensburg
Durban
Tel: +27 (0) 31 275 4200
E-mail: dbn@davislangdon.co.za
Directors: Andries Schoeman
Dean Narainsamy
George
BACK TO INDEX
Tel: +27 (0) 44 873 5070
E-mail: grg@davislangdon.co.za
Director: Dean Chandler
Johannesburg
Tel: +27 (0) 11 544 1800
E-mail: jhb@davislangdon.co.za
Directors: Indresen Pillay
Kevin Pickup
Alastair Reid
Pusetso Makote
Auret van Lille
Craig Stuart
Klerksdorp
Tel: +27 (0) 18 464 1641
E-mail: klk@davislangdon.co.za
Director: Bertus van Eeden
Nelspruit
Tel: +27 (0) 84 944 2305
E-mail: gary.vanrensburg@davislangdon.co.za
Director: Indresen Pillay
DIRECTORY OF OFFICES 79
Pietermaritzburg
Tel: +27 (0) 33 345 8371
E-mail: pmb@davislangdon.co.za
Director: Andries Schoeman
Port Elizabeth
Tel: +27 (0) 41 365 6221
E-mail: pe@davislangdon.co.za
Director: Dean Chandler
Port Shepstone
Tel: +27 (0) 39 682 4114
E-mail: pshep@davislangdon.co.za
Director: Andries Schoeman
Pretoria
Tel: +27 (0) 12 460 5100
E-mail: pta@davislangdon.co.za
Directors: Pieter Rossouw
Don Reid
Gerhard Brümmer
Andries Cilliers
BACK TO INDEX
Tobie van Wyk
Johan Kemp
Richards Bay
Tel: +27 (0) 35 789 7672
E-mail: rbay@davislangdon.co.za
Director: Andries Schoeman
Stellenbosch
Tel: +27 (0) 21 880 8300
E-mail: stb@davislangdon.co.za
Directors: Sam Kelbrick
Ian Sutherland
Francois du Toit
ENGINEERING
Johannesburg
Tel: +27 (0) 11 544 4300
E-mail: eng@davislangdon.co.za
Directors: Rob Black
Ian Gildenhuys
Craig Hall
AFRICA
INTERNATIONAL
Tel: +27 (0) 11 544 1800
E-mail: indresen.pillay@davislangdon.co.za
Director: Indresen Pillay
BOTSWANA
Davis Langdon Botswana
Tel: +267 390 0711
E-mail: admin@davislangdon.co.bw
BACK TO INDEX
Directors: Fred Selolwane
Rob Black
MOZAMBIQUE
Davis Langdon Mozambique
Tel: +258 21 490 696/7
E-mail: admin@davislangdon.co.mz
Director: Indresen Pillay
Local director: Charle Viljoen
NIGERIA
Tillyard Nigeria in association with Davis Langdon
Tel: +234 (0) 803 300 4712
E-mail: john.tuffrey@tillyardng.com
Directors: John Tuffrey
Yemi Osisami
Indresen Pillay
DIRECTORY OF OFFICES 81
PROJECT MANAGEMENT
Kwa-Zulu Natal
Tel: +27 (0) 31 275 4200
E-mail: martin.donnelly@davislangdon.co.za
greg.pearson@davislangdon.co.za
Directors: Martin Donnelly
Greg Pearson
Gauteng
Tel: +27 (0) 11 544 1800
E-mail: rob.fleming@davislangdon.co.za
Director: Rob Fleming
Western Cape
Tel: +27 (0) 21 423 7840
E-mail: nigel.sessions@davislangdon.co.za
Director: Nigel Sessions
Africa
Tel: +27 (0) 31 275 4200
E-mail: martin.donnelly@davislangdon.co.za
BACK TO INDEX
Director: Martin Donnelly
BUILDING SERVICES
DAVIS LANGDON BUILDING SERVICES
Stellenbosch
Tel: +27 (0) 21 880 8300
E-mail: stb@davislangdon.co.za
Directors: Sam Kelbrick
Willie Boylan
Durban
Tel: +27 (0) 31 275 4200
E-mail: dbn@davislangdon.co.za
Director: Andries Schoeman
Johannesburg
Tel: +27 (0) 11 544 4300
E-mail: jhb@davislangdon.co.za
