Sei sulla pagina 1di 9

1.

INTRODUCTION 
 
The Rock support is used to improve the stability and maintain the load carrying capability 
of Rock near the boundaries of under ground excavations.  
The term support can be reserved for use in those cases in which the rock mass is truly 
supported by structural elements which carry in whole or part, the weights of individual rock 
blocks isolated by discontinuities or of zones of loosened rock. 
 
General Details about the Rock Support 
The  best  known  set  of  empirical  design  rules  are  those  for  pattern  rock  bolting 
developed  by  Lang  (1961)  during  the  construction  of  the  snowy  mountains  hydroelectric 
scheme  in  Australia.  These  rules  are  still  widely  used  for  determining  the  bolt  lengths  and 
spacing for ‘permanent’ excavations. 
Lang gives the minimum bolt length, L as the greatest of  
(a) twice the bolt spacing , s 
(b) three times the width of critical and potentially unstable rock blocks defined by 
the average discontinuity spacing ,b 
(c) 0.5 B for spans of B < 6m. 
0.25 for spans of B = 18 ‐30m. 
 
Concrete Shotcrete 
The  shotcreting  of  the  Power  House  Cavern  is  primarily  to  satisfy  the  following  main 
objectives: 
• To prevent leakage of water 
• To ensure long – term stability under Rock pressure in static an dynamic condition. 
The shotcrete is generally PCC and the thickness is designed to ensure safety against maximum 
external pressure in the Cavern. 
 
 
 
2. ROCK BOLT DESIGN 
Designing  the  Engineering  Structures  is  to  consider  the  Relationship  between  the  capacity  C 
(Strength or Resisting force) of the element and the Demand D (Stress or Distributing force).The 
factor of safety of the structure is defined as F = C/D and failure is assumed to occur when F is 
less than 1. 
A  slab  of  thickness‘t’  being  supported  by  one  Rock  Bolts  in  a  pattern  spaced  grid,                     
spacing of S x S. 

ROCK BOLT DESIGN
Design Parameter's

3
Unit weight of Rock   Υ = 27 kN/m
Thickness of the Rock Wedge  t = 1 m (assumption)
Spacing  S = 1.5 m
2
Yield Stress of Steel Fe = 415 N/mm
Dia of the Rock Bolt d = 25 mm

The weight of Block Being carried by the Bolt,
Stress or Distributing Force D
2
D = Υ x t x S
D = 60.75 kN

Force due to Bolt

The Strength and Capacity of the one bolt,
2
Tensile Stress of the Bolt  0.66 x Fe = 273.9 N/mm
Capacity C = 134.45 kN

Factor of Safety  F = 2.2

 SATISFIED
 
 
 
 
 
 
 
3. ANALYSIS OF POWER HOUSE CAVERN 
The total length of the power house cavern is 215m. To find the shotcrete thickness of power 
house  cavern,  the  cavern  has  been  modeled  in  STAAD.pro  using  4  noded  plate  elements  per 
meter width of the cavern. The thickness of plates assumed as 100mm. 
 
(i). Supports:  
 FIXED  BUT  SPRING  (Movements  has  restrained  at  X  and  Y  directions  with  spring  constant  of 
42034.47 kN/m2) has been provided to an account of Rock and concrete interaction. 
 
Indirect Estimates of the Deformation Modulus: 
Rock class – II 
RMR = 80 – 61 for Good Rock 
For RMR greater than 50 
Em = 2 RMR – 100 
Em = 2 * 70 – 100 
Em = 40000 kN/m2 
 
Here Spring constant has been calculated from following formula: 
K = E/ (1‐ μ2),  
Where, 
 K is spring constant (kN/m2) 
 E is Young’s modulus (kN/m2) and,  
μ is Poisson’s ratio. 
K = 40000/ (1‐0.222) = 42034.47 kN/m2 
 
Fig: 3.1 Cavern Model 

(ii). Loads:  
a) Self weight of the shotcrete 
Self weight of shotcrete is considered with multiplying factor of 1. 
b) External Rock Load 
Rock load has been calculated from two methods  
ƒ Bierbaumer's method. 
ƒ Kommerell’s method 

Bierbaumer’s method. 
 This theory states that a tunnel is acted upon by the load of a rock mass bounded by a parabola 
of height, h = αH.  
Height of the overburden above the 
crown of the excavated Cavity to Rock 
Line H1 = 27.91 m
Height of the overburden above the 
Rock line to NSL  H2 = 43.54 m
Height of the excavated Cavity m = 49 m
Width of the excavated cavity b = 21 m
3
Bulk density of Rock   ΥR = 27 kN/m
3
Density of saturated soil  Υs = 22 kN/m

angle of Internal Friction ø = 49 degree
(for Biotite Gnesis)

The base width B of the Parabola Rock Load
B = b + 2m tan (45º  ‐ ø /2) B = 57.64 m

H < 5B   = 1 = 1

According to this theory the tunnel is acted upon 
by a rock mass bounded by a parabola of height  h  h1 = 27.91 m
=  H h2 = 43.54 m

2
The maximum vertical pressure coming on the  pR = 753.57 kN/m
2
roof   p = Υh pS = 957.88 kN/m
2
Total Pressure  p = pR + pS p = 1711.45 kN/m
Kommerell’s method: 
 
In his analysis, Kommerell assumed that the sliding surfaces are started from the lower corners 
of the walls at an angle of 45º + ø/2 extending to the crown and then continuing in a parabola 
of height h. 
for the construction of horizontal pressure diagram,the end values e1 and e2 are required to 
be computed.
2
e1 = hΥ.tan  (45º ‐ ø/2) 
2
e2 =(h+m)Υ.tan  (45º ‐ ø/2)
2
e1 = 239.243 kN/m
2
e2 = 409.088 kN/m  
 

       
Fig: 3.2 Vertical Pressure         Fig: 3.3 Horizontal Pressure 
 
 
c) Rock Bolt Force 
As per calculation, capacity of one rock bolt force 134.5 kN  

Fig: 3.4 Rock Bolt Force

d) Load Combination 
 1.5 times of all the Pressures and force. 

Fig: 3.5 Load Combination
Fig: 3.6 Moment Contour 

As Per IS 456:2000
2
Grade of Concrete  = 25 N/mm

STAAD OUTPUT
Power house cavern Crown
Moment due to Combination of Loads = 218 kNm
Lining Thickness 
d = √Mu /(0.138*fck*b) = 251.373 mm

Say 250mm

Power house cavern Wall
Moment due to Combination of Loads = 94.5 kNm
Lining Thickness 
d = √Mu /(0.138*fck*b) = 165.503 mm

Say 200mm
Fig: 3.7 Shear stress Contour

Maximum shear stress of concrete = 3.1 N/mm2 (From IS 456: 2000, Table 20) 

Design Shear stress of concrete lining = 2.31 N/mm2 

Shear stress is within the limit   , Hence Safe 

4. SUMMARY OF DESIGN REPORT 

• Rock Bolts  

Spacing of Rock Bolts = 1.5 x 1.5 m 

Diameter of the bolt = 25mm 

Length of the Rock Bolt = 5m 

• Shotcrete Thickness 

Thickness of shotcrete at the arch = 250 mm  

Thickness of shotcrete at the side wall = 200 mm     