KANALIZACIJA

• PODELA :
1. GRADSKA KANALIZACIJA
2. KUĆNA KANALIZACIJA

1.GRADSKA KANALIZACIJA

• GRADSKU MREŽU SAČINJAVAJU


RAZVODI KERAMIČKIH CEVI
PROFILA Ø150-400 mm I
KOLEKTORI
• KOLEKTORI FEKALIJE ODVODE DO
MESTA PREČIŠĆAVANJA ILI DO
VODOTOKOVA.
• KOLEKTORI SE RADE OD BETONA,
A NJIHOVO DNO SE OBLAŽE
KERAM.PLOČICAMA ILI KLINKER
OPEKOM KAO ZAŠTITA BETONA
OD KANALSKOG SADRŽAJA
• POSTAVLJAJU SE NA DUBINI OD
1,0 -2,4 m
• U NIVOU ULICE POSTAVLJU SE
ŠAHTOVI_OKNA RADI KONTORLE I
ČIŠĆENJA NA SVAKIH 50-100m
• ZA SLIVANJE ATMOSFERSKIH
VODA POSTAVLJAJU SE SLIVNICI
NA RASTOJANJU OD 30-50m

1
10/31/2008

PODELA GRADSKE KANALIZACIJE

• PREMA NAČINU • PO NAČINU


PRIKUPLJANJA I VR. ODVOĐENJA VODE
OTPADNIH VODA: 1.GRAVITACIONA
1. OPŠTI -SKUPNI KANALIZACIJA
SISTEM, 2.PUMPNA KANALIZACIJA
SVA OTPADNA VODA - koristi sisteme pumpi za
IDE U ISTU MREŽU podizanje vode
2. SEPARACIONI SISTEM - koristi se u ravničarskim
ODVAJA SE MREŽA ZA ili u brdovitim terenima
OTPADNU, OD MREŽE
ZA ATMOSFERSKU
VODU

TEHNIČKI PROPISI /NEKI OD NJIH/


NE POSTOJE JEDINSTVENI TEHNIČKI PROPISI ZA KANALIZACIJU
NA TERITORIJI SRBIJE, VEĆ SVAKI GRAD PROPISUJE NAČIN
IZVOĐENJA I KORIŠĆENJA KANALIZACIONIH UREĐAJA

• PREMA NAŠIM PROPISIMA U KOLEKTOR SE MOGU ISPUSTITI SAMO


OTPADNE VODE IZ KUPATILA, KUHINJE, SVA METEORSKA VODA,
ZANATSKA I INDUSTRIJSKA PREČIŠĆENA VODA OD HEMIJSKIH I
MEHANIČKIN SASTOJAKA I PODZEMNA VODA UZ SPECIJALNA
ODOBRENJA
• NE SME SE U KANALIZACIJU UBACIVATI PEPEO, KISELINE, ALKALIJE I
SOLI, KOSTI, KRPE, KUĆNO ĐUBRE, PESAK, TVRDI PREDMETI, VRELA
VODA, EKSPLOZIVNE I ZAPALJIVI MATERIJALI
• DOMAĆINSTAVA KOJA NISU SPOJENA NA GRADSKI VODOVOD
NE SMEJU BITI PRIKLJUČENA NI NA GRADSKU KANALIZACIJU
• REZERVOARI ZA LED, RIBNJACI I TOME SL. NE SMEJU SE DIREKTNO
VEZATI ZA KANALIZACIJU
• NE DOZVOLJAVA SE UKOPAVANJE HORIZNTALNIH KANALIZACIONIH
ODVODONIKA IZNAD VODOVODNIH CEVI
• KANALIZ.CEVI IZVAN ZGRADE MORAJU BITI UKOPANE NA MIN.1m ISPOD
TERENA

2
10/31/2008

KUĆNA KANALIZACIJA

SANITARNA – FEKALNA KIŠNA KANALIZACIJA

KUĆNA KANALIZACIJA
sastoji se iz:

 KUĆNE MREŽE
 DVORIŠNE MREŽE
 PRIKLJUČKA NA
GRADSKU
KANALIZACIJU
 ULIČNOG KANALA -
ODVODNIKA

3
10/31/2008

TEHNIČKI USLOVI ZA KUĆNU KANALIZACIJU

• UPOTREBLJENI MATERIJAL TREBA DA JE KVALITETAN I DA


TRAJE KOLIKO I SAM OBJEKAT
• KANALIZACIJA MORA BITI IZVEDENA PO VAŽEĆIM PROPISIMA
• SPOJEVI MORAJU BITI BESPREKORNO IZVEDENI
• MORA SE OBEZBEDITI DOVOLJNA I STALNA KOLIČINA VODE
ZA ISPIRANJE
• SISTEM MORA BITI ZAŠTIĆEN OD MRAZA I NAGLIH
TEMPERATURNIH PROMENA
• CEVI NE SMEJU BITI POD UTICAJEM SLEGANJA ZGRADE I
DRUGIH POTRESA
• STALNA KONTROLA I ODRŽAVANJE SISTEMA U ISPRAVNOM
STANJU

...ŠTA SE RADI U NASELJIMA ILI


POJEDINAČNIM OBJEKTIMA GDE NEMA
SISTEMA GRADSKE KANALIZACIJE ?...

KUĆNIM KANALOM SE OTPADNE VODE SPROVODE


DO UREĐAJA ZA PREČIŠČAVANJE I TO:
 MALI OBJEKTI U NEPROPUSNE SEPTIČKE JAME
 SANITARNO I TEHNIČKI JE ISPRAVNO
SPROVOĐENJE OTPADNIH VODA U SEPTIČKE JAME
GDE SE PREČIŠĆAVANJE VRŠI TALOŽEJEM

4
10/31/2008

SASTAVNI DELOVI KANALIZACIJE


-KANALIZACIONE CEVI-
izrađuju se :
 KERAMIKA
 LIVENO GVOŽĐE
 AZBEST-CEMENTA
 METAL
 POLIVINIL-PVC
 BETON
 STAKLO

PRIMENA FAZONSKIH KOMADA

 PRAVA CEV -za horizontalni razvod mreže


 LUKOVI -za promene pravca kanala 45°ili 90°
 RAČVE- za ukrštanje i spajanje kanala, razlikujemo
jednostruke i dvostruke, mogu biti prave,kose ili lučne
 REDUKCIJE za povećanje profila cevi
- redukcioni luk od 90°se postavlja kada vertikala skreće
u horizontalni razvod
- redukcioni luk od 45°se radi kada skretanje i
povećavanje cevi radi ulaska u širi kanal
 REVIZIONE RAČVE I LUKOVI za kontrolu i čišćenje
mreže u slučaju da se cevi zapuše, pa zbog toga imaju
poklopac

5
10/31/2008

• od LIVENOG GVOŽĐA / po Jus-u/ koriste se samo u gornjem


razvodu; izrada u svim oblicima i dužinama – fazonski elementi
• od AZBEST-CEMENTA - cevi SALONIT, prednosti su: lakoća,
neporoznost, otpornost na vlagu i temperaturne promene i hemijske
uticaje, laka montaža; izrada u svim oblicima i dužinama – fazonski
elementi
• KERAMIČKE cevi /po Jus-u/ koriste se u donjem razvodu, kada su
u pitanju otpadne vode sa kiselinama koje nagrizaju matal npr.
laboratorije; izrada u svim oblicima i dužinama – fazonski elementi
• METALNE CEVI rade se od olova, mesinga, hromirane ili
poniklovane; dolaze u obzir samo kod nameštanja pribora i
sanitarnih uređaja. Veličina im je colovima, ne postoje fazonski
elemeti /sem kod mesinganih/
• PVC CEVI-JUVIDUR CEVI, proizvode se po Jus-u, najveću
prednost od gore navedenih im daje glatkoća unutrašnjosti i
spoljašnosti cevi, dužine cevi do 4m (6,8,10,12m); izrada u svim
oblicima i dužinama – fazonski elementi, najviše se upotrebljavaju u
kućnim, kišnim i industrijskim kanalizacionim razvodima
• BETONSKE CEVI / po Jus-u/, kružnog i jajastog profila,služe za
odvod atmosferskih voda u uličnoj i dvorišnoj mreži; neotporne su na
koroziju,agresivno zemljište i podzemne vode
• STAKLENE CEVI, potpuno providne, imaju najbolja svojstava,
pogodne za industriju ili laboratorije