Directors: Alastair Reid
Ian Gildenhuys
Otto la Grange
BACK TO INDEX
Director: Erwin Wallendorf
Kempton Park
Tel: +27 (0) 11 394 6203
E-mail: kempton@abalaing.co.za
Director: Clyde Aitken
Port Elizabeth
Tel: +27 (0) 41 365 6221
E-mail: estelle.pe@abalaing.co.za
Director: Erwin Wallendorf
Manager: DeWet Muller
Pretoria
Tel: +27 (0) 12 643 0777
E-mail: pta@abalaing.co.za
deonvo@abalaing.co.za
Manager: Deon van Onselen
Vereeniging
Tel: +27 (0) 16 422 6330
E-mail: vereeniging@abalaing.co.za
Director: Jan Kloppers
DIRECTORY OF OFFICES 83
SPECIFICATION CONSULTANCY
DAVIS LANGDON SCHUMANN SMITH
Johannesburg
Tel: +27 (0) 11 544 4331
E-mail: john.chapman@davislangdon.co.za
shawn.kennard@davislangdon.co.za
Directors: John Chapman
Shawn Kennard
BACK TO INDEX
BACK TO INDEX
Bahrain Steven Gee
steven.gee@davislangdon.com
Egypt Kevin Sims
kevin.sims@davislangdon.com
Kingdom of
Saudi Arabia Paul Ralph
paul.ralph@davislangdon.com
Lebanon Muhyiddin Itani
dll.mi@cyberia.net.lb
Qatar Steven Humphrey
steven.humphrey@davislangdon.com
United Arab
Emirates Steven Coats
steven.coats@davislangdon.com
AUSTRALASIA
DIRECTORY OF OFFICES 85
ASIA PACIFIC
Brunei Justin Teoh
justin@dlsjubm.com.my
China Joseph Lee
lyk@dlshk.com
India Lorimer Doig
dlsindia@dls.com.in
Indonesia Peter Robinson
dlsjkt@dls.co.id
Japan Seiichi Hayashida
info@dlsjapan.com
Kazakhstan Max Lee
dlskz@dlskz.com
Malaysia Loo Ming Chee
info@dlsjubm.com.my
Pakistan Junaid Hamid
info@dls.com.pk
Philippines Alan Hearn
manila@dls.com.ph
Singapore Jim Pollock
dlssp3@dls.com.sg
BACK TO INDEX
South Korea Max Lee Mun-Su
dlsk@dlskorea.com
Thailand Leong Choong Peng
general@dls.co.th
Vietnam Mark Olive
dlsvietnam@dls.com.sg
AFRICA REGION
Botswana Fred Selolwane
fred@davislangdon.co.bw
Mozambique Charle Viljoen
charle.viljoen@davislangdon.co.mz
Nigeria John Tuffrey
john.tuffrey@tillyardng.com
South Africa Indresen Pillay
indresen.pillay@davislangdon.com
USA
BACK TO INDEX
dotted valley that encircles it. The site K2, named
arbitrarily by an archaeologist in the 1930's, lies a
kilometre from Mapungubwe Hill in a small valley
surrounded by sandstone cliffs.
MAGNIFICENT MAPUNGUBWE 89
60 DAVIS LANGDON MAGNIFICENT MAPUNGUBWE
PHOTOGRAPH © MARIUS LOOTS
As custodian of the archaeological collections since its
discovery, a public museum was founded at the
university in June 2000. The museum currently
manages a collection of about 156 000 objects related
to the cultural, natural, technological and historical
importance of Mapungubwe. On display are original
artefacts, including the famous gold rhino, other gold
ornaments, copper, iron, ivory, bone, trade glass
beads, clay figurines, Chinese celadon and ceramic
ware, and includes ancient dinosaur fossils from the
Mapungubwe site, reflecting the cultural significance
and diversity of the Kingdom of Mapungubwe.