A P.O.P. Punning:
Check floor surface before
1 laying and ensure polythene sheet
above flooring
Check the walls are made as per
2
position of customer choice
Check there is no nails fixed to the
3
walls
Check for wire mesh not to be
4 outside plaster surface at flush
joints and at electrical cutouts
Check for plastered surface above
5 the electrical conduit line and
around electrical boxes
Check for surface cracks and also
6 along electrical conduit lines at
door edges
Check the top surface of skirting
7 tiles are free from all loose
materials
Check for material brand / quality
8
being used as per specs.
Check the application layer
9
thickness before finishing.
Check for finish inside the loft
10
areas & under kitchen counter

11 Check for edge sharpness next to


the window openings, loft lines
Check for surface smoothness
12 using aluminium / teak wooden
scales / lighting bulbs
Status by the end of
Sl. No. Description Comments Observations Rectifications Signatures
the day
Check for edge finish around the
13
electrical fit outs
Check for joints between walls and
14 wall / ceiling for straightness and
right angles

15 Check protective layer for flooring


surface from POP droppings
B Primer :
Check base surface finish before
1 applying primer coat to fillup any
cracks, openings

2 Check for material brand / quality


of primer being used as per specs.
Check the primer drums are not
3
kept directly above the floor
Check the primer mix (primer :
4
thinner)
Check the surface cleaning from
5 primer coat over electrical boxes,
door frames, al. windows wooden
skirting & flooring