POSTAVLJANJE KANALIZACIONIH CEVI


u zemlji:
 ODVODNA CEV SE POLAŽE U
ISKOPAN ROV MIN. ŠIRINE
80 cm
 DUBINA ROVA min. 1m
 cevi se POLAŽU u sloju
PESKA (sigurno i meko ležište,
lakše se izvodi određeni nagib,
drenaža terena i ravnomerno
prenošenje pritiska ostalih
naležućih slojeva na cevi) ili
ZDRAVICE(moraju se produbiti
ležišta za naglavke)
 ZATRPAVANJE, preko PESKA
ide SLOJ SITNE ZDRAVE
ZEMLJE oko 50 cm i oprezno
se nabija ručnim nabijačima +
20 cm sloja ravne zemlje koja
se opet nabija

6
10/31/2008

SPAJANJE CEVI
/KERAMIČKE CEVI/
 SPOJNA SREDSTVA SU:
KANTRANISANO UŽE-
KUČINA I
DVOKOMPONENTNI KIT-
ASFALT
 MOŽE I POMOĆU
GUMENOG UMETKA
 AKO CEV PROLAZI
PORED DRVETA NA
MESTU NAGLAVKA
MORA SE NAPRAVITI
PRSTEN OD BETONA U
DEBLJINI OD 5 cm
 SPOJEVI MORAJU BITI
VODOOTPORNI,
NEPROPUSNI ZA
GASOVE I ELASTIČNI

SPAJANJE GVOZEDNIH LIVENIH CEVI

• KUČINA +
RASTOPLJENO OLOVO

• MOGU SE SPOJITI I
POMOĆU GUMENOG
UMETKA

7
10/31/2008

SPAJANJE PLASTIČNIH PVC CEVI

• SPAJAJU SE POMOĆU
GUMENOG PRSTENA
ILI LEPLJENJEM CEVI

• RADI SE PREMA
UPUTSTVU
PROIZVOĐAČA

DOZVOLJENI NAGIBI-PADOVI

• DOZVOLJEN NAGIB JE U
RASPONU OD
min. 1.33% (1:75) do
max. 6,66% (1:15)
• OPTIMALNI NAGIB JE 3% ZA
KRAĆE MREŽE
• KOD PRIMENE MINIMALNOG
NAGIBA TREBA OBEZBEDITI
KANAL ZA DODATNO
ISPIRANJE UVOĐENJEM
VEĆEG BROJA KIŠNIH
VERTIKALA I REVIZIONIH
OTVORA

• NAGIB SE ODREĐUJE POMOĆU


INSTRUMENATA ILI POMOĆU
RAVNJAČE I LIBELE

8
10/31/2008

VOĐENJE CEVI KROZ OBJEKAT


TREBA VODITI RAČUNA O POSTAVLJANJU CEVI PORED ILI
KROZ ZIDOVE, TAVANICE I TEMELJE

• PORED ZIDOVA na 1m od
zida sa unutrašnje strane, na
1,5m sa spoljne strane zida,
zbog postavljanja zaštite zida
i hidroizolacije
• KROZ ZIDOVE , otvor pod
uglom od 90°, 5 cm veći od
prečnika cevi, cev se na
mestu otvora zaštićuje
izolacionom trakom
• VETIKALE se moraju kačiti i
poduhvatati za zid
obujmicama ili kukama na
rastojanju od 2m

