Wrok Estimated

Date: April 11, 2011

Project : Building Centre

Length Breadth Depth/


S.No Description Unit QTY height Total Gross
(m) (m)
(m)

1 Footing Concrete 4000 psi Cum


F1 30 5.7 5.7 0.9 877.23
F2 4 3.3 3.3 0.6 26.136
F4 1 14.62 3.62 0.9 47.63196
1 16.78 2.87 0.9 43.34274
1 8.48 11.9 0.9 90.8208
F5 (Varies) 0.5 15.775 5.525 0.45 19.61029688
1 15.775 4.78 0.45 33.932025
F6 2 4.5 4.5 0.6 24.3
F7 4 6.6 5.1 0.75 100.98
F8 1 6.9 5.7 0.9 35.397
F7-A 1 6.6 5.1 0.75 25.245 1,324.63

2 Lean Concrete 1:3:6 Cum


From Grid 300+1-4-850/A+375-G+1150 1 37.845 18.025 0.075 51.16
From Grid 4+850-7-1610/A+375-H+1150 1 40.01 18.74 0.075 56.23
From Grid 7+1610-12/A+375-H+3561 1 33.835 42.421 0.075 107.65
From Grid 12-17+1000/B-H+1200 1 12.53 31.685 0.075 29.78
Deduction -0.5 38.485 8.305 0.075 (11.99) 232.83

3 Lean Concrete on waterProofing 1:3:6 Cum


From Grid 300+1-4-850/A+375-G+1150 1 37.845 18.025 0.075 51.16
From Grid 4+850-7-1610/A+375-H+1150 1 40.01 18.74 0.075 56.23
From Grid 7+1610-12/A+375-H+3561 1 33.835 42.421 0.075 107.65
From Grid 12-17+1000/B-H+1200 1 12.53 31.685 0.075 29.78
-0.5 38.485 8.305 0.075 (11.99) 232.83
4 Retaining Wall 4000 psi
Toe Concrete of Retaining Wall 1 290 1.2 0.45 156.60

Retaining wall 1 290 0.3 3.8 330.60 487.20

5 Column upto 3rd Floor at 14100 5000 psi Cum


C1 18 0.60 0.60 16.30 105.62
C2 2 0.60 0.30 16.75 6.03
C3 30 0.90 0.90 15.95 387.59
C4 5 0.60 0.60 16.15 29.07
C5 9 1.05 0.30 16.55 46.92
C6 1 1.05 0.30 16.70 5.26
C7 9 0.60 0.60 16.00 51.84
C3-A 2 0.90 0.90 17.85 28.92
C5-A 1 1.05 0.30 17.85 5.62 666.87

6 Concrete of SOG at -3150/ Basement 1:2:4 Cum


Depth/
Length Breadth
S.No Description Unit QTY height Total Gross
(m) (m)
(m)
From Grid 1-4+450/A-G-150 1 18.875 36.095 0.2 136.26
From Grid 4-450-7-1460/A-H-150 1 17.59 38.26 0.2 134.60
From Grid 7+1460-12/2211 0.5 33.685 2.211 0.2 7.45
From Grid 7+1460-12/A-H-150 1 33.685 38.26 0.2 257.76
From Grid 12-2840/B-H-150 1 2.84 30.26 0.2 17.19
From Grid 13-815-17-150/B-H-150 0.5 9.54 30.26 0.2 28.87 582.12

7 Ground Floor Slab at 0.00 4000 psi Cum


From Grid 1-4+450/A-G-225 1 18.95 36.095 0.2 136.80
From Grid 4-450-7-1460/A-H-225 1 17.59 38.26 0.2 134.60
From Grid 7+1460-14-150/2574 0.5 47.38 2.574 0.2 12.20
From Grid 7+1460-12/A-H-225 1 33.96 38.26 0.2 259.86
From Grid 12+3167/B-H-150 1 3.167 30.335 0.2 19.21
From 3100+Grid 13-14-150/B-H-150 0.5 10.02 30.335 0.2 30.40 593.07

8 Ground Floor Beams 4000 psi Cum


GB-1 1 8.6 0.3 0.9 2.32
GB-2 1 7.5 0.3 1.3 2.93
GB-3 2 10.19 0.3 1.4 8.56
GB-4 1 5.035 0.3 1.3 1.96
GB-5 1 7.4 0.3 1.3 2.89
GB-6 1 12.92 0.3 0.9 3.49
GB-7 1 8.45 0.3 1.3 3.30
GB-8 1 7.25 0.3 1.3 2.83
GB-9 1 7.135 0.3 0.9 1.93
GB-10 1 8.9 0.3 1.4 3.74
GB-11 1 7.25 0.3 0.6 1.31 35.24

9 Elevator Walls 5000 psi Cum


W-13 upto 3rd Floor 2 3.05 0.45 18.45 50.65
W-4 upto 3rd Floor 1 7.7 0.45 18.45 63.93
W-4A upto SOG 1 7.7 0.3 2.2 5.08
W-19 upto S.L +8020 1 2.85 0.3 12.97 11.09
W-6 upto SOG 1 5.635 0.3 2.2 3.72
W-18 upto S.L +8020 1 5.635 0.3 12.97 21.93
W-20 1 2.85 0.3 2.2 1.88
158.27
Toe 1 0.9 - 158.27

10 Staircase Cum
CEMENT BAGS CONSUMPTION
Project:Building Center
S.No. Description Total Concrete Unit Total Cement Bags Bags Consumed
1 Footing Concrete 4000 psi 1,324.63 Cum 9,934.69
2 Lean Concrete 1:3:6 232.83 Cum 1013.14
3 Lean Concrete on waterProofing 1:3:6 232.83 Cum 1013.14
4 Retaining Wall 4000 psi 487.20 Cum 3,654.00
5 Column upto 3rd Floor at 14100 5000 psi 666.87 Cum 5,735.07
6 Concrete of SOG at -3150/ Basement 1:2:4 582.12 Cum 3618.64
7 Ground Floor Slab at 0.00 4000 psi 593.07 Cum 4,448.00
8 Ground Floor Beams 4000 psi 35.24 Cum 264.28
9 Elevator Walls 5000 psi Cum -
10 Staircase Cum
29,680.96 3,000.00
Bags Required

26,680.96