VOĐENJE HORIZONTALNOG RAZVODA KROZ


TAVANICE - MK:

1. U DEBLJINI
SAMOG PODA (u
sloju cementne
košuljice)
2. U SASTAVU MK
vešanjem za
uzengije ili u
prostoru između
dva rebra
3. ISPOD MK-
horizontalni
razvod potpuno
vidan

9
10/31/2008

VOĐENJE CEVI U ODNOSU NA TEMELJE


• CEV SE MOŽE VODITI ISPOD TRAKASTOG TEMLJA
• CEV SE NE SME VODITI ISPOD TEMELJA SAMCA

KANALIZACIONE VERTIKALE

• FEKALNE VERTIKALE
TREBA STAVLJATI PORED
KLOZETA
• POSTAVLJAJU SE NA
UNUTRAŠNJE ZIDOVE U
VIDNE ILI NE VIDLJIVE
ŽLJEBOVE ILI U
INSTALACIONE BLOKOVE
• KOD GRUPNIH KLOZETA NA
JEDNU VERTIKALU SE
MOGU PRIKLJUČITI ČETIRI
KLOZETA I TO DVA SA
JEDNE I DVA SA DRUGE
STRANE, AKO IH IMA VIŠE
OD ČETIRI UVODI SE JOŠ
JEDNA VERTIKALA

10
10/31/2008

...GDE NE SME DA PROĐE FEKALNA


VERTIKALA!?...
• NA SPOLJNOM ZIDU ( U SPES.SLUČAJU MORA SE
TERMIČKI IZOLOVATI)
• KROZ SKLONIŠTE
• KROZ STAMBENE I ADMINISTRATIVNE PROSTORE
( U SPECI.SLUČAJEVIMA MORA SE IZOLAVITI
ZVUČNO, POSTAVITI U ŽLJEBOVE, NE SME SE
POSTAVLJATI REVIZIJA U TOM DELU PROSTORA)
• KROZ PROSTORIJE ZA ČUVANJE I PRIPREMU
HRANE
• KROZ PROSTOR TRAFOSTANICA, TELEFONSKIH
CENTRALA I DR. SPEC.ELEKTOINSTALACIJA

PROVETRAVANJE KANALIZACIONE MREŽE


• FUNKCIJA SPREČAVANJE POJAVE GASOVA I NEPRIJATNOG MIRISA
• SVAKA VERTIKLA IZNAD ZADNJEG IZLIVNOG MESTA MORA IMATI
VENTILACIONI KANAL, A ZAVRŠAVA SE SA VENTILACIONOM GLAVOM
KOJA IMA VENTILACIONU KAPU SA OTVORIMA
• NJEN PREČNIK JE UVEĆAN ZA 50mm U ODNOSU NA VERTIKALU
• SIFON- SPREČAVA PRODOR NEPRIJATNOG MIRISA I GASOVA U
PROSTORIJE PREKO SANITARNIH UREĐAJA; MESTO MU JE IZMEĐU
ODVODNE CEVI I SANITARNOG PRIBORA;RADI SE OD LIVENOG
GVOŽĐA ILI PONIKLOVANOG MESINGA, MOŽE SE UGRADITI
NAKNADNO ILI JE VEČ U SASTAVU SAMOG UREĐAJA, ON
FUNKCIONIŠE AUTOMATSKI TAKO STO SE PRI KORIŠĆENJU
PRIBORA VODA IZ SIFONA PRAZNI I PUNI SE SVEŽOM VODOM

11
10/31/2008

PODNA REŠETKA
• TO SU SLIVNICI KOJI SE POSTAVLJAJU U PODU
KUPATILA,KLOZETA,PERIONICA
• HORIZONTALNA I VERTIKALNA PODNA REŠTKA
• IZRADA OD LIVENOG GVOŽĐA, PLASTIKE ILI ČELIKA (preko nje
poklopac okruglog ili kvadratnog oblika od hroma)
• CEV KOJA ODVODI VODU IZ PODNE REŠETKE JE Ø70 mm

DELOVI DVORIŠNE MREŽE


OLUČNJACI

• DEO SU DVORIŠNE KANALIZACIONE MREŽE


• POSTAVLJAJU SE NA DELU TROTOARA
• PRIHVATAJU ATMOSFERSKU VODU IZ OLUKA I
TROTOARA
• NEMAJU SIFON (AKO SE NALAZE NA TERASAMA
MORAJU IMATI SIFON)

12
10/31/2008

GAJGER SLIVNIK
• IZRAĐUJE SE OD BETONA I LIVENOG GVOŽĐA
• DEO DVORIŠNE KANALIZACIONE MREŽE
• SLUŽI ZA ODVOD KIŠNICE, SNEGA,...
• SA GORNJE STRANE POKLOPAC
Ø150,300,400mm, A DONJI DEO IMA SIFON

REVIZIONA OKNA
1.OD OPEKE 2.OD BETONA
 OD OPEKE POSTAVLJAJU SE U ZDRAVOM
ZEMLJIŠTU, GDE NEMA KOLSKOG PRILAZA, U
PODRUMIMA I U DVORIŠTIMA
 OD BETONA POSTAVLJAJU SE U NASUTOM ,
SLABOM ZEMLJIŠTU, ILI NA VEĆIM DVORIŠNIM
POVRŠINAMA PREKO KOJIH IDE KOLSKI
SAOBRAĆAJ
 POSTAVLJAJU SE NA MESTU:
1.UKRŠTANJA DVA ILI VIŠE REVIZIONA KANALA
2.KADA JE GLAVNI KANAL DUŽI OD 24 m
3.KOD SKRETANJA KANALA POD UGLOM OD 90°
 U NJEGA SE SMEŠTAJU REVIZIONE CEVI,LUKOVI I
RAČVE

13
10/31/2008

REVIZIONO OKNO
1.OPEKA 2.BETON
cev leži na pesku dno silaza je od betona
i u njega su ugrađene
poluobličaste cevi kinete

GLAVNA REVIZIONA KASKADNA OKNA


1.OPEKA 2.BETON

14
10/31/2008

• VEZA ULIČNOG
KANALA OD BETONA I
GL.KUĆNOG KANALA

• VEZA ULIČNOG
KANALA OD KERAMIKE
SA GL.KUĆNIM
KANALOM

ISPITIVANJE ISPRAVNOSTI KUĆNE


KANALIZACIONE MREŽE
• ISPITIVANJE HORIZONTALNE MREŽE
kontrolišu se nagibi, ispravnost i spojevi cevi, mreža se
puni vodom ili vodom obojenom krečnim mlekom
• ISPITIVANJE VERTIKALNE MREŽE
mreža se puni vodom ili vazduhom pod pritiskom 3,00
bara u vremenu od 15 min, ako su spojevi dobri nivo
vode ne sme da pokazuje manju vrednost
• ISPITIVANJE PO POSTAVLJANJU SANITARNIH
UREĐAJA
vrši se dimom ili mirisom u trajanju od 15 min, sifoni se
napune vodom, a onda se spec. aparatom dim ubacuje u
donji deo mreže, kada se dim pojavi otvori se zatvore i
pristupa se pregledu instalacija, ako svi sifoni drže vodu
instalacija je ispravna

15
10/31/2008

PRIJEM, KORIŠĆENJE I ODRŽAVANJE


INSTALACIJE KANALIZACIJE

ZA PRIJEM GOTOVE INSTALACIJE


POTREBNO JE IMATI:
• ATEST
• PISMENU POTVRDU O ISPRAVNOSTI U TOKU I
ZAVRŠETKU RADOVA , KAO I O PRIMENI VAŽEĆIH
PROPISA PRILIKOM NJENOG IZVOĐENJA

16